2015 Africa Rail Conference
Nigeria: Country Spotlight
By
ENGR. ADESEYI SIJUWADE, FNSE, FCILT
July, 2015
MANAGING DIRECTOR
NIGERIAN RAILWAY CORPORATION
Infrastructure Development Plan
Railway Development Programme
 Opportunities for Private Sector Participation
Conclusion
Overview
Infrastructure Development Plan
 The backbone of a nation’s economy is its
stock of infrastructure
 Typically, for developed countries,
infrastructure is responsible for about 70%
of GDP, but in Nigeria, infrastructure
accounts for only 35 - 40% of GDP
 The infrastructure gap of about
USD2.9trillion is intended to be closed over
the next 30 years
 To stimulate further growth and
diversification of the Nigerian economy,
attract foreign investment and enhance job
creation, the Federal Government came up
with the Vision 20:2020 roadmap.
Infrastructure Development Plan – Cont’d
• Nigeria’s Vision 20:2020 aims to promote sustained
and inclusive economic growth, and elevate
Nigeria’s economy to be among the top 20
economies in the world by the year 2020
• Inspired by Vision 20:2020 aspirations, the
National Integrated Infrastructure Master Plan
(NIIMP) was developed as an all inclusive
approach to infrastructure delivery.
• The NIIMP is a 30 year plan that covers “core”
infrastructure – Transport, Energy, ICT and Water
and others such as Agriculture, Mining, Housing
and Social Infrastructure with priority projects
outlined for the first 5 years of the plan
Infrastructure Development Plan: Focus on Rail
Vision 20:2020 - At least 40 million tons of freight by 2020.
Action Plans
RAIL • Rehabilitation of the existing narrow gauge rail (3500km network)
• Completion of the Ajaokuta-Warri standard gauge line.
• Rehabilitation of rail links within Nigeria’s main ports.
• Construction of mass transit rail lines in Lagos and Abuja.
• Construction of rail lines to link Inland Container Depots (ICDs) to sea ports
• Concession of the rail lines from Lagos to Kano and from Port Harcourt to Maiduguri.
• Expansion of the standard gauge network by 784km
NIIMP
Targets
RAIL • To invest about USD75B over the next 30 years which will include construction of over 6,000
kilometres of new standard gauge lines
• Link all major economic centres to the rail network
• Provide adequate rail infrastructure for even economic development of the country.
• Create an enabling environment for private sector participation in the provision of rail infrastructure.
Railway Development Programme - Background
The Nigeria Railway system is about 117years
old.
Between 1898 and 1964 Nigeria had built a
network of narrow gauge rail lines totaling
3505km.
In 1986, the Federal Government of Nigeria
commenced the construction of 326 km standard
gauge rail line phase 1 from Itakpe – Ajaokuta –
Warri.
However, for over two decades, the rail system
became comatose up till 2009 when the
government commenced implementation of a 25
year Strategic Vision to revive the sector
adopting a systematic dual approach.
This entails the rehabilitation of the entire
existing narrow gauge lines simultaneously with
the development of standard gauge lines.
In February, 2011 the Federal Government of
Nigeria commenced the construction of 187.5
km Abuja – Kaduna Standard gauge rail line.
HISTORICAL DEVELOPMENT OF
RAILWAYS IN NIGERIA
GOMBE – MAIDUGURI
1963 – 1964(302km)
BAUCHI – GOMBE
1961 – 1963(166km)
KURU – BAUCHI
1958 – 1961(166km)
KADUNA JUNCTION -
KAFANCHAN 1922 –
1927(179km)
ENUGU-MAKURDI
1916 – 1924(220km)
PH - ENUGU
1914 – 1916(243km)
KANO - BARO
1907 –1911(562km)
JEBBA - MINNA
1909 -1915(225km)
IBADAN - JEBBA
1901 –1909(295km)
LAGOS - IBADAN
1898 –1901(193km)
KAF – JOS OPENED 1927
(101km)
PH – ONNE ON-
GOING 19km
AJAOKUTA – WARRI
ONGOING (277km)
Railway Development Programme – Track Rehabilitation
 The rehabilitation of over 90% of the
entire 3500km narrow gauge network
throughout the country is near
completion.
 Rehabilitation of the Lagos to Kano,
and Port Harcourt to Gombe lines is
completed and passenger services and
haulage of goods along the lines have
since commenced.
 Rehabilitation of sidings and loop lines
along the Western line, including links
to key industrial locations between
Lagos and Kano and a spur line to the
Kaduna Power Plant Complex is
expected to be completed by end of
2015.
Railway Development Programme – Update on
Rehabilitation Projects
Contract Distance Contractor Physical Progress
Track & Signalling – Western Line (Lagos –Jebba)
Lagos – Ibadan – Ilorin - Jebba
488km CCECC Nig. Ltd. 100%
Track & Signalling – Western Line (Jebba – Kano)
Jebba – Minna – Kaduna – Zaria - Kano
636km Costain (WA) Ltd 99.5%
Signalling & Telecoms – Eastern and Western Lines
Upgrading of Signalling Equipment
1,657km A3&O / Gear Group / Ansaldo 45%
Track– Eastern Line (PH – Makurdi)
PH – Umuahia – Enugu - Makurdi
463km Eser Contracting W. A 85%
Track – Eastern Line (Makurdi – Kuru, Plus Spur Jos &
Kafanchan)
Makurdi – Lafia – Kuru – Spur to Jos – Kafachan and Kaduna
554m CGGC 85%
Track – Eastern Line (Kuru – Maiduguri)
Kuru – Bauchi – Gombe - Maiduguri
640km Lingo 47%
Track – Zaria – Kaura Namoda
Zaria – Funtua – Gusau – Kaura Namoda
221km Duluidas 90%
Addendum to Lagos to Jebba Contract
Rehabilitation of Sidings & LoopLines from Lagos – Kano and
Lagos – Kano CCECC 65%
Railway Development Programme – Track Rehabilitation
Track Condition at Aba Before Rehabilitation
Akerri Bridge Before Rehabilitation Akerri Bridge After Rehabilitation
Track Condition at Aba After Rehabilitation
Railway Development Programme - Construction of New
Standard Gauge Lines
 Construction of the Itakpe – Ajaokuta –
Warri Standard Gauge line (277km) is in
progress and expected to be completed by
end of 2015.
 Construction of Abuja(Idu) – Kaduna
Standard gauge line (187km) is over 85%
also expected to be delivered end of 2015.
 Construction of Lagos – Ibadan Standard
Gauge (double track) 2 x 180km has been
awarded and will commence as soon as
funding arrangement is concluded with the
China Exim Bank by the Federal Ministry
of Finance.
Abuja - Kaduna
Itakpe – Ajaokuta – Warri
States Light Rail project
Various State Governments are
embarking on light rail projects to
address the urban transportation
challenges:
 Lagos State rail mass transit Blue
Line project is ongoing
 River State Mono-rail project in
Port Harcourt is about 95%
completed
 Ogun State has just award an
inter/intra state rail construction
project to the CCECC
 Abuja Light Rail project is nearing
completion
Blue Line, Lagos
Railway Development Programme - Locomotives and
Rolling Stock
FUNCTIONAL REPAIRABLE
LOCOMOTIVES
• Shunters
• Mainline
29 55
WAGONS
• Container
• Oil Tank
