HIGHLIGHTS OF THE RAILWAY BUDGET 2011-12

Introduction

      Budget attempts to combine a strong economic focus with equal
      emphasis on social inclusion with a human face.

Policy Initiatives

      Railways have developed several business-oriented policies for the
      first time.
          o Railways’ Infrastructure for Industry Initiative (R3i)
          o Private Freight Terminal (PFT)
          o Special Freight Train Operators (SFTO)
          o Automobile Freight Train Operators (AFTO)
          o Automobile and Ancillary Hubs
          o Kisan Vision (Cold Chains)
          o New Catering Policy
          o Rail Connectivity to Coal and Iron Ore mines (R2CI)

      85 proposals received; Single Window System set up to take forward
      these proposals.

Rail Based Industries

      Setting up of rail-based industries for meeting demand for rolling
      stock.
      The works at New Jalpaiguri, Adra, Jellingham and Kulti taken up in
      collaboration with different PSUs.
      First coach from Rae Bareli coach factory to be rolled out in next
      three months.
      Projects for supply of locomotives, coaches & critical loco
      components being taken forward in many locations.
      Group of Officers working on PPP/JV project models.
      Work initiated at Budge Budge, Dankuni, Naopara, Anara, Tindharia,
      New Cooch Behar, Kharagpur, Haldia, Guwahati and Kazipet.
      Wagon factory in Orissa to taken up, once land identified.
      ICF Perambur’s second unit to come up.
      Setting up of Palakkad coach factory.
      Burn Standard Company Limited and Braithwaite Company Limited
      brought under Ministry of Railways.

                                   1
Setting up of a Bridge Factory in J&K and an Institute for Tunnel &
      Bridge Engineering at Jammu.
      Setting up of Metro Coach Factory in Singur.
      Setting up of a diesel locomotive centre in Manipur.
      Setting up of a Centre of Excellence in software at Darjeeling.
      Setting up of two wagon factories under JV/PPP mode at Kolar &
      Alappuzha and one at Buniadpur.
      Setting up of a factory for manufacturing on-track machines and a
      new track machine POH facility at Uluberia.
      Setting up of Rail Industrial Parks at Jellingham and New
      Bongaigaon.
      A unit to manufacture car steel bogies and couplers through JV
      between Burn Standard Co. Ltd and SAIL already initiated in
      Jellingham Park.
      Setting up of 700 MW gas-based power plant at Thakurli in
      Maharashtra.
      Setting up of additional mechanized laundry cleaning units at Nagpur,
      Chandigarh & Bhopal. In 23 locations laundries are under installatin.

Expansion of Rail Infrastructure

      700 km of new lines being completed in 2010-11
      800 km gauge conversion, 700 km doubling and 1,000 km
      electrification targetted for completion in 2010-11.
      Survey of 94 out of 114 socially desirable new lines completed.
      A new scheme ‘Pradhan Mantri Rail Vikas Yojana’ to start to fund
      socially desirable projects.
      Construction of 4 new lines to connect unserved and underserved
      regions.
      Increase in allocation of 19 projects in under-developed and under-
      served areas to Rs 771 cr.
      Non-lapsable fund for railway projects in North East region created.
      All state capitals in the North East except Sikkim to be connected in
      next 7 years.

Dignity to the Poor

      Provision of small shelter through Sukhi Griha Scheme to track side
      dwellers. 10,000 dwelling units to be provided in Mumbai, Sealdah,
      Siliguri, Tiruchirapalli etc on pilot basis.


                                    2
Annual Plan 2011-12

      Highest ever plan outlay of Rs 57,630 cr.

         o   Gross Budgetary Support Rs 20,000 cr
         o   Diesel Cess Rs 1,041 cr
         o   Internal Resources Rs 14,219 cr.
         o   Market Borrowing Rs 20,594 cr; PPP/WIS Rs 1,776 cr.

      1,300 km new lines, 867 km doubling, 1017 km gauge conversion
      targetted in 2011-12.
      Rs 9,583 cr provided for new lines, Rs 5,406 cr for doubling, Rs 2,470
      cr for gauge conversion and Rs 13,820 cr for acquisition of rolling
      stock.

Safety and Security

      Anti Collision Device (ACD) sanctioned to cover 8 zonal railways.
      All unmanned level crossings of TVU upto 3000 to be eliminated.
      Construction of 200 ROBs & 325 RUBs/subways.
      Deployment of GPS-based ‘Fog Safe’ device.
      Two new trains and two projects as a special package to states which
      ensure trouble free running of trains.
      All India Security Help line on a single number set up.


Green Initiatives

      2011-12 to be ‘Year of Green Energy’
      Regenerative braking in Mumbai EMUs.
      Production of locos with ‘hotel load converters’
      Use of solar energy at LC gates and stations, windmill at ICF
      Chennai.
      Use of bio-diesel, CNG and LNG in locos and workshops.
      Free supply of 14 lakh CFLs to railway households.

