Integrated Resource Planning:
- An Engineer’s Perspective
October 25, 2013
J. James Peterson
Road Map
• Who we are
– Company overview
– Modeled system
– Unique modeling challenges
• Plan on uncertainty
– Stochastic modeling techniques
– Interfacing with SQL Server
• Lessons learned
Idaho Power Service Area and Resources
Modeled Region
Major Power Plants
Modeling Hydro in AURORA
• 17 Hydro plants
– Of these plants Brownlee, Oxbow and Hells Canyon are used to meet hourly
load variations (load following)
– All other facilities are modeled as “run of river” and are not used to meet
hourly load variations
• Stream flow forecasts
– Reflect declining stream flows in the Snake River
• Generation forecast from PDR580
– Monthly generation forecasts for each plant
2013 IRP: Brownlee Total Inflow
Forecasted Flows 2013 - 2032
7.00
7.50
8.00
8.50
9.00
9.50
10.00
10.50
11.00
11.50
12.00
MillionsofAcre-Feet
Brownlee Total Inflow
Forecasted Flows 2013 - 2032
50% Exceedance
70% Exceedance
90% Exceedance
Seasonal Reservoir Cycle
1860
1880
1900
1920
1940
1960
1980
2000
2020
2040
2060
2080
5000
10000
15000
20000
25000
30000
35000
40000
45000
50000
55000
60000
10/1/2011 11/1/2011 12/1/2011 1/1/2012 2/1/2012 3/1/2012 4/1/2012 5/1/2012 6/1/2012 7/1/2012 8/1/2012 9/1/2012
BRNelevation(feet)
flow(cfs)
OUTFLOW INFLOW BRN ELEVATION
AURORA HCC vs Observed HCC
AURORA Output
2009 HCC Observed
Nameplate Capacity
Environmental Stewardship
Integrated with Operations
Above: Fall Chinook Salmon Redds
Fall Chinook Salmon Redd
On-line Wind Capacity
Divided Public Opinion
Divided Public Opinion
Modeling Wind in AURORA
• Monthly Generation Trends
• Hourly Generation Trends
The inherent variability of wind provides modeling challenges. For the 2013 IRP, wind is
modeled based on 2009  2011 historical data for southern Idaho. Hourly generation data is
scaled to better represent recently installed wind projects. Modeled PURPA wind projects have
a combined nameplate capacity of approximately 576 MW.
Upon analysis, trends were observed in the wind generation data. These hourly and monthly
trends were used in the development of a12 month x 24 hour matrix of capacity factors.
Capacity factors were then applied to the combined nameplate rating to produce wind
generation values that reflect monthly and hourly variation in the wind. The AURORA
simulation applies the generation values derived from the 12 month x 24 hour matrix.
The same analysis was applied to the Elkhorn Valley wind project.
0
50
100
150
200
250
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
PURPAWindGeneration(MW)
Hours in Day
January February March April
May June July August
September October November December
PURPA Wind by Month 2009  2011
Alternative Modeling: Pumped Storage
0
500
1000
1500
2000
2500
3000
3500
4000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
SystemGeneration(MWh)
Hours in Day
July 25, 2018: Peak Load = 3,437 MW
On-PeakHours3-7PM
Total Existing System: Generation,
PPA & Market Purchases
LL Wind
Pumped
Storage
LL Wind Generation Removed
(System Pumping)
Alternative Modeling: Pumped Storage
Hour January February March April May June July August September October November December
1 204,607 188,028 219,546 203,301 198,432 171,303 149,050 148,926 138,962 161,723 241,367 210,947
2 200,920 185,203 222,091 198,633 195,611 166,243 154,315 146,589 140,919 151,499 244,069 209,825
3 197,646 180,659 219,381 201,089 187,641 160,597 152,576 145,124 147,152 149,608 250,588 210,981
4 189,748 180,006 218,994 206,429 186,469 158,665 150,599 145,432 148,072 154,694 251,301 214,801
5 184,688 174,210 220,274 206,407 186,912 155,561 160,262 144,026 151,406 149,831 259,590 212,458
6 176,752 170,978 225,934 207,044 185,497 159,837 161,153 139,793 156,557 155,409 266,097 213,593
7 0 0 0 0 0 0 0 0 0 0 0 0
8 200,000 200,000 200,000 109,186 0 0 0 0 0 200,000 200,000 152,142
9 200,000 200,000 200,000 200,000 0 0 0 0 0 200,000 200,000 200,000
10 200,000 200,000 200,000 200,000 0 0 0 0 0 200,000 200,000 200,000
11 47,529 200,000 200,000 200,000 45,092 0 0 0 0 47,378 198,426 0
12 0 0 200,000 200,000 0 0 0 0 0 0 0 0
13 0 0 23,105 0 0 0 0 0 0 0 0 0
14 0 0 0 0 0 0 0 0 0 0 0 0
15 0 0 0 0 0 0 0 0 0 0 0 0
16 0 0 0 0 0 200,000 180,232 135,723 0 0 0 0
17 0 0 0 0 200,000 200,000 200,000 200,000 148,435 0 0 0
18 0 0 0 0 200,000 200,000 200,000 200,000 200,000 0 200,000 200,000
19 200,000 156,254 0 0 200,000 200,000 200,000 200,000 200,000 0 200,000 200,000
20 200,000 200,000 0 0 200,000 200,000 200,000 200,000 200,000 200,000 200,000 200,000
21 200,000 0 200,000 200,000 200,000 52,897 0 0 200,000 200,000 200,000 200,000
22 0 0 200,000 200,000 200,000 0 0 0 0 0 0 0
23 199,164 178,015 226,635 205,732 209,456 172,054 146,787 146,077 155,051 201,488 244,720 209,525
24 205,886 188,219 226,025 207,847 206,346 171,862 150,548 153,685 147,425 184,969 240,300 208,046
LL Wind Generation (kW)
*System Pumping*
HH Pumped Storage
Generation (kW)
*System Generating*
LL Wind Generation (kW)
*System Pumping*
Represents wind energy being stored during off-
peak hours
Represents stored energy being discharged
during on-peak hours (3-7 pm)
Combined Wind Projects to Pumped Storage
Alternative Modeling: Pumped Storage
January February March April May June July August September October November December
19 9 9 11 22 19 19 19 21 20 19 19
9 8 10 9 19 18 18 18 19 21 20 20
20 10 8 10 18 17 17 17 18 9 8 18
10 20 11 21 21 16 20 20 20 10 9 21
8 11 21 12 20 20 16 16 17 8 21 9
21 19 12 22 17 21 21 21 16 11 10 10
11 21 22 8 11 15 15 15 22 22 18 8
18 12 13 20 12 22 22 22 15 12 11 11
12 22 7 13 16 14 14 14 14 19 22 22
22 7 20 19 13 13 13 13 13 13 12 12
13 13 14 18 14 12 23 12 12 14 13 13
7 18 19 14 15 23 12 23 11 18 7 17
Peak Load Hours (2013 IRP Forecast): Ranked Hours From Highest Load
• Generation hours were selected based on hourly load ranking (highest to lowest)
•Pumped storage plant generated at full capacity on these identified hours
HourEnding
Alternative Modeling: Pumped Storage
• Reduce need for additional peak-hour capacity
•Convert intermittent product into a firm product
•Help integrate wind energy (possibly reduce wind integration charge)
Mid-C Market Prices
$-
$20
$40
$60
$80
$100
$120
$140
2013_01
2013_06
2013_11
2014_04
2014_09
2015_02
2015_07
2015_12
2016_05
2016_10
2017_03
2017_08
2018_01
2018_06
2018_11
2019_04
2019_09
2020_02
2020_07
2020_12
2021_05
2021_10
2022_03
2022_08
2023_01
2023_06
2023_11
2024_04
