ABOUT NTPC
• NTPCis the largest power generating company in india, was setup
in 1975to accelerate power development in the country.
• NTPChas installed capacity of (43803 MW).
• NTPChas 16 coal based power stations (31182MW).
• NTPChas 7 gas based power stations (4017MW).
• NTPChas 7 power stations in joint ventures (8604MW).
• In1997 ,Government of india granted NTPCstatus of ‘Navratna’.
ABOUT NTPC, TANDA
• Tanda Thermal Power Station is located inAmbedkar Nagar district in the
Indian state of Uttar Pradesh. The power plant is one of the coal based
power plants of NTPC.
• Inthe year 2000,Uttar Pradesh State Electricity Board (U.P.S.E.B.)
transferred Tanda Thermal Power Plant to NTPCLimited against
payment overdue.
• After that this plant, because of the better maintenance by NTPC Limited,
this power plant has crossed its Plant Load Factor (P.L.F) to more than
100%.
CAPACITY OF PLANT
Stage-I and present installed capacity are listed below:
Unit Number
Installed Capacity
(MW)
Date of
Commissioning
Status
1 110 Running
2 110 Running
3 110 Running
4 110 Running
CPACITY OF PLANT
For Stage-II, NTPC Limited hasstarted
construction/installation of two new units of 660 MWs each
Unit Number
Commissioned
Capacity (MW)
Date of
Commissioning
Status
5 660
Under
Construction
6 660
Under
Construction
Stage-I :4x110 MWs= 440 MWs(Current Power Generation)
Stage-II :660 MW+ 660 MW= 1320MW
TotalPower Generation (Aftercompletion of Stage-II): 1720 MWs
COALSOURCE
North Karnpura CoalFields
WATER SOURCE
Tanda Canal of Saryu
River
SOURCES OF PLANT
OPERATION OF
THERMALPOWER PLANT
MAIN DEPARTMENTS OF PLANT
•Coal handling plant
•Boiler
•Superheater
•Turbine
•Generator
•Condenser
•Cooling Tower
COAL HANDLING PLANT
• The function of coal handling plant
is automatic feeding of coal to the
boiler furnace.
• Athermal power plantburns
enormous amountsof coal.
• A200MW plant may require
around 2000 tons of coal daily
• following are the process of plant-:
1. Bunkering process
2. Unloading process
3. Feeding process
4. Screening process
5. Crushing process
•Aboiler or steam generator is
a closed vessel to which water
under pressure,is converted
into steam.
•It is one of the major
components of a thermal power
plant.
•Always designed toabsorb
maximum amount of heat
released in the process of
combustion.
BOILER
SUPER HEATER
•Adevice which moves last traces
of moisture.
•It helps in reduction in
requirement of steamquantity.
•Steam being dry reduces the
mechanical resistance ofturbine.
•No corrosion at the Turbine
blades.
TURBINE
•Asteam turbine converts heat energy
of steam into mechanical energy and
drives the generator.
• It uses the principle that steam when
issuing from a small opening attains a
high velocity.
•This velocity attained during
expansion depends on the initial and
final heat content of the steam.
•This difference b/w initial and final
heat content represents the heat energy
converted intokinetic energy.
•These are of two types :-
1. Impulse turbine
2. Reaction turbine
GENERATOR
•The Synchronus Generator is used to generate power by connecting the
shaft of the Turbine to the shaft of the generator which create the magnetic
flux producing Emf.
•The generated voltage will generally 33 KVto 11 KVmax.
•the generated Voltage is stepped up by connecting Step up transformerand
is also used for auxilliarypurpose.
CONDENSER
• Which condenses the steam at
the exhaustof turbine.
• It creates a very low
pressure at the exhaust of
turbine, this helps in
converting heat energy of
steam into mechanical
energy in the prime mover.
• The condensed steam can
be used as feed water to the
boiler.
COOLING TOWER
• Remove heat from the water
discharged from the condenser
so that the water can be
discharged to the river or re
circulated and reused.
• Air can be circulated in the
cooling towers through natural
draft and mechanical draft.
UTILISATION OF SECONDARY RAW
MATERIAL (ASH)
• Construction of embankments and fills
• Construction of road in sub-base
• Manufacture of cement
• Manufacture of bricks/blocks
• Filling as flowable fill material
• Agriculture as soil amendment/source of essential plant
nutrients
ADVANTAGES
•The fuel used is quite cheap.
•Less initial cost as compared to other generating plants.
•It can be installed at any place irrespective of the existence
of coal.
•The coal can be easily transported to the site
•It require less space as compared to Hydro power plants.
•Cost of generation is less than that of diesel power plants.
DISADVANTAGES
•It pollutes the atmosphere due to production of large amount of
smoke and fumes.
•It is costlier in running cost as compared to Hydro electric
plants.
•Maintenance cost ismore.
THANK
YOU