Passenger/Rail Users’ Amenities

      442 more stations upgraded as Adarsh Stations.
      236 more stations included in the list of Adarsh Stations
      More MFCs and Budget Hotels to be set up at 45 locations.
      Introduction of pan-India multi-purpose ‘Go India’ smart card.
                                     3
Two new passenger terminals in Kerala and one each in Uttar Pradesh
     & West Bengal.
     Better accessibility for physically challenged customers; extension of
     Rail Yatri Sevaks to six more stations.
     New portal for e-ticketing.
     Internet access on Howrah- Rajdhani Express on pilot basis.
     Extension of Train Management System to five stations.
     Introduction of advance booking of Retiring Rooms.
     Introduction of new super AC class of travel.
     Feasibility study with the help of Japan to raise speed of passenger
     trains to 160-200 kmph.

Staff Welfare

     Expanding the scope of Liberalized Active Retirement Scheme for
     Guaranteed Employment for safety category staff.
     Extending medical facilities to both dependent father & mother.
     Increasing the scholarship for girl child of group-D employees to
     Rs.1,200 pm.
     Setting up of Railway Vidyalaya Prabandhan Board.
     Provision of 20 Road Medical Vans.
     20 additional hostels for children of railway employees to be set up.

Training and Recruitment

     Recruitment for 1.75 lakh vacancies of group C & D initiated,
     including backlog of SC/ST quota.
     Mega recruitment drive on; 16,000 ex-servicemen to be inducted by
     end of March 2011.
     Training Center to be set up at Kharagpur.
     Three multi-disciplinary training centres to be set up with an exclusive
     international centre at Agra.
     New basic training centre at Kurseong.
     Five polytechnics to be set up.

Sports

     Railway sportsperson won 25 medals in the Commonwealth Games
     2010 and 7 out of 14 golds won by India in the Asian Games.
     A separate sports cadre to be created.


                                     4
Cultural Activities

      A special ‘Sanskriti Express’ exhibition train being run to
      commemorate the 150th Birth Anniversary of Gurudev Rabindranath
      Tagore is being run which will also go to Bangladesh.
      Running of Vivekananda Express to be extended for two more years.

Financial Performance 2010-11

      Disruption of train movement resulted in loss of Rs 1,500 cr and Rs
      2,000 cr due to ban on export of iron ore.
      Loading target reduced by 20 MT to 924 MT.
      Gross Traffic Receipts fixed at Rs 94,840 cr, higher by Rs 75 cr over
      Budget Estimates.
      Ordinary Working Expenses fixed at Rs 67,000 cr, an increase of Rs
      2,000 cr over Budget Estimate.
      Current dividend liability to be fully discharged.
      Excess of Rs 4,105 cr.
      Operating Ratio of 92.1% as compared to 92.3% in Budget Estimates.
      Revised Plan Outlay of Rs 40,315 cr.

Budget Estimates 2011-12

      Freight loading of 993 MT and passenger growth of 6.4%.
      Gross Traffic Receipts at Rs 1,06,239 cr to exceed one lakh crore
      mark for the first time.
      Ordinary Working Expenses assessed at Rs 73,650 cr.
      Appropriation to DRF at Rs 7000 cr.
      Provision of Rs 6,735 cr made for dividend payment.
      Excess at Rs 5,258 cr and Operating Ratio of 91.1%.

Metropolitan Projects

      Entire section from Mahanayak Uttam Kumar to Kavi Subhash
      commissioned in Kolkata.
      34 new services to be introduced in Kolkata Metro.
      Core committee set up to closely monitor progress of on-going works
      at four sections of Metro Railway Kolkata.
      Seven new surveys for new connectivity of Kolkata Metro Railway to
      be taken up.
      20-car MEMU trains introduced on Northern Railway.
      Development of Integrated Suburban Railway Network in large cities.
                                    5
Setting up of Kolkata Rail Vikas Corporation for upgrading entire
     suburban system of Kolkata.

Production Units

  • Capacity of DLW to be augmented to 300 locos

Concessions

     Concession to physically handicapped persons to be extended on
     Rajdhani and Shatabdi trains.
     Concession of 50% to press correspondents with family increased to
     twice a year.
     Concession to Kirti and Shaurya Chakra awardees to be extended to
     Rajdhani and Shatabdi trains.
     Facility of card passes to be extended to the parents of unmarried
     posthumous Param Vir Chakra & Ashok Chakra gallantry award
     winners.
     Senior citizen concession to be increased from 30% to 40% for men;
     women to get senior citizen concession from 58 years age.

Wagon Procurement

     Record procurement of 16,500 wagons being done in 2010-11.
     Target for 2011-12 kept at 18,000 wagons.

Dedicated Freight Corridors

     Main loan agreement for Phase I of Western Corridor of DFC signed
     with JICA.
     DFC project will be completed as scheduled.

New Lines / Gauge Conversion / Doubling

     27 sections of New Lines of about 700 km to be completed in 2010-
     11.
     800 km target for gauge conversion to be met with work being
     completed on 15 sections.
     700 km target of doubling to be met with completion of 52 sections.
     40 sections of New Lines covering 1,075 km targeted to be completed
     in 2011-12.

