By: Mohamed Ahmed Said-Aamin
Student at Puntland State university
Email: caawiye254@gmail.com
Tell: +252907719668
 Objectives
 Definition of project and project management
 Characteristics of Project
 Constraints of project Management
 Nine Areas of project Management
 Project Life cycle
 Project phase
 Evaluation and Assessment
After end the lesson, you should able to:
 Define concept of project Management
 Identify stage of project life cycle
 Examine project assessment and evaluation
 A project is a temporary endeavor designed
to produce a unique product, service or result
with a defined beginning and end (usually
time-constrained, and often constrained by
funding or deliverables) undertaken to meet
unique goals and objectives, typically to bring
about beneficial change or added value.
 Project Management: is the application of
knowledge, skills, tools, and techniques to
project activities to meet project
requirements. Project Management is
accomplished through the use of the
processes such as: initiating, planning,
executing, controlling and closing.
 Objective: Each and every project needs to be guided
to achieve an objective or a set of objectives. It
ceases to exist when the objective is achieved.
 Life Span: A project has beginning and end. It cannot
continue forever.
 Constraints: A project has a schedule. It operates
within the constraints of time, cost and quality. Every
project requires certain investment of resources.
 Unique: Every project is unique. No two projects are
exactly similar.
 System: All projects need to undergo a system of
inputs-process - Outputs.
 Life Cycle: Every project will have its own phase-
based cycle.
 Teamwork: A project has many participants. It
requires teamwork under the leadership of the
Project Manager
 Organization Structure: A project is a temporary
organization. A project usually has its own
budget and management.
 Planning and Control System: A project requires
information, planning and control system. The
actual performance is compared with the planned
targets.
 Collection of Activities: A project is a collection of
activities that are linked together to constitute a
system.
They are nine knowledge areas
 Project scope
 Project time
 Project cost
 Project quality
 Project Human resource
 Project Communications
 Project risk
 Project procurement
 Project integration
Time
Cost
Quality
Scope
 Develop phase- initial phase, preparing
project charter
 Concept phase- project planning
 Execute phase- includes implementation,
conducting project activities
 Finish phase- conclusion of the project and
closing of project
 Initiation involves starting up the project, by documenting
a business case, feasibility study, and terms of reference,
appointing the team and setting up a Project Office.
 Planning involves setting out the roadmap for the project
by creating the following plans: project plan, resource
plan, financial plan, quality plan, acceptance plan and
communications plan.
 Execution involves building the deliverables and
controlling the project delivery, scope, costs, quality, risks
and issues.
 Monitoring and Evaluation: this is monitoring the
achievements of project objectives and goals
 Closure involves winding-down the project by releasing
staff, handing over deliverables to the customer and
completing a post implementation review.
Stages in project
cycle
Potential NGO’s Involvement
Project Identification
 Provide advice/information on local conditions
 Participate in environmental and social
assessment
 Organize consultations with
beneficiaries/Affected parties
 Transmit expressed needs/priorities of local
communities to project staff.
 Act as a source, model or sponsor of project
ideas implement pilot project.
Project design
 Consult to the government, to local
communities
 Assist in promoting a participatory approach to
project design
 Channel information to local population
Financing
 Co-financier( in money or in kind) of a project
component
 Source of funds for activities complementary to the
proposed donor- financed project.
Implementation
 Project contractor or manager( for delivery of service,
training, constrauction)
 Promote community participation in project activities
 Financial intermediary role
 Supplier of technical knowledge to local beneficiary
 Advisor to local communities on how to take advantage of
project-financed goods or service
 Implement of complementary activities
Monitoring and evaluation  NGO contracted to monitor project progress or evaluate
project results
 Facilitate participatory monitoring and evaluation
 Project selection methods help guide an
organizations decisions and weight them against
alternative projects. As a project manager or owner,
you will inevitably have to make decisions regarding
which projects to implement. As a team, you will
