Introduction
• This code deals with the planning, selection,
design considerations and installation of air
conditioning, heating and mechanical ventilation
system.
• Computerized weather data is now available and
has been included for around 60 locations across
the country covering all 5 climatic zones.
• Since the last revision of the Code in 2005, there
has seen tremendous emphasis on energy
conservation to meet the challenges posed by the
climatic change.
Scope
• This code aims to ensure an air conditioning,
heating and mechanical ventilation system by
managing air temperature, humidity, indoor air
quality.
• Distribution of conditional air for specific use.
• Occupancy of built space while giving
consideration to minimizing energy consumption
and other resources.
Refrigerants
Refrigerants are mainly classified as follows:-
• Based on toxicity they are classified into two types namely
class A, class B.
• Based on flammability they are classified into four types
namely class 1, class 2L, class 2, class 3.
Matrix Diagram of Safety Group Classification
System of refregirents
Planning
The planning includes the following considerations:
• Fundamental requirements.
• Design considerations.
• Equipment room for central air conditioning plant.
• Pipe shafts.
• Supply air ducts and return air ducts.
• Cooling tower.
• Energy efficiency.(Designers shall aim for energy
efficiency in buildings with the right blend of passive
and active design strategies )
Outdoor design conditions
• The outdoor design considerations are taken from table 2. For
cities not provided in the table interpolations are used
considering the climatic conditions.
• For normal comfort conditions, values under 1% column
should be used for cooling loads and 99% percent for heating
loads.
• For critical applications, values under 0.4% column should be
considered for cooling loads and 99.6% column for heating
loads.
Outdoor Design conditions
Indoor design conditions
• One of the primary objective of designing indoor
environment is to ensure thermal comfort of all occupants.
• HVAC is employed for same purpose only though building
design is limited.
• The following are the 4 environmental parameters which
are controlled by HVAC systems and are also controlled by it
1.Air temperature(C0).
2.Radiant temperature (C0).
3.Air speed (m/s).
4.Relative humidity (percent).
• The following are the 2 additional parameters which affect
thermal comfort but are not controllable
1.Activity rate (W/m2).
2.Clothing insulation (m2.K/W).
Design of air conditioning
• General.
• Design considerations.
• Factors to be considered for different applications.
Refrigeration for cold stores
• Key elements and components of cold room.
• Typical design inputs for a standard cold room.
• Importance of heat loads.
• Considerations for cold room selections.
• Installation and maintenance of cold room.
• Cold room safety.
Heating
• Various heating equipment / systems are:
• Hot water heated coils.
• Electrical heating.
• Solar water heating systems.
• Condenser heat recovery system.
• Heat pump.
• Ground source Heat pump.
Mechanical Ventilation
Tunnel ventilation system Underground car park ventilation system
Commercial kitchen ventilation.Industrial ventilation system
Installation of HVAC systems
• Installation of air conditioning systems.
• Installation of split air conditioners.
• Installation if VRF systems.
• Installation of mechanical ventilation system.
Symbols, units , color codes and
identification of services
• Color code is required for easy identification of various items
in an air conditioning installation for correct identification and
interpretation.
Nbc hvac ppt

More Related Content

What's hot

The british school design case study
The british school design case studyThe british school design case study
The british school design case study
Chandan kumar
 
3 star hotel 'green horizon' at ranchi
3 star hotel  'green horizon' at ranchi3 star hotel  'green horizon' at ranchi
3 star hotel 'green horizon' at ranchiSadanand Kumar
 
Office case study
Office case studyOffice case study
Office case study
Shourya Puri
 
vishwaja hyderabad climate
 vishwaja hyderabad climate vishwaja hyderabad climate
vishwaja hyderabad climate
Bellamkonda Vishwaja
 
Need of climate responsive measures for buildings
Need of climate responsive measures for buildingsNeed of climate responsive measures for buildings
Need of climate responsive measures for buildings
Sukhneet Kaur
 
Courtyard Effect (passive cooling technique)
Courtyard Effect (passive cooling technique)Courtyard Effect (passive cooling technique)
Courtyard Effect (passive cooling technique)
Drishty Ranjit
 
Double skin facade
Double skin facade Double skin facade
Double skin facade
DanishPathan7
 