                                  6
A target of 1,017 km under Gauge conversion covering 20 sections
     has been fixed for 2011-12.
     Doubling of 35 sections covering 867 km to be done in 2011-12.
     190 surveys out of 251 surveys announced in 2009-10 and 2010-11 to
     be completed by March 2011.

Rail Tourism

     In partnership with Ministry of Tourism, station improvement is
     planned on 50:50 cost sharing basis at 24 stations.

Suburban Services

     47 additional services to be started for Mumbai suburban.
     107 suburban services in Mumbai area to be augmented from 9-car to
     12-car rakes.
     9 additional services to be run in Chennai area.
     50 new suburban services to be introduced in Kolkata area.
     Introduction of peak-time local to BBD Bagh from
     Bongaon/Krishnanagar.
     Two non-stop trains between Bardhman & Howrah to be introduced.
     10 additional services to be run in Secunderabad area and 83 suburban
     services to be augmented from 6-car to 9-car services.
     2 additional services to be run on Delhi-Ghaziabad section.

Trains

     9 new Duronto trains to be introduced.
     AC double decker services to be introduced on Jaipur-Delhi and
     Ahmedabad-Mumbai routes.
     3 new Shatabdis to be introduced.
     Frequency of 5 Durontos to be increased.
     4 Vivek Express trains to be introduced, to commemorate Swami
     Vivekananda.
     4 Kavi Guru Express trains to be introduced, on the occasion of 150th
     birth anniversary of Rabindra Nath Tagore.
     10 Rajya Rani Express trains connecting state capitals with important
     cities in respective states.
     To promote tourism, special tourist trains called ‘Janam Bhoomi
     Gaurav’ to be introduced on four routes.
     56 new express trains to be introduced.

                                   7
13 new passenger services, 22 DEMU services and 8 MEMU services
     are to be introduced.
     The run of 33 trains to be extended.
     Frequency of 17 trains to be increased.
     Special trains to be run to meet spikes in the demand for passenger
     traffic during vacations, festivals, melas etc.

Projects in 2011-12

     25 new line, 6 gauge conversion and 28 doubling projects are
     proposed to be taken up.
     A Central Organization for Project Implementation (COPI) with
     offices at Delhi, Kolkata, Mumbai and Bangalore proposed to be set
     up.
     107 new line surveys, 4 gauge conversion surveys and 16 doubling
     surveys are proposed to be taken up in 2011-12.
     In 2011-12, 1000 km route to be electrified.


                                 *****




                                  8

More Related Content

What's hot

Dedicated Freight corridor
Dedicated Freight corridorDedicated Freight corridor
Dedicated Freight corridorRupali Sharma
 
New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21Rajesh Prasad
 
Rail budget 2016 17 highlights
Rail budget 2016 17 highlightsRail budget 2016 17 highlights
Rail budget 2016 17 highlightsNeha Sharma
 
Dedicated Freight Corridor
Dedicated Freight CorridorDedicated Freight Corridor
Dedicated Freight CorridorSameer Dhurat
 
Highlights: Indian Railway Budget 2014-15
Highlights: Indian Railway Budget 2014-15Highlights: Indian Railway Budget 2014-15
Highlights: Indian Railway Budget 2014-15Jhunjhunwalas
 
Transportation & communication OF PAKISTAN PPT
Transportation & communication OF PAKISTAN PPTTransportation & communication OF PAKISTAN PPT
Transportation & communication OF PAKISTAN PPTABDUL SAMAD
 
Full Speech of the Minister for Railways 2016-17
Full Speech of the Minister for Railways 2016-17Full Speech of the Minister for Railways 2016-17
Full Speech of the Minister for Railways 2016-17News Nation
 
Indian Rail Budget 2016-2017
Indian Rail Budget 2016-2017Indian Rail Budget 2016-2017
Indian Rail Budget 2016-2017Pankaj Walia
 
Turnaround Of Railway Business Strategy
Turnaround Of Railway  Business StrategyTurnaround Of Railway  Business Strategy
Turnaround Of Railway Business Strategyshilpa sahithi
 
Railway budget 2015 in details
Railway budget  2015 in detailsRailway budget  2015 in details
Railway budget 2015 in detailsNone!
 
Transportation and communication of pakistan
Transportation and communication of pakistanTransportation and communication of pakistan
Transportation and communication of pakistanAwais Munir
 
Railway Budget 2015-16
Railway Budget 2015-16Railway Budget 2015-16
Railway Budget 2015-16EdelmanIndiaPA
 

What's hot (19)

Dedicated Freight corridor
Dedicated Freight corridorDedicated Freight corridor
Dedicated Freight corridor
 
New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21
 
Dfc ppt
Dfc pptDfc ppt
Dfc ppt
 
Rail budget 2016 17 highlights
Rail budget 2016 17 highlightsRail budget 2016 17 highlights
Rail budget 2016 17 highlights
 
Dedicated Freight Corridor
Dedicated Freight CorridorDedicated Freight Corridor
Dedicated Freight Corridor
 