need to carefully analyze all of these contributing
factors (i.e: the goals of the organization, customer
requirements, timeframes, budget, urgency,
scheduling, etc..)
 Evidently, there are many stages that precedes this
critical one, all amounting to these decisions: Which
projects should we undertake? How do we
decide? These are very important questions to
explore, for the answers will ultimately influence the
project’s outcome.
What is a community involvement program?
 A community involvement program is a process in which
community participation is used to improve major decisions
during the planning, development and operational stages of a
housing project. A good community involvement program
contributes to the best possible development and operating
decisions.
Who is responsible for community involvement?
 Success will involve early identification of someone in your
organization who has responsibility for the community
involvement program. The amount of time required in this role
will vary according to the size and scope of the project. Smaller
projects may require only a few hours per week during planning
and construction stages, while larger or contentious projects
may require one or more days per week.
How do I develop a community involvement program?
 Based on good practice and the experiences of developers of
housing for homeless projects, HUA recommends 6 steps for
your community involvement program. See page 2 (over) for a
description of these steps.
Assessment
How Will I know if/When I have addressed the
Problem/Issue?
Assessment concept
 What is being learned?
 What is the Impact being made by instruction?
 What is working?
 What is not working?
Assessment – The systematic determination of the
results of an effort or intervention.
Rationale: Allows for the continuous improvement
of project components.
How Will I know how well I have addressed the
Problem/Issue?
Evaluation concept
 How well is the project working?
 How do you know that
 Value is/has being added?
 How valid are the
 Assessment measures?
 How effective are the
 Intervention strategies?
Assessment and Evaluation.
 Why? – A Requirement for “Accountability
 What? – Evidence that “Expectations have
been met”
 When? – Continuously to “Monitor Progress”
and at Designated Intervals to Ascertain
Success.
 How? – Varies, “Aligned with Needs”
 Evaluation is a systematic determination of a
subject's merit, worth and significance, using
criteria governed by a set of standards. It can
assist an organization, program, project or any
other intervention or initiative to assess any aim,
realisable concept/proposal, or any alternative,
to help in decision-making; or to ascertain the
degree of achievement or value in regard to the
aim and objectives and results of any such action
that has been completed. The primary purpose of
evaluation, in addition to gaining insight into
prior or existing initiatives, is to enable reflection
and assist in the identification of future change
 Selecting an evaluation type provides direction for your evaluation.
It helps keep the evaluation process focused on its main purpose
and determines the evaluation questions that should be answered
and the data that should be collected. The most common types of
evaluation are: formative, process, and summative.
 Formative evaluation is an ongoing evaluation that starts early in a
project. It assesses the nature of the project, the needs the project
addresses, and the progress and implementation of the project. It
can identify major gaps in the project’s content and operational
aspects (i.e., what was done and how) and suggest ways to
improve them.
 Process evaluation is used to monitor activities to make sure a
project is being implemented and completed as designed and on
time. It can be complementary to formative evaluation. Although
formative evaluation has a larger scope than process evaluation,
there are many similarities between them: both focus on the
effectiveness and the operational aspect of a project; both start at
a very early stage of a project and can be performed by internal
staff; and both require a strong monitoring mechanism to track
operational activities and to collect information related to the
process.
 Summative evaluation is an overall assessment of
the project’s effectiveness and achievements. It
reveals whether the project did what it was
designed to do. It provides information for future
planning and decisions and usually is completed
when the project is over. This type of evaluation
usually does not directly affect the current
project, but it helps stakeholders decide the
future of this or similar projects. To provide
adequate information, a summative evaluation
requires a set of well-defined goals and
objectives for the project and a plan that keeps
the focus of evaluation on the end-results.