• Covered
• Hopper
• Wooden
250 550
COACHES
• Standard
• 1st Class
• Sleepers
• Canteen
• Inspection
• Baggage Vans
120 50
 Refurbished 250 wagons
 Refurbished 120coaches
 Procured 25Nos. 2500HP GE Locomotives
 Procured 4 Nos. 1800HP CNR Locomotives
 Procured 40Nos. Oil Tank Wagons
 Procured 2Nos. 100ton Telescopic Cranes
 Procured 4Nos. 60ton Overhead Cranes
 Procured 3 Nos. Inspection Vehicles
 Procured 5Nos. Rail Road Recovery Vehicles
 Procured 3 Nos. Wheel Lathe Machine, fully installed
 Procured 2 Sets of Diesel Multiple Units (DMU)
 Procured 11Nos. 68-Seater Air-conditioned Coaches
 Procured 18Nos. 4-Seater Motorized Rail Trolley
 Procured 2Nos. 16-Seater Rail Buses & 2Nos. Rail Cars
 Ordered 2Nos. 1800HP CNR Locomotives and 2Nos. Power Cars to be
delivered in 2015
 Ordered for 2Nos. 3,500 HP Locomotives with in-built power car and
5Nos. Air Conditioned Coaches for Standard Gauge Line to be
delivered in 2015
Railway Development Programme – Modernisation of
Locomotives & Rolling Stock
 NRC is moving towards localization and skills transfer
 Modernization of NRC’s existing, GE Transportation
U-series and other EMD series locomotives
 Modernisation of 60Nos. Flat Bed Wagons (Primarily
used for movement of bonded containers from Ports)
 Modernisation of 20Nos. Pan Xtra Goods (PXG)
Covered Wagons (Primarily used for movement of
bagged cement)
 Modernisation of 40Nos. Covered Hopper Wagon
(CHW) Primarily used for movement of Wheat
 Modernisation of 6Nos. Power Cars (Housing
generators that supply electricity for air-conditioning
and lighting in passenger coaches)
Railway Development Programme - Current Train Operations
• Passengers Service
Intra-city Mass Transit:
Lagos Mass Transit Train: 18 Trips per day,
Kaduna Intracity Mass : 10 Trips per day
Intercity Passenger Service:
Lagos – Kano –Lagos Train: twice per week,
Lagos-Ilorin-Lagos Train: thrice per week,
Offa – Kano - Offa Train: Once a week,
Minna – Kaduna – Minna Train: thrice per
week,
Kano – Nguru Train: twice per week,
Enugu – Port Harcourt – Enugu twice per week
Port Harcourt – Kafanchan once a week
Kaduna – Gombe – Kaduna once a week
Excursion Trains: Highly patronized during
festivities
Coming Soon: New Mixed Trains from Kano –
Port Harcourt , and Gombe to PH to commence in
July, 2015
• Freight Service
Flour Mills (Wheat) Traffic: Lagos to Kano,
carrying about 3,000 tons per month
Lafarge Cement Traffic, Lagos to Kano, carrying
about 3,000 tons monthly
Movement of containers for ICNL: Lagos to Kano
about 2,000 tons monthly
Track Materials for Eastern Line Contractors, about
9,000 tons monthly
Movement of Petroleum Products for NRC and
Connect rail: Lagos to Kano
Coming Soon – Container Traffic for APM, Lagos
to Kano
0
1 000 000
2 000 000
3 000 000
4 000 000
5 000 000
6 000 000
2009 2010 2011 2012 2013 2014
OPERATIONAL PERFORMANCE – PASSENGER SERVICES
Opportunities for Private Sector Participation - Projection Of
Train Services Over The Next 10 Years
Route 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Narrow Gauge
Eastern Line (PortHarcourt - Maiduguri)
Western Line (Lagos - Kano)
Standard Gauge
Itakpe - Ajaokuta - Warri
Abuja - Kaduna
Lagos - Ibadan
Zaria –Kaura Namoda- Birnin Konni
Ajaokuta(Eganyi) - Obajana - Abuja
Ajaokuta - Oturkpo - Onitsha
Eganyi(Near Ajaokuta) - Lokoja - Abaji -
Abuja
Lagos - Abuja (High Speed)
Opportunities for Private Sector Participation - Projected
Rolling Stock Requirement For The Next 10 Years
Rolling Stock 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 total
Locomotives
20 25 20 25 230 37 42 44 42 50 535
Coaches 100 100 100 100 846 200 200 100 100 200 2,046
Wagons 350 250 250 200 3,100 1,250 200 200 200 200 9,300
Opportunities for Private Sector Participation – PPP Initiatives
 Finance, Supply, and jointly manage with
NRC, utilization of wagons to enhance
freight haulage capacity
 Finance, Supply, and jointly manage with
NRC, utilization of coaches to enhance
passenger carriage capacity
 Design, Build, Maintain, Operate, and
Transfer (DBMOT) of Warehousing to
provide suitable, safe and secure storage
space for goods
 Finance, Supply, and Operate modern
facilities and provide services for loading
and offloading of goods
1) Logistics Services
Remodelling and Redevelopment of 9 Major Railway
Stations to incorporate Commercial Outlet
2) Station Remodelling and Redevelopment
 Development of 8Nos. Railway Landed Properties at
Prime locations for Residential, Hotel and other
Commercial purposes
3) Development of Railway Landed Properties
Outline Business Cases (OBC) for the 3 PPP
initiatives are being finalised by our
Transaction Advisers following which
Procurement Process for PPP Consortiums
will commence
S/N FEASIBILITY STUDIES COMPLETED
1 Lagos - Abuja (High Speed 550km)
2 Ajaokuta (Eganyi)-Obajana-Jakura-Baro-Abuja with additional line from Ajaokuta - Otukpo - to include the
Anyigba - Ejule - Idah - Adoru - Nsukka - Adani - Omor - Anaku - Aguleri - Nsugbe - Onitsha Rail Line (821km)
3 Zaria-Kaura Namoda-Sokoto- Illela -Birnin Konni (Niger Republic - 520km)
4 Benin-Agbor-Onitsha-Nnewi-Owerri-Aba with additional line from Onitsha-Enugu-Abakaliki (500km)
5 Eganyi(Near Ajaokuta) - Lokoja - Abaji - Abuja (280km)
FEASIBILITY STUDIES ON-GOING
6 Kano – Bichi - Katsina – Jibiya (354km)
7 Sokoto – Birnin Kebbi - Jega – Yauri - Makera with a branch line to Kontagora (408km)
8 Aba – Ikot Ekpene - Ibiono - Itu (Spur Uyo) Odukpani Calabar (340km)
9 Port Harcourt – Aba – Umuahia – Enugu – Makurdi – Lafia - Jos – Bauchi – Gombe- Biu - Maiduguri (1,552km)
10 Calabar -Ikom – Obudu – Ogoja – KatsinaAla – Wukari – Jalingo – Yola – Maiduguri (1,069km)
11 Kano – Nguru – Gashua – Damaturu – Maiduguri – Gamboru Ngala (707km)
Opportunities for Private Sector Participation – Greenfield Projects
20
Conclusion
Nigeria is making appreciable efforts to address its infrastructure challenges
The Federal Government has demonstrated great commitment towards
Revitalization and Modernization of the rail system
However, Government cannot fully address the Railway infrastructural challenges
without significant involvement of the private sector
The Government is making efforts to provide the enabling environment for
effective Private sector participation in the country’s rail sector - The Nigerian
Railway Corporation Act of 1955 is in the process of being repealed and re-
enacted. The draft Bill has been forwarded to the National Assembly.
Nigeria’s investment climate is currently very attractive hence the increase in the
FDI inflow in recent times
Now is the time to take advantage of the enormous opportunities in Nigeria Rail
Sector.
Thank you for Listening

