Nuts & Bolts of
Visual Studio Scrum v1.0 Template
Dog Food Conference III
Alexei V. Govorine
1
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
Backlog
• Why Agile?
• Scrum Overview
• Visual Studio Scrum v1.0 Template
• Q&A
© 2010 Cardinal Solutions Group
2
Some of the slides were contributed by:
Richard Hundhausen, Aaron Bjork, Martin Hinshelwood, Paul Neumeyer, Ken Schwaber, Randy Pagels, Jeff Hunsaker, & others
Visual Studio 2010 ALM - Scrum
About Alexei
ALM Consultant at Cardinal Solutions Group
http://www.CardinalSolutions.com
Microsoft Visual Studio ALM MVP
http://mvp.support.microsoft.com/profile/Alexei
Professional Scrum Developer Trainer
http://courses.scrum.org/about/alexei-govorine
Co-founder of COALMG
http://www.coalmg.org
© 2010 Cardinal Solutions Group
3govorin.blogspot.com www.twitter.com/Leshka
Visual Studio 2010 ALM - Scrum
• Over 200 professionals with
offices in 3 cities
• A Microsoft “Managed
Partner” since 2008; Gold
Certified since 1999
• VSTS Inner Circle Partner
• Help customers drive
business value from Microsoft
technologies
• Visual Studio ALM/TFS
• SharePoint 2010, MOSS 2007
• Microsoft Business
Intelligence (MSBI)
• Microsoft Online Services
• .NET Architecture/
Development
• Client Training
Who is Cardinal?
Fast Facts Our Focus
Company Overview
4
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
WHAT IS AGILE?
TIMEBOX ACTIVITY – 2 MIN
© 2006 Cardinal Solutions Group
5
Please write down a few words or a
sentence on what Agile means to you.
Visual Studio 2010 ALM - Scrum
* AGILE
Agile software development focuses on regularly delivering
business value. It embraces change while leveraging
feedback to produce high quality, desired results.
© 2009 Cardinal Solutions Group
6
* Different for every company
Agile is a Movement
Represented by Methodologies &
Frameworks
Comprised of a set of
Development & Engineering
Practices
Visual Studio 2010 ALM - Scrum
Why Agile? (Project Challenges)
7
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
The Forrester Wave™: Agile Development Management Tools, Q2 2010, Forrester Research, Inc., May 5, 2010.
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
The Forrester Wave™: Agile Development Management Tools, Q2 2010, Forrester Research, Inc., May 5, 2010.
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
Indeed.com™: Trend search on keywords: agile, scrum, lean, kanban, xp, iterative, cmmi, waterfall, rup. May 25, 2010.
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
Backlog
Why Agile?
• Scrum Overview
• Visual Studio Scrum v1.0 Template
• Q&A
© 2010 Cardinal Solutions Group
11
Visual Studio 2010 ALM - Scrum
Scrum Overview
© 2010 Cardinal Solutions Group
12
Scrum in the sports of “rugby union” and “rugby league”, is a way of restarting the game, either
after an accidental infringement or (in rugby league only) when the ball has gone out of play.
Visual Studio 2010 ALM - Scrum
“Scrum is a framework for developing
complex products and systems. It is
grounded in empirical process control theory.
Scrum employs an iterative, incremental
approach to optimize predictability and
control risk.”
-Ken Schwaber
From the originator of Scrum
Used now by:
Microsoft, Sun, Sony Ericcson, Philips, Google, BBC, IBM, Motorola, Hewlett Packard, Oracle,
JPMorgan, CapitalOne, Alliance, Electronic Arts, DoubleClick, SalesForce.com, Nokia, Siemens,
Intel, Yahoo, Xerox, Cisco, SSW… and lots more.
