Overview
Nodal Background
• Constraints -- $ matter
• What’s in a Hub price? What’s in a Zonal price?
Shift Factors and Congestion
Pricing Considerations
• Congestion
• Marginal Losses
Nodal vs. Zonal – the role of Interregional and Local Constraints
© PA Knowledge Limited 2014
3
Four constraints account for 50+% of projected 2015 PJM congestion
______________________________
Source: PJM Market Efficiency Analysis Base Congestion Results
0%
2%
4%
6%
8%
10%
12%
14%
16%
18%
20%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
© PA Knowledge Limited 2014
4
Two of the top four constraints are M2M
Source: PJM Market Efficiency Analysis Base Congestion Results
Facility Name Area Constraint Type
Frequency
(Hours)
Market
Congestion ($
Millions)
Share of 2015
Congestion (%)
Cumulative 2015
Congestion (%)
AP SOUTH L/O BED-BLA PJM INTERFACE 1,627 103.6 17% 17%
Monticello to East Winamac 138 kV M2M LINE 2,569 99.0 17% 34%
Oak Grove to Galesburg 161 kV M2M LINE 3,281 60.0 10% 44%
Cloverdale to Lexington 500 kV AEP - DVP LINE 631 37.0 6% 51%
Elliot to Elliot 138 kV AEP LINE 338 30.0 5% 56%
AEP-DOM L/O BED-BLA PJM INTERFACE 706 26.7 5% 60%
Graceton to BAGLEY 230 kV BGE LINE 826 22.0 4% 64%
Miami Fort to Willey 138 kV DEO&K LINE 310 20.0 3% 67%
Braidwood to East Frankfort 345 kV CE LINE 147 18.0 3% 70%
Hunterstown 230 kV ME XFMR 254 18.0 3% 73%
Dravosburg to West Mifflin 138 kV DLCO LINE 1,275 14.4 2% 76%
Tiltonsville to Windsor 138 kV AP - AEP LINE 36 12.4 2% 78%
Wurno to Claytor Lake 138 kV AEP LINE 84 11.0 2% 80%
Cordova to Nelson 345 kV CE LINE 333 9.9 2% 81%
Belvidere to Marengo Tap 138 kV CE LINE 227 8.0 1% 83%
WESTERN INTERFACE PJM INTERFACE 257 7.1 1% 84%
CENTRAL INTERFACE PJM INTERFACE 658 6.6 1% 85%
6EDFERRY to Dickerson Station "D" 230 kV PEPCO - DVP LINE 39 6.3 1% 86%
Hennepin to Hennepin 138 kV M2M LINE 570 5.9 1% 87%
Kewanee to E D Edwards 138 kV M2M LINE 298 5.9 1% 88%
Cherry Valley to Cherry Valley 138 kV CE LINE 119 5.3 1% 89%
Woodville to 15USAP 138 kV DLCO LINE 449 5.0 1% 90%
2014 Market Efficiency Analysis Base Congestion Results: 2015 System Topology
© PA Knowledge Limited 2014
5
PJM East Hub – it may not be what you think
ISO hubs typically consist of numerous individual nodes.
Nodes can be geographically and electrically diverse,
making it difficult to isolate the impact of individual
transmission constraints.
• PJM East consists of 216 individual nodes
• 84% of the nodes are load nodes
• 49% of the nodes are located in the Delmarva area
• 92% are located in PECO and Delmarva
Transmission Zone EHV GEN LOAD Total % Total
AECO 1 1 0%
DPL 14 99 113 49%
JCPL 1 1 0%
PECO 17 81 98 43%
PPL 1 1 0%
PSEG 1 4 10 15 7%
Total 1 36 192 229 100%
% Total 0% 16% 84% 100%
Bus Type
PJM East Hub Definition
© PA Knowledge Limited 2014
6
Load buses dominate the composition of PJM Hub definitions
Hub
Total
Buses EHV GEN LOAD Total
AEP GEN HUB 39 100% 100%
AEP-DAYTON HUB 1108 11% 89% 100%
ATSI GEN HUB 64 100% 100%
CHICAGO GEN HUB 131 100% 100%
CHICAGO HUB 190 5% 95% 100%
DOMINION HUB 626 12% 88% 100%
EASTERN HUB 216 0% 15% 84% 100%
N ILLINOIS HUB 219 11% 89% 100%
NEW JERSEY HUB 367 100% 100%
OHIO HUB 761 4% 96% 100%
WESTERN HUB 99 4% 27% 69% 100%
© PA Knowledge Limited 2014
7
Pricing in the PECO zone: Congestion and Marginal Losses
© PA Knowledge Limited 2014
8
While average losses basis differentials can be larger than congestion basis
differentials, variation in congestion basis differentials is an order of magnitude
greater.
Liberty Basis Basis Component Year*
Average Basis
($/MWh)
Standard
Deviation
Coefficient of
Variation
2009 (1.48) 1.69 114
2010 (2.56) 5.74 224
2011 (1.66) 2.82 170
2012 (2.98) 4.69 157
2009 (1.25) 0.80 64
2010 (1.60) 1.22 76
2011 (1.52) 1.17 77
2012 (1.46) 0.74 51
2009 (0.23) 1.26 544
2010 (0.96) 5.15 538
2011 (0.14) 2.48 1,782
2012 (1.53) 4.46 293
2009 (0.31) 0.34 110
2010 (0.90) 5.52 616
2011 (0.36) 2.21 611
2012 (0.22) 0.25 112
2009 (0.37) 0.28 75
2010 (0.45) 0.43 95
2011 (0.31) 0.40 127
2012 (0.24) 0.12 51
2009 0.06 0.23 410
2010 (0.44) 5.32 1,198
2011 (0.05) 2.09 4,192
2012 0.02 0.22 1,321
* 2012 values for the period through 3/31/2012
Variation in Basis Differentials
LibertyBasistoPECOZone
Total LMP Basis
Loss Basis
Congestion Basis
Total LMP Basis
Loss Basis
Congestion Basis
LibertyBasistoPJMEastHubUnitBasistoPECOZoneUnitBasistoPJMEastHub
© PA Knowledge Limited 2014
9
Shift factors represent the change in power flow on a line when an injection is made
at one bus and a corresponding change in withdrawal is made at the reference bus
Shift factors are calculated for a specific system topology. Shift factors change when the
topology changes or line impedance changes. Shift factors do not change if the
injection/withdrawal amount increases for any set of locations.
Source: CAISO
© PA Knowledge Limited 2014
10
Generators that drive flows on the Eddystone-Island Road Constraint
Unit(s) S.F. Description
Eddystone 3 .252 380 MW oil/gas-fired steam (Exelon Generating)
Eddystone CT .250 (4) 18-20 MW oil-fired CTs (Exelon Generating)
Eddystone 4 .247 380 MW oil/gas-fired steam (Exelon Generating)
Liberty CC .231 540 MW gas-fired CC (Equipower Resources)
Marcus Hook .139 808 MW gas-fired CC (NextEra Energy)
Hay Road 4 .116 182 MW gas-fired CT (Calpine)
Edge Moor 5 .116 445 MW oil/gas-fired steam (Calpine)
Hay Road 1, 3 .088 (2) 121 MW gas-fired CT (Calpine)
Edge Moor 3, 4 .088 86 MW and 174 MW gas-fired steam (Calpine)
Units that Increase Congestion on the Eddystone–Island Road Constraint
Unit(s) S.F. Description
Southwark -.175 (4) 18 MW oil-fired CTs (Exelon Generation)
Schuylkill CT -.170 (2) 18 MW oil-fired CTs (Exelon Generation)
Grays Ferry Cogeneration -.167 150 MW gas-fired CC (Veolia Environnement S.A.)
Schuylkill -.164 175 MW oil-fired steam (Exelon Generation)
Delaware CT -.100 (4) 18 MW oil-fired CTs (Exelon Generating)
Richmond -.058 (2) 65 MW oil-fired CTs (Exelon Generating)
Fairless Works -.036 (2) 680 MW gas-fired CCs (Dominion)
Croydon -.035 (8) 60 MW oil-fired CTs (Exelon Generating)
Burlington GT -.035 (13) mostly 40-50 MW oil/gas-fired CTs (PSEG)
Limerick 1 -.025 1190 MW nuclear (Exelon Generating)
Limerick 2 -.018 1190 MW nuclear (Exelon Generating)
Units that offset Congestion on the Eddystone–Island Road Constraint
© PA Knowledge Limited 2014
11
Pricing across PJM reflects local and broader regional constraints
Western
Hub
AEP –
Dayton Hub
NI Hub
© PA Knowledge Limited 2014
12
Generators competing for west to east transfer across Black Oak – Beddington
Unit/Bus Area Shift Factor
Capacity at
Node (MW)
Potential Impact
on Constraint
% of
Potential
Impact
Cum %
Potential
Impact
Hatfield AP 0.115 1,550 178 9.6% 9.6%
02MNFDG3 FE 0.033 2,682 88 4.7% 14.3%
Harrison AP 0.040 1,901 76 4.1% 18.4%
Fort Martin AP 0.066 1,072 71 3.8% 22.2%
Sammis FE 0.032 1,925 62 3.3% 25.5%
15BVRVL1 DLCO 0.033 1,866 62 3.3% 28.9%
05GVG1 AEP 0.017 2,620 45 2.4% 31.3%
05RKG2 AEP 0.014 3,095 42 2.3% 33.5%
KEYS G2 PJM 0.024 1,642 40 2.1% 35.7%
05CDG3 AEP 0.032 1,215 39 2.1% 37.7%
01PLEAS1 AP 0.031 1,222 38 2.0% 39.8%
Twin Ridges AP 0.183 200 37 2.0% 41.7%
02CALPG2 FE 0.022 1,633 36 1.9% 43.7%
Warrior Run AP 0.200 176 35 1.9% 45.6%
09STUART DAY 0.015 2,255 34 1.8% 47.4%
02PERRG1 FE 0.026 1,281 33 1.8% 49.2%
05CVG4 AEP 0.020 1,580 32 1.7% 50.9%
© PA Knowledge Limited 2014
13
The broader regional transmission system will be improved if/when the Byron to
Wayne 345 kV line is added
Transmission flows
across ComEd are
generally west-to-
east and are limited
by the constraints
involving the two
large 345 kV lines,
and its interaction
with the underlying
138 kV system.
© PA Knowledge Limited 2014
14
Shift factors differ substantially, even for units located geographically close together
AEP PJM
Contingent Branch Monitored Element
From
Area
To
Area
All Gen:
Max -
Min
Gen in
ComEd
Zone:
Max -
Min Gavin Wauk Byron Dresden Kincaid Zion Keystn
CHERRY VA; R_SILVER LK; R NERC_FG_ID_3771 WEC CE 0.207 0.207 0.000 0.091 0.119 (0.016) 0.000 (0.088) 0.000
05DUMONT_WILTON ; NERC_FG_ID_2286 CE NIPS 0.242 0.190 0.023 (0.132) (0.120) (0.137) (0.079) (0.132) 0.023
NERC_FG_ID_3771 WEC CE 0.180 0.180 0.000 0.098 0.077 (0.014) 0.000 (0.082) 0.000
NERC_FG_ID_2286 CE NIPS 0.179 0.176 0.013 (0.075) (0.068) (0.076) (0.043) (0.076) 0.013
05DUMONT_WILTON ; NERC_FG_ID_2515 NIPS CE 0.152 0.089 (0.018) 0.110 0.100 0.113 0.065 0.110 (0.018)
GARFIELD ; R_To_TAYLOR ; R CE CE 0.077 0.077 0.007 (0.027) (0.022) (0.023) (0.008) (0.027) 0.007
NERC_FG_ID_3222 E FRANKFO; R_To_E FRxmid CE CE 0.074 0.074 0.002 (0.016) (0.012) (0.024) (0.008) (0.016) 0.002
NERC_FG_ID_2515 NIPS CE 0.097 0.074 (0.010) 0.065 0.058 0.064 0.036 0.065 (0.010)
NERC_FG_ID_2407 AEP-DOM AEP DVP 0.163 0.041 0.189 0.065 0.053 0.071 0.044 0.065 0.027
8MT STM_8VALLEY_500 AEP-DOM AEP DVP 0.163 0.041 0.190 0.065 0.054 0.071 0.045 0.065 0.027
AEP-Dom_01PRNTY_8MT STM AEP-DOM AEP DVP 0.181 0.040 0.204 0.078 0.067 0.084 0.059 0.078 0.023
05JEFRSO_05ROCKPT 06CLIFTY_To_7TRIMBLE OVEC LGEE 0.066 0.040 0.017 (0.019) (0.025) (0.017) (0.049) (0.019) 0.008
AEP-DOM AEP DVP 0.180 0.040 0.195 0.071 0.059 0.076 0.052 0.071 0.015
GARFIELD ; B_To_TAYLOR ; B CE CE 0.039 0.039 0.006 (0.026) (0.021) (0.021) (0.006) (0.026) 0.006
05MOUNTN_05BELMON AEP-DOM AEP DVP 0.269 0.038 0.262 0.097 0.086 0.103 0.080 0.097 (0.007)
06CLIFTY_To_7TRIMBLE OVEC LGEE 0.040 0.021 0.013 (0.009) (0.014) (0.007) (0.027) (0.009) 0.005
01BEDNGT_01BLACKO APSouthInterface AP DVP 0.026 0.016 0.129 0.110 0.107 0.117 0.103 0.110 0.125
APSouthInterface AP DVP 0.023 0.015 0.103 0.089 0.086 0.095 0.082 0.089 0.099
05DUMONT_WILTON ; NERC_FG_ID_2563 CE CE 0.019 0.014 0.001 (0.016) (0.015) (0.017) (0.009) (0.016) 0.001