More Related Content

What's hot

Electric Vehicles - State of play and policy framework
Electric Vehicles - State of play and policy frameworkElectric Vehicles - State of play and policy framework
Electric Vehicles - State of play and policy framework
Leonardo ENERGY
 
Ppt on DMRC
Ppt on DMRCPpt on DMRC
Ppt on DMRC
Urvashi Khandelwal
 
Electric Vehicles
Electric VehiclesElectric Vehicles
Electric Vehicles
Doga Ozden
 
Amsterdam City Logistics 2020
Amsterdam City Logistics 2020Amsterdam City Logistics 2020
Amsterdam City Logistics 2020
Walther Ploos van Amstel
 
Bharat mala project and pradhan mantri gram sadak
Bharat mala project and pradhan mantri gram sadakBharat mala project and pradhan mantri gram sadak
Bharat mala project and pradhan mantri gram sadak
ANIKETBAMBOLE1
 
Electric Vehicle Industry
Electric Vehicle IndustryElectric Vehicle Industry
How to plan for urban cycling (UKR) - 2017 Edition
How to plan for urban cycling (UKR) - 2017 EditionHow to plan for urban cycling (UKR) - 2017 Edition
How to plan for urban cycling (UKR) - 2017 Edition
velotransport
 
Urban Logistics
Urban LogisticsUrban Logistics
Urban Logistics
Remi Philippe
 
Bullet train project in india
Bullet train project in indiaBullet train project in india
Bullet train project in india
Dipen Bharadava
 
TRANSPORTE Y DESARROLLO URBANO METROVIA GUAYAQUIL
TRANSPORTE Y DESARROLLO URBANO  METROVIA  GUAYAQUIL TRANSPORTE Y DESARROLLO URBANO  METROVIA  GUAYAQUIL
TRANSPORTE Y DESARROLLO URBANO METROVIA GUAYAQUIL Fagner Glinski
 
PPT On High Speed Railways
PPT On High Speed RailwaysPPT On High Speed Railways
PPT On High Speed Railways
Nabh Agrawal
 
Public bicycle sharing
Public bicycle sharingPublic bicycle sharing
Analysis of Impact of East West Metro Corridor on Land Use
Analysis of Impact of East West Metro Corridor on Land UseAnalysis of Impact of East West Metro Corridor on Land Use
Analysis of Impact of East West Metro Corridor on Land UseAnirban Mahajan
 
Railway transportation 2.1
Railway transportation 2.1Railway transportation 2.1
Railway transportation 2.1Hasan Gunes
 
Presentation on bullet train
Presentation on bullet trainPresentation on bullet train
Presentation on bullet train
Krishna Mohan Mishra
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in indiaSourav Paul
 
Mobility and City Streets: Importance of Public Transport by OP Agarwal
Mobility and City Streets: Importance of Public Transport by OP AgarwalMobility and City Streets: Importance of Public Transport by OP Agarwal
Mobility and City Streets: Importance of Public Transport by OP Agarwal
WRI Ross Center for Sustainable Cities
 
Case Study on - Vadodara halol Toll road
Case Study on - Vadodara halol Toll roadCase Study on - Vadodara halol Toll road
Case Study on - Vadodara halol Toll road
Deepam patidar
 
Tram seminar ppt
Tram seminar pptTram seminar ppt
Tram seminar ppt
ashik ks
 
Electric vehicles in india in 2021
Electric vehicles in india in 2021Electric vehicles in india in 2021
Electric vehicles in india in 2021
Pratima Pandey
 

What's hot (20)

Electric Vehicles - State of play and policy framework
Electric Vehicles - State of play and policy frameworkElectric Vehicles - State of play and policy framework
Electric Vehicles - State of play and policy framework
 
Ppt on DMRC
Ppt on DMRCPpt on DMRC
Ppt on DMRC
 
Electric Vehicles
Electric VehiclesElectric Vehicles
Electric Vehicles
 
Amsterdam City Logistics 2020
Amsterdam City Logistics 2020Amsterdam City Logistics 2020
Amsterdam City Logistics 2020
 
Bharat mala project and pradhan mantri gram sadak
Bharat mala project and pradhan mantri gram sadakBharat mala project and pradhan mantri gram sadak
Bharat mala project and pradhan mantri gram sadak
 
Electric Vehicle Industry
Electric Vehicle IndustryElectric Vehicle Industry
Electric Vehicle Industry
 
How to plan for urban cycling (UKR) - 2017 Edition
How to plan for urban cycling (UKR) - 2017 EditionHow to plan for urban cycling (UKR) - 2017 Edition
How to plan for urban cycling (UKR) - 2017 Edition
 
Urban Logistics
Urban LogisticsUrban Logistics
Urban Logistics
 
Bullet train project in india
Bullet train project in indiaBullet train project in india
Bullet train project in india
 