2024_09
2025_02
2025_07
2025_12
2026_05
2026_10
2027_03
2027_08
2028_01
2028_04
2028_11
2029_04
2029_09
2030_02
2030_05
2030_12
2031_05
2031_10
2032_03
2032_08
Mid-CMarketPrices($/MWh)
AURORA Mid-C LL
Forwards (Nov 28, 2012) Mid-C LL
2018  2032 Carbon Adder
Increases Market Prices in
AURORA Mid-C LL
Peak-Hour Deficits: 2013 IRP
Applying Modeling Results
• Alternative portfolios are layered over existing system
configuration
– Total portfolio costs are derived and compared
– 20 year IRP planning period analyzed
• AURORA Portfolio Costs
Total portfolio cost = Resource cost + Contract purchases (ie. PURPA & PPA) +
Market Purchases – Market Sales
Stephen Hawking:
A Brief History of Time
• AURORA Portfolio Costs
Total portfolio cost = Resource cost + Contract purchases (ie. PURPA & PPA) +
Market Purchases – Market Sales
Hawking noted that an editor warned him
that for every equation in the book the
readership would be halved.
Stephen Hawking:
A Brief History of Time
• AURORA Portfolio Costs
Total portfolio cost = Resource cost + Contract purchases (ie. PURPA & PPA) +
Market Purchases – Market Sales
Hawking noted that an editor warned him
that for every equation in the book the
readership would be halved DOUBLED.
AURORA Stochastic Overview
• Better Insight
– The basic relationships of the electricity system
are nonlinear. A stochastic analysis can lead to
insights that might not otherwise be understood.
These observed relationships change over time.
• Uncertainty Analysis of Fundamental Drivers
– Variability in the following drivers were studied:
* Natural gas
* Customer load
* Hydroelectric variability
* CO2 adder
• Uses Common and Well-Known Techniques
– The 2013 IRP stochastic studies were done using
Latin-Hypercube sampling. While not used, the
Monte Carlo method is also an option.
26
Two Methods For Examining
Uncertainty in AURORA
• Endogenous
– AURORAxmp has the internal capability to specify distributions for select
drivers/variables, and will generate samples from the statistical distributions using
Monte Carlo or Latin Hypercube sampling.
– It will also tabulate the input variables and specified results by iteration.
• Exogenous
– You can use an external Monte Carlo sampling application to generate input data
for use in AURORAxmp.
– The external source of data can be used to create samples for multiple studies
where AURORAxmp is used as the electric market pricing engine.
– AURORAxmp scripting or computational dataset capabilities can be used to
modify the input data.
Slide courtesy of EPIS
27
Portfolios Analyzed
• Portfolio 1
– B2H_DR_SCCT
• Portfolio 2
– B2H_DR
• Portfolio 6
– ICL_BSU: Coal Retirement
• Portfolio 7
– Coal Conversion to NG
• Portfolio 3
– DR_CCCT_SCCT
• Portfolio 4
– CCCT_DR_CCCT
• Portfolio 5
– CCCT_CCCT_DR
* Refer to 2013 IRP for complete portfolio descriptions
• Portfolio 8 (Valmy closure)
– B2H_DR_CCCT
• Portfolio 9 (Valmy closure)
– CCCT_CCCT_SCCT
Risk Factors Sampled
• Customer Load (regional & local)
– Normal Distribution
– 50% Regional Correlation
• Henry Hub Natural Gas Price
– Log-normal Distribution
– 65% Serial correlation
• Hydro Generation (local and regional)
– Normal Distribution
– 50% Serial Correlation, 70% Regional Correlation
• Carbon Adder
– Low, Planning & High Scenarios
– Stratified Sample
Approach
• Random draws performed on an annual basis
• Each risk factor simultaneously employed
• 102 Iterations performed for each of the 7 portfolios
• NPV for 20 year period
Stochastic Dispersion:
P_0
P_1
P_2
P_3
P_4
P_5
P_6
P_7
$2,000,000 $4,000,000 $6,000,000 $8,000,000 $10,000,000 $12,000,000 $14,000,000
PortfolioNumber
Total Portfolio Cost [2013 through 2032] (NPV 000s $)
Stochastics: 1 Iteration
Planning Carbon
Stochastic Dispersion:
P_0
P_1
P_2
P_3
P_4
P_5
P_6
P_7
$2,000,000 $4,000,000 $6,000,000 $8,000,000 $10,000,000 $12,000,000 $14,000,000
PortfolioNumber
Total Portfolio Cost [2013 through 2032] (NPV 000s $)
Stochastics: 3 Iiterations
High Carbon
Planning Carbon
Low Carbon
Stochastic Dispersion:
P_0
P_1
P_2
P_3
P_4
P_5
P_6
P_7
$2,000,000 $4,000,000 $6,000,000 $8,000,000 $10,000,000 $12,000,000 $14,000,000
PortfolioNumber
Total Portfolio Cost [2013 through 2032] (NPV 000s $)
Stochastics: 12 Iiterations
Low Carbon
Planning Carbon
High Carbon
Stochastic Dispersion:
Stochastic Results
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
$0 $2,500,000 $5,000,000 $7,500,000 $10,000,000
ExceedanceProbability
Total Portfolio Costs (2013 NPV $000s)
Portfolio #1: B2H_DR_SCCT
Portfolio #2: B2H_DR
Portfolio #3: DR_CCCT_SCCT
Portfolio #4: CCCT_DR_CCCT
Portfolio #5: CCCT_CCCT_DR
Portfolio #6: ICL_BSU
Portfolio #7: Coal to NG Conversion
Portfolio #8:B2H_DR_CCCT
Portfolio #9:DR_CCCT_CCCT_SCCT
Stochastic Results
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
$0 $2,500,000 $5,000,000 $7,500,000 $10,000,000
ExceedanceProbability
Total PortfolioCosts (2013 NPV$000s)
Portfolio #1: B2H_DR_SCCT
Portfolio #2: B2H_DR
Portfolio #3: DR_CCCT_SCCT
Portfolio #4: CCCT_DR_CCCT
Portfolio #5: CCCT_CCCT_DR
Portfolio #6: ICL_BSU
Portfolio #7: Coal to NG Conversion
Portfolio #8:B2H_DR_CCCT
Portfolio #9:DR_CCCT_CCCT_SCCT
Another Stochastic Example
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
$8,000,000
$9,000,000
$10,000,000
-$5 $5 $15 $25 $35 $45 $55
TotalPortfolioCost(NPV2013$000s)
2018 Carbon Adder (Nominal$s)
Stochastic Based - Carbon Adder Tipping Point
Low Carbon
Planning Carbon
High CarbonPortfolio #6
(ICL_BSU)
Portfolio #2
(B2H_DR)
Low Carbon
Planning Carbon
High Carbon
Another Stochastic Example
$0
$20
$40
$60
$80
$100
$120
$140
$160
$180
$200
$0 $2 $4 $6 $8 $10 $12 $14 $16 $18 $20 $22
Mid-CMarketPrices($/MWh)
Henry Hub Natural Gas Price ($/MMBtu)
High Carbon
Planning Carbon
Low Carbon
Preferred Portfolio
• AURORA
– Latin Hyper-cube performed well
– Flexibility for resource analysis
– Serial and regional correlations of risk variables
– Wide range of stochastic futures sampled in short time period
• Mid-C market has quantifiable, non-linear trends
– Stochastic modeling assists in the identification of trends
Lessons Learned
• SQL Server
– Fast
– Multiple users
– Multiple instances of AURORA
– Huge DB size capacity
– Flexibility for queries
Questions?
1981 Flashback
1981 Flashback
How Idaho Power Company uses AURORAxmp
How Idaho Power Company uses AURORAxmp
How Idaho Power Company uses AURORAxmp
How Idaho Power Company uses AURORAxmp
How Idaho Power Company uses AURORAxmp