More Related Content

What's hot

Project planning
Project planning Project planning
Project planning
Dipnarayan Thakur
 
Project monitoring
Project monitoringProject monitoring
Project monitoring
Krishna Mishra
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
Jo Balucanag - Bitonio
 
Project Implementation
Project ImplementationProject Implementation
Project Implementation
Shidin Divakar
 
Community Organization
Community OrganizationCommunity Organization
Community Organization
Dr. Purshottam Jaspa
 
Project formulation for social welfare in social welfare administration
Project formulation for social welfare in social welfare administrationProject formulation for social welfare in social welfare administration
Project formulation for social welfare in social welfare administration
PoojaSharma1336
 
Capacity Building: What it is and Why it Works!
Capacity Building: What it is  and Why it Works!Capacity Building: What it is  and Why it Works!
Capacity Building: What it is and Why it Works!
Aaron Holland-Plum
 
Difference between supervision and monitoring by sajjad awan
Difference between supervision and monitoring by sajjad awanDifference between supervision and monitoring by sajjad awan
Difference between supervision and monitoring by sajjad awanMalik Sajjad Ahmad Awan
 
MANAGEMENT OF SELF HELP GROUPS
MANAGEMENT OF SELF HELP GROUPSMANAGEMENT OF SELF HELP GROUPS
MANAGEMENT OF SELF HELP GROUPS
GK Dutta
 
Project Monitoring & Evaluation
Project Monitoring & EvaluationProject Monitoring & Evaluation
Project Monitoring & Evaluation
Srinivasan Rengasamy
 
unit 7:participatory project management concept and case of Nepal
unit 7:participatory project management concept and case of Nepalunit 7:participatory project management concept and case of Nepal
unit 7:participatory project management concept and case of Nepal
Roshan Pant
 
PRA & PLA Techniques for Collection of Qualitative Informations
PRA & PLA Techniques for Collection of Qualitative InformationsPRA & PLA Techniques for Collection of Qualitative Informations
PRA & PLA Techniques for Collection of Qualitative Informations
Mohammad Aslam Shaiekh
 
Project evaluation
Project evaluationProject evaluation
Project evaluation
Keshav Maheshwari
 
Project management tools and techniques
Project management tools and techniquesProject management tools and techniques
Project management tools and techniques
Tata Dinyuy
 
Project Monitoring and Evaluation
Project Monitoring and Evaluation Project Monitoring and Evaluation
Project Monitoring and Evaluation
Central University of Karnataka Kalaburagi
 
Scope and Process of Community Organization
Scope and Process of Community OrganizationScope and Process of Community Organization
Scope and Process of Community Organization
Dr. Purshottam Jaspa
 
Theory of Change
Theory of ChangeTheory of Change
Theory of Change
clearsateam
 
Monitoring and Evaluation for Project management.
Monitoring and Evaluation for Project management.Monitoring and Evaluation for Project management.
Monitoring and Evaluation for Project management.
Muthuraj K
 
Introduction to the Logical Framework Approach
Introduction to the Logical Framework ApproachIntroduction to the Logical Framework Approach
Introduction to the Logical Framework Approach
Damien Sweeney
 

What's hot (20)

Project planning
Project planning Project planning
Project planning
 
Project monitoring
Project monitoringProject monitoring
Project monitoring
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Project Implementation
Project ImplementationProject Implementation
Project Implementation
 
Community Organization
Community OrganizationCommunity Organization
Community Organization
 
Project formulation for social welfare in social welfare administration
Project formulation for social welfare in social welfare administrationProject formulation for social welfare in social welfare administration
Project formulation for social welfare in social welfare administration
 
Capacity Building: What it is and Why it Works!
Capacity Building: What it is  and Why it Works!Capacity Building: What it is  and Why it Works!
Capacity Building: What it is and Why it Works!
 