TRANSPORTE Y DESARROLLO URBANO METROVIA GUAYAQUIL
TRANSPORTE Y DESARROLLO URBANO  METROVIA  GUAYAQUIL TRANSPORTE Y DESARROLLO URBANO  METROVIA  GUAYAQUIL
TRANSPORTE Y DESARROLLO URBANO METROVIA GUAYAQUIL
 
PPT On High Speed Railways
PPT On High Speed RailwaysPPT On High Speed Railways
PPT On High Speed Railways
 
Public bicycle sharing
Public bicycle sharingPublic bicycle sharing
Public bicycle sharing
 
Analysis of Impact of East West Metro Corridor on Land Use
Analysis of Impact of East West Metro Corridor on Land UseAnalysis of Impact of East West Metro Corridor on Land Use
Analysis of Impact of East West Metro Corridor on Land Use
 
Railway transportation 2.1
Railway transportation 2.1Railway transportation 2.1
Railway transportation 2.1
 
Presentation on bullet train
Presentation on bullet trainPresentation on bullet train
Presentation on bullet train
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
 
Mobility and City Streets: Importance of Public Transport by OP Agarwal
Mobility and City Streets: Importance of Public Transport by OP AgarwalMobility and City Streets: Importance of Public Transport by OP Agarwal
Mobility and City Streets: Importance of Public Transport by OP Agarwal
 
Case Study on - Vadodara halol Toll road
Case Study on - Vadodara halol Toll roadCase Study on - Vadodara halol Toll road
Case Study on - Vadodara halol Toll road
 
Tram seminar ppt
Tram seminar pptTram seminar ppt
Tram seminar ppt
 
Electric vehicles in india in 2021
Electric vehicles in india in 2021Electric vehicles in india in 2021
Electric vehicles in india in 2021
 

Viewers also liked

The NN2020 group high speed railway for Nigeria
The NN2020 group high speed railway for NigeriaThe NN2020 group high speed railway for Nigeria
The NN2020 group high speed railway for Nigeria
Chidi Obihara
 
The Strategic Importance of Railways in Africa. Overview of the Present Syste...
The Strategic Importance of Railways in Africa. Overview of the Present Syste...The Strategic Importance of Railways in Africa. Overview of the Present Syste...
The Strategic Importance of Railways in Africa. Overview of the Present Syste...
Chartered Institute of Logistics and Transport (International)
 
Growth through corridor and port development
Growth through corridor and port developmentGrowth through corridor and port development
Growth through corridor and port development
Tristan Wiggill
 
FEDERAL MINISTRY OF WORKS: TRANSFORMING NIGERIA ROADS, ACHIEVEMENTS AND CHALL...
FEDERAL MINISTRY OF WORKS: TRANSFORMING NIGERIA ROADS, ACHIEVEMENTS AND CHALL...FEDERAL MINISTRY OF WORKS: TRANSFORMING NIGERIA ROADS, ACHIEVEMENTS AND CHALL...
FEDERAL MINISTRY OF WORKS: TRANSFORMING NIGERIA ROADS, ACHIEVEMENTS AND CHALL...
Nigeria Centenary
 
SUSTAINABLE Biofuels INDUSTRY in Nigeria
SUSTAINABLE Biofuels INDUSTRY in NigeriaSUSTAINABLE Biofuels INDUSTRY in Nigeria
SUSTAINABLE Biofuels INDUSTRY in Nigeria
Nigeria Alternative Energy Expo
 

Viewers also liked (6)

Nigerija
NigerijaNigerija
Nigerija
 
The NN2020 group high speed railway for Nigeria
The NN2020 group high speed railway for NigeriaThe NN2020 group high speed railway for Nigeria
The NN2020 group high speed railway for Nigeria
 
The Strategic Importance of Railways in Africa. Overview of the Present Syste...
The Strategic Importance of Railways in Africa. Overview of the Present Syste...The Strategic Importance of Railways in Africa. Overview of the Present Syste...
The Strategic Importance of Railways in Africa. Overview of the Present Syste...
 
Growth through corridor and port development
Growth through corridor and port developmentGrowth through corridor and port development
Growth through corridor and port development
 
FEDERAL MINISTRY OF WORKS: TRANSFORMING NIGERIA ROADS, ACHIEVEMENTS AND CHALL...
FEDERAL MINISTRY OF WORKS: TRANSFORMING NIGERIA ROADS, ACHIEVEMENTS AND CHALL...FEDERAL MINISTRY OF WORKS: TRANSFORMING NIGERIA ROADS, ACHIEVEMENTS AND CHALL...
FEDERAL MINISTRY OF WORKS: TRANSFORMING NIGERIA ROADS, ACHIEVEMENTS AND CHALL...
 
SUSTAINABLE Biofuels INDUSTRY in Nigeria
SUSTAINABLE Biofuels INDUSTRY in NigeriaSUSTAINABLE Biofuels INDUSTRY in Nigeria
SUSTAINABLE Biofuels INDUSTRY in Nigeria
 

Similar to Nigeria rail industry

Ministry of Transport Report
Ministry of Transport ReportMinistry of Transport Report
Ministry of Transport Report
TransformNG
 
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar #MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar
FMINigeria
 
Mooc project -adeolu oketayo--23rd february 2022
Mooc project -adeolu oketayo--23rd february 2022Mooc project -adeolu oketayo--23rd february 2022
Mooc project -adeolu oketayo--23rd february 2022
ADEOLUOKETAYO1
 
Transpot system in India
Transpot system in IndiaTranspot system in India
Transpot system in India
Abhishek kumar Pandey
 
Dfc
DfcDfc
THE EAST AND CENTRAL AFRICA REGIONAL DEVELOPMENT. Why Kenya remain the hegemo...
THE EAST AND CENTRAL AFRICA REGIONAL DEVELOPMENT. Why Kenya remain the hegemo...THE EAST AND CENTRAL AFRICA REGIONAL DEVELOPMENT. Why Kenya remain the hegemo...
THE EAST AND CENTRAL AFRICA REGIONAL DEVELOPMENT. Why Kenya remain the hegemo...
Caroline Kinya Ikiriinya
 
Globalization and indian railways
Globalization and indian railwaysGlobalization and indian railways
Globalization and indian railways
Chitresh Shrivastva
 
Fmt
FmtFmt
project.pptx
project.pptxproject.pptx
project.pptx
AyeshaHassan91
 
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHARINDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
Bhavik khakhkhar
 
Development of Transport Infrastructure in Afghanistan
Development of Transport Infrastructure in AfghanistanDevelopment of Transport Infrastructure in Afghanistan
Development of Transport Infrastructure in Afghanistan
Hafizullah Sadat
 