05DUMONT_WILTON ; NERC_FG_ID_556 CE NIPS 0.019 0.014 0.001 (0.016) (0.015) (0.017) (0.009) (0.016) 0.001
ComEd
© PA Knowledge Limited 2014
15
Shift factors can be transformed to highlight differences between nodes and pricing
points
AEP PJM
Contingent Branch Monitored Element From Area To Area Gavin Wauk Byron Dresden Kincaid Zion Keystn
CHERRY VA; R_SILVER LK; R NERC_FG_ID_3771 WEC CE (0.119) (0.027) - (0.135) (0.119) (0.207) (0.119)
05DUMONT_WILTON ; NERC_FG_ID_2286 CE NIPS 0.143 (0.011) - (0.017) 0.041 (0.011) 0.143
NERC_FG_ID_3771 WEC CE (0.077) 0.021 - (0.091) (0.077) (0.159) (0.077)
NERC_FG_ID_2286 CE NIPS 0.081 (0.008) - (0.008) 0.025 (0.008) 0.081
05DUMONT_WILTON ; NERC_FG_ID_2515 NIPS CE (0.118) 0.010 - 0.013 (0.035) 0.010 (0.118)
GARFIELD ; R_To_TAYLOR ; R CE CE 0.029 (0.005) - (0.000) 0.015 (0.005) 0.029
NERC_FG_ID_3222 E FRANKFO; R_To_E FRxmid CE CE 0.014 (0.003) - (0.011) 0.004 (0.003) 0.014
NERC_FG_ID_2515 NIPS CE (0.068) 0.007 - 0.006 (0.022) 0.007 (0.068)
NERC_FG_ID_2407 AEP-DOM AEP DVP 0.136 0.012 - 0.018 (0.009) 0.012 (0.026)
8MT STM_8VALLEY_500 AEP-DOM AEP DVP 0.136 0.012 - 0.018 (0.009) 0.012 (0.027)
AEP-Dom_01PRNTY_8MT STM AEP-DOM AEP DVP 0.137 0.012 - 0.017 (0.008) 0.011 (0.044)
05JEFRSO_05ROCKPT 06CLIFTY_To_7TRIMBLE OVEC LGEE 0.042 0.006 - 0.009 (0.024) 0.006 0.033
AEP-DOM AEP DVP 0.135 0.011 - 0.017 (0.008) 0.011 (0.045)
GARFIELD ; B_To_TAYLOR ; B CE CE 0.027 (0.005) - (0.001) 0.014 (0.005) 0.027
05MOUNTN_05BELMON AEP-DOM AEP DVP 0.176 0.011 - 0.017 (0.007) 0.011 (0.093)
06CLIFTY_To_7TRIMBLE OVEC LGEE 0.027 0.005 - 0.007 (0.013) 0.005 0.019
01BEDNGT_01BLACKO APSouthInterface AP DVP 0.021 0.003 - 0.010 (0.004) 0.003 0.017
APSouthInterface AP DVP 0.017 0.003 - 0.009 (0.004) 0.003 0.013
05DUMONT_WILTON ; NERC_FG_ID_2563 CE CE 0.016 (0.001) - (0.002) 0.005 (0.001) 0.016
05DUMONT_WILTON ; NERC_FG_ID_556 CE NIPS 0.016 (0.001) - (0.002) 0.005 (0.001) 0.016
ComEd
© PA Knowledge Limited 2014
16
Aurora’s LMP contribution output provides the basis for identifying those constraints
that drive congestion-based LMP differences.
Contingent Branch Monitored Element Index #
From
Area To Area Generator Sample
Generators in
ComEd Zone
Average of all Binding Constraints 2.27 0.20
GARFIELD ; R_To_TAYLOR ; R 1 CE CE 30.32 30.32
NERC_FG_ID_2417 JFRANTBROSUL NERC_FG_ID_2871NHBHBG__PTDF 2 BREC LGEE 36.91 9.77
GARFIELD ; B_To_TAYLOR ; B 3 CE CE 8.51 5.43
05JEFRSO_05ROCKPT 06CLIFTY_To_7TRIMBLE 4 OVEC LGEE 12.69 6.55
05DUMONT_WILTON ; NERC_FG_ID_2286BURMUNWILDUM 5 CE NIPS 9.28 4.75
CHERRY VA; R_SILVER LK; R NERC_FG_ID_3771PPRZIO__PTDF 6 WEC CE 5.67 5.67
05MOUNTN_05BELMON 05CLOVRD_To_05CLOVRD 7 AEP AEP 170.60 5.15
NERC_FG_ID_3222 EFRGDBEFRGDR E FRANKFO; R_To_E FRxmid 8 CE CE 3.88 3.88
NERC_FG_ID_2353 BLOBEDPRNMTS 05CLOVRD_To_05CLOVRD 9 AEP AEP 134.78 3.85
NERC_FG_ID_3217 BYCH_BBYNWEM NERC_FG_ID_3814MGPSTR__PTDF 10 METC WEC 3.62 3.62
NERC_FG_ID_2417 JFRANTBROSUL 05NAGEL_To_05NAGEL 11 AEP AEP 7.50 2.13
NERC_FG_ID_2407 CLVLEXMTSVAL AEP-DOM 12 AEP DVP 8.77 2.05
01HATFLD_01RONCO CLEVELAND 13 METC METC 3.48 1.71
8MT STM_8VALLEY_500 AEP-DOM 14 AEP DVP 6.10 1.42
NERC_FG_ID_2353 BLOBEDPRNMTS CLEVELAND 15 METC METC 2.48 1.25
AEP-Dom_01PRNTY_8MT STM AEP-DOM 16 AEP DVP 5.93 1.23
05MOUNTN_05BELMON AEP-DOM 17 AEP DVP 6.37 0.84
05DUMONT_WILTON ; NERC_FG_ID_2515BURSHE__PTDF 18 NIPS CE 1.43 0.50
06CLIFTY_To_7TRIMBLE 19 OVEC LGEE 0.85 0.46
01HATFLD_01RONCO 05KAMMER_To_05WBELLA 20 AEP AEP 53.33 0.13
LMP Contribution (Max - Min)
© PA Knowledge Limited 2014
17
While average congestion is similar across generating nodes in the ComEd zone,
the impact of individual constraints differs greatly.
ComEd nodal prices are driven by constraints located outside of that zone.
Const.
From
Area To Area
CE Max -
Min Wauk Byron
Bright
Stalk Wind
Farm
Lee
Energy Dresden Powrtn
Quad
Cities
Will
County
Kendall
County Kincaid Zion
Avg all Constraints 0.20 (2.70) (2.70) (2.67) (2.65) (2.61) (2.60) (2.60) (2.59) (2.59) (2.57) (2.50)
1 CE CE 30.32 10.84 8.83 (16.18) 8.38 9.01 10.70 7.32 11.61 14.15 3.16 10.86
2 BREC LGEE 9.77 (16.19) (19.16) (13.70) (20.16) (14.59) (16.00) (23.47) (14.58) (14.91) (21.90) (16.23)
3 CE CE 5.43 5.45 4.35 1.49 4.09 4.47 5.16 3.55 6.84 6.06 1.60 5.49
4 OVEC LGEE 6.55 (3.85) (5.02) (2.92) (5.43) (3.33) (4.18) (6.71) (3.36) (3.53) (9.47) (3.93)
5 CE NIPS 4.75 5.04 4.61 7.77 4.47 5.25 4.91 4.02 5.53 5.03 3.02 5.04
6 WEC CE 5.67 (2.51) (3.26) 0.47 (2.57) 0.44 0.26 (2.26) 0.56 0.58 0.00 2.42
7 AEP AEP 5.15 (99.40) (100.54) (98.49) (100.95) (98.95) (99.64) (102.22) (98.88) (99.05) (103.63) (99.41)
8 CE CE 3.88 1.17 0.89 1.49 0.84 1.70 1.37 0.75 2.97 1.26 0.58 1.17
9 AEP AEP 3.85 (103.79) (104.62) (103.12) (104.92) (103.45) (103.97) (105.86) (103.41) (103.53) (106.97) (103.79)
10 METC WEC 3.62 3.04 3.35 0.00 3.21 0.00 0.00 3.28 0.00 0.00 0.00 3.17
11 AEP AEP 2.13 (4.52) (5.17) (4.00) (5.40) (4.19) (4.51) (6.13) (4.19) (4.27) (5.82) (4.52)
12 AEP DVP 2.05 (3.49) (2.86) (3.99) (2.65) (3.81) (3.52) (1.94) (3.81) (3.74) (2.40) (3.48)
13 METC METC 1.71 (5.91) (4.83) (6.10) (4.77) (5.97) (5.86) (4.57) (6.00) (5.98) (4.39) (5.91)
14 AEP DVP 1.42 (2.44) (2.00) (2.79) (1.86) (2.66) (2.46) (1.37) (2.66) (2.61) (1.68) (2.44)
15 METC METC 1.25 (4.09) (3.31) (4.23) (3.27) (4.14) (4.06) (3.12) (4.16) (4.14) (2.99) (4.09)
16 AEP DVP 1.23 (2.57) (2.19) (2.87) (2.07) (2.76) (2.59) (1.64) (2.76) (2.72) (1.92) (2.57)
17 AEP DVP 0.84 (2.30) (2.04) (2.51) (1.96) (2.44) (2.32) (1.67) (2.43) (2.41) (1.89) (2.30)
18 NIPS CE 0.50 (1.05) (0.95) (0.79) (0.93) (1.08) (1.04) (0.84) (1.08) (1.12) (0.62) (1.05)
Selected Generating Plants Located in ComEd Zone
© PA Knowledge Limited 2014
18
Congestion contribution can be transformed to highlight differences among nodes
and pricing points
Const.
From
Area To Area
CE Max -
Min Wauk Byron
Bright
Stalk Wind
Farm
Lee
Energy Dresden Powrtn
Quad
Cities
Will
County
Kendall
County Kincaid Zion
Avg all Constraints 0.20 (0.01) - 0.03 0.04 0.08 0.10 0.10 0.10 0.10 0.12 0.19
1 CE CE 30.32 2.01 - (25.01) (0.46) 0.17 1.87 (1.51) 2.77 5.31 (5.67) 2.03
2 BREC LGEE 9.77 2.97 - 5.46 (1.00) 4.57 3.16 (4.31) 4.59 4.25 (2.74) 2.93
3 CE CE 5.43 1.10 - (2.87) (0.26) 0.11 0.80 (0.81) 2.48 1.71 (2.75) 1.14
4 OVEC LGEE 6.55 1.17 - 2.10 (0.41) 1.69 0.84 (1.68) 1.66 1.49 (4.45) 1.10
5 CE NIPS 4.75 0.44 - 3.17 (0.14) 0.65 0.31 (0.59) 0.92 0.42 (1.59) 0.43
6 WEC CE 5.67 0.75 - 3.73 0.69 3.70 3.51 1.00 3.82 3.84 3.26 5.67
7 AEP AEP 5.15 1.14 - 2.05 (0.41) 1.59 0.90 (1.68) 1.66 1.49 (3.09) 1.13
8 CE CE 3.88 0.28 - 0.60 (0.05) 0.81 0.48 (0.14) 2.08 0.37 (0.31) 0.28
9 AEP AEP 3.85 0.84 - 1.51 (0.30) 1.17 0.65 (1.23) 1.22 1.09 (2.34) 0.83
10 METC WEC 3.62 (0.32) - (3.35) (0.14) (3.35) (3.35) (0.08) (3.35) (3.35) (3.35) (0.18)
11 AEP AEP 2.13 0.66 - 1.18 (0.22) 0.98 0.67 (0.95) 0.98 0.91 (0.64) 0.65
12 AEP DVP 2.05 (0.63) - (1.13) 0.21 (0.95) (0.66) 0.92 (0.95) (0.88) 0.46 (0.62)
13 METC METC 1.71 (1.08) - (1.27) 0.07 (1.13) (1.03) 0.26 (1.17) (1.14) 0.45 (1.08)
14 AEP DVP 1.42 (0.44) - (0.78) 0.15 (0.66) (0.46) 0.63 (0.66) (0.61) 0.32 (0.43)
15 METC METC 1.25 (0.78) - (0.92) 0.05 (0.82) (0.75) 0.20 (0.85) (0.83) 0.33 (0.78)
16 AEP DVP 1.23 (0.38) - (0.68) 0.13 (0.57) (0.40) 0.55 (0.57) (0.53) 0.27 (0.37)
17 AEP DVP 0.84 (0.26) - (0.47) 0.09 (0.39) (0.28) 0.38 (0.39) (0.36) 0.16 (0.26)
18 NIPS CE 0.50 (0.09) - 0.17 0.03 (0.12) (0.08) 0.12 (0.13) (0.17) 0.33 (0.09)
19 OVEC LGEE 0.46 0.10 - 0.18 (0.04) 0.15 0.08 (0.15) 0.15 0.14 (0.28) 0.10
20 AEP DVP 0.23 0.05 - 0.09 (0.02) 0.07 0.04 (0.07) 0.07 0.07 (0.14) 0.05
Selected Generating Plants Located in ComEd Zone
© PA Knowledge Limited 2014
19
Transformation also makes it easier to identify constraints that drive broader
interregional congestion
PJM 500
Penelec
Index #
From
Area To Area Gavin DC Cook Wauk Byron
Bright
Stalk
Wind
Farm
Lee
Energy Dresden Powrtn
Quad
Cities
Will
County
Kendall
County Kincaid Zion Keystone
Average - 0.64 0.66 0.66 0.69 0.71 0.75 0.76 0.76 0.76 0.77 0.79 0.86 2.27
1 CE CE - -0.05 13.38 11.37 -13.64 10.92 11.55 13.24 9.86 14.15 16.69 5.70 13.40 0.00
2 BREC LGEE - -22.25 -29.63 -32.60 -27.14 -33.60 -28.02 -29.43 -36.91 -28.01 -28.34 -35.34 -29.66 -7.90
3 CE CE - 0.32 7.09 6.00 3.13 5.74 6.11 6.80 5.19 8.48 7.70 3.24 7.14 0.32
4 OVEC LGEE - -4.24 -7.07 -8.24 -6.14 -8.64 -6.55 -7.40 -9.92 -6.58 -6.74 -12.69 -7.14 -1.76
5 CE NIPS - -0.64 5.91 5.47 8.64 5.33 6.12 5.78 4.89 6.39 5.89 3.88 5.91 0.00
6 WEC CE - 0.02 -2.51 -3.26 0.47 -2.57 0.44 0.26 -2.26 0.56 0.58 0.00 2.42 0.00
7 AEP AEP - 36.29 31.14 30.00 32.06 29.60 31.60 30.90 28.33 31.66 31.49 26.91 31.14 170.60
8 CE CE - -0.29 1.32 1.04 1.64 0.99 1.85 1.52 0.90 3.12 1.42 0.73 1.32 0.00
9 AEP AEP - 12.03 8.25 7.41 8.92 7.11 8.58 8.06 6.18 8.63 8.50 5.07 8.24 134.78
10 METC WEC - 0.00 3.04 3.35 0.00 3.21 0.00 0.00 3.28 0.00 0.00 0.00 3.17 0.00
11 AEP AEP - -2.26 -5.89 -6.54 -5.37 -6.77 -5.56 -5.88 -7.50 -5.56 -5.64 -7.19 -5.89 -0.81
12 AEP DVP - 5.28 6.73 7.36 6.23 7.58 6.42 6.70 8.28 6.42 6.48 7.82 6.74 8.77
13 METC METC - 1.78 -1.52 -0.44 -1.70 -0.37 -1.57 -1.47 -0.18 -1.61 -1.58 0.01 -1.52 1.00
14 AEP DVP - 3.66 4.66 5.10 4.32 5.25 4.45 4.65 5.74 4.45 4.49 5.42 4.67 6.10
15 METC METC - 1.21 -1.12 -0.34 -1.26 -0.30 -1.17 -1.09 -0.15 -1.20 -1.17 -0.02 -1.13 -0.42
16 AEP DVP - 3.25 4.11 4.49 3.81 4.62 3.92 4.09 5.04 3.92 3.96 4.76 4.12 5.93
17 AEP DVP - 3.34 3.90 4.16 3.69 4.25 3.77 3.88 4.54 3.77 3.80 4.32 3.90 6.37
18 NIPS CE - 0.14 -1.22 -1.13 -0.96 -1.10 -1.25 -1.21 -1.01 -1.25 -1.30 -0.79 -1.22 0.00
19 OVEC LGEE - -0.28 -0.48 -0.58 -0.40 -0.61 -0.43 -0.50 -0.73 -0.43 -0.44 -0.85 -0.48 -0.17
20 AEP AEP - 5.18 4.74 4.78 4.72 4.79 4.70 4.73 4.83 4.72 4.72 4.73 4.75 53.33
AEP ComEd