Highlights: Indian Railway Budget 2014-15
Highlights: Indian Railway Budget 2014-15Highlights: Indian Railway Budget 2014-15
Highlights: Indian Railway Budget 2014-15
 
Railway
RailwayRailway
Railway
 
Rail budget 2011-12
Rail budget 2011-12Rail budget 2011-12
Rail budget 2011-12
 
Transportation & communication OF PAKISTAN PPT
Transportation & communication OF PAKISTAN PPTTransportation & communication OF PAKISTAN PPT
Transportation & communication OF PAKISTAN PPT
 
Railway Budget
Railway Budget Railway Budget
Railway Budget
 
Full Speech of the Minister for Railways 2016-17
Full Speech of the Minister for Railways 2016-17Full Speech of the Minister for Railways 2016-17
Full Speech of the Minister for Railways 2016-17
 
Railway pakistan
Railway pakistanRailway pakistan
Railway pakistan
 
Indian Rail Budget 2016-2017
Indian Rail Budget 2016-2017Indian Rail Budget 2016-2017
Indian Rail Budget 2016-2017
 
Turnaround Of Railway Business Strategy
Turnaround Of Railway  Business StrategyTurnaround Of Railway  Business Strategy
Turnaround Of Railway Business Strategy
 
Railway budget 2015 in details
Railway budget  2015 in detailsRailway budget  2015 in details
Railway budget 2015 in details
 
Dfc
DfcDfc
Dfc
 
Transportation and communication of pakistan
Transportation and communication of pakistanTransportation and communication of pakistan
Transportation and communication of pakistan
 
Railway Budget 2015-16
Railway Budget 2015-16Railway Budget 2015-16
Railway Budget 2015-16
 
India : Railways Sector Report_August 2013
India : Railways Sector Report_August 2013India : Railways Sector Report_August 2013
India : Railways Sector Report_August 2013
 

Viewers also liked

Strategic marketing and rural marketing
Strategic marketing and rural marketingStrategic marketing and rural marketing
Strategic marketing and rural marketingNil Wahulkar
 
DRUG ABUSE PREVENTION PRESENTATION
DRUG ABUSE PREVENTION PRESENTATIONDRUG ABUSE PREVENTION PRESENTATION
DRUG ABUSE PREVENTION PRESENTATIONHerdan Hermida
 
Drug Awareness Presentation
Drug Awareness PresentationDrug Awareness Presentation
Drug Awareness Presentationdengranai
 
Study: The Future of VR, AR and Self-Driving Cars
Study: The Future of VR, AR and Self-Driving CarsStudy: The Future of VR, AR and Self-Driving Cars
Study: The Future of VR, AR and Self-Driving CarsLinkedIn
 

Viewers also liked (6)

Rail way bugets
Rail way bugetsRail way bugets
Rail way bugets
 
Strategic marketing and rural marketing
Strategic marketing and rural marketingStrategic marketing and rural marketing
Strategic marketing and rural marketing
 
Rural marketing
Rural marketingRural marketing
Rural marketing
 
DRUG ABUSE PREVENTION PRESENTATION
DRUG ABUSE PREVENTION PRESENTATIONDRUG ABUSE PREVENTION PRESENTATION
DRUG ABUSE PREVENTION PRESENTATION
 
Drug Awareness Presentation
Drug Awareness PresentationDrug Awareness Presentation
Drug Awareness Presentation
 
Study: The Future of VR, AR and Self-Driving Cars
Study: The Future of VR, AR and Self-Driving CarsStudy: The Future of VR, AR and Self-Driving Cars
Study: The Future of VR, AR and Self-Driving Cars
 

Similar to Rail budget highlights2011-12

Railway budget 2011 12 by dilip bhavel
Railway budget 2011 12 by dilip bhavelRailway budget 2011 12 by dilip bhavel
Railway budget 2011 12 by dilip bhavelDilip253
 
Highlights of Railway Budget 2012-13
Highlights of Railway Budget 2012-13Highlights of Railway Budget 2012-13
Highlights of Railway Budget 2012-13Deep Das
 
Indain railway
Indain railwayIndain railway
Indain railwayMayur Bari
 
indian railways Presentation .
 indian railways Presentation . indian railways Presentation .
indian railways Presentation .Akash Gupta
 
Railway budget details
Railway budget detailsRailway budget details
Railway budget detailsNone!
 