More Related Content

What's hot

Cutting Costs for Energy Producers by 1 Cent per Kilowatt Hour
Cutting Costs for Energy Producers by 1 Cent per Kilowatt HourCutting Costs for Energy Producers by 1 Cent per Kilowatt Hour
Cutting Costs for Energy Producers by 1 Cent per Kilowatt HourSentient Science
 
2010 deep research report on cost and price of china wind power equipment
2010 deep research report on cost and price of china wind power equipment2010 deep research report on cost and price of china wind power equipment
2010 deep research report on cost and price of china wind power equipmentqyresearch
 
Introduction of CO2 Reduction Technologies in Steelworks
Introduction of  CO2 Reduction Technologies in SteelworksIntroduction of  CO2 Reduction Technologies in Steelworks
Introduction of CO2 Reduction Technologies in Steelworks
Energy-Education-Resource-Center
 
Long-term energy system modelling with improved resolution to address short-t...
Long-term energy system modelling with improved resolution to address short-t...Long-term energy system modelling with improved resolution to address short-t...
Long-term energy system modelling with improved resolution to address short-t...
IEA-ETSAP
 
Practically Delivering Energy-Reducing Technology To Optimise Efficiency On T...
Practically Delivering Energy-ReducingTechnology To Optimise Efficiency On T...Practically Delivering Energy-ReducingTechnology To Optimise Efficiency On T...
Practically Delivering Energy-Reducing Technology To Optimise Efficiency On T...
Andy_Watson_Sim
 
RWF PR90
RWF PR90RWF PR90
RWF PR90
Paul Keisch
 
spatial_load_analysis
spatial_load_analysisspatial_load_analysis
spatial_load_analysisDavid Hollema
 
Elia group full year results 2013
Elia group full year results 2013Elia group full year results 2013
Elia group full year results 2013Elia
 
Michel Sacotte - Schneider Electric
Michel Sacotte - Schneider ElectricMichel Sacotte - Schneider Electric
Michel Sacotte - Schneider Electric
cwiemeexpo
 
33 freeman modelling_energy_losses_due_to_snow_on_pv_systems
33 freeman modelling_energy_losses_due_to_snow_on_pv_systems33 freeman modelling_energy_losses_due_to_snow_on_pv_systems
33 freeman modelling_energy_losses_due_to_snow_on_pv_systems
Sandia National Laboratories: Energy & Climate: Renewables
 
Presentation Jacques Vandermeiren at Trends Lunch
Presentation Jacques Vandermeiren at Trends LunchPresentation Jacques Vandermeiren at Trends Lunch
Presentation Jacques Vandermeiren at Trends Lunch
Elia
 
James Goss - Motor Design Ltd
James Goss - Motor Design Ltd James Goss - Motor Design Ltd
James Goss - Motor Design Ltd
cwiemeexpo
 
Res evolution italy_gse
Res evolution italy_gseRes evolution italy_gse
Res evolution italy_gse
Gestore dei Servizi Energetici
 
Wind Solar Colocation 2016
Wind Solar Colocation 2016Wind Solar Colocation 2016
Wind Solar Colocation 2016
Turlough Guerin GAICD FGIA
 
Ds 090823
Ds 090823Ds 090823
Ds 090823
edozar
 
3. DNV GL - Koen Broess
3. DNV GL - Koen Broess3. DNV GL - Koen Broess
3. DNV GL - Koen Broess
Dutch Power
 
2014 PV Performance Modeling Workshop: Optimizing PV Designs with HelioScope:...
2014 PV Performance Modeling Workshop: Optimizing PV Designs with HelioScope:...2014 PV Performance Modeling Workshop: Optimizing PV Designs with HelioScope:...
2014 PV Performance Modeling Workshop: Optimizing PV Designs with HelioScope:...
Sandia National Laboratories: Energy & Climate: Renewables
 
PV 2.0: Italian Focus - Luca Bendetti, GSE
PV 2.0: Italian Focus - Luca Bendetti, GSE PV 2.0: Italian Focus - Luca Bendetti, GSE
PV 2.0: Italian Focus - Luca Bendetti, GSE
Gestore dei Servizi Energetici
 
3 5 solar_forecasting-golnas-2016_v3
3 5 solar_forecasting-golnas-2016_v33 5 solar_forecasting-golnas-2016_v3

What's hot (20)

Cutting Costs for Energy Producers by 1 Cent per Kilowatt Hour
Cutting Costs for Energy Producers by 1 Cent per Kilowatt HourCutting Costs for Energy Producers by 1 Cent per Kilowatt Hour
Cutting Costs for Energy Producers by 1 Cent per Kilowatt Hour
 
2010 deep research report on cost and price of china wind power equipment
2010 deep research report on cost and price of china wind power equipment2010 deep research report on cost and price of china wind power equipment
2010 deep research report on cost and price of china wind power equipment
 
Introduction of CO2 Reduction Technologies in Steelworks
Introduction of  CO2 Reduction Technologies in SteelworksIntroduction of  CO2 Reduction Technologies in Steelworks
Introduction of CO2 Reduction Technologies in Steelworks
 
Long-term energy system modelling with improved resolution to address short-t...
Long-term energy system modelling with improved resolution to address short-t...Long-term energy system modelling with improved resolution to address short-t...
Long-term energy system modelling with improved resolution to address short-t...
 
Practically Delivering Energy-Reducing Technology To Optimise Efficiency On T...
Practically Delivering Energy-ReducingTechnology To Optimise Efficiency On T...Practically Delivering Energy-ReducingTechnology To Optimise Efficiency On T...
Practically Delivering Energy-Reducing Technology To Optimise Efficiency On T...
 