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
• Scrum has become mainstream in the last half decade or so
• 50% of Agile software practitioners most closely follow
Scrum
• A further 24% follow some variation of Scrum (variations are
often referred to as “ScrumBut”)
Trends in the adoption of Scrum
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
• The project is split into Sprints
• At the end of each Sprint a working
iteration of the product is available
• Each Sprint includes parts of
planning, work and review
• 3 Roles, 6 Timeboxes and 4
Artefacts
Scrum on Slide
http://www.scrum.org/scrumguides
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
Roles in Scrum
Product Owner ScrumMaster Team
Stakeholders = everyone else
ScrumTeam
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
• Who is responsible for maximizing the value of
the work that the Scrum Team does
• Controls “What” is in the product
– Sets Vision for the product
– Sets Priorities
– Deals with Stakeholders
– Deals with clarification for the Team
Key Role – Product Owner
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
• Who is responsible for ensuring the process is
understood and followed
• The “Process”
– Host meetings
– Manage process
– Remove impediments
Key Role - ScrumMaster
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
• Which does the work
• Converts the “What” into “How”
– Cross-functional
– Engineering Practices
– Each iteration commit on functionality to build
– Plan the tasks
– Self organize to build the iteration
– The Product Owner and ScrumMaster cannot
assign a task to the Team or a particular Team
member
Key Role – Team
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
• The Sprint is timeboxed
• Meetings are timeboxed
• “Timeboxed” means the time runs out
– You can’t add time or extend
– You complete what you can
– You do better next time
Scrum uses Timeboxes
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
• Release Planning 8 hours
• Sprint 4 Weeks
• Sprint Planning 8 hours
• Daily Scrum 15 minutes
• Sprint Review 4 hours
• Sprint Retrospective 4 hours
Timeboxes of Scrum
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
• Sprint = Iteration
• The Sprint can be 1, 2, 3 or 4 weeks
– Beyond 4 weeks is a “smell”
– Beyond 6 weeks is a “stench”
• Keep the Sprint length consistent
• Project Risks has influence on Sprint length
• My experience: 2 weeks
Sprint Timeboxes of Scrum
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
What that looks like on a Calendar?
4h 2h 2h
Sprint of 2 weeks
doing the work +
Daily Scrums
Sprint Planning
Sprint Review
Sprint Retrospective
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
• Is a list of features for the Product
• Normally a mixture of User Stories & Bugs
• Each item is given
– An acceptance criteria
– An estimate by the Team
– A business value by the Product Owner
• Some User Stories may be large and need future
decomposition into smaller user stories
Key Artefact - Product Backlog
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
• A list of the Product Backlog Items and Sprint
tasks for each
– Each task will have an estimate of hours
remaining to complete
– The aim is to meet the Team’s “done” criteria
– Decomposition of Product Backlog into Tasks
for the sprint
Key Artefact – Sprint Backlog
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
Key Artefact - Release Burndown Chart
• A Release/Product Burndown measures work remaining
across the time of a release plan
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
Key Artefact - Sprint Burndown Chart
• A Sprint Burndown measures work remaining across the
time of a Sprint
Visual Studio 2010 ALM - Scrum
Backlog
Why Agile?