INDIA - SURGING AHEAD
INDIA - SURGING AHEAD INDIA - SURGING AHEAD
INDIA - SURGING AHEAD
Vita Kravchuk
 
project.pptx
project.pptxproject.pptx
project.pptx
AyeshaHassan91
 
Rail budget highlights2011-12
Rail budget highlights2011-12Rail budget highlights2011-12
Rail budget highlights2011-12Nil Wahulkar
 
Pakistan railways
Pakistan railwaysPakistan railways
Pakistan railways
Aamir Soomro
 
09.02.1012 Sustaining the coal sector with the road and transportation policy...
09.02.1012 Sustaining the coal sector with the road and transportation policy...09.02.1012 Sustaining the coal sector with the road and transportation policy...
09.02.1012 Sustaining the coal sector with the road and transportation policy...
The Business Council of Mongolia
 
Investment outlook: what investors are looking for - John Meyer, SP Angel
Investment outlook: what investors are looking for - John Meyer, SP AngelInvestment outlook: what investors are looking for - John Meyer, SP Angel
Investment outlook: what investors are looking for - John Meyer, SP Angel
Mining On Top
 
Infrastructure
InfrastructureInfrastructure
Infrastructure
Amit Patidar
 
Railways Sector Report - July 2018
Railways Sector Report - July 2018Railways Sector Report - July 2018
Railways Sector Report - July 2018
India Brand Equity Foundation
 

Similar to Nigeria rail industry (20)

Ministry of Transport Report
Ministry of Transport ReportMinistry of Transport Report
Ministry of Transport Report
 
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar #MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar
#MP2013 Presentation of the Hon. Minister of Transport, Senator Idris Umar
 
Mooc project -adeolu oketayo--23rd february 2022
Mooc project -adeolu oketayo--23rd february 2022Mooc project -adeolu oketayo--23rd february 2022
Mooc project -adeolu oketayo--23rd february 2022
 
Transpot system in India
Transpot system in IndiaTranspot system in India
Transpot system in India
 
Dfc
DfcDfc
Dfc
 
THE EAST AND CENTRAL AFRICA REGIONAL DEVELOPMENT. Why Kenya remain the hegemo...
THE EAST AND CENTRAL AFRICA REGIONAL DEVELOPMENT. Why Kenya remain the hegemo...THE EAST AND CENTRAL AFRICA REGIONAL DEVELOPMENT. Why Kenya remain the hegemo...
THE EAST AND CENTRAL AFRICA REGIONAL DEVELOPMENT. Why Kenya remain the hegemo...
 
Globalization and indian railways
Globalization and indian railwaysGlobalization and indian railways
Globalization and indian railways
 
Fmt
FmtFmt
Fmt
 
project.pptx
project.pptxproject.pptx
project.pptx
 
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHARINDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
 
Development of Transport Infrastructure in Afghanistan
Development of Transport Infrastructure in AfghanistanDevelopment of Transport Infrastructure in Afghanistan
Development of Transport Infrastructure in Afghanistan
 
INDIA - SURGING AHEAD
INDIA - SURGING AHEAD INDIA - SURGING AHEAD
INDIA - SURGING AHEAD
 
logistics
logisticslogistics
logistics
 
project.pptx
project.pptxproject.pptx
project.pptx
 
Rail budget highlights2011-12
Rail budget highlights2011-12Rail budget highlights2011-12
Rail budget highlights2011-12
 
Pakistan railways
Pakistan railwaysPakistan railways
Pakistan railways
 
09.02.1012 Sustaining the coal sector with the road and transportation policy...
09.02.1012 Sustaining the coal sector with the road and transportation policy...09.02.1012 Sustaining the coal sector with the road and transportation policy...
09.02.1012 Sustaining the coal sector with the road and transportation policy...
 
Investment outlook: what investors are looking for - John Meyer, SP Angel
Investment outlook: what investors are looking for - John Meyer, SP AngelInvestment outlook: what investors are looking for - John Meyer, SP Angel
Investment outlook: what investors are looking for - John Meyer, SP Angel
 
Infrastructure
InfrastructureInfrastructure
Infrastructure
 
Railways Sector Report - July 2018
Railways Sector Report - July 2018Railways Sector Report - July 2018
Railways Sector Report - July 2018
 

More from Tristan Wiggill

Business Fleet Africa May 2023.pdf
Business Fleet Africa May 2023.pdfBusiness Fleet Africa May 2023.pdf
Business Fleet Africa May 2023.pdf
Tristan Wiggill
 
Business Fleet Africa April 2023.pdf
Business Fleet Africa April 2023.pdfBusiness Fleet Africa April 2023.pdf
Business Fleet Africa April 2023.pdf
Tristan Wiggill
 
Business Fleet Africa March 2023.pdf
Business Fleet Africa March 2023.pdfBusiness Fleet Africa March 2023.pdf
Business Fleet Africa March 2023.pdf
Tristan Wiggill
 
Business Fleet Africa January 2023.pdf
Business Fleet Africa January 2023.pdfBusiness Fleet Africa January 2023.pdf
Business Fleet Africa January 2023.pdf
Tristan Wiggill
 
Business Fleet Africa December 2022.pdf
Business Fleet Africa December 2022.pdfBusiness Fleet Africa December 2022.pdf
Business Fleet Africa December 2022.pdf
Tristan Wiggill
 
Business Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdfBusiness Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdf
Tristan Wiggill
 
Business Fleet Africa October 2022.pdf
Business Fleet Africa October 2022.pdfBusiness Fleet Africa October 2022.pdf
Business Fleet Africa October 2022.pdf
Tristan Wiggill
 
How do we keep Gauteng moving?
How do we keep Gauteng moving?How do we keep Gauteng moving?
How do we keep Gauteng moving?
Tristan Wiggill
 
Gauteng Transport Authority update
Gauteng Transport Authority updateGauteng Transport Authority update
Gauteng Transport Authority update
Tristan Wiggill
 
Road Funding in South Africa
Road Funding in South AfricaRoad Funding in South Africa
Road Funding in South Africa
Tristan Wiggill
 
Self regulation and road funding perspectives from the road transport managem...
Self regulation and road funding perspectives from the road transport managem...Self regulation and road funding perspectives from the road transport managem...
Self regulation and road funding perspectives from the road transport managem...
Tristan Wiggill
 
Roads: So how do we pay for them?
Roads: So how do we pay for them?Roads: So how do we pay for them?
Roads: So how do we pay for them?
Tristan Wiggill
 
Road funding from a freight forwarding and logistics perspective
Road funding from a freight forwarding and logistics perspectiveRoad funding from a freight forwarding and logistics perspective
Road funding from a freight forwarding and logistics perspective
Tristan Wiggill
 