RWF PR90
RWF PR90RWF PR90
RWF PR90
 
spatial_load_analysis
spatial_load_analysisspatial_load_analysis
spatial_load_analysis
 
Elia group full year results 2013
Elia group full year results 2013Elia group full year results 2013
Elia group full year results 2013
 
Michel Sacotte - Schneider Electric
Michel Sacotte - Schneider ElectricMichel Sacotte - Schneider Electric
Michel Sacotte - Schneider Electric
 
33 freeman modelling_energy_losses_due_to_snow_on_pv_systems
33 freeman modelling_energy_losses_due_to_snow_on_pv_systems33 freeman modelling_energy_losses_due_to_snow_on_pv_systems
33 freeman modelling_energy_losses_due_to_snow_on_pv_systems
 
Presentation Jacques Vandermeiren at Trends Lunch
Presentation Jacques Vandermeiren at Trends LunchPresentation Jacques Vandermeiren at Trends Lunch
Presentation Jacques Vandermeiren at Trends Lunch
 
Presentation N14
Presentation N14Presentation N14
Presentation N14
 
James Goss - Motor Design Ltd
James Goss - Motor Design Ltd James Goss - Motor Design Ltd
James Goss - Motor Design Ltd
 
Res evolution italy_gse
Res evolution italy_gseRes evolution italy_gse
Res evolution italy_gse
 
Wind Solar Colocation 2016
Wind Solar Colocation 2016Wind Solar Colocation 2016
Wind Solar Colocation 2016
 
Ds 090823
Ds 090823Ds 090823
Ds 090823
 
3. DNV GL - Koen Broess
3. DNV GL - Koen Broess3. DNV GL - Koen Broess
3. DNV GL - Koen Broess
 
2014 PV Performance Modeling Workshop: Optimizing PV Designs with HelioScope:...
2014 PV Performance Modeling Workshop: Optimizing PV Designs with HelioScope:...2014 PV Performance Modeling Workshop: Optimizing PV Designs with HelioScope:...
2014 PV Performance Modeling Workshop: Optimizing PV Designs with HelioScope:...
 
PV 2.0: Italian Focus - Luca Bendetti, GSE
PV 2.0: Italian Focus - Luca Bendetti, GSE PV 2.0: Italian Focus - Luca Bendetti, GSE
PV 2.0: Italian Focus - Luca Bendetti, GSE
 
3 5 solar_forecasting-golnas-2016_v3
3 5 solar_forecasting-golnas-2016_v33 5 solar_forecasting-golnas-2016_v3
3 5 solar_forecasting-golnas-2016_v3
 

Viewers also liked

Barcelona Ppt2
Barcelona Ppt2Barcelona Ppt2
Barcelona Ppt2
jasanchez
 
andy_final_writing (1)
andy_final_writing (1)andy_final_writing (1)
andy_final_writing (1)Andrew Mulcahy
 
PICMET 2009
PICMET 2009PICMET 2009
PICMET 2009
GeoDiga
 
Better burger
Better burgerBetter burger
Better burgerelseils
 
Ensemble: a Recommendation Tool for Promoting Communications in Software Teams
Ensemble: a Recommendation Tool for Promoting Communications in Software TeamsEnsemble: a Recommendation Tool for Promoting Communications in Software Teams
Ensemble: a Recommendation Tool for Promoting Communications in Software Teams
rsse2008
 
Wolf & Dragon Gold
Wolf & Dragon GoldWolf & Dragon Gold
Wolf & Dragon Gold
steamyr
 
Preliminary Explorations at the Cave Complex at Kothaligad, Taluka Karjat, Di...
Preliminary Explorations at the Cave Complex at Kothaligad, Taluka Karjat, Di...Preliminary Explorations at the Cave Complex at Kothaligad, Taluka Karjat, Di...
Preliminary Explorations at the Cave Complex at Kothaligad, Taluka Karjat, Di...
Raamesh Gowri Raghavan
 
ABSTENCIONISTAS O BORREGOS
ABSTENCIONISTAS O BORREGOSABSTENCIONISTAS O BORREGOS
ABSTENCIONISTAS O BORREGOS
GARFUNDIO MORATINOS RUA
 
AWS Customer Presentation - Justin.tv
AWS Customer Presentation - Justin.tvAWS Customer Presentation - Justin.tv
AWS Customer Presentation - Justin.tv
Amazon Web Services
 
IIJlab seminar - Linux Kernel Library: Reusable monolithic kernel (in Japanese)
IIJlab seminar - Linux Kernel Library: Reusable monolithic kernel (in Japanese)IIJlab seminar - Linux Kernel Library: Reusable monolithic kernel (in Japanese)
IIJlab seminar - Linux Kernel Library: Reusable monolithic kernel (in Japanese)
Hajime Tazaki
 
Poptrie: A Compressed Trie with Population Count for Fast and Scalable Softwa...
Poptrie: A Compressed Trie with Population Count for Fast and Scalable Softwa...Poptrie: A Compressed Trie with Population Count for Fast and Scalable Softwa...
Poptrie: A Compressed Trie with Population Count for Fast and Scalable Softwa...
Hirochika Asai
 
[Fintech in Asia] E-payments - Marvelstone Tech at SGX event
[Fintech in Asia] E-payments - Marvelstone Tech at SGX event[Fintech in Asia] E-payments - Marvelstone Tech at SGX event
[Fintech in Asia] E-payments - Marvelstone Tech at SGX event
Joe Seunghyun Cho
 
IRNI IRISHA NAZLI (AA12114) PSM2
IRNI IRISHA NAZLI (AA12114) PSM2IRNI IRISHA NAZLI (AA12114) PSM2
IRNI IRISHA NAZLI (AA12114) PSM2Irni Irisha
 
Un niño griego en clase
Un niño griego en claseUn niño griego en clase
Un niño griego en clase
Ana Ovando
 

Viewers also liked (15)

Barcelona Ppt2
Barcelona Ppt2Barcelona Ppt2
Barcelona Ppt2
 
andy_final_writing (1)
andy_final_writing (1)andy_final_writing (1)
andy_final_writing (1)
 
PICMET 2009
PICMET 2009PICMET 2009
PICMET 2009
 
X-STYLE SEPT comp
X-STYLE SEPT compX-STYLE SEPT comp
X-STYLE SEPT comp
 
Better burger
Better burgerBetter burger
Better burger
 
Ensemble: a Recommendation Tool for Promoting Communications in Software Teams
Ensemble: a Recommendation Tool for Promoting Communications in Software TeamsEnsemble: a Recommendation Tool for Promoting Communications in Software Teams
Ensemble: a Recommendation Tool for Promoting Communications in Software Teams
 
Wolf & Dragon Gold
Wolf & Dragon GoldWolf & Dragon Gold
Wolf & Dragon Gold
 
Preliminary Explorations at the Cave Complex at Kothaligad, Taluka Karjat, Di...
Preliminary Explorations at the Cave Complex at Kothaligad, Taluka Karjat, Di...Preliminary Explorations at the Cave Complex at Kothaligad, Taluka Karjat, Di...
Preliminary Explorations at the Cave Complex at Kothaligad, Taluka Karjat, Di...
 
ABSTENCIONISTAS O BORREGOS
ABSTENCIONISTAS O BORREGOSABSTENCIONISTAS O BORREGOS
ABSTENCIONISTAS O BORREGOS
 
AWS Customer Presentation - Justin.tv
AWS Customer Presentation - Justin.tvAWS Customer Presentation - Justin.tv
AWS Customer Presentation - Justin.tv
 
IIJlab seminar - Linux Kernel Library: Reusable monolithic kernel (in Japanese)
IIJlab seminar - Linux Kernel Library: Reusable monolithic kernel (in Japanese)IIJlab seminar - Linux Kernel Library: Reusable monolithic kernel (in Japanese)
IIJlab seminar - Linux Kernel Library: Reusable monolithic kernel (in Japanese)
 
Poptrie: A Compressed Trie with Population Count for Fast and Scalable Softwa...
Poptrie: A Compressed Trie with Population Count for Fast and Scalable Softwa...Poptrie: A Compressed Trie with Population Count for Fast and Scalable Softwa...
Poptrie: A Compressed Trie with Population Count for Fast and Scalable Softwa...
 