Scrum Overview
• Visual Studio Scrum v1.0 Template
• Q&A
© 2010 Cardinal Solutions Group
28
Visual Studio 2010 ALM - Scrum
VISUAL STUDIO SCRUM V1.0
TFS PROCESS TEMPLATE
© 2010 Cardinal Solutions Group
29
Visual Studio 2010 ALM - Scrum
Visual Studio 2010
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
Microsoft Visual Studio Scrum 1.0
• A process template introduced shortly after
Visual Studio 2010 launched
– This demonstrates how popular Scrum is and
also Microsoft’s commitment to supporting Scrum
• Maps directly to the Scrum concepts
– Sprint vs. Iteration, PBI vs. User Story,
Impediment vs. Issue
• Available as free download from Microsoft:
– http://shrinkster.com/1exg
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
Visual Studio Scrum 1.0 Artifacts
Work Item Types Team Queries Reports
Sprint All Sprints Release Burndown
Product Backlog Item Product Backlog Sprint Burndown
Task Blocked Tasks Velocity
Impediment Open Impediments Build Success Over Time *
Bug Sprint Backlog Build Summary *
Test Case * Test Cases Test Case Readiness *
Shared Steps * Unfinished Work Test Plan Progress *
Work in Progress
* Nearly identical to that found in the MSF for Agile Software Development 5.0 template
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
Areas and Iterations
• Areas represent the components or related
features of the product (the where)
• Iterations represent the releases and Sprints
(the when)
• By default, only Project
Administrators may make
changes to areas and iterations
• Tip: avoid making your area
hierarchy too complex
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
Sprint Work Item Type
• Provides a way for your team to capture
additional metadata about the Sprint
– Start date, finish date, goal, and retrospective
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
Product Backlog Item Work Item Type
• Represents a product requirement
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
PBI State
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
Task Work Item Type
• Represents the detailed work the team must do
in order to achieve their Sprint Goal
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
Task State
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
Impediment Work Item Type
• Represents an issue or problem that prevents
the team from completing its tasks efficiently
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
Impediment State
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
Test Case Work Item Type
• Used to define both manual and automated tests
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
Test Case State
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
Bug Work Item Type
• Represents a defect in the product
• PBI
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
Bug State
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
Queries
• Product queries
– All Sprints
– Product Backlog
• Current Sprint queries
– Blocked Tasks
– Open Impediments
– Sprint Backlog
– Test Cases
– Unfinished Work
– Work in Progress
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
Reports
• Scrum reports
– Release Burndown
– Sprint Burndown
– Velocity
• Engineering reports
– Build Summary
– Builds Success Over Time
– Test Case Readiness
– Test Plan Progress
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
Visual Studio Scrum Activities
• Scrum team projects have many standard and
repetitive activities
– Setting up a new Team Project Collection
– Setting up a new Team Project
– Setting up Sprints
– Building Product Backlog
– Managing Acceptance Criterias
– Planning a Sprint
– Daily activities
– Tracking a Sprint Progress
– Completing a Sprint
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
Mapping Scrum to Visual Studio 2010
Scrum Concept Visual Studio Scrum 1.0
Team Team Foundation Server security groups
Definition of Done Wiki entry or document on the portal
Product Team Project
Product Backlog Product Backlog team query
Product Backlog Item Product Backlog Item work item
Acceptance Criteria
Acceptance Criteria field and (optionally) associated Test Case work
items
Release Iteration Path (high level)
Release Goal Wiki entry or document on the portal
Release Capacity Wiki entry or document on the portal
Sprint Iteration Path (low level) and associated Sprint work item
Sprint Dates Start Date and Finish Date fields
Sprint Goal Sprint Goal field
Sprint Capacity Wiki entry or document on the portal
Sprint Backlog Sprint Backlog team query
Task Task work item
Burndown and Velocity Release Burndown, Sprint Burndown, and Velocity reports
Impediment Impediment work item
Bug Bug work item
Retrospective Retrospective field in the Sprint work item
* without customization
*
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
This demonstration will cover:
DEMO
• *Install and Configure
• *Template Customization
• *Areas and Iterations
• Managing Sprint work items
• Creating a Product Backlog Item
• Creating and linking a Task
• Creating and linking a Test Case
• Creating and linking a Bug
• Managing Impediments
Visual Studio Scrum 1.0
© 2010 Cardinal Solutions Group
Visual Studio 2010 ALM - Scrum
© 2010 Cardinal Solutions Group
50
Visual Studio 2010 ALM - Scrum
© 2010 Cardinal Solutions Group
51
Visual Studio 2010 ALM - Scrum
© 2010 Cardinal Solutions Group
52
Visual Studio 2010 ALM - Scrum
Burndown
Why Agile?