More Related Content

What's hot

Harmonic drive ultra flat_component_specsheet
Harmonic drive ultra  flat_component_specsheetHarmonic drive ultra  flat_component_specsheet
Harmonic drive ultra flat_component_specsheet
Electromate
 
Shimpo able vrl_brochure
Shimpo able vrl_brochureShimpo able vrl_brochure
Shimpo able vrl_brochure
Electromate
 
Harmonic fr specsheet
Harmonic fr specsheetHarmonic fr specsheet
Harmonic fr specsheet
Electromate
 
Optimus Energy Australian Wholesale Price list
Optimus Energy Australian Wholesale Price listOptimus Energy Australian Wholesale Price list
Optimus Energy Australian Wholesale Price list
Optimus Energy Philippines
 
Harmonic csd shd_catalog
Harmonic csd shd_catalogHarmonic csd shd_catalog
Harmonic csd shd_catalog
Electromate
 
Torque systems mdm-5000_product_guide
Torque systems mdm-5000_product_guideTorque systems mdm-5000_product_guide
Torque systems mdm-5000_product_guide
Electromate
 
Harmonic drive hdt t cup_specsheet
Harmonic drive hdt t cup_specsheetHarmonic drive hdt t cup_specsheet
Harmonic drive hdt t cup_specsheet
Electromate
 
Ptg gc couplings 2018 5 7
Ptg gc couplings 2018 5 7Ptg gc couplings 2018 5 7
Ptg gc couplings 2018 5 7
Timo Ala-Jaaski
 
Harmonic shd 2uh_lw_catalog
Harmonic shd 2uh_lw_catalogHarmonic shd 2uh_lw_catalog
Harmonic shd 2uh_lw_catalog
Electromate
 
CS Unitec Nut Runners: 6 1014 0010
CS Unitec Nut Runners: 6 1014 0010CS Unitec Nut Runners: 6 1014 0010
CS Unitec Nut Runners: 6 1014 0010
CS Unitec
 
Harmonic drive sha cg specsheet
Harmonic drive sha cg specsheetHarmonic drive sha cg specsheet
Harmonic drive sha cg specsheet
Electromate
 
LCC Asia Pacific Engineering & Contractors Update 294
LCC Asia Pacific Engineering & Contractors Update 294LCC Asia Pacific Engineering & Contractors Update 294
LCC Asia Pacific Engineering & Contractors Update 294
LCC Asia Pacific Corporate Finance
 
CS Unitec Mixers: 7 1112 0010
CS Unitec Mixers: 7 1112 0010CS Unitec Mixers: 7 1112 0010
CS Unitec Mixers: 7 1112 0010
CS Unitec
 
CS Unitec Mixers: 7 1111 0010
CS Unitec Mixers: 7 1111 0010CS Unitec Mixers: 7 1111 0010
CS Unitec Mixers: 7 1111 0010
CS Unitec
 
SCS110AG Standard Model LTspice Model (Free SPICE Model)
SCS110AG Standard Model LTspice Model (Free SPICE Model)SCS110AG Standard Model LTspice Model (Free SPICE Model)
SCS110AG Standard Model LTspice Model (Free SPICE Model)
Tsuyoshi Horigome
 
CS Unitec Nut Runners: 6 1014 0075
CS Unitec Nut Runners: 6 1014 0075CS Unitec Nut Runners: 6 1014 0075
CS Unitec Nut Runners: 6 1014 0075
CS Unitec
 
SCS110AG (LTspice Model)
SCS110AG (LTspice Model)SCS110AG (LTspice Model)
SCS110AG (LTspice Model)
Tsuyoshi Horigome
 
CS Unitec Nut Runners: 6 1014 0099
CS Unitec Nut Runners: 6 1014 0099CS Unitec Nut Runners: 6 1014 0099
CS Unitec Nut Runners: 6 1014 0099
CS Unitec
 
Exoplanet exoplanet.eu catalog updated.cs
Exoplanet exoplanet.eu catalog updated.csExoplanet exoplanet.eu catalog updated.cs
Exoplanet exoplanet.eu catalog updated.cs
thomasrimlinger
 

What's hot (19)

Harmonic drive ultra flat_component_specsheet
Harmonic drive ultra  flat_component_specsheetHarmonic drive ultra  flat_component_specsheet
Harmonic drive ultra flat_component_specsheet
 
Shimpo able vrl_brochure
Shimpo able vrl_brochureShimpo able vrl_brochure
Shimpo able vrl_brochure
 
Harmonic fr specsheet
Harmonic fr specsheetHarmonic fr specsheet
Harmonic fr specsheet
 
Optimus Energy Australian Wholesale Price list
Optimus Energy Australian Wholesale Price listOptimus Energy Australian Wholesale Price list
Optimus Energy Australian Wholesale Price list
 
Harmonic csd shd_catalog
Harmonic csd shd_catalogHarmonic csd shd_catalog
Harmonic csd shd_catalog
 
Torque systems mdm-5000_product_guide
Torque systems mdm-5000_product_guideTorque systems mdm-5000_product_guide
Torque systems mdm-5000_product_guide
 
Harmonic drive hdt t cup_specsheet
Harmonic drive hdt t cup_specsheetHarmonic drive hdt t cup_specsheet
Harmonic drive hdt t cup_specsheet
 