Difference between supervision and monitoring by sajjad awan
Difference between supervision and monitoring by sajjad awanDifference between supervision and monitoring by sajjad awan
Difference between supervision and monitoring by sajjad awan
 
Project evaluation
Project evaluationProject evaluation
Project evaluation
 
MANAGEMENT OF SELF HELP GROUPS
MANAGEMENT OF SELF HELP GROUPSMANAGEMENT OF SELF HELP GROUPS
MANAGEMENT OF SELF HELP GROUPS
 
Project Monitoring & Evaluation
Project Monitoring & EvaluationProject Monitoring & Evaluation
Project Monitoring & Evaluation
 
unit 7:participatory project management concept and case of Nepal
unit 7:participatory project management concept and case of Nepalunit 7:participatory project management concept and case of Nepal
unit 7:participatory project management concept and case of Nepal
 
PRA & PLA Techniques for Collection of Qualitative Informations
PRA & PLA Techniques for Collection of Qualitative InformationsPRA & PLA Techniques for Collection of Qualitative Informations
PRA & PLA Techniques for Collection of Qualitative Informations
 
Project evaluation
Project evaluationProject evaluation
Project evaluation
 
Project management tools and techniques
Project management tools and techniquesProject management tools and techniques
Project management tools and techniques
 
Project Monitoring and Evaluation
Project Monitoring and Evaluation Project Monitoring and Evaluation
Project Monitoring and Evaluation
 
Scope and Process of Community Organization
Scope and Process of Community OrganizationScope and Process of Community Organization
Scope and Process of Community Organization
 
Theory of Change
Theory of ChangeTheory of Change
Theory of Change
 
Monitoring and Evaluation for Project management.
Monitoring and Evaluation for Project management.Monitoring and Evaluation for Project management.
Monitoring and Evaluation for Project management.
 
Introduction to the Logical Framework Approach
Introduction to the Logical Framework ApproachIntroduction to the Logical Framework Approach
Introduction to the Logical Framework Approach
 

Similar to Ngo’s project management

Project monitoring-evaluation-sr-1223744598885201-9
Project monitoring-evaluation-sr-1223744598885201-9Project monitoring-evaluation-sr-1223744598885201-9
Project monitoring-evaluation-sr-1223744598885201-9Harinder Goel
 
A2011214171642 1
A2011214171642 1A2011214171642 1
A2011214171642 1
Sreejith Rajan P
 
PME- CH 1.pptx
PME- CH 1.pptxPME- CH 1.pptx
PME- CH 1.pptx
ermiasalex30
 
Project management
Project managementProject management
Project management
Biswa Prusty
 
Definations for Learning 24 July 2022 [Autosaved].pptx
Definations for Learning 24 July 2022 [Autosaved].pptxDefinations for Learning 24 July 2022 [Autosaved].pptx
Definations for Learning 24 July 2022 [Autosaved].pptx
InayatUllah780749
 
Project management
Project managementProject management
Project management
Er. BHUSHAN SARISE
 
M&E.ppt
M&E.pptM&E.ppt
M&E.ppt
selam49
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
HarsimratDeo1
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
HarsimratDeo1
 
unit-3.pptx
unit-3.pptxunit-3.pptx
unit-3.pptx
Prabin Pandit
 
Project Management How To
Project Management How ToProject Management How To
Project Management How To
kellyfrey
 
Assignment
Assignment Assignment
Assignment
BarryAllen147
 
Objectives of Project evaluation
Objectives of Project evaluationObjectives of Project evaluation
Objectives of Project evaluation
Robina Nasir
 
Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.ppt
GeorgeKabongah2
 
BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1
Imoh Etuk
 
Program or project management process report
Program or project management process report Program or project management process report
Program or project management process report Danes Ganancial
 
ACCA Chapter 12 and 13_ Accounting & Finance
ACCA Chapter 12 and 13_ Accounting & FinanceACCA Chapter 12 and 13_ Accounting & Finance
ACCA Chapter 12 and 13_ Accounting & Finance
scribdpebbly302
 
Construction Management in Developing Countries, Lecture 10
Construction Management in Developing Countries, Lecture 10Construction Management in Developing Countries, Lecture 10
Construction Management in Developing Countries, Lecture 10
Hari Krishna Shrestha
 