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHARINDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHARBhavik khakhkhar
 
Indian Railway Infrastracture
Indian Railway InfrastractureIndian Railway Infrastracture
Indian Railway Infrastracturemaheshrotale
 
Rail Budget 2016-17
Rail Budget 2016-17 Rail Budget 2016-17
Rail Budget 2016-17 VIJAY KAMBOJ
 
Railway Recruitment Board (RRB)
Railway Recruitment Board (RRB)Railway Recruitment Board (RRB)
Railway Recruitment Board (RRB)Sunil Kumar Meena
 
Railway Budget2013 14-
Railway Budget2013 14-Railway Budget2013 14-
Railway Budget2013 14-Varun Kumar
 
Indian Rail Budget 2016-2017
Indian Rail Budget 2016-2017Indian Rail Budget 2016-2017
Indian Rail Budget 2016-2017Pankaj Walia
 
Opportunities in Railway construction- development operations of infrastructu...
Opportunities in Railway construction- development operations of infrastructu...Opportunities in Railway construction- development operations of infrastructu...
Opportunities in Railway construction- development operations of infrastructu...Rajesh Prasad
 

Similar to Rail budget highlights2011-12 (20)

Railway budget 2011 12 by dilip bhavel
Railway budget 2011 12 by dilip bhavelRailway budget 2011 12 by dilip bhavel
Railway budget 2011 12 by dilip bhavel
 
Highlights of Railway Budget 2012-13
Highlights of Railway Budget 2012-13Highlights of Railway Budget 2012-13
Highlights of Railway Budget 2012-13
 
Railway highlights
Railway highlightsRailway highlights
Railway highlights
 
Indain railway
Indain railwayIndain railway
Indain railway
 
indian railways Presentation .
 indian railways Presentation . indian railways Presentation .
indian railways Presentation .
 
Nl infrastructure aug 22 - aug 28, 2015
Nl infrastructure aug 22 - aug 28, 2015Nl infrastructure aug 22 - aug 28, 2015
Nl infrastructure aug 22 - aug 28, 2015
 
Railway budget details
Railway budget detailsRailway budget details
Railway budget details
 
Nl infrastructure sep 26 - oct 2, 2015
Nl infrastructure sep 26 - oct 2, 2015Nl infrastructure sep 26 - oct 2, 2015
Nl infrastructure sep 26 - oct 2, 2015
 
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHARINDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
 
Indian Railway Infrastracture
Indian Railway InfrastractureIndian Railway Infrastracture
Indian Railway Infrastracture
 
Nl infrastructure aug 29 - sept 4, 2015
Nl infrastructure aug 29 - sept 4, 2015Nl infrastructure aug 29 - sept 4, 2015
Nl infrastructure aug 29 - sept 4, 2015
 
Rail Budget 2016-17
Rail Budget 2016-17 Rail Budget 2016-17
Rail Budget 2016-17
 
Railway Recruitment Board (RRB)
Railway Recruitment Board (RRB)Railway Recruitment Board (RRB)
Railway Recruitment Board (RRB)
 
Railway Budget2013 14-
Railway Budget2013 14-Railway Budget2013 14-
Railway Budget2013 14-
 
Pk railway
Pk railwayPk railway
Pk railway
 
Pk railway
Pk railwayPk railway
Pk railway
 
The RVNL Story 2019
The RVNL Story 2019The RVNL Story 2019
The RVNL Story 2019
 
Indian Rail Budget 2016-2017
Indian Rail Budget 2016-2017Indian Rail Budget 2016-2017
Indian Rail Budget 2016-2017
 
Nl infrastructure aug 8 - 14, 2015
Nl infrastructure aug 8 - 14, 2015Nl infrastructure aug 8 - 14, 2015
Nl infrastructure aug 8 - 14, 2015
 
Opportunities in Railway construction- development operations of infrastructu...
Opportunities in Railway construction- development operations of infrastructu...Opportunities in Railway construction- development operations of infrastructu...
Opportunities in Railway construction- development operations of infrastructu...
 

Recently uploaded

Vendors of country report usefull datass
Vendors of country report usefull datassVendors of country report usefull datass
Vendors of country report usefull datassDilipParmar63
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanasabutalha2013
 
Cracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptxCracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptxWorkforce Group
 
Evolution and Growth of Supply chain.pdf
Evolution and Growth of Supply chain.pdfEvolution and Growth of Supply chain.pdf
Evolution and Growth of Supply chain.pdfGutaMengesha1
 
Byrd & Chen’s Canadian Tax Principles 2023-2024 Edition 1st edition Volumes I...
Byrd & Chen’s Canadian Tax Principles 2023-2024 Edition 1st edition Volumes I...Byrd & Chen’s Canadian Tax Principles 2023-2024 Edition 1st edition Volumes I...
Byrd & Chen’s Canadian Tax Principles 2023-2024 Edition 1st edition Volumes I...ssuserf63bd7
 
State of D2C in India: A Logistics Update
State of D2C in India: A Logistics UpdateState of D2C in India: A Logistics Update
State of D2C in India: A Logistics UpdateRedSeer
 
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product DiscoveryDesmond Leo
 
The Leading Cyber Security Entrepreneur of India in 2024.pdf
The Leading Cyber Security Entrepreneur of India in 2024.pdfThe Leading Cyber Security Entrepreneur of India in 2024.pdf
The Leading Cyber Security Entrepreneur of India in 2024.pdfinsightssuccess2
 
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdfSOFTTECHHUB
 
Using Generative AI for Content Marketing
Using Generative AI for Content MarketingUsing Generative AI for Content Marketing
Using Generative AI for Content MarketingChuck Aikens
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiaFalcon Invoice Discounting
 
Hyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings releaseHyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings releaseirhcs
 
IPTV Subscription UK: Your Guide to Choosing the Best Service
IPTV Subscription UK: Your Guide to Choosing the Best ServiceIPTV Subscription UK: Your Guide to Choosing the Best Service
IPTV Subscription UK: Your Guide to Choosing the Best ServiceDragon Dream Bar
 
LinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptxLinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptxSymbio Agency Ltd
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographerofm712785
 
The Inspiring Personality To Watch In 2024.pdf
The Inspiring Personality To Watch In 2024.pdfThe Inspiring Personality To Watch In 2024.pdf
The Inspiring Personality To Watch In 2024.pdfinsightssuccess2
 
New Product Development.kjiy7ggbfdsddggo9lo
New Product Development.kjiy7ggbfdsddggo9loNew Product Development.kjiy7ggbfdsddggo9lo
New Product Development.kjiy7ggbfdsddggo9logalbokkahewagenitash
 
Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corp.
 
Pitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deckPitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deckHajeJanKamps
 
Event Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybridEvent Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybridHolger Mueller
 

Recently uploaded (20)

Vendors of country report usefull datass
Vendors of country report usefull datassVendors of country report usefull datass
Vendors of country report usefull datass
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
Cracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptxCracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptx
 
Evolution and Growth of Supply chain.pdf
Evolution and Growth of Supply chain.pdfEvolution and Growth of Supply chain.pdf
Evolution and Growth of Supply chain.pdf
 
Byrd & Chen’s Canadian Tax Principles 2023-2024 Edition 1st edition Volumes I...
Byrd & Chen’s Canadian Tax Principles 2023-2024 Edition 1st edition Volumes I...Byrd & Chen’s Canadian Tax Principles 2023-2024 Edition 1st edition Volumes I...
Byrd & Chen’s Canadian Tax Principles 2023-2024 Edition 1st edition Volumes I...
 
State of D2C in India: A Logistics Update
State of D2C in India: A Logistics UpdateState of D2C in India: A Logistics Update
State of D2C in India: A Logistics Update
 
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
 
The Leading Cyber Security Entrepreneur of India in 2024.pdf
The Leading Cyber Security Entrepreneur of India in 2024.pdfThe Leading Cyber Security Entrepreneur of India in 2024.pdf
The Leading Cyber Security Entrepreneur of India in 2024.pdf
 
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf
12 Conversion Rate Optimization Strategies for Ecommerce Websites.pdf
 
Using Generative AI for Content Marketing
Using Generative AI for Content MarketingUsing Generative AI for Content Marketing
Using Generative AI for Content Marketing
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
Hyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings releaseHyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings release
 
IPTV Subscription UK: Your Guide to Choosing the Best Service
IPTV Subscription UK: Your Guide to Choosing the Best ServiceIPTV Subscription UK: Your Guide to Choosing the Best Service
IPTV Subscription UK: Your Guide to Choosing the Best Service
 
LinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptxLinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptx
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
The Inspiring Personality To Watch In 2024.pdf
The Inspiring Personality To Watch In 2024.pdfThe Inspiring Personality To Watch In 2024.pdf
The Inspiring Personality To Watch In 2024.pdf
 
New Product Development.kjiy7ggbfdsddggo9lo
New Product Development.kjiy7ggbfdsddggo9loNew Product Development.kjiy7ggbfdsddggo9lo
New Product Development.kjiy7ggbfdsddggo9lo
 
Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024
 
Pitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deckPitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deck
 
Event Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybridEvent Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybrid
 