Ptg gc couplings 2018 5 7
Ptg gc couplings 2018 5 7Ptg gc couplings 2018 5 7
Ptg gc couplings 2018 5 7
 
Harmonic shd 2uh_lw_catalog
Harmonic shd 2uh_lw_catalogHarmonic shd 2uh_lw_catalog
Harmonic shd 2uh_lw_catalog
 
CS Unitec Nut Runners: 6 1014 0010
CS Unitec Nut Runners: 6 1014 0010CS Unitec Nut Runners: 6 1014 0010
CS Unitec Nut Runners: 6 1014 0010
 
Harmonic drive sha cg specsheet
Harmonic drive sha cg specsheetHarmonic drive sha cg specsheet
Harmonic drive sha cg specsheet
 
LCC Asia Pacific Engineering & Contractors Update 294
LCC Asia Pacific Engineering & Contractors Update 294LCC Asia Pacific Engineering & Contractors Update 294
LCC Asia Pacific Engineering & Contractors Update 294
 
CS Unitec Mixers: 7 1112 0010
CS Unitec Mixers: 7 1112 0010CS Unitec Mixers: 7 1112 0010
CS Unitec Mixers: 7 1112 0010
 
CS Unitec Mixers: 7 1111 0010
CS Unitec Mixers: 7 1111 0010CS Unitec Mixers: 7 1111 0010
CS Unitec Mixers: 7 1111 0010
 
SCS110AG Standard Model LTspice Model (Free SPICE Model)
SCS110AG Standard Model LTspice Model (Free SPICE Model)SCS110AG Standard Model LTspice Model (Free SPICE Model)
SCS110AG Standard Model LTspice Model (Free SPICE Model)
 
CS Unitec Nut Runners: 6 1014 0075
CS Unitec Nut Runners: 6 1014 0075CS Unitec Nut Runners: 6 1014 0075
CS Unitec Nut Runners: 6 1014 0075
 
SCS110AG (LTspice Model)
SCS110AG (LTspice Model)SCS110AG (LTspice Model)
SCS110AG (LTspice Model)
 
CS Unitec Nut Runners: 6 1014 0099
CS Unitec Nut Runners: 6 1014 0099CS Unitec Nut Runners: 6 1014 0099
CS Unitec Nut Runners: 6 1014 0099
 
Exoplanet exoplanet.eu catalog updated.cs
Exoplanet exoplanet.eu catalog updated.csExoplanet exoplanet.eu catalog updated.cs
Exoplanet exoplanet.eu catalog updated.cs
 

Viewers also liked

Day-Ahead LMP Forecasting with AURORAxmp
Day-Ahead LMP Forecasting with AURORAxmpDay-Ahead LMP Forecasting with AURORAxmp
Day-Ahead LMP Forecasting with AURORAxmp
EPIS Inc
 
Final Seasonal Assessment of Resource Adequacy for the ERCOT Region, Summer 2...
Final Seasonal Assessment of Resource Adequacy for the ERCOT Region, Summer 2...Final Seasonal Assessment of Resource Adequacy for the ERCOT Region, Summer 2...
Final Seasonal Assessment of Resource Adequacy for the ERCOT Region, Summer 2...
EPIS Inc
 
2009 Wind Technologies Market Report - Powerpoint
2009 Wind Technologies Market Report -  Powerpoint2009 Wind Technologies Market Report -  Powerpoint
2009 Wind Technologies Market Report - Powerpoint
Glenn Klith Andersen
 
2014 PV Distribution System Modeling Workshop: Interconnection Standards in C...
2014 PV Distribution System Modeling Workshop: Interconnection Standards in C...2014 PV Distribution System Modeling Workshop: Interconnection Standards in C...
2014 PV Distribution System Modeling Workshop: Interconnection Standards in C...
Sandia National Laboratories: Energy & Climate: Renewables
 
2014 PV Performance Modeling Workshop: Optimizing PV Designs with HelioScope:...
2014 PV Performance Modeling Workshop: Optimizing PV Designs with HelioScope:...2014 PV Performance Modeling Workshop: Optimizing PV Designs with HelioScope:...
2014 PV Performance Modeling Workshop: Optimizing PV Designs with HelioScope:...
Sandia National Laboratories: Energy & Climate: Renewables
 
2014 PV Reliability, Operations & Maintenance Workshop: Unlocking Opportuniti...
2014 PV Reliability, Operations & Maintenance Workshop: Unlocking Opportuniti...2014 PV Reliability, Operations & Maintenance Workshop: Unlocking Opportuniti...
2014 PV Reliability, Operations & Maintenance Workshop: Unlocking Opportuniti...
Sandia National Laboratories: Energy & Climate: Renewables
 
2014 PV Reliability, Operations & Maintenance Workshop: O&M with SCADA, AlsoE...
2014 PV Reliability, Operations & Maintenance Workshop: O&M with SCADA, AlsoE...2014 PV Reliability, Operations & Maintenance Workshop: O&M with SCADA, AlsoE...
2014 PV Reliability, Operations & Maintenance Workshop: O&M with SCADA, AlsoE...
Sandia National Laboratories: Energy & Climate: Renewables
 
Grid 20/20 Public Policy and Wholesale Energy Markets
Grid 20/20 Public Policy and Wholesale Energy Markets Grid 20/20 Public Policy and Wholesale Energy Markets
Grid 20/20 Public Policy and Wholesale Energy Markets
Daymark Energy Advisors
 
2014 PV Distribution System Modeling Workshop: CA Rule 21 Update: Tom Bialek,...
2014 PV Distribution System Modeling Workshop: CA Rule 21 Update: Tom Bialek,...2014 PV Distribution System Modeling Workshop: CA Rule 21 Update: Tom Bialek,...
2014 PV Distribution System Modeling Workshop: CA Rule 21 Update: Tom Bialek,...
Sandia National Laboratories: Energy & Climate: Renewables
 
2014 PV Distribution System Modeling Workshop: Capabilities of Advanced Inver...
2014 PV Distribution System Modeling Workshop: Capabilities of Advanced Inver...2014 PV Distribution System Modeling Workshop: Capabilities of Advanced Inver...
2014 PV Distribution System Modeling Workshop: Capabilities of Advanced Inver...
Sandia National Laboratories: Energy & Climate: Renewables
 
3Gender and Energy Resource Management Projects
3Gender and Energy Resource Management Projects3Gender and Energy Resource Management Projects
3Gender and Energy Resource Management Projects
Nancy Drost
 
2014 PV Distribution System Modeling Workshop: Data and Models for High Penet...
2014 PV Distribution System Modeling Workshop: Data and Models for High Penet...2014 PV Distribution System Modeling Workshop: Data and Models for High Penet...
2014 PV Distribution System Modeling Workshop: Data and Models for High Penet...
Sandia National Laboratories: Energy & Climate: Renewables
 
2014 PV Distribution System Modeling Workshop: European codes & guidelines fo...
2014 PV Distribution System Modeling Workshop: European codes & guidelines fo...2014 PV Distribution System Modeling Workshop: European codes & guidelines fo...
2014 PV Distribution System Modeling Workshop: European codes & guidelines fo...
Sandia National Laboratories: Energy & Climate: Renewables
 
2014 PV Performance Modeling Workshop: SolarAnywhere: WebWeb-Accessible Irrad...
2014 PV Performance Modeling Workshop: SolarAnywhere: WebWeb-Accessible Irrad...2014 PV Performance Modeling Workshop: SolarAnywhere: WebWeb-Accessible Irrad...
2014 PV Performance Modeling Workshop: SolarAnywhere: WebWeb-Accessible Irrad...
Sandia National Laboratories: Energy & Climate: Renewables
 
2014 PV Reliability, Operations & Maintenance Workshop: HelioPower
2014 PV Reliability, Operations & Maintenance Workshop: HelioPower2014 PV Reliability, Operations & Maintenance Workshop: HelioPower
2014 PV Reliability, Operations & Maintenance Workshop: HelioPower
Sandia National Laboratories: Energy & Climate: Renewables
 
2014 PV Performance Modeling Workshop: Results from Flash Testing at Multiple...
2014 PV Performance Modeling Workshop: Results from Flash Testing at Multiple...2014 PV Performance Modeling Workshop: Results from Flash Testing at Multiple...
2014 PV Performance Modeling Workshop: Results from Flash Testing at Multiple...
Sandia National Laboratories: Energy & Climate: Renewables
 
2014 PV Performance Modeling Workshop: Inverter performance models Opportunit...
2014 PV Performance Modeling Workshop: Inverter performance models Opportunit...2014 PV Performance Modeling Workshop: Inverter performance models Opportunit...
2014 PV Performance Modeling Workshop: Inverter performance models Opportunit...
Sandia National Laboratories: Energy & Climate: Renewables
 
transmission line
transmission line transmission line
transmission line
singh1515
 
High Voltage Dc (HVDC) transmission
High Voltage Dc (HVDC) transmissionHigh Voltage Dc (HVDC) transmission
High Voltage Dc (HVDC) transmission
ZunAib Ali
 

Viewers also liked (19)

Day-Ahead LMP Forecasting with AURORAxmp
Day-Ahead LMP Forecasting with AURORAxmpDay-Ahead LMP Forecasting with AURORAxmp
Day-Ahead LMP Forecasting with AURORAxmp
 
Final Seasonal Assessment of Resource Adequacy for the ERCOT Region, Summer 2...
Final Seasonal Assessment of Resource Adequacy for the ERCOT Region, Summer 2...Final Seasonal Assessment of Resource Adequacy for the ERCOT Region, Summer 2...
Final Seasonal Assessment of Resource Adequacy for the ERCOT Region, Summer 2...
 
2009 Wind Technologies Market Report - Powerpoint
2009 Wind Technologies Market Report -  Powerpoint2009 Wind Technologies Market Report -  Powerpoint
2009 Wind Technologies Market Report - Powerpoint
 
2014 PV Distribution System Modeling Workshop: Interconnection Standards in C...
2014 PV Distribution System Modeling Workshop: Interconnection Standards in C...2014 PV Distribution System Modeling Workshop: Interconnection Standards in C...
2014 PV Distribution System Modeling Workshop: Interconnection Standards in C...
 
2014 PV Performance Modeling Workshop: Optimizing PV Designs with HelioScope:...
2014 PV Performance Modeling Workshop: Optimizing PV Designs with HelioScope:...2014 PV Performance Modeling Workshop: Optimizing PV Designs with HelioScope:...
2014 PV Performance Modeling Workshop: Optimizing PV Designs with HelioScope:...
 
2014 PV Reliability, Operations & Maintenance Workshop: Unlocking Opportuniti...
2014 PV Reliability, Operations & Maintenance Workshop: Unlocking Opportuniti...2014 PV Reliability, Operations & Maintenance Workshop: Unlocking Opportuniti...
2014 PV Reliability, Operations & Maintenance Workshop: Unlocking Opportuniti...
 
2014 PV Reliability, Operations & Maintenance Workshop: O&M with SCADA, AlsoE...
2014 PV Reliability, Operations & Maintenance Workshop: O&M with SCADA, AlsoE...2014 PV Reliability, Operations & Maintenance Workshop: O&M with SCADA, AlsoE...
2014 PV Reliability, Operations & Maintenance Workshop: O&M with SCADA, AlsoE...
 
Grid 20/20 Public Policy and Wholesale Energy Markets
Grid 20/20 Public Policy and Wholesale Energy Markets Grid 20/20 Public Policy and Wholesale Energy Markets
Grid 20/20 Public Policy and Wholesale Energy Markets
 
2014 PV Distribution System Modeling Workshop: CA Rule 21 Update: Tom Bialek,...
2014 PV Distribution System Modeling Workshop: CA Rule 21 Update: Tom Bialek,...2014 PV Distribution System Modeling Workshop: CA Rule 21 Update: Tom Bialek,...
2014 PV Distribution System Modeling Workshop: CA Rule 21 Update: Tom Bialek,...
 