[Fintech in Asia] E-payments - Marvelstone Tech at SGX event
[Fintech in Asia] E-payments - Marvelstone Tech at SGX event[Fintech in Asia] E-payments - Marvelstone Tech at SGX event
[Fintech in Asia] E-payments - Marvelstone Tech at SGX event
 
IRNI IRISHA NAZLI (AA12114) PSM2
IRNI IRISHA NAZLI (AA12114) PSM2IRNI IRISHA NAZLI (AA12114) PSM2
IRNI IRISHA NAZLI (AA12114) PSM2
 
Un niño griego en clase
Un niño griego en claseUn niño griego en clase
Un niño griego en clase
 

Similar to How Idaho Power Company uses AURORAxmp

Inverted Energy: Diesel Generator Set Replacement
Inverted Energy: Diesel Generator Set Replacement Inverted Energy: Diesel Generator Set Replacement
Inverted Energy: Diesel Generator Set Replacement
Inverted2019
 
Solar Energy Assessment Report for 100 kWp of Bengaluru, Karnataka created by...
Solar Energy Assessment Report for 100 kWp of Bengaluru, Karnataka created by...Solar Energy Assessment Report for 100 kWp of Bengaluru, Karnataka created by...
Solar Energy Assessment Report for 100 kWp of Bengaluru, Karnataka created by...
Sayanti Sanyal
 
Development of a concept for the modular design and sizing of a pv ice making...
Development of a concept for the modular design and sizing of a pv ice making...Development of a concept for the modular design and sizing of a pv ice making...
Development of a concept for the modular design and sizing of a pv ice making...
Ricardo Faerron Guzmán
 
Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...
Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...
Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...
Sayanti Sanyal
 
Dual Axis Solar Tracker Using Microcontroller
Dual Axis Solar Tracker Using MicrocontrollerDual Axis Solar Tracker Using Microcontroller
Dual Axis Solar Tracker Using Microcontroller
IRJET Journal
 
Green Energy From Heat - Themo Electric Generation (TEG)
Green Energy From Heat  - Themo Electric Generation (TEG)Green Energy From Heat  - Themo Electric Generation (TEG)
Green Energy From Heat - Themo Electric Generation (TEG)
jamietpe
 
6.2_Integrated Design and Financial Model_Knapp_EPRI/SNL Microgrid
6.2_Integrated Design and Financial Model_Knapp_EPRI/SNL Microgrid6.2_Integrated Design and Financial Model_Knapp_EPRI/SNL Microgrid
6.2_Integrated Design and Financial Model_Knapp_EPRI/SNL Microgrid
Sandia National Laboratories: Energy & Climate: Renewables
 
The role of energy storage in planning our energy needs in the UAE
The role of energy storage in planning our energy needs in the UAEThe role of energy storage in planning our energy needs in the UAE
The role of energy storage in planning our energy needs in the UAE
ReedExhibitionsMiddl
 
A stand-alone, solar powered commercial bank with EV for public transport
A stand-alone, solar powered commercial bank with EV for public transportA stand-alone, solar powered commercial bank with EV for public transport
A stand-alone, solar powered commercial bank with EV for public transport
alatop007
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)
inventionjournals
 
EFFICACY OF NET METER IN ACE SOLAR POWER PLANT
EFFICACY OF NET METER IN ACE SOLAR POWER PLANTEFFICACY OF NET METER IN ACE SOLAR POWER PLANT
EFFICACY OF NET METER IN ACE SOLAR POWER PLANT
IRJET Journal
 
michaux-ppt.pptx
michaux-ppt.pptxmichaux-ppt.pptx
michaux-ppt.pptx
Tupapi16
 
Solar Energy Generation Potential on National Highways
Solar Energy Generation Potential on National HighwaysSolar Energy Generation Potential on National Highways
Solar Energy Generation Potential on National Highways
IRJET Journal
 
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Implementing Agreement (IA)
 
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)Projectproposalon10mwsolarpvpowerplant 160312085340 (2)
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)
Muzaffar Ahmad
 
Project Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power PlantProject Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power Plant
Vignesh Sekar
 
Project report-TATA Power
Project report-TATA PowerProject report-TATA Power
Project report-TATA PowerSHIVAM DWIVEDI
 
Scenario analysis of data centres in the Irish energy system
Scenario analysis of data centres in the Irish energy systemScenario analysis of data centres in the Irish energy system
Scenario analysis of data centres in the Irish energy system
IEA-ETSAP
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
IJERD Editor
 
Design of Stand-Alone Solar PV System
Design of Stand-Alone Solar PV SystemDesign of Stand-Alone Solar PV System
Design of Stand-Alone Solar PV System
sangeetkhule
 

Similar to How Idaho Power Company uses AURORAxmp (20)

Inverted Energy: Diesel Generator Set Replacement
Inverted Energy: Diesel Generator Set Replacement Inverted Energy: Diesel Generator Set Replacement
Inverted Energy: Diesel Generator Set Replacement
 
Solar Energy Assessment Report for 100 kWp of Bengaluru, Karnataka created by...
Solar Energy Assessment Report for 100 kWp of Bengaluru, Karnataka created by...Solar Energy Assessment Report for 100 kWp of Bengaluru, Karnataka created by...
Solar Energy Assessment Report for 100 kWp of Bengaluru, Karnataka created by...
 
Development of a concept for the modular design and sizing of a pv ice making...
Development of a concept for the modular design and sizing of a pv ice making...Development of a concept for the modular design and sizing of a pv ice making...
Development of a concept for the modular design and sizing of a pv ice making...
 
Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...
Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...
Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...
 
Dual Axis Solar Tracker Using Microcontroller
Dual Axis Solar Tracker Using MicrocontrollerDual Axis Solar Tracker Using Microcontroller
Dual Axis Solar Tracker Using Microcontroller
 
Green Energy From Heat - Themo Electric Generation (TEG)
Green Energy From Heat  - Themo Electric Generation (TEG)Green Energy From Heat  - Themo Electric Generation (TEG)
Green Energy From Heat - Themo Electric Generation (TEG)
 
6.2_Integrated Design and Financial Model_Knapp_EPRI/SNL Microgrid
6.2_Integrated Design and Financial Model_Knapp_EPRI/SNL Microgrid6.2_Integrated Design and Financial Model_Knapp_EPRI/SNL Microgrid
6.2_Integrated Design and Financial Model_Knapp_EPRI/SNL Microgrid
 
The role of energy storage in planning our energy needs in the UAE
The role of energy storage in planning our energy needs in the UAEThe role of energy storage in planning our energy needs in the UAE
The role of energy storage in planning our energy needs in the UAE
 
A stand-alone, solar powered commercial bank with EV for public transport
A stand-alone, solar powered commercial bank with EV for public transportA stand-alone, solar powered commercial bank with EV for public transport
A stand-alone, solar powered commercial bank with EV for public transport
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)
 
EFFICACY OF NET METER IN ACE SOLAR POWER PLANT
EFFICACY OF NET METER IN ACE SOLAR POWER PLANTEFFICACY OF NET METER IN ACE SOLAR POWER PLANT
EFFICACY OF NET METER IN ACE SOLAR POWER PLANT
 
michaux-ppt.pptx
michaux-ppt.pptxmichaux-ppt.pptx
michaux-ppt.pptx
 
Solar Energy Generation Potential on National Highways
Solar Energy Generation Potential on National HighwaysSolar Energy Generation Potential on National Highways
Solar Energy Generation Potential on National Highways
 