Feedback on DRiVE: Distance-based Road user charge Voluntary Experiment
Feedback on DRiVE: Distance-based Road user charge Voluntary ExperimentFeedback on DRiVE: Distance-based Road user charge Voluntary Experiment
Feedback on DRiVE: Distance-based Road user charge Voluntary Experiment
Tristan Wiggill
 
E-tolls: The Impact on Development in Gauteng
E-tolls: The Impact on Development in GautengE-tolls: The Impact on Development in Gauteng
E-tolls: The Impact on Development in Gauteng
Tristan Wiggill
 
Transport and the economy: Understanding the relationship...and the dangers
Transport and the economy: Understanding the relationship...and the dangersTransport and the economy: Understanding the relationship...and the dangers
Transport and the economy: Understanding the relationship...and the dangers
Tristan Wiggill
 
Sout Africa's fuel price
Sout Africa's fuel priceSout Africa's fuel price
Sout Africa's fuel price
Tristan Wiggill
 
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
Tristan Wiggill
 
Beneficiaries of an optimally designed transportation system
Beneficiaries of an optimally designed transportation system Beneficiaries of an optimally designed transportation system
Beneficiaries of an optimally designed transportation system
Tristan Wiggill
 
Road Funds and Road User Charging in SADC
Road Funds and Road User Charging in SADC Road Funds and Road User Charging in SADC
Road Funds and Road User Charging in SADC
Tristan Wiggill
 

More from Tristan Wiggill (20)

Business Fleet Africa May 2023.pdf
Business Fleet Africa May 2023.pdfBusiness Fleet Africa May 2023.pdf
Business Fleet Africa May 2023.pdf
 
Business Fleet Africa April 2023.pdf
Business Fleet Africa April 2023.pdfBusiness Fleet Africa April 2023.pdf
Business Fleet Africa April 2023.pdf
 
Business Fleet Africa March 2023.pdf
Business Fleet Africa March 2023.pdfBusiness Fleet Africa March 2023.pdf
Business Fleet Africa March 2023.pdf
 
Business Fleet Africa January 2023.pdf
Business Fleet Africa January 2023.pdfBusiness Fleet Africa January 2023.pdf
Business Fleet Africa January 2023.pdf
 
Business Fleet Africa December 2022.pdf
Business Fleet Africa December 2022.pdfBusiness Fleet Africa December 2022.pdf
Business Fleet Africa December 2022.pdf
 
Business Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdfBusiness Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdf
 
Business Fleet Africa October 2022.pdf
Business Fleet Africa October 2022.pdfBusiness Fleet Africa October 2022.pdf
Business Fleet Africa October 2022.pdf
 
How do we keep Gauteng moving?
How do we keep Gauteng moving?How do we keep Gauteng moving?
How do we keep Gauteng moving?
 
Gauteng Transport Authority update
Gauteng Transport Authority updateGauteng Transport Authority update
Gauteng Transport Authority update
 
Road Funding in South Africa
Road Funding in South AfricaRoad Funding in South Africa
Road Funding in South Africa
 
Self regulation and road funding perspectives from the road transport managem...
Self regulation and road funding perspectives from the road transport managem...Self regulation and road funding perspectives from the road transport managem...
Self regulation and road funding perspectives from the road transport managem...
 
Roads: So how do we pay for them?
Roads: So how do we pay for them?Roads: So how do we pay for them?
Roads: So how do we pay for them?
 
Road funding from a freight forwarding and logistics perspective
Road funding from a freight forwarding and logistics perspectiveRoad funding from a freight forwarding and logistics perspective
Road funding from a freight forwarding and logistics perspective
 
Feedback on DRiVE: Distance-based Road user charge Voluntary Experiment
Feedback on DRiVE: Distance-based Road user charge Voluntary ExperimentFeedback on DRiVE: Distance-based Road user charge Voluntary Experiment
Feedback on DRiVE: Distance-based Road user charge Voluntary Experiment
 
E-tolls: The Impact on Development in Gauteng
E-tolls: The Impact on Development in GautengE-tolls: The Impact on Development in Gauteng
E-tolls: The Impact on Development in Gauteng
 
Transport and the economy: Understanding the relationship...and the dangers
Transport and the economy: Understanding the relationship...and the dangersTransport and the economy: Understanding the relationship...and the dangers
Transport and the economy: Understanding the relationship...and the dangers
 
Sout Africa's fuel price
Sout Africa's fuel priceSout Africa's fuel price
Sout Africa's fuel price
 
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
 
Beneficiaries of an optimally designed transportation system
Beneficiaries of an optimally designed transportation system Beneficiaries of an optimally designed transportation system
Beneficiaries of an optimally designed transportation system
 
Road Funds and Road User Charging in SADC
Road Funds and Road User Charging in SADC Road Funds and Road User Charging in SADC
Road Funds and Road User Charging in SADC
 

Recently uploaded

BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
PaulBryant58
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
HajeJanKamps
 
Filing Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed GuideFiling Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed Guide
YourLegal Accounting
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 

Recently uploaded (20)

BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
 
Filing Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed GuideFiling Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed Guide
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 