2014 PV Distribution System Modeling Workshop: Capabilities of Advanced Inver...
2014 PV Distribution System Modeling Workshop: Capabilities of Advanced Inver...2014 PV Distribution System Modeling Workshop: Capabilities of Advanced Inver...
2014 PV Distribution System Modeling Workshop: Capabilities of Advanced Inver...
 
3Gender and Energy Resource Management Projects
3Gender and Energy Resource Management Projects3Gender and Energy Resource Management Projects
3Gender and Energy Resource Management Projects
 
2014 PV Distribution System Modeling Workshop: Data and Models for High Penet...
2014 PV Distribution System Modeling Workshop: Data and Models for High Penet...2014 PV Distribution System Modeling Workshop: Data and Models for High Penet...
2014 PV Distribution System Modeling Workshop: Data and Models for High Penet...
 
2014 PV Distribution System Modeling Workshop: European codes & guidelines fo...
2014 PV Distribution System Modeling Workshop: European codes & guidelines fo...2014 PV Distribution System Modeling Workshop: European codes & guidelines fo...
2014 PV Distribution System Modeling Workshop: European codes & guidelines fo...
 
2014 PV Performance Modeling Workshop: SolarAnywhere: WebWeb-Accessible Irrad...
2014 PV Performance Modeling Workshop: SolarAnywhere: WebWeb-Accessible Irrad...2014 PV Performance Modeling Workshop: SolarAnywhere: WebWeb-Accessible Irrad...
2014 PV Performance Modeling Workshop: SolarAnywhere: WebWeb-Accessible Irrad...
 
2014 PV Reliability, Operations & Maintenance Workshop: HelioPower
2014 PV Reliability, Operations & Maintenance Workshop: HelioPower2014 PV Reliability, Operations & Maintenance Workshop: HelioPower
2014 PV Reliability, Operations & Maintenance Workshop: HelioPower
 
2014 PV Performance Modeling Workshop: Results from Flash Testing at Multiple...
2014 PV Performance Modeling Workshop: Results from Flash Testing at Multiple...2014 PV Performance Modeling Workshop: Results from Flash Testing at Multiple...
2014 PV Performance Modeling Workshop: Results from Flash Testing at Multiple...
 
2014 PV Performance Modeling Workshop: Inverter performance models Opportunit...
2014 PV Performance Modeling Workshop: Inverter performance models Opportunit...2014 PV Performance Modeling Workshop: Inverter performance models Opportunit...
2014 PV Performance Modeling Workshop: Inverter performance models Opportunit...
 
transmission line
transmission line transmission line
transmission line
 
High Voltage Dc (HVDC) transmission
High Voltage Dc (HVDC) transmissionHigh Voltage Dc (HVDC) transmission
High Voltage Dc (HVDC) transmission
 

Similar to Nodal Insights for Generation Owners and Modeling with AURORAxmp

TTI San Antonio Work in Eagle Ford Shale
TTI San Antonio Work in Eagle Ford ShaleTTI San Antonio Work in Eagle Ford Shale
TTI San Antonio Work in Eagle Ford Shale
Texas A&M Transportation Institute
 
Ceylon Electricity Board Statistical Digest 2015
Ceylon Electricity Board Statistical Digest 2015Ceylon Electricity Board Statistical Digest 2015
Ceylon Electricity Board Statistical Digest 2015
Private Consultants
 
GPL - HT Network - 25.10.21.ppt
GPL - HT Network - 25.10.21.pptGPL - HT Network - 25.10.21.ppt
GPL - HT Network - 25.10.21.ppt
nivyamachado
 
TMI MOTOR 3512 1GZ
TMI MOTOR 3512 1GZTMI MOTOR 3512 1GZ
TMI MOTOR 3512 1GZ
Giovanny Bocanegra
 
WEG Contactors Oveload Relays
WEG Contactors Oveload RelaysWEG Contactors Oveload Relays
WEG Contactors Oveload Relays
Allan Bernardino
 
Combustion Turbine Efficiency Impact
Combustion Turbine Efficiency ImpactCombustion Turbine Efficiency Impact
Combustion Turbine Efficiency Impact
Katherine Corcoran
 
Corporate presentation 2 q 14 vf wa
Corporate presentation 2 q 14 vf  waCorporate presentation 2 q 14 vf  wa
Corporate presentation 2 q 14 vf wa
Empresa de Energía de Bogotá
 
Corporate presentation 2 q 14 v ff sa
Corporate presentation 2 q 14 v ff saCorporate presentation 2 q 14 v ff sa
Corporate presentation 2 q 14 v ff sa
Empresa de Energía de Bogotá
 
Review Week_12_Customer_PulauPanggung (PT.BAS).pptx
Review Week_12_Customer_PulauPanggung (PT.BAS).pptxReview Week_12_Customer_PulauPanggung (PT.BAS).pptx
Review Week_12_Customer_PulauPanggung (PT.BAS).pptx
noelmanroe1
 
Advanced energy storage sizing case RTSoft
Advanced energy storage sizing case RTSoftAdvanced energy storage sizing case RTSoft
Advanced energy storage sizing case RTSoft
ViktorSinenko
 
Power flex400
Power flex400Power flex400
Power flex400
Trung Dang
 
Presentation (group)
Presentation (group)Presentation (group)
Presentation (group)
Ankit Grover
 
lcc asia pacific weekly engineering report edition 442
lcc asia pacific weekly engineering report edition 442lcc asia pacific weekly engineering report edition 442
lcc asia pacific weekly engineering report edition 442
LCC Asia Pacific Corporate Finance
 
Advanced Energy Storage Sizing
Advanced Energy Storage SizingAdvanced Energy Storage Sizing
Advanced Energy Storage Sizing
ViktorSinenko
 
Motor Technical Brochure for ABB LT Motors LT
Motor Technical Brochure for ABB LT Motors LTMotor Technical Brochure for ABB LT Motors LT
Motor Technical Brochure for ABB LT Motors LT
RajivSharma636471
 
Bảng giá mitsubishi 2020
Bảng giá mitsubishi 2020Bảng giá mitsubishi 2020
Bảng giá mitsubishi 2020
PhmAnhHuy
 
Green Energy From Heat - Themo Electric Generation (TEG)
Green Energy From Heat  - Themo Electric Generation (TEG)Green Energy From Heat  - Themo Electric Generation (TEG)
Green Energy From Heat - Themo Electric Generation (TEG)
jamietpe
 
[Case Study] 42.2 kW K-Electric Net Metering Services
[Case Study] 42.2 kW K-Electric Net Metering Services[Case Study] 42.2 kW K-Electric Net Metering Services
[Case Study] 42.2 kW K-Electric Net Metering Services
Zorays Solar Pakistan
 
Corporate presentation 2 q 14 vf1 wa
Corporate presentation 2 q 14 vf1 waCorporate presentation 2 q 14 vf1 wa
Corporate presentation 2 q 14 vf1 wa
Empresa de Energía de Bogotá
 
RK Engineering AF contactors_overload relays catalog_1SXU100109C0201.pdf
RK Engineering AF contactors_overload relays catalog_1SXU100109C0201.pdfRK Engineering AF contactors_overload relays catalog_1SXU100109C0201.pdf
RK Engineering AF contactors_overload relays catalog_1SXU100109C0201.pdf
RK Engineering
 

Similar to Nodal Insights for Generation Owners and Modeling with AURORAxmp (20)

TTI San Antonio Work in Eagle Ford Shale
TTI San Antonio Work in Eagle Ford ShaleTTI San Antonio Work in Eagle Ford Shale
TTI San Antonio Work in Eagle Ford Shale
 
Ceylon Electricity Board Statistical Digest 2015
Ceylon Electricity Board Statistical Digest 2015Ceylon Electricity Board Statistical Digest 2015
Ceylon Electricity Board Statistical Digest 2015
 
GPL - HT Network - 25.10.21.ppt
GPL - HT Network - 25.10.21.pptGPL - HT Network - 25.10.21.ppt
GPL - HT Network - 25.10.21.ppt
 
TMI MOTOR 3512 1GZ
TMI MOTOR 3512 1GZTMI MOTOR 3512 1GZ
TMI MOTOR 3512 1GZ
 
WEG Contactors Oveload Relays
WEG Contactors Oveload RelaysWEG Contactors Oveload Relays
WEG Contactors Oveload Relays
 
Combustion Turbine Efficiency Impact
Combustion Turbine Efficiency ImpactCombustion Turbine Efficiency Impact
Combustion Turbine Efficiency Impact
 
Corporate presentation 2 q 14 vf wa
Corporate presentation 2 q 14 vf  waCorporate presentation 2 q 14 vf  wa
Corporate presentation 2 q 14 vf wa
 
Corporate presentation 2 q 14 v ff sa
Corporate presentation 2 q 14 v ff saCorporate presentation 2 q 14 v ff sa
Corporate presentation 2 q 14 v ff sa
 
Review Week_12_Customer_PulauPanggung (PT.BAS).pptx
Review Week_12_Customer_PulauPanggung (PT.BAS).pptxReview Week_12_Customer_PulauPanggung (PT.BAS).pptx
Review Week_12_Customer_PulauPanggung (PT.BAS).pptx
 
Advanced energy storage sizing case RTSoft
Advanced energy storage sizing case RTSoftAdvanced energy storage sizing case RTSoft
Advanced energy storage sizing case RTSoft
 
Power flex400
Power flex400Power flex400
Power flex400
 
Presentation (group)
Presentation (group)Presentation (group)
Presentation (group)
 
lcc asia pacific weekly engineering report edition 442
lcc asia pacific weekly engineering report edition 442lcc asia pacific weekly engineering report edition 442
lcc asia pacific weekly engineering report edition 442
 
Advanced Energy Storage Sizing
Advanced Energy Storage SizingAdvanced Energy Storage Sizing
Advanced Energy Storage Sizing
 
Motor Technical Brochure for ABB LT Motors LT
Motor Technical Brochure for ABB LT Motors LTMotor Technical Brochure for ABB LT Motors LT
Motor Technical Brochure for ABB LT Motors LT
 
Bảng giá mitsubishi 2020
Bảng giá mitsubishi 2020Bảng giá mitsubishi 2020
Bảng giá mitsubishi 2020
 
Green Energy From Heat - Themo Electric Generation (TEG)
Green Energy From Heat  - Themo Electric Generation (TEG)Green Energy From Heat  - Themo Electric Generation (TEG)
Green Energy From Heat - Themo Electric Generation (TEG)
 
[Case Study] 42.2 kW K-Electric Net Metering Services
[Case Study] 42.2 kW K-Electric Net Metering Services[Case Study] 42.2 kW K-Electric Net Metering Services
[Case Study] 42.2 kW K-Electric Net Metering Services
 
Corporate presentation 2 q 14 vf1 wa
Corporate presentation 2 q 14 vf1 waCorporate presentation 2 q 14 vf1 wa
Corporate presentation 2 q 14 vf1 wa
 
RK Engineering AF contactors_overload relays catalog_1SXU100109C0201.pdf
RK Engineering AF contactors_overload relays catalog_1SXU100109C0201.pdfRK Engineering AF contactors_overload relays catalog_1SXU100109C0201.pdf
RK Engineering AF contactors_overload relays catalog_1SXU100109C0201.pdf
 

More from EPIS Inc

Preliminary Seasonal Assessment of Resource Adequacy for the ERCOT Region, Su...
Preliminary Seasonal Assessment of Resource Adequacy for the ERCOT Region, Su...Preliminary Seasonal Assessment of Resource Adequacy for the ERCOT Region, Su...
Preliminary Seasonal Assessment of Resource Adequacy for the ERCOT Region, Su...
EPIS Inc
 
2015 Long-Term Reliability Assessment by NERC
2015 Long-Term Reliability Assessment by NERC2015 Long-Term Reliability Assessment by NERC
2015 Long-Term Reliability Assessment by NERC
EPIS Inc
 