UNIT-1.pptx
UNIT-1.pptxUNIT-1.pptx
UNIT-1.pptx
Raja Manyam
 
Collaborative 2 ingrid margarita and sandra
Collaborative 2 ingrid margarita and sandraCollaborative 2 ingrid margarita and sandra
Collaborative 2 ingrid margarita and sandra
Sandra Guevara
 

Similar to Ngo’s project management (20)

Project monitoring-evaluation-sr-1223744598885201-9
Project monitoring-evaluation-sr-1223744598885201-9Project monitoring-evaluation-sr-1223744598885201-9
Project monitoring-evaluation-sr-1223744598885201-9
 
A2011214171642 1
A2011214171642 1A2011214171642 1
A2011214171642 1
 
PME- CH 1.pptx
PME- CH 1.pptxPME- CH 1.pptx
PME- CH 1.pptx
 
Project management
Project managementProject management
Project management
 
Definations for Learning 24 July 2022 [Autosaved].pptx
Definations for Learning 24 July 2022 [Autosaved].pptxDefinations for Learning 24 July 2022 [Autosaved].pptx
Definations for Learning 24 July 2022 [Autosaved].pptx
 
Project management
Project managementProject management
Project management
 
M&E.ppt
M&E.pptM&E.ppt
M&E.ppt
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
unit-3.pptx
unit-3.pptxunit-3.pptx
unit-3.pptx
 
Project Management How To
Project Management How ToProject Management How To
Project Management How To
 
Assignment
Assignment Assignment
Assignment
 
Objectives of Project evaluation
Objectives of Project evaluationObjectives of Project evaluation
Objectives of Project evaluation
 
Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.ppt
 
BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1
 
Program or project management process report
Program or project management process report Program or project management process report
Program or project management process report
 
ACCA Chapter 12 and 13_ Accounting & Finance
ACCA Chapter 12 and 13_ Accounting & FinanceACCA Chapter 12 and 13_ Accounting & Finance
ACCA Chapter 12 and 13_ Accounting & Finance
 
Construction Management in Developing Countries, Lecture 10
Construction Management in Developing Countries, Lecture 10Construction Management in Developing Countries, Lecture 10
Construction Management in Developing Countries, Lecture 10
 
UNIT-1.pptx
UNIT-1.pptxUNIT-1.pptx
UNIT-1.pptx
 
Collaborative 2 ingrid margarita and sandra
Collaborative 2 ingrid margarita and sandraCollaborative 2 ingrid margarita and sandra
Collaborative 2 ingrid margarita and sandra
 

Recently uploaded

Modern Database Management 12th Global Edition by Hoffer solution manual.docx
Modern Database Management 12th Global Edition by Hoffer solution manual.docxModern Database Management 12th Global Edition by Hoffer solution manual.docx
Modern Database Management 12th Global Edition by Hoffer solution manual.docx
ssuserf63bd7
 
W.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest ExperienceW.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest Experience
William (Bill) H. Bender, FCSI
 
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
gcljeuzdu
 
TCS AI for Business Study – Key Findings
TCS AI for Business Study – Key FindingsTCS AI for Business Study – Key Findings
TCS AI for Business Study – Key Findings
Tata Consultancy Services
 
Founder-Game Director Workshop (Session 1)
Founder-Game Director  Workshop (Session 1)Founder-Game Director  Workshop (Session 1)
Founder-Game Director Workshop (Session 1)
Amir H. Fassihi
 
Leadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact PlanLeadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact Plan
Muhammad Adil Jamil
 
Training- integrated management system (iso)
Training- integrated management system (iso)Training- integrated management system (iso)
Training- integrated management system (iso)
akaash13
 
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
CIOWomenMagazine
 
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
juniourjohnstone
 

Recently uploaded (9)

Modern Database Management 12th Global Edition by Hoffer solution manual.docx
Modern Database Management 12th Global Edition by Hoffer solution manual.docxModern Database Management 12th Global Edition by Hoffer solution manual.docx
Modern Database Management 12th Global Edition by Hoffer solution manual.docx
 