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
 
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)Projectproposalon10mwsolarpvpowerplant 160312085340 (2)
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)
 
Project Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power PlantProject Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power Plant
 
Project report-TATA Power
Project report-TATA PowerProject report-TATA Power
Project report-TATA Power
 
Scenario analysis of data centres in the Irish energy system
Scenario analysis of data centres in the Irish energy systemScenario analysis of data centres in the Irish energy system
Scenario analysis of data centres in the Irish energy system
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
 
Design of Stand-Alone Solar PV System
Design of Stand-Alone Solar PV SystemDesign of Stand-Alone Solar PV System
Design of Stand-Alone Solar PV System
 

More from EPIS Inc

Final Seasonal Assessment of Resource Adequacy for the ERCOT Region, Summer 2...
Final Seasonal Assessment of Resource Adequacy for the ERCOT Region, Summer 2...Final Seasonal Assessment of Resource Adequacy for the ERCOT Region, Summer 2...
Final Seasonal Assessment of Resource Adequacy for the ERCOT Region, Summer 2...
EPIS Inc
 
Preliminary Seasonal Assessment of Resource Adequacy for the ERCOT Region, Su...
Preliminary Seasonal Assessment of Resource Adequacy for the ERCOT Region, Su...Preliminary Seasonal Assessment of Resource Adequacy for the ERCOT Region, Su...
Preliminary Seasonal Assessment of Resource Adequacy for the ERCOT Region, Su...
EPIS Inc
 
2015 Long-Term Reliability Assessment by NERC
2015 Long-Term Reliability Assessment by NERC2015 Long-Term Reliability Assessment by NERC
2015 Long-Term Reliability Assessment by NERC
EPIS Inc
 
2015 Summer Reliability Assessment by NERC
2015 Summer Reliability Assessment by NERC2015 Summer Reliability Assessment by NERC
2015 Summer Reliability Assessment by NERC
EPIS Inc
 
Nodal Insights for Generation Owners and Modeling with AURORAxmp
Nodal Insights for Generation Owners and Modeling with AURORAxmpNodal Insights for Generation Owners and Modeling with AURORAxmp
Nodal Insights for Generation Owners and Modeling with AURORAxmp
EPIS Inc
 
Using Historical Data To Fine-Tune AURORAxmp Predictive Capabilities
Using Historical Data To Fine-Tune  AURORAxmp Predictive CapabilitiesUsing Historical Data To Fine-Tune  AURORAxmp Predictive Capabilities
Using Historical Data To Fine-Tune AURORAxmp Predictive Capabilities
EPIS Inc
 
Southern Company History and Usage of AURORAxmp
Southern Company History and Usage of AURORAxmpSouthern Company History and Usage of AURORAxmp
Southern Company History and Usage of AURORAxmp
EPIS Inc
 
Day-Ahead LMP Forecasting with AURORAxmp
Day-Ahead LMP Forecasting with AURORAxmpDay-Ahead LMP Forecasting with AURORAxmp
Day-Ahead LMP Forecasting with AURORAxmp
EPIS Inc
 
Modeling and Valuing Cogeneration with AURORAxmp
Modeling and Valuing Cogeneration with AURORAxmpModeling and Valuing Cogeneration with AURORAxmp
Modeling and Valuing Cogeneration with AURORAxmp
EPIS Inc
 
What does wind really cost? Modeling Wind Resources In AURORAxmp.
What does wind really cost? Modeling Wind Resources In AURORAxmp. What does wind really cost? Modeling Wind Resources In AURORAxmp.
What does wind really cost? Modeling Wind Resources In AURORAxmp.
EPIS Inc
 

More from EPIS Inc (10)

Final Seasonal Assessment of Resource Adequacy for the ERCOT Region, Summer 2...
Final Seasonal Assessment of Resource Adequacy for the ERCOT Region, Summer 2...Final Seasonal Assessment of Resource Adequacy for the ERCOT Region, Summer 2...
Final Seasonal Assessment of Resource Adequacy for the ERCOT Region, Summer 2...
 
Preliminary Seasonal Assessment of Resource Adequacy for the ERCOT Region, Su...
Preliminary Seasonal Assessment of Resource Adequacy for the ERCOT Region, Su...Preliminary Seasonal Assessment of Resource Adequacy for the ERCOT Region, Su...
Preliminary Seasonal Assessment of Resource Adequacy for the ERCOT Region, Su...
 
2015 Long-Term Reliability Assessment by NERC
2015 Long-Term Reliability Assessment by NERC2015 Long-Term Reliability Assessment by NERC
2015 Long-Term Reliability Assessment by NERC
 
2015 Summer Reliability Assessment by NERC
2015 Summer Reliability Assessment by NERC2015 Summer Reliability Assessment by NERC
2015 Summer Reliability Assessment by NERC
 
Nodal Insights for Generation Owners and Modeling with AURORAxmp
Nodal Insights for Generation Owners and Modeling with AURORAxmpNodal Insights for Generation Owners and Modeling with AURORAxmp
Nodal Insights for Generation Owners and Modeling with AURORAxmp
 
Using Historical Data To Fine-Tune AURORAxmp Predictive Capabilities
Using Historical Data To Fine-Tune  AURORAxmp Predictive CapabilitiesUsing Historical Data To Fine-Tune  AURORAxmp Predictive Capabilities
Using Historical Data To Fine-Tune AURORAxmp Predictive Capabilities
 
Southern Company History and Usage of AURORAxmp
Southern Company History and Usage of AURORAxmpSouthern Company History and Usage of AURORAxmp
Southern Company History and Usage of AURORAxmp
 
Day-Ahead LMP Forecasting with AURORAxmp
Day-Ahead LMP Forecasting with AURORAxmpDay-Ahead LMP Forecasting with AURORAxmp
Day-Ahead LMP Forecasting with AURORAxmp
 
Modeling and Valuing Cogeneration with AURORAxmp
Modeling and Valuing Cogeneration with AURORAxmpModeling and Valuing Cogeneration with AURORAxmp
Modeling and Valuing Cogeneration with AURORAxmp
 
What does wind really cost? Modeling Wind Resources In AURORAxmp.
What does wind really cost? Modeling Wind Resources In AURORAxmp. What does wind really cost? Modeling Wind Resources In AURORAxmp.
What does wind really cost? Modeling Wind Resources In AURORAxmp.
 

Recently uploaded

zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex ProofszkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
Alex Pruden
 
Assure Contact Center Experiences for Your Customers With ThousandEyes
Assure Contact Center Experiences for Your Customers With ThousandEyesAssure Contact Center Experiences for Your Customers With ThousandEyes
Assure Contact Center Experiences for Your Customers With ThousandEyes
ThousandEyes
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
KAMESHS29
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Aggregage
 
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Nexer Digital
 
Enhancing Performance with Globus and the Science DMZ
Enhancing Performance with Globus and the Science DMZEnhancing Performance with Globus and the Science DMZ
Enhancing Performance with Globus and the Science DMZ
Globus
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
Laura Byrne
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
ControlCase
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Paige Cruz
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
Guy Korland
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
KatiaHIMEUR1
 
By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024
Pierluigi Pugliese
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
Adtran
 
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdfSAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
Peter Spielvogel
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Albert Hoitingh
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
James Anderson
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
Prayukth K V
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
Thijs Feryn
 
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance
 
A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...
sonjaschweigert1
 

Recently uploaded (20)

zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex ProofszkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
 
Assure Contact Center Experiences for Your Customers With ThousandEyes
Assure Contact Center Experiences for Your Customers With ThousandEyesAssure Contact Center Experiences for Your Customers With ThousandEyes
Assure Contact Center Experiences for Your Customers With ThousandEyes
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
 
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?
 