Nigeria rail industry

  • 1. 2015 Africa Rail Conference Nigeria: Country Spotlight By ENGR. ADESEYI SIJUWADE, FNSE, FCILT July, 2015 MANAGING DIRECTOR NIGERIAN RAILWAY CORPORATION
  • 2. Infrastructure Development Plan Railway Development Programme  Opportunities for Private Sector Participation Conclusion Overview
  • 3. Infrastructure Development Plan  The backbone of a nation’s economy is its stock of infrastructure  Typically, for developed countries, infrastructure is responsible for about 70% of GDP, but in Nigeria, infrastructure accounts for only 35 - 40% of GDP  The infrastructure gap of about USD2.9trillion is intended to be closed over the next 30 years  To stimulate further growth and diversification of the Nigerian economy, attract foreign investment and enhance job creation, the Federal Government came up with the Vision 20:2020 roadmap.
  • 4. Infrastructure Development Plan – Cont’d • Nigeria’s Vision 20:2020 aims to promote sustained and inclusive economic growth, and elevate Nigeria’s economy to be among the top 20 economies in the world by the year 2020 • Inspired by Vision 20:2020 aspirations, the National Integrated Infrastructure Master Plan (NIIMP) was developed as an all inclusive approach to infrastructure delivery. • The NIIMP is a 30 year plan that covers “core” infrastructure – Transport, Energy, ICT and Water and others such as Agriculture, Mining, Housing and Social Infrastructure with priority projects outlined for the first 5 years of the plan
  • 5. Infrastructure Development Plan: Focus on Rail Vision 20:2020 - At least 40 million tons of freight by 2020. Action Plans RAIL • Rehabilitation of the existing narrow gauge rail (3500km network) • Completion of the Ajaokuta-Warri standard gauge line. • Rehabilitation of rail links within Nigeria’s main ports. • Construction of mass transit rail lines in Lagos and Abuja. • Construction of rail lines to link Inland Container Depots (ICDs) to sea ports • Concession of the rail lines from Lagos to Kano and from Port Harcourt to Maiduguri. • Expansion of the standard gauge network by 784km NIIMP Targets RAIL • To invest about USD75B over the next 30 years which will include construction of over 6,000 kilometres of new standard gauge lines • Link all major economic centres to the rail network • Provide adequate rail infrastructure for even economic development of the country. • Create an enabling environment for private sector participation in the provision of rail infrastructure.
  • 6. Railway Development Programme - Background The Nigeria Railway system is about 117years old. Between 1898 and 1964 Nigeria had built a network of narrow gauge rail lines totaling 3505km. In 1986, the Federal Government of Nigeria commenced the construction of 326 km standard gauge rail line phase 1 from Itakpe – Ajaokuta – Warri. However, for over two decades, the rail system became comatose up till 2009 when the government commenced implementation of a 25 year Strategic Vision to revive the sector adopting a systematic dual approach. This entails the rehabilitation of the entire existing narrow gauge lines simultaneously with the development of standard gauge lines. In February, 2011 the Federal Government of Nigeria commenced the construction of 187.5 km Abuja – Kaduna Standard gauge rail line.
  • 7. HISTORICAL DEVELOPMENT OF RAILWAYS IN NIGERIA GOMBE – MAIDUGURI 1963 – 1964(302km) BAUCHI – GOMBE 1961 – 1963(166km) KURU – BAUCHI 1958 – 1961(166km) KADUNA JUNCTION - KAFANCHAN 1922 – 1927(179km) ENUGU-MAKURDI 1916 – 1924(220km) PH - ENUGU 1914 – 1916(243km) KANO - BARO 1907 –1911(562km) JEBBA - MINNA 1909 -1915(225km) IBADAN - JEBBA 1901 –1909(295km) LAGOS - IBADAN 1898 –1901(193km) KAF – JOS OPENED 1927 (101km) PH – ONNE ON- GOING 19km AJAOKUTA – WARRI ONGOING (277km)
  • 8. Railway Development Programme – Track Rehabilitation  The rehabilitation of over 90% of the entire 3500km narrow gauge network throughout the country is near completion.  Rehabilitation of the Lagos to Kano, and Port Harcourt to Gombe lines is completed and passenger services and haulage of goods along the lines have since commenced.  Rehabilitation of sidings and loop lines along the Western line, including links to key industrial locations between Lagos and Kano and a spur line to the Kaduna Power Plant Complex is expected to be completed by end of 2015.
  • 9. Railway Development Programme – Update on Rehabilitation Projects Contract Distance Contractor Physical Progress Track & Signalling – Western Line (Lagos –Jebba) Lagos – Ibadan – Ilorin - Jebba 488km CCECC Nig. Ltd. 100% Track & Signalling – Western Line (Jebba – Kano) Jebba – Minna – Kaduna – Zaria - Kano 636km Costain (WA) Ltd 99.5% Signalling & Telecoms – Eastern and Western Lines Upgrading of Signalling Equipment 1,657km A3&O / Gear Group / Ansaldo 45% Track– Eastern Line (PH – Makurdi) PH – Umuahia – Enugu - Makurdi 463km Eser Contracting W. A 85% Track – Eastern Line (Makurdi – Kuru, Plus Spur Jos & Kafanchan) Makurdi – Lafia – Kuru – Spur to Jos – Kafachan and Kaduna 554m CGGC 85% Track – Eastern Line (Kuru – Maiduguri) Kuru – Bauchi – Gombe - Maiduguri 640km Lingo 47% Track – Zaria – Kaura Namoda Zaria – Funtua – Gusau – Kaura Namoda 221km Duluidas 90% Addendum to Lagos to Jebba Contract Rehabilitation of Sidings & LoopLines from Lagos – Kano and Lagos – Kano CCECC 65%
  • 10. Railway Development Programme – Track Rehabilitation Track Condition at Aba Before Rehabilitation Akerri Bridge Before Rehabilitation Akerri Bridge After Rehabilitation Track Condition at Aba After Rehabilitation
  • 11. Railway Development Programme - Construction of New Standard Gauge Lines  Construction of the Itakpe – Ajaokuta – Warri Standard Gauge line (277km) is in progress and expected to be completed by end of 2015.  Construction of Abuja(Idu) – Kaduna Standard gauge line (187km) is over 85% also expected to be delivered end of 2015.  Construction of Lagos – Ibadan Standard Gauge (double track) 2 x 180km has been awarded and will commence as soon as funding arrangement is concluded with the China Exim Bank by the Federal Ministry of Finance. Abuja - Kaduna Itakpe – Ajaokuta – Warri
  • 12. States Light Rail project Various State Governments are embarking on light rail projects to address the urban transportation challenges:  Lagos State rail mass transit Blue Line project is ongoing  River State Mono-rail project in Port Harcourt is about 95% completed  Ogun State has just award an inter/intra state rail construction project to the CCECC  Abuja Light Rail project is nearing completion Blue Line, Lagos