Rail budget highlights2011-12

  • 1. HIGHLIGHTS OF THE RAILWAY BUDGET 2011-12 Introduction Budget attempts to combine a strong economic focus with equal emphasis on social inclusion with a human face. Policy Initiatives Railways have developed several business-oriented policies for the first time. o Railways’ Infrastructure for Industry Initiative (R3i) o Private Freight Terminal (PFT) o Special Freight Train Operators (SFTO) o Automobile Freight Train Operators (AFTO) o Automobile and Ancillary Hubs o Kisan Vision (Cold Chains) o New Catering Policy o Rail Connectivity to Coal and Iron Ore mines (R2CI) 85 proposals received; Single Window System set up to take forward these proposals. Rail Based Industries Setting up of rail-based industries for meeting demand for rolling stock. The works at New Jalpaiguri, Adra, Jellingham and Kulti taken up in collaboration with different PSUs. First coach from Rae Bareli coach factory to be rolled out in next three months. Projects for supply of locomotives, coaches & critical loco components being taken forward in many locations. Group of Officers working on PPP/JV project models. Work initiated at Budge Budge, Dankuni, Naopara, Anara, Tindharia, New Cooch Behar, Kharagpur, Haldia, Guwahati and Kazipet. Wagon factory in Orissa to taken up, once land identified. ICF Perambur’s second unit to come up. Setting up of Palakkad coach factory. Burn Standard Company Limited and Braithwaite Company Limited brought under Ministry of Railways. 1
  • 2. Setting up of a Bridge Factory in J&K and an Institute for Tunnel & Bridge Engineering at Jammu. Setting up of Metro Coach Factory in Singur. Setting up of a diesel locomotive centre in Manipur. Setting up of a Centre of Excellence in software at Darjeeling. Setting up of two wagon factories under JV/PPP mode at Kolar & Alappuzha and one at Buniadpur. Setting up of a factory for manufacturing on-track machines and a new track machine POH facility at Uluberia. Setting up of Rail Industrial Parks at Jellingham and New Bongaigaon. A unit to manufacture car steel bogies and couplers through JV between Burn Standard Co. Ltd and SAIL already initiated in Jellingham Park. Setting up of 700 MW gas-based power plant at Thakurli in Maharashtra. Setting up of additional mechanized laundry cleaning units at Nagpur, Chandigarh & Bhopal. In 23 locations laundries are under installatin. Expansion of Rail Infrastructure 700 km of new lines being completed in 2010-11 800 km gauge conversion, 700 km doubling and 1,000 km electrification targetted for completion in 2010-11. Survey of 94 out of 114 socially desirable new lines completed. A new scheme ‘Pradhan Mantri Rail Vikas Yojana’ to start to fund socially desirable projects. Construction of 4 new lines to connect unserved and underserved regions. Increase in allocation of 19 projects in under-developed and under- served areas to Rs 771 cr. Non-lapsable fund for railway projects in North East region created. All state capitals in the North East except Sikkim to be connected in next 7 years. Dignity to the Poor Provision of small shelter through Sukhi Griha Scheme to track side dwellers. 10,000 dwelling units to be provided in Mumbai, Sealdah, Siliguri, Tiruchirapalli etc on pilot basis. 2
  • 3. Annual Plan 2011-12 Highest ever plan outlay of Rs 57,630 cr. o Gross Budgetary Support Rs 20,000 cr o Diesel Cess Rs 1,041 cr o Internal Resources Rs 14,219 cr. o Market Borrowing Rs 20,594 cr; PPP/WIS Rs 1,776 cr. 1,300 km new lines, 867 km doubling, 1017 km gauge conversion targetted in 2011-12. Rs 9,583 cr provided for new lines, Rs 5,406 cr for doubling, Rs 2,470 cr for gauge conversion and Rs 13,820 cr for acquisition of rolling stock. Safety and Security Anti Collision Device (ACD) sanctioned to cover 8 zonal railways. All unmanned level crossings of TVU upto 3000 to be eliminated. Construction of 200 ROBs & 325 RUBs/subways. Deployment of GPS-based ‘Fog Safe’ device. Two new trains and two projects as a special package to states which ensure trouble free running of trains. All India Security Help line on a single number set up. Green Initiatives 2011-12 to be ‘Year of Green Energy’ Regenerative braking in Mumbai EMUs. Production of locos with ‘hotel load converters’ Use of solar energy at LC gates and stations, windmill at ICF Chennai. Use of bio-diesel, CNG and LNG in locos and workshops. Free supply of 14 lakh CFLs to railway households. Passenger/Rail Users’ Amenities 442 more stations upgraded as Adarsh Stations. 236 more stations included in the list of Adarsh Stations More MFCs and Budget Hotels to be set up at 45 locations. Introduction of pan-India multi-purpose ‘Go India’ smart card. 3
  • 4. Two new passenger terminals in Kerala and one each in Uttar Pradesh & West Bengal. Better accessibility for physically challenged customers; extension of Rail Yatri Sevaks to six more stations. New portal for e-ticketing. Internet access on Howrah- Rajdhani Express on pilot basis. Extension of Train Management System to five stations. Introduction of advance booking of Retiring Rooms. Introduction of new super AC class of travel. Feasibility study with the help of Japan to raise speed of passenger trains to 160-200 kmph. Staff Welfare Expanding the scope of Liberalized Active Retirement Scheme for Guaranteed Employment for safety category staff. Extending medical facilities to both dependent father & mother. Increasing the scholarship for girl child of group-D employees to Rs.1,200 pm. Setting up of Railway Vidyalaya Prabandhan Board. Provision of 20 Road Medical Vans. 20 additional hostels for children of railway employees to be set up. Training and Recruitment Recruitment for 1.75 lakh vacancies of group C & D initiated, including backlog of SC/ST quota. Mega recruitment drive on; 16,000 ex-servicemen to be inducted by end of March 2011. Training Center to be set up at Kharagpur. Three multi-disciplinary training centres to be set up with an exclusive international centre at Agra. New basic training centre at Kurseong. Five polytechnics to be set up. Sports Railway sportsperson won 25 medals in the Commonwealth Games 2010 and 7 out of 14 golds won by India in the Asian Games. A separate sports cadre to be created. 4