2015 Summer Reliability Assessment by NERC
2015 Summer Reliability Assessment by NERC2015 Summer Reliability Assessment by NERC
2015 Summer Reliability Assessment by NERC
EPIS Inc
 
Using Historical Data To Fine-Tune AURORAxmp Predictive Capabilities
Using Historical Data To Fine-Tune  AURORAxmp Predictive CapabilitiesUsing Historical Data To Fine-Tune  AURORAxmp Predictive Capabilities
Using Historical Data To Fine-Tune AURORAxmp Predictive Capabilities
EPIS Inc
 
How Idaho Power Company uses AURORAxmp
How Idaho Power Company uses AURORAxmpHow Idaho Power Company uses AURORAxmp
How Idaho Power Company uses AURORAxmp
EPIS Inc
 
Southern Company History and Usage of AURORAxmp
Southern Company History and Usage of AURORAxmpSouthern Company History and Usage of AURORAxmp
Southern Company History and Usage of AURORAxmp
EPIS Inc
 
Modeling and Valuing Cogeneration with AURORAxmp
Modeling and Valuing Cogeneration with AURORAxmpModeling and Valuing Cogeneration with AURORAxmp
Modeling and Valuing Cogeneration with AURORAxmp
EPIS Inc
 
What does wind really cost? Modeling Wind Resources In AURORAxmp.
What does wind really cost? Modeling Wind Resources In AURORAxmp. What does wind really cost? Modeling Wind Resources In AURORAxmp.
What does wind really cost? Modeling Wind Resources In AURORAxmp.
EPIS Inc
 

More from EPIS Inc (8)

Preliminary Seasonal Assessment of Resource Adequacy for the ERCOT Region, Su...
Preliminary Seasonal Assessment of Resource Adequacy for the ERCOT Region, Su...Preliminary Seasonal Assessment of Resource Adequacy for the ERCOT Region, Su...
Preliminary Seasonal Assessment of Resource Adequacy for the ERCOT Region, Su...
 
2015 Long-Term Reliability Assessment by NERC
2015 Long-Term Reliability Assessment by NERC2015 Long-Term Reliability Assessment by NERC
2015 Long-Term Reliability Assessment by NERC
 
2015 Summer Reliability Assessment by NERC
2015 Summer Reliability Assessment by NERC2015 Summer Reliability Assessment by NERC
2015 Summer Reliability Assessment by NERC
 
Using Historical Data To Fine-Tune AURORAxmp Predictive Capabilities
Using Historical Data To Fine-Tune  AURORAxmp Predictive CapabilitiesUsing Historical Data To Fine-Tune  AURORAxmp Predictive Capabilities
Using Historical Data To Fine-Tune AURORAxmp Predictive Capabilities
 
How Idaho Power Company uses AURORAxmp
How Idaho Power Company uses AURORAxmpHow Idaho Power Company uses AURORAxmp
How Idaho Power Company uses AURORAxmp
 
Southern Company History and Usage of AURORAxmp
Southern Company History and Usage of AURORAxmpSouthern Company History and Usage of AURORAxmp
Southern Company History and Usage of AURORAxmp
 
Modeling and Valuing Cogeneration with AURORAxmp
Modeling and Valuing Cogeneration with AURORAxmpModeling and Valuing Cogeneration with AURORAxmp
Modeling and Valuing Cogeneration with AURORAxmp
 
What does wind really cost? Modeling Wind Resources In AURORAxmp.
What does wind really cost? Modeling Wind Resources In AURORAxmp. What does wind really cost? Modeling Wind Resources In AURORAxmp.
What does wind really cost? Modeling Wind Resources In AURORAxmp.
 

Recently uploaded

GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
Neo4j
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
KatiaHIMEUR1
 
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
Neo4j
 
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
Zilliz
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
Matthew Sinclair
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
DianaGray10
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Aggregage
 
“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”
Claudio Di Ciccio
 
A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...
sonjaschweigert1
 
Large Language Model (LLM) and it’s Geospatial Applications
Large Language Model (LLM) and it’s Geospatial ApplicationsLarge Language Model (LLM) and it’s Geospatial Applications
Large Language Model (LLM) and it’s Geospatial Applications
Rohit Gautam
 
Microsoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdfMicrosoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdf
Uni Systems S.M.S.A.
 
Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
Kumud Singh
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Paige Cruz
 
Data structures and Algorithms in Python.pdf
Data structures and Algorithms in Python.pdfData structures and Algorithms in Python.pdf
Data structures and Algorithms in Python.pdf
TIPNGVN2
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems S.M.S.A.
 
Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...
Zilliz
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
Safe Software
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
Matthew Sinclair
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
DianaGray10
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
SOFTTECHHUB
 

Recently uploaded (20)

GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
 
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
 
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
 
“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”
 
A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...
 
Large Language Model (LLM) and it’s Geospatial Applications
Large Language Model (LLM) and it’s Geospatial ApplicationsLarge Language Model (LLM) and it’s Geospatial Applications
Large Language Model (LLM) and it’s Geospatial Applications
 
Microsoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdfMicrosoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdf
 
Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
 
Data structures and Algorithms in Python.pdf
Data structures and Algorithms in Python.pdfData structures and Algorithms in Python.pdf
Data structures and Algorithms in Python.pdf
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
 
Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
 

Nodal Insights for Generation Owners and Modeling with AURORAxmp

  • 1. © PA Knowledge Limited 2014 1 NODAL INSIGHTS 2014 Electric Market Forecasting Conference September 17-19, 2014
  • 2. © PA Knowledge Limited 2014 2 Overview Nodal Background • Constraints -- $ matter • What’s in a Hub price? What’s in a Zonal price? Shift Factors and Congestion Pricing Considerations • Congestion • Marginal Losses Nodal vs. Zonal – the role of Interregional and Local Constraints
  • 3. © PA Knowledge Limited 2014 3 Four constraints account for 50+% of projected 2015 PJM congestion ______________________________ Source: PJM Market Efficiency Analysis Base Congestion Results 0% 2% 4% 6% 8% 10% 12% 14% 16% 18% 20% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
  • 4. © PA Knowledge Limited 2014 4 Two of the top four constraints are M2M Source: PJM Market Efficiency Analysis Base Congestion Results Facility Name Area Constraint Type Frequency (Hours) Market Congestion ($ Millions) Share of 2015 Congestion (%) Cumulative 2015 Congestion (%) AP SOUTH L/O BED-BLA PJM INTERFACE 1,627 103.6 17% 17% Monticello to East Winamac 138 kV M2M LINE 2,569 99.0 17% 34% Oak Grove to Galesburg 161 kV M2M LINE 3,281 60.0 10% 44% Cloverdale to Lexington 500 kV AEP - DVP LINE 631 37.0 6% 51% Elliot to Elliot 138 kV AEP LINE 338 30.0 5% 56% AEP-DOM L/O BED-BLA PJM INTERFACE 706 26.7 5% 60% Graceton to BAGLEY 230 kV BGE LINE 826 22.0 4% 64% Miami Fort to Willey 138 kV DEO&K LINE 310 20.0 3% 67% Braidwood to East Frankfort 345 kV CE LINE 147 18.0 3% 70% Hunterstown 230 kV ME XFMR 254 18.0 3% 73% Dravosburg to West Mifflin 138 kV DLCO LINE 1,275 14.4 2% 76% Tiltonsville to Windsor 138 kV AP - AEP LINE 36 12.4 2% 78% Wurno to Claytor Lake 138 kV AEP LINE 84 11.0 2% 80% Cordova to Nelson 345 kV CE LINE 333 9.9 2% 81% Belvidere to Marengo Tap 138 kV CE LINE 227 8.0 1% 83% WESTERN INTERFACE PJM INTERFACE 257 7.1 1% 84% CENTRAL INTERFACE PJM INTERFACE 658 6.6 1% 85% 6EDFERRY to Dickerson Station "D" 230 kV PEPCO - DVP LINE 39 6.3 1% 86% Hennepin to Hennepin 138 kV M2M LINE 570 5.9 1% 87% Kewanee to E D Edwards 138 kV M2M LINE 298 5.9 1% 88% Cherry Valley to Cherry Valley 138 kV CE LINE 119 5.3 1% 89% Woodville to 15USAP 138 kV DLCO LINE 449 5.0 1% 90% 2014 Market Efficiency Analysis Base Congestion Results: 2015 System Topology
  • 5. © PA Knowledge Limited 2014 5 PJM East Hub – it may not be what you think ISO hubs typically consist of numerous individual nodes. Nodes can be geographically and electrically diverse, making it difficult to isolate the impact of individual transmission constraints. • PJM East consists of 216 individual nodes • 84% of the nodes are load nodes • 49% of the nodes are located in the Delmarva area • 92% are located in PECO and Delmarva Transmission Zone EHV GEN LOAD Total % Total AECO 1 1 0% DPL 14 99 113 49% JCPL 1 1 0% PECO 17 81 98 43% PPL 1 1 0% PSEG 1 4 10 15 7% Total 1 36 192 229 100% % Total 0% 16% 84% 100% Bus Type PJM East Hub Definition
  • 6. © PA Knowledge Limited 2014 6 Load buses dominate the composition of PJM Hub definitions Hub Total Buses EHV GEN LOAD Total AEP GEN HUB 39 100% 100% AEP-DAYTON HUB 1108 11% 89% 100% ATSI GEN HUB 64 100% 100% CHICAGO GEN HUB 131 100% 100% CHICAGO HUB 190 5% 95% 100% DOMINION HUB 626 12% 88% 100% EASTERN HUB 216 0% 15% 84% 100% N ILLINOIS HUB 219 11% 89% 100% NEW JERSEY HUB 367 100% 100% OHIO HUB 761 4% 96% 100% WESTERN HUB 99 4% 27% 69% 100%
  • 7. © PA Knowledge Limited 2014 7 Pricing in the PECO zone: Congestion and Marginal Losses
  • 8. © PA Knowledge Limited 2014 8 While average losses basis differentials can be larger than congestion basis differentials, variation in congestion basis differentials is an order of magnitude greater. Liberty Basis Basis Component Year* Average Basis ($/MWh) Standard Deviation Coefficient of Variation 2009 (1.48) 1.69 114 2010 (2.56) 5.74 224 2011 (1.66) 2.82 170 2012 (2.98) 4.69 157 2009 (1.25) 0.80 64 2010 (1.60) 1.22 76 2011 (1.52) 1.17 77 2012 (1.46) 0.74 51 2009 (0.23) 1.26 544 2010 (0.96) 5.15 538 2011 (0.14) 2.48 1,782 2012 (1.53) 4.46 293 2009 (0.31) 0.34 110 2010 (0.90) 5.52 616 2011 (0.36) 2.21 611 2012 (0.22) 0.25 112 2009 (0.37) 0.28 75 2010 (0.45) 0.43 95 2011 (0.31) 0.40 127 2012 (0.24) 0.12 51 2009 0.06 0.23 410 2010 (0.44) 5.32 1,198 2011 (0.05) 2.09 4,192 2012 0.02 0.22 1,321 * 2012 values for the period through 3/31/2012 Variation in Basis Differentials LibertyBasistoPECOZone Total LMP Basis Loss Basis Congestion Basis Total LMP Basis Loss Basis Congestion Basis LibertyBasistoPJMEastHubUnitBasistoPECOZoneUnitBasistoPJMEastHub
  • 9. © PA Knowledge Limited 2014 9 Shift factors represent the change in power flow on a line when an injection is made at one bus and a corresponding change in withdrawal is made at the reference bus Shift factors are calculated for a specific system topology. Shift factors change when the topology changes or line impedance changes. Shift factors do not change if the injection/withdrawal amount increases for any set of locations. Source: CAISO
  • 10. © PA Knowledge Limited 2014 10 Generators that drive flows on the Eddystone-Island Road Constraint Unit(s) S.F. Description Eddystone 3 .252 380 MW oil/gas-fired steam (Exelon Generating) Eddystone CT .250 (4) 18-20 MW oil-fired CTs (Exelon Generating) Eddystone 4 .247 380 MW oil/gas-fired steam (Exelon Generating) Liberty CC .231 540 MW gas-fired CC (Equipower Resources) Marcus Hook .139 808 MW gas-fired CC (NextEra Energy) Hay Road 4 .116 182 MW gas-fired CT (Calpine) Edge Moor 5 .116 445 MW oil/gas-fired steam (Calpine) Hay Road 1, 3 .088 (2) 121 MW gas-fired CT (Calpine) Edge Moor 3, 4 .088 86 MW and 174 MW gas-fired steam (Calpine) Units that Increase Congestion on the Eddystone–Island Road Constraint Unit(s) S.F. Description Southwark -.175 (4) 18 MW oil-fired CTs (Exelon Generation) Schuylkill CT -.170 (2) 18 MW oil-fired CTs (Exelon Generation) Grays Ferry Cogeneration -.167 150 MW gas-fired CC (Veolia Environnement S.A.) Schuylkill -.164 175 MW oil-fired steam (Exelon Generation) Delaware CT -.100 (4) 18 MW oil-fired CTs (Exelon Generating) Richmond -.058 (2) 65 MW oil-fired CTs (Exelon Generating) Fairless Works -.036 (2) 680 MW gas-fired CCs (Dominion) Croydon -.035 (8) 60 MW oil-fired CTs (Exelon Generating) Burlington GT -.035 (13) mostly 40-50 MW oil/gas-fired CTs (PSEG) Limerick 1 -.025 1190 MW nuclear (Exelon Generating) Limerick 2 -.018 1190 MW nuclear (Exelon Generating) Units that offset Congestion on the Eddystone–Island Road Constraint
  • 11. © PA Knowledge Limited 2014 11 Pricing across PJM reflects local and broader regional constraints Western Hub AEP – Dayton Hub NI Hub
  • 12. © PA Knowledge Limited 2014 12 Generators competing for west to east transfer across Black Oak – Beddington Unit/Bus Area Shift Factor Capacity at Node (MW) Potential Impact on Constraint % of Potential Impact Cum % Potential Impact Hatfield AP 0.115 1,550 178 9.6% 9.6% 02MNFDG3 FE 0.033 2,682 88 4.7% 14.3% Harrison AP 0.040 1,901 76 4.1% 18.4% Fort Martin AP 0.066 1,072 71 3.8% 22.2% Sammis FE 0.032 1,925 62 3.3% 25.5% 15BVRVL1 DLCO 0.033 1,866 62 3.3% 28.9% 05GVG1 AEP 0.017 2,620 45 2.4% 31.3% 05RKG2 AEP 0.014 3,095 42 2.3% 33.5% KEYS G2 PJM 0.024 1,642 40 2.1% 35.7% 05CDG3 AEP 0.032 1,215 39 2.1% 37.7% 01PLEAS1 AP 0.031 1,222 38 2.0% 39.8% Twin Ridges AP 0.183 200 37 2.0% 41.7% 02CALPG2 FE 0.022 1,633 36 1.9% 43.7% Warrior Run AP 0.200 176 35 1.9% 45.6% 09STUART DAY 0.015 2,255 34 1.8% 47.4% 02PERRG1 FE 0.026 1,281 33 1.8% 49.2% 05CVG4 AEP 0.020 1,580 32 1.7% 50.9%
  • 13. © PA Knowledge Limited 2014 13 The broader regional transmission system will be improved if/when the Byron to Wayne 345 kV line is added Transmission flows across ComEd are generally west-to- east and are limited by the constraints involving the two large 345 kV lines, and its interaction with the underlying 138 kV system.
  • 14. © PA Knowledge Limited 2014 14 Shift factors differ substantially, even for units located geographically close together AEP PJM Contingent Branch Monitored Element From Area To Area All Gen: Max - Min Gen in ComEd Zone: Max - Min Gavin Wauk Byron Dresden Kincaid Zion Keystn CHERRY VA; R_SILVER LK; R NERC_FG_ID_3771 WEC CE 0.207 0.207 0.000 0.091 0.119 (0.016) 0.000 (0.088) 0.000 05DUMONT_WILTON ; NERC_FG_ID_2286 CE NIPS 0.242 0.190 0.023 (0.132) (0.120) (0.137) (0.079) (0.132) 0.023 NERC_FG_ID_3771 WEC CE 0.180 0.180 0.000 0.098 0.077 (0.014) 0.000 (0.082) 0.000 NERC_FG_ID_2286 CE NIPS 0.179 0.176 0.013 (0.075) (0.068) (0.076) (0.043) (0.076) 0.013 05DUMONT_WILTON ; NERC_FG_ID_2515 NIPS CE 0.152 0.089 (0.018) 0.110 0.100 0.113 0.065 0.110 (0.018) GARFIELD ; R_To_TAYLOR ; R CE CE 0.077 0.077 0.007 (0.027) (0.022) (0.023) (0.008) (0.027) 0.007 NERC_FG_ID_3222 E FRANKFO; R_To_E FRxmid CE CE 0.074 0.074 0.002 (0.016) (0.012) (0.024) (0.008) (0.016) 0.002 NERC_FG_ID_2515 NIPS CE 0.097 0.074 (0.010) 0.065 0.058 0.064 0.036 0.065 (0.010) NERC_FG_ID_2407 AEP-DOM AEP DVP 0.163 0.041 0.189 0.065 0.053 0.071 0.044 0.065 0.027 8MT STM_8VALLEY_500 AEP-DOM AEP DVP 0.163 0.041 0.190 0.065 0.054 0.071 0.045 0.065 0.027 AEP-Dom_01PRNTY_8MT STM AEP-DOM AEP DVP 0.181 0.040 0.204 0.078 0.067 0.084 0.059 0.078 0.023 05JEFRSO_05ROCKPT 06CLIFTY_To_7TRIMBLE OVEC LGEE 0.066 0.040 0.017 (0.019) (0.025) (0.017) (0.049) (0.019) 0.008 AEP-DOM AEP DVP 0.180 0.040 0.195 0.071 0.059 0.076 0.052 0.071 0.015 GARFIELD ; B_To_TAYLOR ; B CE CE 0.039 0.039 0.006 (0.026) (0.021) (0.021) (0.006) (0.026) 0.006 05MOUNTN_05BELMON AEP-DOM AEP DVP 0.269 0.038 0.262 0.097 0.086 0.103 0.080 0.097 (0.007) 06CLIFTY_To_7TRIMBLE OVEC LGEE 0.040 0.021 0.013 (0.009) (0.014) (0.007) (0.027) (0.009) 0.005 01BEDNGT_01BLACKO APSouthInterface AP DVP 0.026 0.016 0.129 0.110 0.107 0.117 0.103 0.110 0.125 APSouthInterface AP DVP 0.023 0.015 0.103 0.089 0.086 0.095 0.082 0.089 0.099 05DUMONT_WILTON ; NERC_FG_ID_2563 CE CE 0.019 0.014 0.001 (0.016) (0.015) (0.017) (0.009) (0.016) 0.001 05DUMONT_WILTON ; NERC_FG_ID_556 CE NIPS 0.019 0.014 0.001 (0.016) (0.015) (0.017) (0.009) (0.016) 0.001 ComEd