  • 13. Railway Development Programme - Locomotives and Rolling Stock FUNCTIONAL REPAIRABLE LOCOMOTIVES • Shunters • Mainline 29 55 WAGONS • Container • Oil Tank • Covered • Hopper • Wooden 250 550 COACHES • Standard • 1st Class • Sleepers • Canteen • Inspection • Baggage Vans 120 50  Refurbished 250 wagons  Refurbished 120coaches  Procured 25Nos. 2500HP GE Locomotives  Procured 4 Nos. 1800HP CNR Locomotives  Procured 40Nos. Oil Tank Wagons  Procured 2Nos. 100ton Telescopic Cranes  Procured 4Nos. 60ton Overhead Cranes  Procured 3 Nos. Inspection Vehicles  Procured 5Nos. Rail Road Recovery Vehicles  Procured 3 Nos. Wheel Lathe Machine, fully installed  Procured 2 Sets of Diesel Multiple Units (DMU)  Procured 11Nos. 68-Seater Air-conditioned Coaches  Procured 18Nos. 4-Seater Motorized Rail Trolley  Procured 2Nos. 16-Seater Rail Buses & 2Nos. Rail Cars  Ordered 2Nos. 1800HP CNR Locomotives and 2Nos. Power Cars to be delivered in 2015  Ordered for 2Nos. 3,500 HP Locomotives with in-built power car and 5Nos. Air Conditioned Coaches for Standard Gauge Line to be delivered in 2015
  • 14. Railway Development Programme – Modernisation of Locomotives & Rolling Stock  NRC is moving towards localization and skills transfer  Modernization of NRC’s existing, GE Transportation U-series and other EMD series locomotives  Modernisation of 60Nos. Flat Bed Wagons (Primarily used for movement of bonded containers from Ports)  Modernisation of 20Nos. Pan Xtra Goods (PXG) Covered Wagons (Primarily used for movement of bagged cement)  Modernisation of 40Nos. Covered Hopper Wagon (CHW) Primarily used for movement of Wheat  Modernisation of 6Nos. Power Cars (Housing generators that supply electricity for air-conditioning and lighting in passenger coaches)
  • 15. Railway Development Programme - Current Train Operations • Passengers Service Intra-city Mass Transit: Lagos Mass Transit Train: 18 Trips per day, Kaduna Intracity Mass : 10 Trips per day Intercity Passenger Service: Lagos – Kano –Lagos Train: twice per week, Lagos-Ilorin-Lagos Train: thrice per week, Offa – Kano - Offa Train: Once a week, Minna – Kaduna – Minna Train: thrice per week, Kano – Nguru Train: twice per week, Enugu – Port Harcourt – Enugu twice per week Port Harcourt – Kafanchan once a week Kaduna – Gombe – Kaduna once a week Excursion Trains: Highly patronized during festivities Coming Soon: New Mixed Trains from Kano – Port Harcourt , and Gombe to PH to commence in July, 2015 • Freight Service Flour Mills (Wheat) Traffic: Lagos to Kano, carrying about 3,000 tons per month Lafarge Cement Traffic, Lagos to Kano, carrying about 3,000 tons monthly Movement of containers for ICNL: Lagos to Kano about 2,000 tons monthly Track Materials for Eastern Line Contractors, about 9,000 tons monthly Movement of Petroleum Products for NRC and Connect rail: Lagos to Kano Coming Soon – Container Traffic for APM, Lagos to Kano
  • 16. 0 1 000 000 2 000 000 3 000 000 4 000 000 5 000 000 6 000 000 2009 2010 2011 2012 2013 2014 OPERATIONAL PERFORMANCE – PASSENGER SERVICES
  • 17. Opportunities for Private Sector Participation - Projection Of Train Services Over The Next 10 Years Route 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Narrow Gauge Eastern Line (PortHarcourt - Maiduguri) Western Line (Lagos - Kano) Standard Gauge Itakpe - Ajaokuta - Warri Abuja - Kaduna Lagos - Ibadan Zaria –Kaura Namoda- Birnin Konni Ajaokuta(Eganyi) - Obajana - Abuja Ajaokuta - Oturkpo - Onitsha Eganyi(Near Ajaokuta) - Lokoja - Abaji - Abuja Lagos - Abuja (High Speed)
  • 18. Opportunities for Private Sector Participation - Projected Rolling Stock Requirement For The Next 10 Years Rolling Stock 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 total Locomotives 20 25 20 25 230 37 42 44 42 50 535 Coaches 100 100 100 100 846 200 200 100 100 200 2,046 Wagons 350 250 250 200 3,100 1,250 200 200 200 200 9,300
  • 19. Opportunities for Private Sector Participation – PPP Initiatives  Finance, Supply, and jointly manage with NRC, utilization of wagons to enhance freight haulage capacity  Finance, Supply, and jointly manage with NRC, utilization of coaches to enhance passenger carriage capacity  Design, Build, Maintain, Operate, and Transfer (DBMOT) of Warehousing to provide suitable, safe and secure storage space for goods  Finance, Supply, and Operate modern facilities and provide services for loading and offloading of goods 1) Logistics Services Remodelling and Redevelopment of 9 Major Railway Stations to incorporate Commercial Outlet 2) Station Remodelling and Redevelopment  Development of 8Nos. Railway Landed Properties at Prime locations for Residential, Hotel and other Commercial purposes 3) Development of Railway Landed Properties Outline Business Cases (OBC) for the 3 PPP initiatives are being finalised by our Transaction Advisers following which Procurement Process for PPP Consortiums will commence
  • 20. S/N FEASIBILITY STUDIES COMPLETED 1 Lagos - Abuja (High Speed 550km) 2 Ajaokuta (Eganyi)-Obajana-Jakura-Baro-Abuja with additional line from Ajaokuta - Otukpo - to include the Anyigba - Ejule - Idah - Adoru - Nsukka - Adani - Omor - Anaku - Aguleri - Nsugbe - Onitsha Rail Line (821km) 3 Zaria-Kaura Namoda-Sokoto- Illela -Birnin Konni (Niger Republic - 520km) 4 Benin-Agbor-Onitsha-Nnewi-Owerri-Aba with additional line from Onitsha-Enugu-Abakaliki (500km) 5 Eganyi(Near Ajaokuta) - Lokoja - Abaji - Abuja (280km) FEASIBILITY STUDIES ON-GOING 6 Kano – Bichi - Katsina – Jibiya (354km) 7 Sokoto – Birnin Kebbi - Jega – Yauri - Makera with a branch line to Kontagora (408km) 8 Aba – Ikot Ekpene - Ibiono - Itu (Spur Uyo) Odukpani Calabar (340km) 9 Port Harcourt – Aba – Umuahia – Enugu – Makurdi – Lafia - Jos – Bauchi – Gombe- Biu - Maiduguri (1,552km) 10 Calabar -Ikom – Obudu – Ogoja – KatsinaAla – Wukari – Jalingo – Yola – Maiduguri (1,069km) 11 Kano – Nguru – Gashua – Damaturu – Maiduguri – Gamboru Ngala (707km) Opportunities for Private Sector Participation – Greenfield Projects 20
  • 21. Conclusion Nigeria is making appreciable efforts to address its infrastructure challenges The Federal Government has demonstrated great commitment towards Revitalization and Modernization of the rail system However, Government cannot fully address the Railway infrastructural challenges without significant involvement of the private sector The Government is making efforts to provide the enabling environment for effective Private sector participation in the country’s rail sector - The Nigerian Railway Corporation Act of 1955 is in the process of being repealed and re- enacted. The draft Bill has been forwarded to the National Assembly. Nigeria’s investment climate is currently very attractive hence the increase in the FDI inflow in recent times Now is the time to take advantage of the enormous opportunities in Nigeria Rail Sector.
  • 22. Thank you for Listening