  • 5. Cultural Activities A special ‘Sanskriti Express’ exhibition train being run to commemorate the 150th Birth Anniversary of Gurudev Rabindranath Tagore is being run which will also go to Bangladesh. Running of Vivekananda Express to be extended for two more years. Financial Performance 2010-11 Disruption of train movement resulted in loss of Rs 1,500 cr and Rs 2,000 cr due to ban on export of iron ore. Loading target reduced by 20 MT to 924 MT. Gross Traffic Receipts fixed at Rs 94,840 cr, higher by Rs 75 cr over Budget Estimates. Ordinary Working Expenses fixed at Rs 67,000 cr, an increase of Rs 2,000 cr over Budget Estimate. Current dividend liability to be fully discharged. Excess of Rs 4,105 cr. Operating Ratio of 92.1% as compared to 92.3% in Budget Estimates. Revised Plan Outlay of Rs 40,315 cr. Budget Estimates 2011-12 Freight loading of 993 MT and passenger growth of 6.4%. Gross Traffic Receipts at Rs 1,06,239 cr to exceed one lakh crore mark for the first time. Ordinary Working Expenses assessed at Rs 73,650 cr. Appropriation to DRF at Rs 7000 cr. Provision of Rs 6,735 cr made for dividend payment. Excess at Rs 5,258 cr and Operating Ratio of 91.1%. Metropolitan Projects Entire section from Mahanayak Uttam Kumar to Kavi Subhash commissioned in Kolkata. 34 new services to be introduced in Kolkata Metro. Core committee set up to closely monitor progress of on-going works at four sections of Metro Railway Kolkata. Seven new surveys for new connectivity of Kolkata Metro Railway to be taken up. 20-car MEMU trains introduced on Northern Railway. Development of Integrated Suburban Railway Network in large cities. 5
  • 6. Setting up of Kolkata Rail Vikas Corporation for upgrading entire suburban system of Kolkata. Production Units • Capacity of DLW to be augmented to 300 locos Concessions Concession to physically handicapped persons to be extended on Rajdhani and Shatabdi trains. Concession of 50% to press correspondents with family increased to twice a year. Concession to Kirti and Shaurya Chakra awardees to be extended to Rajdhani and Shatabdi trains. Facility of card passes to be extended to the parents of unmarried posthumous Param Vir Chakra & Ashok Chakra gallantry award winners. Senior citizen concession to be increased from 30% to 40% for men; women to get senior citizen concession from 58 years age. Wagon Procurement Record procurement of 16,500 wagons being done in 2010-11. Target for 2011-12 kept at 18,000 wagons. Dedicated Freight Corridors Main loan agreement for Phase I of Western Corridor of DFC signed with JICA. DFC project will be completed as scheduled. New Lines / Gauge Conversion / Doubling 27 sections of New Lines of about 700 km to be completed in 2010- 11. 800 km target for gauge conversion to be met with work being completed on 15 sections. 700 km target of doubling to be met with completion of 52 sections. 40 sections of New Lines covering 1,075 km targeted to be completed in 2011-12. 6
  • 7. A target of 1,017 km under Gauge conversion covering 20 sections has been fixed for 2011-12. Doubling of 35 sections covering 867 km to be done in 2011-12. 190 surveys out of 251 surveys announced in 2009-10 and 2010-11 to be completed by March 2011. Rail Tourism In partnership with Ministry of Tourism, station improvement is planned on 50:50 cost sharing basis at 24 stations. Suburban Services 47 additional services to be started for Mumbai suburban. 107 suburban services in Mumbai area to be augmented from 9-car to 12-car rakes. 9 additional services to be run in Chennai area. 50 new suburban services to be introduced in Kolkata area. Introduction of peak-time local to BBD Bagh from Bongaon/Krishnanagar. Two non-stop trains between Bardhman & Howrah to be introduced. 10 additional services to be run in Secunderabad area and 83 suburban services to be augmented from 6-car to 9-car services. 2 additional services to be run on Delhi-Ghaziabad section. Trains 9 new Duronto trains to be introduced. AC double decker services to be introduced on Jaipur-Delhi and Ahmedabad-Mumbai routes. 3 new Shatabdis to be introduced. Frequency of 5 Durontos to be increased. 4 Vivek Express trains to be introduced, to commemorate Swami Vivekananda. 4 Kavi Guru Express trains to be introduced, on the occasion of 150th birth anniversary of Rabindra Nath Tagore. 10 Rajya Rani Express trains connecting state capitals with important cities in respective states. To promote tourism, special tourist trains called ‘Janam Bhoomi Gaurav’ to be introduced on four routes. 56 new express trains to be introduced. 7
  • 8. 13 new passenger services, 22 DEMU services and 8 MEMU services are to be introduced. The run of 33 trains to be extended. Frequency of 17 trains to be increased. Special trains to be run to meet spikes in the demand for passenger traffic during vacations, festivals, melas etc. Projects in 2011-12 25 new line, 6 gauge conversion and 28 doubling projects are proposed to be taken up. A Central Organization for Project Implementation (COPI) with offices at Delhi, Kolkata, Mumbai and Bangalore proposed to be set up. 107 new line surveys, 4 gauge conversion surveys and 16 doubling surveys are proposed to be taken up in 2011-12. In 2011-12, 1000 km route to be electrified. ***** 8