Scrum Overview
Visual Studio Scrum v1.0 Template
• Q&A
© 2010 Cardinal Solutions Group
53
Visual Studio 2010 ALM - Scrum
Retrospective … (Q&A)
Resources
• Scrum.org
(http://www.scrum.org)
• Microsoft
(http://msdn.microsoft.com/en-us/vstudio/aa718795.aspx)
• PSD Class
(http://courses.scrum.org/about/alexei-govorine)
• About Cardinal
(http://www.cardinalsolutions.com/training/)
© 2010 Cardinal Solutions Group
54
Visual Studio 2010 ALM - Scrum
Thank You
Contact Alexei:
• @Leshka
• AGovorine@CardinalSolutions.com
• http://govorin.blogspot.com
© 2010 Cardinal Solutions Group
55

Nuts and Bolts of Scrum Template (extended)

  • 1.
    Nuts & Boltsof Visual Studio Scrum v1.0 Template Dog Food Conference III Alexei V. Govorine 1 © 2010 Cardinal Solutions Group
  • 2.
    Visual Studio 2010ALM - Scrum Backlog • Why Agile? • Scrum Overview • Visual Studio Scrum v1.0 Template • Q&A © 2010 Cardinal Solutions Group 2 Some of the slides were contributed by: Richard Hundhausen, Aaron Bjork, Martin Hinshelwood, Paul Neumeyer, Ken Schwaber, Randy Pagels, Jeff Hunsaker, & others
  • 3.
    Visual Studio 2010ALM - Scrum About Alexei ALM Consultant at Cardinal Solutions Group http://www.CardinalSolutions.com Microsoft Visual Studio ALM MVP http://mvp.support.microsoft.com/profile/Alexei Professional Scrum Developer Trainer http://courses.scrum.org/about/alexei-govorine Co-founder of COALMG http://www.coalmg.org © 2010 Cardinal Solutions Group 3govorin.blogspot.com www.twitter.com/Leshka
  • 4.
    Visual Studio 2010ALM - Scrum • Over 200 professionals with offices in 3 cities • A Microsoft “Managed Partner” since 2008; Gold Certified since 1999 • VSTS Inner Circle Partner • Help customers drive business value from Microsoft technologies • Visual Studio ALM/TFS • SharePoint 2010, MOSS 2007 • Microsoft Business Intelligence (MSBI) • Microsoft Online Services • .NET Architecture/ Development • Client Training Who is Cardinal? Fast Facts Our Focus Company Overview 4 © 2010 Cardinal Solutions Group
  • 5.
    Visual Studio 2010ALM - Scrum WHAT IS AGILE? TIMEBOX ACTIVITY – 2 MIN © 2006 Cardinal Solutions Group 5 Please write down a few words or a sentence on what Agile means to you.
  • 6.
    Visual Studio 2010ALM - Scrum * AGILE Agile software development focuses on regularly delivering business value. It embraces change while leveraging feedback to produce high quality, desired results. © 2009 Cardinal Solutions Group 6 * Different for every company Agile is a Movement Represented by Methodologies & Frameworks Comprised of a set of Development & Engineering Practices
  • 7.
    Visual Studio 2010ALM - Scrum Why Agile? (Project Challenges) 7 © 2010 Cardinal Solutions Group
  • 8.
    Visual Studio 2010ALM - Scrum The Forrester Wave™: Agile Development Management Tools, Q2 2010, Forrester Research, Inc., May 5, 2010. © 2010 Cardinal Solutions Group
  • 9.
    Visual Studio 2010ALM - Scrum The Forrester Wave™: Agile Development Management Tools, Q2 2010, Forrester Research, Inc., May 5, 2010. © 2010 Cardinal Solutions Group
  • 10.
    Visual Studio 2010ALM - Scrum Indeed.com™: Trend search on keywords: agile, scrum, lean, kanban, xp, iterative, cmmi, waterfall, rup. May 25, 2010. © 2010 Cardinal Solutions Group
  • 11.
    Visual Studio 2010ALM - Scrum Backlog Why Agile? • Scrum Overview • Visual Studio Scrum v1.0 Template • Q&A © 2010 Cardinal Solutions Group 11
  • 12.
    Visual Studio 2010ALM - Scrum Scrum Overview © 2010 Cardinal Solutions Group 12 Scrum in the sports of “rugby union” and “rugby league”, is a way of restarting the game, either after an accidental infringement or (in rugby league only) when the ball has gone out of play.