More Related Content

What's hot

Thermal power plant ppt
Thermal power plant pptThermal power plant ppt
Thermal power plant ppt
ayushi kesarvani
 
Presentation on thermal power plant
Presentation on thermal power plantPresentation on thermal power plant
Presentation on thermal power plant
Rashmi Nimje
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
Ambuj Kumar Singh
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
Baibhav Saha
 
Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)
sometech
 
Thermal Power Plant - Manual
Thermal Power Plant - ManualThermal Power Plant - Manual
Thermal Power Plant - Manual
Sheel Shah
 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC Simhadri
Ashish Uppu
 
Power plant training in Delhi NCR
Power plant training in Delhi NCRPower plant training in Delhi NCR
Power plant training in Delhi NCR
Raj Nayak
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
Dilip kumar
 
thermal power plant at NTPC
thermal power plant at NTPCthermal power plant at NTPC
thermal power plant at NTPC
richa khatri
 
Kstps ppt
Kstps pptKstps ppt
STEAM POWER PLANT / THERMAL POWER PLANT
STEAM POWER PLANT / THERMAL POWER PLANTSTEAM POWER PLANT / THERMAL POWER PLANT
STEAM POWER PLANT / THERMAL POWER PLANT
S.Vijaya Bhaskar
 
training report
training reporttraining report
training report
Ajay Chauhan
 
Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)
Ajeet Chaurasia
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
ANKESH KUMAR
 
VOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBAVOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBA
VIKASH BAGHEL
 
Power plant
Power plantPower plant
Power plant
Shubham Gupta
 
Training report on thermal power plant
Training report on thermal power plantTraining report on thermal power plant
Training report on thermal power plant
lovely professional university
 
THERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORT
THERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORTTHERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORT
THERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORT
Prasant Kumar
 
thermal power plant
thermal power plant thermal power plant
thermal power plant
GOD BRAIN
 

What's hot (20)

Thermal power plant ppt
Thermal power plant pptThermal power plant ppt
Thermal power plant ppt
 
Presentation on thermal power plant
Presentation on thermal power plantPresentation on thermal power plant
Presentation on thermal power plant
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
 
Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)
 
Thermal Power Plant - Manual
Thermal Power Plant - ManualThermal Power Plant - Manual
Thermal Power Plant - Manual
 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC Simhadri
 
Power plant training in Delhi NCR
Power plant training in Delhi NCRPower plant training in Delhi NCR
Power plant training in Delhi NCR
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
 
thermal power plant at NTPC
thermal power plant at NTPCthermal power plant at NTPC
thermal power plant at NTPC
 
Kstps ppt
Kstps pptKstps ppt
Kstps ppt
 
STEAM POWER PLANT / THERMAL POWER PLANT
STEAM POWER PLANT / THERMAL POWER PLANTSTEAM POWER PLANT / THERMAL POWER PLANT
STEAM POWER PLANT / THERMAL POWER PLANT
 
training report
training reporttraining report
training report
 
Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
 
VOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBAVOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBA
 
Power plant
Power plantPower plant
Power plant
 
Training report on thermal power plant
Training report on thermal power plantTraining report on thermal power plant
Training report on thermal power plant
 
THERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORT
THERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORTTHERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORT
THERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORT
 
thermal power plant
thermal power plant thermal power plant
thermal power plant
 

Similar to Ntpc ppt

Shoaib khan ntpc
Shoaib khan ntpcShoaib khan ntpc
Shoaib khan ntpc
MOHD SHOAIB
 
Richappt
RichapptRichappt
Richappt
richa khatri
 
ntpc dadri
ntpc dadri ntpc dadri
ntpc dadri
Himanika Arora
 
Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt
nilesh choubey
 
adi ntpc.pptx
adi ntpc.pptxadi ntpc.pptx
adi ntpc.pptx
AdityaRaj873503
 
KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptx
ParulChandna6
 
NTPC,Dadri Training presentation
NTPC,Dadri Training presentationNTPC,Dadri Training presentation
NTPC,Dadri Training presentation
Nitish Bhati
 
Ntpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training pptNtpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training ppt
aryan5808
 
Vivek ppt
Vivek pptVivek ppt
Vivek ppt
pspankaj55
 
Chandrapura thermal power station
Chandrapura thermal power stationChandrapura thermal power station
Chandrapura thermal power station
dlinkdir
 
Ntpc dadri ppt
Ntpc dadri pptNtpc dadri ppt
Ntpc dadri ppt
ADITYA GUPTA
 
Ntpc dadri ppt by pc sharma
Ntpc dadri ppt by pc sharmaNtpc dadri ppt by pc sharma
Ntpc dadri ppt by pc sharma
Prakash Sharma
 
Ntpc2 111125042448-phpapp02
Ntpc2 111125042448-phpapp02Ntpc2 111125042448-phpapp02
Ntpc2 111125042448-phpapp02
arvind singh rathore
 
kota super thermal poer plant
kota super thermal poer plantkota super thermal poer plant
kota super thermal poer plant
Niranjan kumar sah
 
12000721061_SUBHOJIT DAS.pptx
12000721061_SUBHOJIT DAS.pptx12000721061_SUBHOJIT DAS.pptx
12000721061_SUBHOJIT DAS.pptx
SubhojitDas48
 
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
Om Prakash
 
Power plant engineering
Power plant engineeringPower plant engineering
Power plant engineering
mahe49
 
Coal based power plant
Coal based power plantCoal based power plant
Coal based power plant
Gaurav Kaushik
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power Station
LekhraJ Meena
 
ppt on kota super thermal power plant
ppt on kota super thermal power plantppt on kota super thermal power plant
ppt on kota super thermal power plant
Arpit Budania
 

Similar to Ntpc ppt (20)

Shoaib khan ntpc
Shoaib khan ntpcShoaib khan ntpc
Shoaib khan ntpc
 
Richappt
RichapptRichappt
Richappt
 
ntpc dadri
ntpc dadri ntpc dadri
ntpc dadri
 
Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt
 
adi ntpc.pptx
adi ntpc.pptxadi ntpc.pptx
adi ntpc.pptx
 
KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptx
 
NTPC,Dadri Training presentation
NTPC,Dadri Training presentationNTPC,Dadri Training presentation
NTPC,Dadri Training presentation
 
Ntpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training pptNtpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training ppt
 
Vivek ppt
Vivek pptVivek ppt
Vivek ppt
 
Chandrapura thermal power station
Chandrapura thermal power stationChandrapura thermal power station
Chandrapura thermal power station
 
Ntpc dadri ppt
Ntpc dadri pptNtpc dadri ppt
Ntpc dadri ppt
 
Ntpc dadri ppt by pc sharma
Ntpc dadri ppt by pc sharmaNtpc dadri ppt by pc sharma
Ntpc dadri ppt by pc sharma
 
Ntpc2 111125042448-phpapp02
Ntpc2 111125042448-phpapp02Ntpc2 111125042448-phpapp02
Ntpc2 111125042448-phpapp02
 
kota super thermal poer plant
kota super thermal poer plantkota super thermal poer plant
kota super thermal poer plant
 