Enhancing Performance with Globus and the Science DMZ
Enhancing Performance with Globus and the Science DMZEnhancing Performance with Globus and the Science DMZ
Enhancing Performance with Globus and the Science DMZ
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
 
By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
 
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdfSAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
 
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
 
A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...
 

How Idaho Power Company uses AURORAxmp

  • 1. Integrated Resource Planning: - An Engineer’s Perspective October 25, 2013 J. James Peterson
  • 2. Road Map • Who we are – Company overview – Modeled system – Unique modeling challenges • Plan on uncertainty – Stochastic modeling techniques – Interfacing with SQL Server • Lessons learned
  • 3. Idaho Power Service Area and Resources
  • 6. Modeling Hydro in AURORA • 17 Hydro plants – Of these plants Brownlee, Oxbow and Hells Canyon are used to meet hourly load variations (load following) – All other facilities are modeled as “run of river” and are not used to meet hourly load variations • Stream flow forecasts – Reflect declining stream flows in the Snake River • Generation forecast from PDR580 – Monthly generation forecasts for each plant
  • 7. 2013 IRP: Brownlee Total Inflow Forecasted Flows 2013 - 2032 7.00 7.50 8.00 8.50 9.00 9.50 10.00 10.50 11.00 11.50 12.00 MillionsofAcre-Feet Brownlee Total Inflow Forecasted Flows 2013 - 2032 50% Exceedance 70% Exceedance 90% Exceedance
  • 8. Seasonal Reservoir Cycle 1860 1880 1900 1920 1940 1960 1980 2000 2020 2040 2060 2080 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000 55000 60000 10/1/2011 11/1/2011 12/1/2011 1/1/2012 2/1/2012 3/1/2012 4/1/2012 5/1/2012 6/1/2012 7/1/2012 8/1/2012 9/1/2012 BRNelevation(feet) flow(cfs) OUTFLOW INFLOW BRN ELEVATION
  • 9. AURORA HCC vs Observed HCC AURORA Output 2009 HCC Observed Nameplate Capacity
  • 10. Environmental Stewardship Integrated with Operations Above: Fall Chinook Salmon Redds
  • 15. Modeling Wind in AURORA • Monthly Generation Trends • Hourly Generation Trends The inherent variability of wind provides modeling challenges. For the 2013 IRP, wind is modeled based on 2009  2011 historical data for southern Idaho. Hourly generation data is scaled to better represent recently installed wind projects. Modeled PURPA wind projects have a combined nameplate capacity of approximately 576 MW. Upon analysis, trends were observed in the wind generation data. These hourly and monthly trends were used in the development of a12 month x 24 hour matrix of capacity factors. Capacity factors were then applied to the combined nameplate rating to produce wind generation values that reflect monthly and hourly variation in the wind. The AURORA simulation applies the generation values derived from the 12 month x 24 hour matrix. The same analysis was applied to the Elkhorn Valley wind project.
  • 16. 0 50 100 150 200 250 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 PURPAWindGeneration(MW) Hours in Day January February March April May June July August September October November December PURPA Wind by Month 2009  2011
  • 17. Alternative Modeling: Pumped Storage 0 500 1000 1500 2000 2500 3000 3500 4000 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 SystemGeneration(MWh) Hours in Day July 25, 2018: Peak Load = 3,437 MW On-PeakHours3-7PM Total Existing System: Generation, PPA & Market Purchases LL Wind Pumped Storage LL Wind Generation Removed (System Pumping)
  • 18. Alternative Modeling: Pumped Storage Hour January February March April May June July August September October November December 1 204,607 188,028 219,546 203,301 198,432 171,303 149,050 148,926 138,962 161,723 241,367 210,947 2 200,920 185,203 222,091 198,633 195,611 166,243 154,315 146,589 140,919 151,499 244,069 209,825 3 197,646 180,659 219,381 201,089 187,641 160,597 152,576 145,124 147,152 149,608 250,588 210,981 4 189,748 180,006 218,994 206,429 186,469 158,665 150,599 145,432 148,072 154,694 251,301 214,801 5 184,688 174,210 220,274 206,407 186,912 155,561 160,262 144,026 151,406 149,831 259,590 212,458 6 176,752 170,978 225,934 207,044 185,497 159,837 161,153 139,793 156,557 155,409 266,097 213,593 7 0 0 0 0 0 0 0 0 0 0 0 0 8 200,000 200,000 200,000 109,186 0 0 0 0 0 200,000 200,000 152,142 9 200,000 200,000 200,000 200,000 0 0 0 0 0 200,000 200,000 200,000 10 200,000 200,000 200,000 200,000 0 0 0 0 0 200,000 200,000 200,000 11 47,529 200,000 200,000 200,000 45,092 0 0 0 0 47,378 198,426 0 12 0 0 200,000 200,000 0 0 0 0 0 0 0 0 13 0 0 23,105 0 0 0 0 0 0 0 0 0 14 0 0 0 0 0 0 0 0 0 0 0 0 15 0 0 0 0 0 0 0 0 0 0 0 0 16 0 0 0 0 0 200,000 180,232 135,723 0 0 0 0 17 0 0 0 0 200,000 200,000 200,000 200,000 148,435 0 0 0 18 0 0 0 0 200,000 200,000 200,000 200,000 200,000 0 200,000 200,000 19 200,000 156,254 0 0 200,000 200,000 200,000 200,000 200,000 0 200,000 200,000 20 200,000 200,000 0 0 200,000 200,000 200,000 200,000 200,000 200,000 200,000 200,000 21 200,000 0 200,000 200,000 200,000 52,897 0 0 200,000 200,000 200,000 200,000 22 0 0 200,000 200,000 200,000 0 0 0 0 0 0 0 23 199,164 178,015 226,635 205,732 209,456 172,054 146,787 146,077 155,051 201,488 244,720 209,525 24 205,886 188,219 226,025 207,847 206,346 171,862 150,548 153,685 147,425 184,969 240,300 208,046 LL Wind Generation (kW) *System Pumping* HH Pumped Storage Generation (kW) *System Generating* LL Wind Generation (kW) *System Pumping* Represents wind energy being stored during off- peak hours Represents stored energy being discharged during on-peak hours (3-7 pm) Combined Wind Projects to Pumped Storage
  • 19. Alternative Modeling: Pumped Storage January February March April May June July August September October November December 19 9 9 11 22 19 19 19 21 20 19 19 9 8 10 9 19 18 18 18 19 21 20 20 20 10 8 10 18 17 17 17 18 9 8 18 10 20 11 21 21 16 20 20 20 10 9 21 8 11 21 12 20 20 16 16 17 8 21 9 21 19 12 22 17 21 21 21 16 11 10 10 11 21 22 8 11 15 15 15 22 22 18 8 18 12 13 20 12 22 22 22 15 12 11 11 12 22 7 13 16 14 14 14 14 19 22 22 22 7 20 19 13 13 13 13 13 13 12 12 13 13 14 18 14 12 23 12 12 14 13 13 7 18 19 14 15 23 12 23 11 18 7 17 Peak Load Hours (2013 IRP Forecast): Ranked Hours From Highest Load • Generation hours were selected based on hourly load ranking (highest to lowest) •Pumped storage plant generated at full capacity on these identified hours HourEnding