  • 13.
    Visual Studio 2010ALM - Scrum “Scrum is a framework for developing complex products and systems. It is grounded in empirical process control theory. Scrum employs an iterative, incremental approach to optimize predictability and control risk.” -Ken Schwaber From the originator of Scrum Used now by: Microsoft, Sun, Sony Ericcson, Philips, Google, BBC, IBM, Motorola, Hewlett Packard, Oracle, JPMorgan, CapitalOne, Alliance, Electronic Arts, DoubleClick, SalesForce.com, Nokia, Siemens, Intel, Yahoo, Xerox, Cisco, SSW… and lots more. © 2010 Cardinal Solutions Group
  • 14.
    Visual Studio 2010ALM - Scrum • Scrum has become mainstream in the last half decade or so • 50% of Agile software practitioners most closely follow Scrum • A further 24% follow some variation of Scrum (variations are often referred to as “ScrumBut”) Trends in the adoption of Scrum © 2010 Cardinal Solutions Group
  • 15.
    Visual Studio 2010ALM - Scrum • The project is split into Sprints • At the end of each Sprint a working iteration of the product is available • Each Sprint includes parts of planning, work and review • 3 Roles, 6 Timeboxes and 4 Artefacts Scrum on Slide http://www.scrum.org/scrumguides © 2010 Cardinal Solutions Group
  • 16.
    Visual Studio 2010ALM - Scrum Roles in Scrum Product Owner ScrumMaster Team Stakeholders = everyone else ScrumTeam © 2010 Cardinal Solutions Group
  • 17.
    Visual Studio 2010ALM - Scrum • Who is responsible for maximizing the value of the work that the Scrum Team does • Controls “What” is in the product – Sets Vision for the product – Sets Priorities – Deals with Stakeholders – Deals with clarification for the Team Key Role – Product Owner © 2010 Cardinal Solutions Group
  • 18.
    Visual Studio 2010ALM - Scrum • Who is responsible for ensuring the process is understood and followed • The “Process” – Host meetings – Manage process – Remove impediments Key Role - ScrumMaster © 2010 Cardinal Solutions Group
  • 19.
    Visual Studio 2010ALM - Scrum • Which does the work • Converts the “What” into “How” – Cross-functional – Engineering Practices – Each iteration commit on functionality to build – Plan the tasks – Self organize to build the iteration – The Product Owner and ScrumMaster cannot assign a task to the Team or a particular Team member Key Role – Team © 2010 Cardinal Solutions Group
  • 20.
    Visual Studio 2010ALM - Scrum • The Sprint is timeboxed • Meetings are timeboxed • “Timeboxed” means the time runs out – You can’t add time or extend – You complete what you can – You do better next time Scrum uses Timeboxes © 2010 Cardinal Solutions Group
  • 21.
    Visual Studio 2010ALM - Scrum • Release Planning 8 hours • Sprint 4 Weeks • Sprint Planning 8 hours • Daily Scrum 15 minutes • Sprint Review 4 hours • Sprint Retrospective 4 hours Timeboxes of Scrum © 2010 Cardinal Solutions Group
  • 22.
    Visual Studio 2010ALM - Scrum • Sprint = Iteration • The Sprint can be 1, 2, 3 or 4 weeks – Beyond 4 weeks is a “smell” – Beyond 6 weeks is a “stench” • Keep the Sprint length consistent • Project Risks has influence on Sprint length • My experience: 2 weeks Sprint Timeboxes of Scrum © 2010 Cardinal Solutions Group
  • 23.
    Visual Studio 2010ALM - Scrum What that looks like on a Calendar? 4h 2h 2h Sprint of 2 weeks doing the work + Daily Scrums Sprint Planning Sprint Review Sprint Retrospective © 2010 Cardinal Solutions Group
  • 24.
    Visual Studio 2010ALM - Scrum • Is a list of features for the Product • Normally a mixture of User Stories & Bugs • Each item is given – An acceptance criteria – An estimate by the Team – A business value by the Product Owner • Some User Stories may be large and need future decomposition into smaller user stories Key Artefact - Product Backlog © 2010 Cardinal Solutions Group
  • 25.