W.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest ExperienceW.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest Experience
 
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
 
TCS AI for Business Study – Key Findings
TCS AI for Business Study – Key FindingsTCS AI for Business Study – Key Findings
TCS AI for Business Study – Key Findings
 
Founder-Game Director Workshop (Session 1)
Founder-Game Director  Workshop (Session 1)Founder-Game Director  Workshop (Session 1)
Founder-Game Director Workshop (Session 1)
 
Leadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact PlanLeadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact Plan
 
Training- integrated management system (iso)
Training- integrated management system (iso)Training- integrated management system (iso)
Training- integrated management system (iso)
 
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...
 
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
 

Ngo’s project management

  • 1. By: Mohamed Ahmed Said-Aamin Student at Puntland State university Email: caawiye254@gmail.com Tell: +252907719668
  • 2.  Objectives  Definition of project and project management  Characteristics of Project  Constraints of project Management  Nine Areas of project Management  Project Life cycle  Project phase  Evaluation and Assessment
  • 3. After end the lesson, you should able to:  Define concept of project Management  Identify stage of project life cycle  Examine project assessment and evaluation
  • 4.  A project is a temporary endeavor designed to produce a unique product, service or result with a defined beginning and end (usually time-constrained, and often constrained by funding or deliverables) undertaken to meet unique goals and objectives, typically to bring about beneficial change or added value.
  • 5.  Project Management: is the application of knowledge, skills, tools, and techniques to project activities to meet project requirements. Project Management is accomplished through the use of the processes such as: initiating, planning, executing, controlling and closing.
  • 6.  Objective: Each and every project needs to be guided to achieve an objective or a set of objectives. It ceases to exist when the objective is achieved.  Life Span: A project has beginning and end. It cannot continue forever.  Constraints: A project has a schedule. It operates within the constraints of time, cost and quality. Every project requires certain investment of resources.  Unique: Every project is unique. No two projects are exactly similar.  System: All projects need to undergo a system of inputs-process - Outputs.  Life Cycle: Every project will have its own phase- based cycle.
  • 7.  Teamwork: A project has many participants. It requires teamwork under the leadership of the Project Manager  Organization Structure: A project is a temporary organization. A project usually has its own budget and management.  Planning and Control System: A project requires information, planning and control system. The actual performance is compared with the planned targets.  Collection of Activities: A project is a collection of activities that are linked together to constitute a system.
  • 8. They are nine knowledge areas  Project scope  Project time  Project cost  Project quality  Project Human resource  Project Communications  Project risk  Project procurement  Project integration
  • 10.  Develop phase- initial phase, preparing project charter  Concept phase- project planning  Execute phase- includes implementation, conducting project activities  Finish phase- conclusion of the project and closing of project
  • 11.  Initiation involves starting up the project, by documenting a business case, feasibility study, and terms of reference, appointing the team and setting up a Project Office.  Planning involves setting out the roadmap for the project by creating the following plans: project plan, resource plan, financial plan, quality plan, acceptance plan and communications plan.  Execution involves building the deliverables and controlling the project delivery, scope, costs, quality, risks and issues.  Monitoring and Evaluation: this is monitoring the achievements of project objectives and goals  Closure involves winding-down the project by releasing staff, handing over deliverables to the customer and completing a post implementation review.
  • 12. Stages in project cycle Potential NGO’s Involvement Project Identification  Provide advice/information on local conditions  Participate in environmental and social assessment  Organize consultations with beneficiaries/Affected parties  Transmit expressed needs/priorities of local communities to project staff.  Act as a source, model or sponsor of project ideas implement pilot project. Project design  Consult to the government, to local communities  Assist in promoting a participatory approach to project design  Channel information to local population
  • 13. Financing  Co-financier( in money or in kind) of a project component  Source of funds for activities complementary to the proposed donor- financed project. Implementation  Project contractor or manager( for delivery of service, training, constrauction)  Promote community participation in project activities  Financial intermediary role  Supplier of technical knowledge to local beneficiary  Advisor to local communities on how to take advantage of project-financed goods or service  Implement of complementary activities Monitoring and evaluation  NGO contracted to monitor project progress or evaluate project results  Facilitate participatory monitoring and evaluation