12000721061_SUBHOJIT DAS.pptx
12000721061_SUBHOJIT DAS.pptx12000721061_SUBHOJIT DAS.pptx
12000721061_SUBHOJIT DAS.pptx
 
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
 
Power plant engineering
Power plant engineeringPower plant engineering
Power plant engineering
 
Coal based power plant
Coal based power plantCoal based power plant
Coal based power plant
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power Station
 
ppt on kota super thermal power plant
ppt on kota super thermal power plantppt on kota super thermal power plant
ppt on kota super thermal power plant
 

More from Faraz Khan

Locomotive Coupler RDSO
Locomotive Coupler RDSOLocomotive Coupler RDSO
Locomotive Coupler RDSO
Faraz Khan
 
OBRA THERMAL POWER PLANT
OBRA THERMAL POWER PLANTOBRA THERMAL POWER PLANT
OBRA THERMAL POWER PLANT
Faraz Khan
 
report on self inflating tires
report on self inflating tiresreport on self inflating tires
report on self inflating tires
Faraz Khan
 
SELF INFLATING TIRES
SELF INFLATING TIRESSELF INFLATING TIRES
SELF INFLATING TIRES
Faraz Khan
 
UPSRTC LUCKNOW
UPSRTC LUCKNOWUPSRTC LUCKNOW
UPSRTC LUCKNOW
Faraz Khan
 
RDSO MOTIVE POWER
RDSO MOTIVE POWERRDSO MOTIVE POWER
RDSO MOTIVE POWER
Faraz Khan
 
Aqua silencer
Aqua silencerAqua silencer
Aqua silencer
Faraz Khan
 
Ultra sonic Machining
Ultra sonic MachiningUltra sonic Machining
Ultra sonic Machining
Faraz Khan
 

More from Faraz Khan (8)

Locomotive Coupler RDSO
Locomotive Coupler RDSOLocomotive Coupler RDSO
Locomotive Coupler RDSO
 
OBRA THERMAL POWER PLANT
OBRA THERMAL POWER PLANTOBRA THERMAL POWER PLANT
OBRA THERMAL POWER PLANT
 
report on self inflating tires
report on self inflating tiresreport on self inflating tires
report on self inflating tires
 
SELF INFLATING TIRES
SELF INFLATING TIRESSELF INFLATING TIRES
SELF INFLATING TIRES
 
UPSRTC LUCKNOW
UPSRTC LUCKNOWUPSRTC LUCKNOW
UPSRTC LUCKNOW
 
RDSO MOTIVE POWER
RDSO MOTIVE POWERRDSO MOTIVE POWER
RDSO MOTIVE POWER
 
Aqua silencer
Aqua silencerAqua silencer
Aqua silencer
 
Ultra sonic Machining
Ultra sonic MachiningUltra sonic Machining
Ultra sonic Machining
 

Recently uploaded

Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
Ratnakar Mikkili
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
awadeshbabu
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
Divyam548318
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
nooriasukmaningtyas
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 

Recently uploaded (20)

Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 

Ntpc ppt

  • 1. SHRI RAMSWAROOP MEMORIAL GROUP OF PROFESSIONAL COLLEGES TEWRIGANJ 227-105 Seminar Presentation on Summer Training at NTPC Tanda Ambedkar Nagar Presented By Faraz Arif B.Tech 4th Year (Mechanical Engineering) 1612240073 M.E - 73
  • 2. ABOUT NTPC • NTPCis the largest power generating company in india, was setup in 1975to accelerate power development in the country. • NTPChas installed capacity of (43803 MW). • NTPChas 16 coal based power stations (31182MW). • NTPChas 7 gas based power stations (4017MW). • NTPChas 7 power stations in joint ventures (8604MW). • In1997 ,Government of india granted NTPCstatus of ‘Navratna’.
  • 3. ABOUT NTPC, TANDA • Tanda Thermal Power Station is located inAmbedkar Nagar district in the Indian state of Uttar Pradesh. The power plant is one of the coal based power plants of NTPC. • Inthe year 2000,Uttar Pradesh State Electricity Board (U.P.S.E.B.) transferred Tanda Thermal Power Plant to NTPCLimited against payment overdue. • After that this plant, because of the better maintenance by NTPC Limited, this power plant has crossed its Plant Load Factor (P.L.F) to more than 100%.
  • 4. CAPACITY OF PLANT Stage-I and present installed capacity are listed below: Unit Number Installed Capacity (MW) Date of Commissioning Status 1 110 Running 2 110 Running 3 110 Running 4 110 Running
  • 5. CPACITY OF PLANT For Stage-II, NTPC Limited hasstarted construction/installation of two new units of 660 MWs each Unit Number Commissioned Capacity (MW) Date of Commissioning Status 5 660 Under Construction 6 660 Under Construction Stage-I :4x110 MWs= 440 MWs(Current Power Generation) Stage-II :660 MW+ 660 MW= 1320MW TotalPower Generation (Aftercompletion of Stage-II): 1720 MWs
  • 6. COALSOURCE North Karnpura CoalFields WATER SOURCE Tanda Canal of Saryu River SOURCES OF PLANT
  • 8. MAIN DEPARTMENTS OF PLANT •Coal handling plant •Boiler •Superheater •Turbine •Generator •Condenser •Cooling Tower
  • 9. COAL HANDLING PLANT • The function of coal handling plant is automatic feeding of coal to the boiler furnace. • Athermal power plantburns enormous amountsof coal. • A200MW plant may require around 2000 tons of coal daily • following are the process of plant-: 1. Bunkering process 2. Unloading process 3. Feeding process 4. Screening process 5. Crushing process
  • 10. •Aboiler or steam generator is a closed vessel to which water under pressure,is converted into steam. •It is one of the major components of a thermal power plant. •Always designed toabsorb maximum amount of heat released in the process of combustion. BOILER
  • 11. SUPER HEATER •Adevice which moves last traces of moisture. •It helps in reduction in requirement of steamquantity. •Steam being dry reduces the mechanical resistance ofturbine. •No corrosion at the Turbine blades.
  • 12. TURBINE •Asteam turbine converts heat energy of steam into mechanical energy and drives the generator. • It uses the principle that steam when issuing from a small opening attains a high velocity. •This velocity attained during expansion depends on the initial and final heat content of the steam. •This difference b/w initial and final heat content represents the heat energy converted intokinetic energy. •These are of two types :- 1. Impulse turbine 2. Reaction turbine
  • 13. GENERATOR •The Synchronus Generator is used to generate power by connecting the shaft of the Turbine to the shaft of the generator which create the magnetic flux producing Emf. •The generated voltage will generally 33 KVto 11 KVmax. •the generated Voltage is stepped up by connecting Step up transformerand is also used for auxilliarypurpose.
  • 14. CONDENSER • Which condenses the steam at the exhaustof turbine. • It creates a very low pressure at the exhaust of turbine, this helps in converting heat energy of steam into mechanical energy in the prime mover. • The condensed steam can be used as feed water to the boiler.
  • 15. COOLING TOWER • Remove heat from the water discharged from the condenser so that the water can be discharged to the river or re circulated and reused. • Air can be circulated in the cooling towers through natural draft and mechanical draft.
  • 16. UTILISATION OF SECONDARY RAW MATERIAL (ASH) • Construction of embankments and fills • Construction of road in sub-base • Manufacture of cement • Manufacture of bricks/blocks • Filling as flowable fill material • Agriculture as soil amendment/source of essential plant nutrients
  • 17. ADVANTAGES •The fuel used is quite cheap. •Less initial cost as compared to other generating plants. •It can be installed at any place irrespective of the existence of coal. •The coal can be easily transported to the site •It require less space as compared to Hydro power plants. •Cost of generation is less than that of diesel power plants.