    Visual Studio 2010ALM - Scrum • A list of the Product Backlog Items and Sprint tasks for each – Each task will have an estimate of hours remaining to complete – The aim is to meet the Team’s “done” criteria – Decomposition of Product Backlog into Tasks for the sprint Key Artefact – Sprint Backlog © 2010 Cardinal Solutions Group
  • 26.
    Visual Studio 2010ALM - Scrum Key Artefact - Release Burndown Chart • A Release/Product Burndown measures work remaining across the time of a release plan © 2010 Cardinal Solutions Group
  • 27.
    Visual Studio 2010ALM - Scrum Key Artefact - Sprint Burndown Chart • A Sprint Burndown measures work remaining across the time of a Sprint
  • 28.
    Visual Studio 2010ALM - Scrum Backlog Why Agile? Scrum Overview • Visual Studio Scrum v1.0 Template • Q&A © 2010 Cardinal Solutions Group 28
  • 29.
    Visual Studio 2010ALM - Scrum VISUAL STUDIO SCRUM V1.0 TFS PROCESS TEMPLATE © 2010 Cardinal Solutions Group 29
  • 30.
    Visual Studio 2010ALM - Scrum Visual Studio 2010 © 2010 Cardinal Solutions Group
  • 31.
    Visual Studio 2010ALM - Scrum Microsoft Visual Studio Scrum 1.0 • A process template introduced shortly after Visual Studio 2010 launched – This demonstrates how popular Scrum is and also Microsoft’s commitment to supporting Scrum • Maps directly to the Scrum concepts – Sprint vs. Iteration, PBI vs. User Story, Impediment vs. Issue • Available as free download from Microsoft: – http://shrinkster.com/1exg © 2010 Cardinal Solutions Group
  • 32.
    Visual Studio 2010ALM - Scrum Visual Studio Scrum 1.0 Artifacts Work Item Types Team Queries Reports Sprint All Sprints Release Burndown Product Backlog Item Product Backlog Sprint Burndown Task Blocked Tasks Velocity Impediment Open Impediments Build Success Over Time * Bug Sprint Backlog Build Summary * Test Case * Test Cases Test Case Readiness * Shared Steps * Unfinished Work Test Plan Progress * Work in Progress * Nearly identical to that found in the MSF for Agile Software Development 5.0 template © 2010 Cardinal Solutions Group
  • 33.
    Visual Studio 2010ALM - Scrum Areas and Iterations • Areas represent the components or related features of the product (the where) • Iterations represent the releases and Sprints (the when) • By default, only Project Administrators may make changes to areas and iterations • Tip: avoid making your area hierarchy too complex © 2010 Cardinal Solutions Group
  • 34.
    Visual Studio 2010ALM - Scrum Sprint Work Item Type • Provides a way for your team to capture additional metadata about the Sprint – Start date, finish date, goal, and retrospective © 2010 Cardinal Solutions Group
  • 35.
    Visual Studio 2010ALM - Scrum Product Backlog Item Work Item Type • Represents a product requirement © 2010 Cardinal Solutions Group
  • 36.
    Visual Studio 2010ALM - Scrum PBI State © 2010 Cardinal Solutions Group
  • 37.
    Visual Studio 2010ALM - Scrum Task Work Item Type • Represents the detailed work the team must do in order to achieve their Sprint Goal © 2010 Cardinal Solutions Group
  • 38.
    Visual Studio 2010ALM - Scrum Task State © 2010 Cardinal Solutions Group
  • 39.
    Visual Studio 2010ALM - Scrum Impediment Work Item Type • Represents an issue or problem that prevents the team from completing its tasks efficiently © 2010 Cardinal Solutions Group
  • 40.
    Visual Studio 2010ALM - Scrum Impediment State © 2010 Cardinal Solutions Group
  • 41.