  • 20. Alternative Modeling: Pumped Storage • Reduce need for additional peak-hour capacity •Convert intermittent product into a firm product •Help integrate wind energy (possibly reduce wind integration charge)
  • 23. Applying Modeling Results • Alternative portfolios are layered over existing system configuration – Total portfolio costs are derived and compared – 20 year IRP planning period analyzed • AURORA Portfolio Costs Total portfolio cost = Resource cost + Contract purchases (ie. PURPA & PPA) + Market Purchases – Market Sales
  • 24. Stephen Hawking: A Brief History of Time • AURORA Portfolio Costs Total portfolio cost = Resource cost + Contract purchases (ie. PURPA & PPA) + Market Purchases – Market Sales Hawking noted that an editor warned him that for every equation in the book the readership would be halved.
  • 25. Stephen Hawking: A Brief History of Time • AURORA Portfolio Costs Total portfolio cost = Resource cost + Contract purchases (ie. PURPA & PPA) + Market Purchases – Market Sales Hawking noted that an editor warned him that for every equation in the book the readership would be halved DOUBLED.
  • 26. AURORA Stochastic Overview • Better Insight – The basic relationships of the electricity system are nonlinear. A stochastic analysis can lead to insights that might not otherwise be understood. These observed relationships change over time. • Uncertainty Analysis of Fundamental Drivers – Variability in the following drivers were studied: * Natural gas * Customer load * Hydroelectric variability * CO2 adder • Uses Common and Well-Known Techniques – The 2013 IRP stochastic studies were done using Latin-Hypercube sampling. While not used, the Monte Carlo method is also an option. 26
  • 27. Two Methods For Examining Uncertainty in AURORA • Endogenous – AURORAxmp has the internal capability to specify distributions for select drivers/variables, and will generate samples from the statistical distributions using Monte Carlo or Latin Hypercube sampling. – It will also tabulate the input variables and specified results by iteration. • Exogenous – You can use an external Monte Carlo sampling application to generate input data for use in AURORAxmp. – The external source of data can be used to create samples for multiple studies where AURORAxmp is used as the electric market pricing engine. – AURORAxmp scripting or computational dataset capabilities can be used to modify the input data. Slide courtesy of EPIS 27
  • 28. Portfolios Analyzed • Portfolio 1 – B2H_DR_SCCT • Portfolio 2 – B2H_DR • Portfolio 6 – ICL_BSU: Coal Retirement • Portfolio 7 – Coal Conversion to NG • Portfolio 3 – DR_CCCT_SCCT • Portfolio 4 – CCCT_DR_CCCT • Portfolio 5 – CCCT_CCCT_DR * Refer to 2013 IRP for complete portfolio descriptions • Portfolio 8 (Valmy closure) – B2H_DR_CCCT • Portfolio 9 (Valmy closure) – CCCT_CCCT_SCCT
  • 29. Risk Factors Sampled • Customer Load (regional & local) – Normal Distribution – 50% Regional Correlation • Henry Hub Natural Gas Price – Log-normal Distribution – 65% Serial correlation • Hydro Generation (local and regional) – Normal Distribution – 50% Serial Correlation, 70% Regional Correlation • Carbon Adder – Low, Planning & High Scenarios – Stratified Sample
  • 30. Approach • Random draws performed on an annual basis • Each risk factor simultaneously employed • 102 Iterations performed for each of the 7 portfolios • NPV for 20 year period
  • 31. Stochastic Dispersion: P_0 P_1 P_2 P_3 P_4 P_5 P_6 P_7 $2,000,000 $4,000,000 $6,000,000 $8,000,000 $10,000,000 $12,000,000 $14,000,000 PortfolioNumber Total Portfolio Cost [2013 through 2032] (NPV 000s $) Stochastics: 1 Iteration Planning Carbon
  • 32. Stochastic Dispersion: P_0 P_1 P_2 P_3 P_4 P_5 P_6 P_7 $2,000,000 $4,000,000 $6,000,000 $8,000,000 $10,000,000 $12,000,000 $14,000,000 PortfolioNumber Total Portfolio Cost [2013 through 2032] (NPV 000s $) Stochastics: 3 Iiterations High Carbon Planning Carbon Low Carbon
  • 33. Stochastic Dispersion: P_0 P_1 P_2 P_3 P_4 P_5 P_6 P_7 $2,000,000 $4,000,000 $6,000,000 $8,000,000 $10,000,000 $12,000,000 $14,000,000 PortfolioNumber Total Portfolio Cost [2013 through 2032] (NPV 000s $) Stochastics: 12 Iiterations Low Carbon Planning Carbon High Carbon
  • 35. Stochastic Results 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% $0 $2,500,000 $5,000,000 $7,500,000 $10,000,000 ExceedanceProbability Total Portfolio Costs (2013 NPV $000s) Portfolio #1: B2H_DR_SCCT Portfolio #2: B2H_DR Portfolio #3: DR_CCCT_SCCT Portfolio #4: CCCT_DR_CCCT Portfolio #5: CCCT_CCCT_DR Portfolio #6: ICL_BSU Portfolio #7: Coal to NG Conversion Portfolio #8:B2H_DR_CCCT Portfolio #9:DR_CCCT_CCCT_SCCT
  • 36. Stochastic Results 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% $0 $2,500,000 $5,000,000 $7,500,000 $10,000,000 ExceedanceProbability Total PortfolioCosts (2013 NPV$000s) Portfolio #1: B2H_DR_SCCT Portfolio #2: B2H_DR Portfolio #3: DR_CCCT_SCCT Portfolio #4: CCCT_DR_CCCT Portfolio #5: CCCT_CCCT_DR Portfolio #6: ICL_BSU Portfolio #7: Coal to NG Conversion Portfolio #8:B2H_DR_CCCT Portfolio #9:DR_CCCT_CCCT_SCCT
  • 37. Another Stochastic Example $3,000,000 $4,000,000 $5,000,000 $6,000,000 $7,000,000 $8,000,000 $9,000,000 $10,000,000 -$5 $5 $15 $25 $35 $45 $55 TotalPortfolioCost(NPV2013$000s) 2018 Carbon Adder (Nominal$s) Stochastic Based - Carbon Adder Tipping Point Low Carbon Planning Carbon High CarbonPortfolio #6 (ICL_BSU) Portfolio #2 (B2H_DR) Low Carbon Planning Carbon High Carbon
  • 38. Another Stochastic Example $0 $20 $40 $60 $80 $100 $120 $140 $160 $180 $200 $0 $2 $4 $6 $8 $10 $12 $14 $16 $18 $20 $22 Mid-CMarketPrices($/MWh) Henry Hub Natural Gas Price ($/MMBtu) High Carbon Planning Carbon Low Carbon
  • 40. • AURORA – Latin Hyper-cube performed well – Flexibility for resource analysis – Serial and regional correlations of risk variables – Wide range of stochastic futures sampled in short time period • Mid-C market has quantifiable, non-linear trends – Stochastic modeling assists in the identification of trends Lessons Learned • SQL Server – Fast – Multiple users – Multiple instances of AURORA – Huge DB size capacity – Flexibility for queries