  • 15. © PA Knowledge Limited 2014 15 Shift factors can be transformed to highlight differences between nodes and pricing points AEP PJM Contingent Branch Monitored Element From Area To Area Gavin Wauk Byron Dresden Kincaid Zion Keystn CHERRY VA; R_SILVER LK; R NERC_FG_ID_3771 WEC CE (0.119) (0.027) - (0.135) (0.119) (0.207) (0.119) 05DUMONT_WILTON ; NERC_FG_ID_2286 CE NIPS 0.143 (0.011) - (0.017) 0.041 (0.011) 0.143 NERC_FG_ID_3771 WEC CE (0.077) 0.021 - (0.091) (0.077) (0.159) (0.077) NERC_FG_ID_2286 CE NIPS 0.081 (0.008) - (0.008) 0.025 (0.008) 0.081 05DUMONT_WILTON ; NERC_FG_ID_2515 NIPS CE (0.118) 0.010 - 0.013 (0.035) 0.010 (0.118) GARFIELD ; R_To_TAYLOR ; R CE CE 0.029 (0.005) - (0.000) 0.015 (0.005) 0.029 NERC_FG_ID_3222 E FRANKFO; R_To_E FRxmid CE CE 0.014 (0.003) - (0.011) 0.004 (0.003) 0.014 NERC_FG_ID_2515 NIPS CE (0.068) 0.007 - 0.006 (0.022) 0.007 (0.068) NERC_FG_ID_2407 AEP-DOM AEP DVP 0.136 0.012 - 0.018 (0.009) 0.012 (0.026) 8MT STM_8VALLEY_500 AEP-DOM AEP DVP 0.136 0.012 - 0.018 (0.009) 0.012 (0.027) AEP-Dom_01PRNTY_8MT STM AEP-DOM AEP DVP 0.137 0.012 - 0.017 (0.008) 0.011 (0.044) 05JEFRSO_05ROCKPT 06CLIFTY_To_7TRIMBLE OVEC LGEE 0.042 0.006 - 0.009 (0.024) 0.006 0.033 AEP-DOM AEP DVP 0.135 0.011 - 0.017 (0.008) 0.011 (0.045) GARFIELD ; B_To_TAYLOR ; B CE CE 0.027 (0.005) - (0.001) 0.014 (0.005) 0.027 05MOUNTN_05BELMON AEP-DOM AEP DVP 0.176 0.011 - 0.017 (0.007) 0.011 (0.093) 06CLIFTY_To_7TRIMBLE OVEC LGEE 0.027 0.005 - 0.007 (0.013) 0.005 0.019 01BEDNGT_01BLACKO APSouthInterface AP DVP 0.021 0.003 - 0.010 (0.004) 0.003 0.017 APSouthInterface AP DVP 0.017 0.003 - 0.009 (0.004) 0.003 0.013 05DUMONT_WILTON ; NERC_FG_ID_2563 CE CE 0.016 (0.001) - (0.002) 0.005 (0.001) 0.016 05DUMONT_WILTON ; NERC_FG_ID_556 CE NIPS 0.016 (0.001) - (0.002) 0.005 (0.001) 0.016 ComEd
  • 16. © PA Knowledge Limited 2014 16 Aurora’s LMP contribution output provides the basis for identifying those constraints that drive congestion-based LMP differences. Contingent Branch Monitored Element Index # From Area To Area Generator Sample Generators in ComEd Zone Average of all Binding Constraints 2.27 0.20 GARFIELD ; R_To_TAYLOR ; R 1 CE CE 30.32 30.32 NERC_FG_ID_2417 JFRANTBROSUL NERC_FG_ID_2871NHBHBG__PTDF 2 BREC LGEE 36.91 9.77 GARFIELD ; B_To_TAYLOR ; B 3 CE CE 8.51 5.43 05JEFRSO_05ROCKPT 06CLIFTY_To_7TRIMBLE 4 OVEC LGEE 12.69 6.55 05DUMONT_WILTON ; NERC_FG_ID_2286BURMUNWILDUM 5 CE NIPS 9.28 4.75 CHERRY VA; R_SILVER LK; R NERC_FG_ID_3771PPRZIO__PTDF 6 WEC CE 5.67 5.67 05MOUNTN_05BELMON 05CLOVRD_To_05CLOVRD 7 AEP AEP 170.60 5.15 NERC_FG_ID_3222 EFRGDBEFRGDR E FRANKFO; R_To_E FRxmid 8 CE CE 3.88 3.88 NERC_FG_ID_2353 BLOBEDPRNMTS 05CLOVRD_To_05CLOVRD 9 AEP AEP 134.78 3.85 NERC_FG_ID_3217 BYCH_BBYNWEM NERC_FG_ID_3814MGPSTR__PTDF 10 METC WEC 3.62 3.62 NERC_FG_ID_2417 JFRANTBROSUL 05NAGEL_To_05NAGEL 11 AEP AEP 7.50 2.13 NERC_FG_ID_2407 CLVLEXMTSVAL AEP-DOM 12 AEP DVP 8.77 2.05 01HATFLD_01RONCO CLEVELAND 13 METC METC 3.48 1.71 8MT STM_8VALLEY_500 AEP-DOM 14 AEP DVP 6.10 1.42 NERC_FG_ID_2353 BLOBEDPRNMTS CLEVELAND 15 METC METC 2.48 1.25 AEP-Dom_01PRNTY_8MT STM AEP-DOM 16 AEP DVP 5.93 1.23 05MOUNTN_05BELMON AEP-DOM 17 AEP DVP 6.37 0.84 05DUMONT_WILTON ; NERC_FG_ID_2515BURSHE__PTDF 18 NIPS CE 1.43 0.50 06CLIFTY_To_7TRIMBLE 19 OVEC LGEE 0.85 0.46 01HATFLD_01RONCO 05KAMMER_To_05WBELLA 20 AEP AEP 53.33 0.13 LMP Contribution (Max - Min)
  • 17. © PA Knowledge Limited 2014 17 While average congestion is similar across generating nodes in the ComEd zone, the impact of individual constraints differs greatly. ComEd nodal prices are driven by constraints located outside of that zone. Const. From Area To Area CE Max - Min Wauk Byron Bright Stalk Wind Farm Lee Energy Dresden Powrtn Quad Cities Will County Kendall County Kincaid Zion Avg all Constraints 0.20 (2.70) (2.70) (2.67) (2.65) (2.61) (2.60) (2.60) (2.59) (2.59) (2.57) (2.50) 1 CE CE 30.32 10.84 8.83 (16.18) 8.38 9.01 10.70 7.32 11.61 14.15 3.16 10.86 2 BREC LGEE 9.77 (16.19) (19.16) (13.70) (20.16) (14.59) (16.00) (23.47) (14.58) (14.91) (21.90) (16.23) 3 CE CE 5.43 5.45 4.35 1.49 4.09 4.47 5.16 3.55 6.84 6.06 1.60 5.49 4 OVEC LGEE 6.55 (3.85) (5.02) (2.92) (5.43) (3.33) (4.18) (6.71) (3.36) (3.53) (9.47) (3.93) 5 CE NIPS 4.75 5.04 4.61 7.77 4.47 5.25 4.91 4.02 5.53 5.03 3.02 5.04 6 WEC CE 5.67 (2.51) (3.26) 0.47 (2.57) 0.44 0.26 (2.26) 0.56 0.58 0.00 2.42 7 AEP AEP 5.15 (99.40) (100.54) (98.49) (100.95) (98.95) (99.64) (102.22) (98.88) (99.05) (103.63) (99.41) 8 CE CE 3.88 1.17 0.89 1.49 0.84 1.70 1.37 0.75 2.97 1.26 0.58 1.17 9 AEP AEP 3.85 (103.79) (104.62) (103.12) (104.92) (103.45) (103.97) (105.86) (103.41) (103.53) (106.97) (103.79) 10 METC WEC 3.62 3.04 3.35 0.00 3.21 0.00 0.00 3.28 0.00 0.00 0.00 3.17 11 AEP AEP 2.13 (4.52) (5.17) (4.00) (5.40) (4.19) (4.51) (6.13) (4.19) (4.27) (5.82) (4.52) 12 AEP DVP 2.05 (3.49) (2.86) (3.99) (2.65) (3.81) (3.52) (1.94) (3.81) (3.74) (2.40) (3.48) 13 METC METC 1.71 (5.91) (4.83) (6.10) (4.77) (5.97) (5.86) (4.57) (6.00) (5.98) (4.39) (5.91) 14 AEP DVP 1.42 (2.44) (2.00) (2.79) (1.86) (2.66) (2.46) (1.37) (2.66) (2.61) (1.68) (2.44) 15 METC METC 1.25 (4.09) (3.31) (4.23) (3.27) (4.14) (4.06) (3.12) (4.16) (4.14) (2.99) (4.09) 16 AEP DVP 1.23 (2.57) (2.19) (2.87) (2.07) (2.76) (2.59) (1.64) (2.76) (2.72) (1.92) (2.57) 17 AEP DVP 0.84 (2.30) (2.04) (2.51) (1.96) (2.44) (2.32) (1.67) (2.43) (2.41) (1.89) (2.30) 18 NIPS CE 0.50 (1.05) (0.95) (0.79) (0.93) (1.08) (1.04) (0.84) (1.08) (1.12) (0.62) (1.05) Selected Generating Plants Located in ComEd Zone
  • 18. © PA Knowledge Limited 2014 18 Congestion contribution can be transformed to highlight differences among nodes and pricing points Const. From Area To Area CE Max - Min Wauk Byron Bright Stalk Wind Farm Lee Energy Dresden Powrtn Quad Cities Will County Kendall County Kincaid Zion Avg all Constraints 0.20 (0.01) - 0.03 0.04 0.08 0.10 0.10 0.10 0.10 0.12 0.19 1 CE CE 30.32 2.01 - (25.01) (0.46) 0.17 1.87 (1.51) 2.77 5.31 (5.67) 2.03 2 BREC LGEE 9.77 2.97 - 5.46 (1.00) 4.57 3.16 (4.31) 4.59 4.25 (2.74) 2.93 3 CE CE 5.43 1.10 - (2.87) (0.26) 0.11 0.80 (0.81) 2.48 1.71 (2.75) 1.14 4 OVEC LGEE 6.55 1.17 - 2.10 (0.41) 1.69 0.84 (1.68) 1.66 1.49 (4.45) 1.10 5 CE NIPS 4.75 0.44 - 3.17 (0.14) 0.65 0.31 (0.59) 0.92 0.42 (1.59) 0.43 6 WEC CE 5.67 0.75 - 3.73 0.69 3.70 3.51 1.00 3.82 3.84 3.26 5.67 7 AEP AEP 5.15 1.14 - 2.05 (0.41) 1.59 0.90 (1.68) 1.66 1.49 (3.09) 1.13 8 CE CE 3.88 0.28 - 0.60 (0.05) 0.81 0.48 (0.14) 2.08 0.37 (0.31) 0.28 9 AEP AEP 3.85 0.84 - 1.51 (0.30) 1.17 0.65 (1.23) 1.22 1.09 (2.34) 0.83 10 METC WEC 3.62 (0.32) - (3.35) (0.14) (3.35) (3.35) (0.08) (3.35) (3.35) (3.35) (0.18) 11 AEP AEP 2.13 0.66 - 1.18 (0.22) 0.98 0.67 (0.95) 0.98 0.91 (0.64) 0.65 12 AEP DVP 2.05 (0.63) - (1.13) 0.21 (0.95) (0.66) 0.92 (0.95) (0.88) 0.46 (0.62) 13 METC METC 1.71 (1.08) - (1.27) 0.07 (1.13) (1.03) 0.26 (1.17) (1.14) 0.45 (1.08) 14 AEP DVP 1.42 (0.44) - (0.78) 0.15 (0.66) (0.46) 0.63 (0.66) (0.61) 0.32 (0.43) 15 METC METC 1.25 (0.78) - (0.92) 0.05 (0.82) (0.75) 0.20 (0.85) (0.83) 0.33 (0.78) 16 AEP DVP 1.23 (0.38) - (0.68) 0.13 (0.57) (0.40) 0.55 (0.57) (0.53) 0.27 (0.37) 17 AEP DVP 0.84 (0.26) - (0.47) 0.09 (0.39) (0.28) 0.38 (0.39) (0.36) 0.16 (0.26) 18 NIPS CE 0.50 (0.09) - 0.17 0.03 (0.12) (0.08) 0.12 (0.13) (0.17) 0.33 (0.09) 19 OVEC LGEE 0.46 0.10 - 0.18 (0.04) 0.15 0.08 (0.15) 0.15 0.14 (0.28) 0.10 20 AEP DVP 0.23 0.05 - 0.09 (0.02) 0.07 0.04 (0.07) 0.07 0.07 (0.14) 0.05 Selected Generating Plants Located in ComEd Zone
  • 19. © PA Knowledge Limited 2014 19 Transformation also makes it easier to identify constraints that drive broader interregional congestion PJM 500 Penelec Index # From Area To Area Gavin DC Cook Wauk Byron Bright Stalk Wind Farm Lee Energy Dresden Powrtn Quad Cities Will County Kendall County Kincaid Zion Keystone Average - 0.64 0.66 0.66 0.69 0.71 0.75 0.76 0.76 0.76 0.77 0.79 0.86 2.27 1 CE CE - -0.05 13.38 11.37 -13.64 10.92 11.55 13.24 9.86 14.15 16.69 5.70 13.40 0.00 2 BREC LGEE - -22.25 -29.63 -32.60 -27.14 -33.60 -28.02 -29.43 -36.91 -28.01 -28.34 -35.34 -29.66 -7.90 3 CE CE - 0.32 7.09 6.00 3.13 5.74 6.11 6.80 5.19 8.48 7.70 3.24 7.14 0.32 4 OVEC LGEE - -4.24 -7.07 -8.24 -6.14 -8.64 -6.55 -7.40 -9.92 -6.58 -6.74 -12.69 -7.14 -1.76 5 CE NIPS - -0.64 5.91 5.47 8.64 5.33 6.12 5.78 4.89 6.39 5.89 3.88 5.91 0.00 6 WEC CE - 0.02 -2.51 -3.26 0.47 -2.57 0.44 0.26 -2.26 0.56 0.58 0.00 2.42 0.00 7 AEP AEP - 36.29 31.14 30.00 32.06 29.60 31.60 30.90 28.33 31.66 31.49 26.91 31.14 170.60 8 CE CE - -0.29 1.32 1.04 1.64 0.99 1.85 1.52 0.90 3.12 1.42 0.73 1.32 0.00 9 AEP AEP - 12.03 8.25 7.41 8.92 7.11 8.58 8.06 6.18 8.63 8.50 5.07 8.24 134.78 10 METC WEC - 0.00 3.04 3.35 0.00 3.21 0.00 0.00 3.28 0.00 0.00 0.00 3.17 0.00 11 AEP AEP - -2.26 -5.89 -6.54 -5.37 -6.77 -5.56 -5.88 -7.50 -5.56 -5.64 -7.19 -5.89 -0.81 12 AEP DVP - 5.28 6.73 7.36 6.23 7.58 6.42 6.70 8.28 6.42 6.48 7.82 6.74 8.77 13 METC METC - 1.78 -1.52 -0.44 -1.70 -0.37 -1.57 -1.47 -0.18 -1.61 -1.58 0.01 -1.52 1.00 14 AEP DVP - 3.66 4.66 5.10 4.32 5.25 4.45 4.65 5.74 4.45 4.49 5.42 4.67 6.10 15 METC METC - 1.21 -1.12 -0.34 -1.26 -0.30 -1.17 -1.09 -0.15 -1.20 -1.17 -0.02 -1.13 -0.42 16 AEP DVP - 3.25 4.11 4.49 3.81 4.62 3.92 4.09 5.04 3.92 3.96 4.76 4.12 5.93 17 AEP DVP - 3.34 3.90 4.16 3.69 4.25 3.77 3.88 4.54 3.77 3.80 4.32 3.90 6.37 18 NIPS CE - 0.14 -1.22 -1.13 -0.96 -1.10 -1.25 -1.21 -1.01 -1.25 -1.30 -0.79 -1.22 0.00 19 OVEC LGEE - -0.28 -0.48 -0.58 -0.40 -0.61 -0.43 -0.50 -0.73 -0.43 -0.44 -0.85 -0.48 -0.17 20 AEP AEP - 5.18 4.74 4.78 4.72 4.79 4.70 4.73 4.83 4.72 4.72 4.73 4.75 53.33 AEP ComEd