    Visual Studio 2010ALM - Scrum Test Case Work Item Type • Used to define both manual and automated tests © 2010 Cardinal Solutions Group
  • 42.
    Visual Studio 2010ALM - Scrum Test Case State © 2010 Cardinal Solutions Group
  • 43.
    Visual Studio 2010ALM - Scrum Bug Work Item Type • Represents a defect in the product • PBI © 2010 Cardinal Solutions Group
  • 44.
    Visual Studio 2010ALM - Scrum Bug State © 2010 Cardinal Solutions Group
  • 45.
    Visual Studio 2010ALM - Scrum Queries • Product queries – All Sprints – Product Backlog • Current Sprint queries – Blocked Tasks – Open Impediments – Sprint Backlog – Test Cases – Unfinished Work – Work in Progress © 2010 Cardinal Solutions Group
  • 46.
    Visual Studio 2010ALM - Scrum Reports • Scrum reports – Release Burndown – Sprint Burndown – Velocity • Engineering reports – Build Summary – Builds Success Over Time – Test Case Readiness – Test Plan Progress © 2010 Cardinal Solutions Group
  • 47.
    Visual Studio 2010ALM - Scrum Visual Studio Scrum Activities • Scrum team projects have many standard and repetitive activities – Setting up a new Team Project Collection – Setting up a new Team Project – Setting up Sprints – Building Product Backlog – Managing Acceptance Criterias – Planning a Sprint – Daily activities – Tracking a Sprint Progress – Completing a Sprint © 2010 Cardinal Solutions Group
  • 48.
    Visual Studio 2010ALM - Scrum Mapping Scrum to Visual Studio 2010 Scrum Concept Visual Studio Scrum 1.0 Team Team Foundation Server security groups Definition of Done Wiki entry or document on the portal Product Team Project Product Backlog Product Backlog team query Product Backlog Item Product Backlog Item work item Acceptance Criteria Acceptance Criteria field and (optionally) associated Test Case work items Release Iteration Path (high level) Release Goal Wiki entry or document on the portal Release Capacity Wiki entry or document on the portal Sprint Iteration Path (low level) and associated Sprint work item Sprint Dates Start Date and Finish Date fields Sprint Goal Sprint Goal field Sprint Capacity Wiki entry or document on the portal Sprint Backlog Sprint Backlog team query Task Task work item Burndown and Velocity Release Burndown, Sprint Burndown, and Velocity reports Impediment Impediment work item Bug Bug work item Retrospective Retrospective field in the Sprint work item * without customization * © 2010 Cardinal Solutions Group
  • 49.
    Visual Studio 2010ALM - Scrum This demonstration will cover: DEMO • *Install and Configure • *Template Customization • *Areas and Iterations • Managing Sprint work items • Creating a Product Backlog Item • Creating and linking a Task • Creating and linking a Test Case • Creating and linking a Bug • Managing Impediments Visual Studio Scrum 1.0 © 2010 Cardinal Solutions Group
  • 50.
    Visual Studio 2010ALM - Scrum © 2010 Cardinal Solutions Group 50
  • 51.
    Visual Studio 2010ALM - Scrum © 2010 Cardinal Solutions Group 51
  • 52.
    Visual Studio 2010ALM - Scrum © 2010 Cardinal Solutions Group 52
  • 53.
    Visual Studio 2010ALM - Scrum Burndown Why Agile? Scrum Overview Visual Studio Scrum v1.0 Template • Q&A © 2010 Cardinal Solutions Group 53
  • 54.
    Visual Studio 2010ALM - Scrum Retrospective … (Q&A) Resources • Scrum.org (http://www.scrum.org) • Microsoft (http://msdn.microsoft.com/en-us/vstudio/aa718795.aspx) • PSD Class (http://courses.scrum.org/about/alexei-govorine) • About Cardinal (http://www.cardinalsolutions.com/training/) © 2010 Cardinal Solutions Group 54
  • 55.