  • 14.  Project selection methods help guide an organizations decisions and weight them against alternative projects. As a project manager or owner, you will inevitably have to make decisions regarding which projects to implement. As a team, you will need to carefully analyze all of these contributing factors (i.e: the goals of the organization, customer requirements, timeframes, budget, urgency, scheduling, etc..)  Evidently, there are many stages that precedes this critical one, all amounting to these decisions: Which projects should we undertake? How do we decide? These are very important questions to explore, for the answers will ultimately influence the project’s outcome.
  • 15. What is a community involvement program?  A community involvement program is a process in which community participation is used to improve major decisions during the planning, development and operational stages of a housing project. A good community involvement program contributes to the best possible development and operating decisions. Who is responsible for community involvement?  Success will involve early identification of someone in your organization who has responsibility for the community involvement program. The amount of time required in this role will vary according to the size and scope of the project. Smaller projects may require only a few hours per week during planning and construction stages, while larger or contentious projects may require one or more days per week. How do I develop a community involvement program?  Based on good practice and the experiences of developers of housing for homeless projects, HUA recommends 6 steps for your community involvement program. See page 2 (over) for a description of these steps.
  • 16. Assessment How Will I know if/When I have addressed the Problem/Issue? Assessment concept  What is being learned?  What is the Impact being made by instruction?  What is working?  What is not working? Assessment – The systematic determination of the results of an effort or intervention. Rationale: Allows for the continuous improvement of project components.
  • 17. How Will I know how well I have addressed the Problem/Issue? Evaluation concept  How well is the project working?  How do you know that  Value is/has being added?  How valid are the  Assessment measures?  How effective are the  Intervention strategies?
  • 18. Assessment and Evaluation.  Why? – A Requirement for “Accountability  What? – Evidence that “Expectations have been met”  When? – Continuously to “Monitor Progress” and at Designated Intervals to Ascertain Success.  How? – Varies, “Aligned with Needs”
  • 19.  Evaluation is a systematic determination of a subject's merit, worth and significance, using criteria governed by a set of standards. It can assist an organization, program, project or any other intervention or initiative to assess any aim, realisable concept/proposal, or any alternative, to help in decision-making; or to ascertain the degree of achievement or value in regard to the aim and objectives and results of any such action that has been completed. The primary purpose of evaluation, in addition to gaining insight into prior or existing initiatives, is to enable reflection and assist in the identification of future change
  • 20.  Selecting an evaluation type provides direction for your evaluation. It helps keep the evaluation process focused on its main purpose and determines the evaluation questions that should be answered and the data that should be collected. The most common types of evaluation are: formative, process, and summative.  Formative evaluation is an ongoing evaluation that starts early in a project. It assesses the nature of the project, the needs the project addresses, and the progress and implementation of the project. It can identify major gaps in the project’s content and operational aspects (i.e., what was done and how) and suggest ways to improve them.  Process evaluation is used to monitor activities to make sure a project is being implemented and completed as designed and on time. It can be complementary to formative evaluation. Although formative evaluation has a larger scope than process evaluation, there are many similarities between them: both focus on the effectiveness and the operational aspect of a project; both start at a very early stage of a project and can be performed by internal staff; and both require a strong monitoring mechanism to track operational activities and to collect information related to the process.
  • 21.  Summative evaluation is an overall assessment of the project’s effectiveness and achievements. It reveals whether the project did what it was designed to do. It provides information for future planning and decisions and usually is completed when the project is over. This type of evaluation usually does not directly affect the current project, but it helps stakeholders decide the future of this or similar projects. To provide adequate information, a summative evaluation requires a set of well-defined goals and objectives for the project and a plan that keeps the focus of evaluation on the end-results.