    Visual Studio 2010ALM - Scrum Thank You Contact Alexei: • @Leshka • AGovorine@CardinalSolutions.com • http://govorin.blogspot.com © 2010 Cardinal Solutions Group 55

Editor's Notes

  • #8 Agile development is not a methodology in itself. It is an umbrella term that describes several agile methodologies. At the signing of the Agile Manifesto in 2001, these methodologies included Scrum, XP, Crystal, FDD, and DSDM. Since then, Lean practices have also emerged as a valuable agile methodology and so are included under the agile development umbrella in the illustration later in this topic.Each agile methodology has a slightly different approach for implementing the core values from the Agile Manifesto, just as many computer languages manifest the core features of object-oriented programming in different ways. A recent survey shows that about 50 percent of agile practitioners say that their team is doing Scrum. Another 20 percent say that they are doing Scrum with XP components. An additional 12 percent say that they are doing XP alone. Because more than 80 percent of agile implementations worldwide are Scrum or XP, MSF for Agile Software Development v5.0 focuses on the core processes and practices of Scrum and XP.Our highest priority is to satisfy the customerthrough early and continuous deliveryof valuable software. Welcome changing requirements, even late in development. Agile processes harness change for the customer's competitive advantage. Deliver working software frequently, from a couple of weeks to a couple of months, with a preference to the shorter timescale. Business people and developers must work together daily throughout the project. Build projects around motivated individuals. Give them the environment and support they need, and trust them to get the job done. The most efficient and effective method of conveying information to and within a development team is face-to-face conversation. Working software is the primary measure of progress. Agile processes promote sustainable development. The sponsors, developers, and users should be able to maintain a constant pace indefinitely. Continuous attention to technical excellence and good design enhances agility. Simplicity--the art of maximizing the amount of work not done--is essential. The best architectures, requirements, and designs emerge from self-organizing teams. At regular intervals, the team reflects on how to become more effective, then tunes and adjusts its behavior accordingly.
  • #15 Ken Schwaber and Jeff Sutherland 1995
  • #17 Scrum uses two parallel, complementary cycles to build releases of a systemOne cycle sustains an emerging list of prioritized requirements called the product backlogThe other cycle consists of development iterations called Sprints that build system increments of these requirementsThese cycles are constructed so that the most appropriate and essential system emerges over the SprintsScrum is a framework for agile development processes. It does not include specific engineering practices. Conversely, XP focuses on engineering practices but does not include an overarching framework of development processes. That does not mean that Scrum does not recommend certain engineering practices or that XP has no process. For example, the first Scrum implemented all of the engineering practices that are now known as XP. However, the Scrum framework for software development was designed to get a team started in two or three days, whereas engineering practices often take many months to implement. Therefore, it left the question of when (and whether) to implement specific practices up to each team. Scrum co-creators Jeff Sutherland and Ken Schwaber recommend that Scrum teams get started immediately and create a list of impediments and a process improvement plan. As engineering practices are identified as impediments, teams should look to XP practices as a way to improve. The best teams run Scrum supplemented with XP practices. Scrum helps XP to scale, and XP helps Scrum to work well.
  • #19 The voice of the customerManages the vision of the productDecides on release date, content and budgetCreates and updates the release plan and reportsDefines value-added and key features of the productContinuously refines requirementsSets schedule by means of prioritizing the Product BacklogWorks with Team to estimate items in the Product BacklogResponsible for the project success and ROI
  • #20 Responsible for establishing Scrum practices and rulesEnsures the process is followedShields team from distractions and helps remove obstaclesEnsures the team is fully functional, productive, and improves qualityEnables close cooperation across all roles and functions and removes barriersEducates everyone on the Scrum processFacilitates rather than directs workHelps the Product Owners understand how to best utilize the capabilities of the team
  • #21 Typically 5-9 people Cross-functionalProgrammers, testers, designers, DBa.k.a. “Developers”Members should be full-time Teams are self-organizingIdeally, no titlesMembership should change only between Sprints, and ideally only between releasesTeam culture should be one of learning and collaborationEngineering practices: Your team can also use proven techniques to design, develop, test, and deliver code. These practices help increase the velocity at which your team delivers value to your customers