Architectural features of composite climate in India
Architectural features of composite climate in IndiaArchitectural features of composite climate in India
Architectural features of composite climate in India
Rohit Bhatt
 
NBC NORMS FOR HVAC SYSTEMS
NBC NORMS FOR HVAC SYSTEMSNBC NORMS FOR HVAC SYSTEMS
NBC NORMS FOR HVAC SYSTEMS
asif anwar
 
Site Analysis
Site Analysis Site Analysis
Site Analysis
Khaled Almusa
 
Ground podium landscape concept
Ground podium landscape conceptGround podium landscape concept
Ground podium landscape concept
GTarun4
 
Nift Raebareli case study
Nift Raebareli case studyNift Raebareli case study
Nift Raebareli case study
Mahak Gupta
 
Composite climate and aurabindo ashramam,new delhi
Composite climate and aurabindo ashramam,new delhiComposite climate and aurabindo ashramam,new delhi
Composite climate and aurabindo ashramam,new delhi
padamatikona swapnika
 
7. Shading devices
7. Shading devices7. Shading devices
7. Shading devices
Rohit Kumar
 
DCR - Development Control Regulations - Professional Practice - Architecture ...
DCR - Development Control Regulations - Professional Practice - Architecture ...DCR - Development Control Regulations - Professional Practice - Architecture ...
DCR - Development Control Regulations - Professional Practice - Architecture ...
Sabarathinam Kuppan
 
HOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEHOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNE
jagrutib22
 
Swimming Pool Design
Swimming Pool DesignSwimming Pool Design
Swimming Pool Design
Charlene Borja
 
Architecture case study - IIM Ahemdabad
Architecture case study - IIM AhemdabadArchitecture case study - IIM Ahemdabad
Architecture case study - IIM Ahemdabad
Onal Kothari
 

What's hot (20)

The british school design case study
The british school design case studyThe british school design case study
The british school design case study
 
3 star hotel 'green horizon' at ranchi
3 star hotel  'green horizon' at ranchi3 star hotel  'green horizon' at ranchi
3 star hotel 'green horizon' at ranchi
 
Office case study
Office case studyOffice case study
Office case study
 
Group Housing Bye Laws
Group Housing Bye LawsGroup Housing Bye Laws
Group Housing Bye Laws
 
vishwaja hyderabad climate
 vishwaja hyderabad climate vishwaja hyderabad climate
vishwaja hyderabad climate
 
Need of climate responsive measures for buildings
Need of climate responsive measures for buildingsNeed of climate responsive measures for buildings
Need of climate responsive measures for buildings
 
Courtyard Effect (passive cooling technique)
Courtyard Effect (passive cooling technique)Courtyard Effect (passive cooling technique)
Courtyard Effect (passive cooling technique)
 
Double skin facade
Double skin facade Double skin facade
Double skin facade
 
Architectural features of composite climate in India
Architectural features of composite climate in IndiaArchitectural features of composite climate in India
Architectural features of composite climate in India
 
NBC NORMS FOR HVAC SYSTEMS
NBC NORMS FOR HVAC SYSTEMSNBC NORMS FOR HVAC SYSTEMS
NBC NORMS FOR HVAC SYSTEMS
 
Site Analysis
Site Analysis Site Analysis
Site Analysis
 
Ground podium landscape concept
Ground podium landscape conceptGround podium landscape concept
Ground podium landscape concept
 
Yamuna sports complex
Yamuna sports complexYamuna sports complex
Yamuna sports complex
 
Nift Raebareli case study
Nift Raebareli case studyNift Raebareli case study
Nift Raebareli case study
 
Composite climate and aurabindo ashramam,new delhi
Composite climate and aurabindo ashramam,new delhiComposite climate and aurabindo ashramam,new delhi
Composite climate and aurabindo ashramam,new delhi
 
7. Shading devices
7. Shading devices7. Shading devices
7. Shading devices
 
DCR - Development Control Regulations - Professional Practice - Architecture ...
DCR - Development Control Regulations - Professional Practice - Architecture ...DCR - Development Control Regulations - Professional Practice - Architecture ...
DCR - Development Control Regulations - Professional Practice - Architecture ...
 
HOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEHOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNE
 
Swimming Pool Design
Swimming Pool DesignSwimming Pool Design
Swimming Pool Design
 
Architecture case study - IIM Ahemdabad
Architecture case study - IIM AhemdabadArchitecture case study - IIM Ahemdabad
Architecture case study - IIM Ahemdabad
 

Similar to Nbc hvac ppt

HVAC Understandings before Design it
HVAC Understandings before Design itHVAC Understandings before Design it
HVAC Understandings before Design it
SakhawatAli44
 
Building services systems in sri lanka ac
Building services systems in sri lanka acBuilding services systems in sri lanka ac
Building services systems in sri lanka ac
Arunali Dhelika
 
JW Marriott Mumbai Sahar - Gold Rated Green Building
JW Marriott Mumbai Sahar - Gold Rated Green BuildingJW Marriott Mumbai Sahar - Gold Rated Green Building
JW Marriott Mumbai Sahar - Gold Rated Green Building
Danfoss India
 
VENTILATION.pdf
VENTILATION.pdfVENTILATION.pdf
VENTILATION.pdf
KishAgrwa1
 
HVAC Cent vs decent ac systems
HVAC Cent vs decent ac systemsHVAC Cent vs decent ac systems
HVAC Cent vs decent ac systems
varunsingh383
 
Design options for hvac distribution systems
Design options for hvac distribution systemsDesign options for hvac distribution systems
Design options for hvac distribution systemsJASON KEMBOI
 
Design of HVAC system for commercial building
Design of HVAC system for commercial buildingDesign of HVAC system for commercial building
Design of HVAC system for commercial building
jayeshmahajan24
 
HVAC AUDIT.pdf
HVAC AUDIT.pdfHVAC AUDIT.pdf
HVAC AUDIT.pdf
ShashikantDrShashika
 
ENERGY, ECONOMIC AND ENVIRONMENTAL ISSUES OF POWER PLANTS(UNIT-5).pptx
ENERGY, ECONOMIC AND ENVIRONMENTAL ISSUES OF POWER PLANTS(UNIT-5).pptxENERGY, ECONOMIC AND ENVIRONMENTAL ISSUES OF POWER PLANTS(UNIT-5).pptx
ENERGY, ECONOMIC AND ENVIRONMENTAL ISSUES OF POWER PLANTS(UNIT-5).pptx
CHANDRA KUMAR S
 
Epbd issues in relation to iIAQ and ventilation
Epbd issues in relation to iIAQ and ventilation Epbd issues in relation to iIAQ and ventilation
Epbd issues in relation to iIAQ and ventilation
SustainableEnergyAut
 
Basics of HVAC - Part 1 (Heating Ventilation Air Conditioning)
Basics of HVAC - Part 1 (Heating Ventilation Air Conditioning)Basics of HVAC - Part 1 (Heating Ventilation Air Conditioning)
Basics of HVAC - Part 1 (Heating Ventilation Air Conditioning)
MOHAMMED KHAN
 
Engineering HVAC
Engineering HVACEngineering HVAC
Engineering HVAC
aubme93
 
report.docx
report.docxreport.docx
report.docx
umair ahmad
 
HVAC for Data Centers
HVAC for Data CentersHVAC for Data Centers
HVAC for Data Centers
ConsultingSpecifyingEngineer
 
Term Project Building Energy audit-methodology.pptx
Term Project  Building Energy audit-methodology.pptxTerm Project  Building Energy audit-methodology.pptx
Term Project Building Energy audit-methodology.pptx
AnishShah206945
 
ch.9.pptx
ch.9.pptxch.9.pptx
IRJET- AC Room Design on HVAC
IRJET- AC Room Design on HVACIRJET- AC Room Design on HVAC
IRJET- AC Room Design on HVAC
IRJET Journal
 

Similar to Nbc hvac ppt (20)

HVAC Understandings before Design it
HVAC Understandings before Design itHVAC Understandings before Design it
HVAC Understandings before Design it
 
Final presentation
Final presentationFinal presentation
Final presentation
 
Building services systems in sri lanka ac
Building services systems in sri lanka acBuilding services systems in sri lanka ac
Building services systems in sri lanka ac
 
JW Marriott Mumbai Sahar - Gold Rated Green Building
JW Marriott Mumbai Sahar - Gold Rated Green BuildingJW Marriott Mumbai Sahar - Gold Rated Green Building
JW Marriott Mumbai Sahar - Gold Rated Green Building
 
VENTILATION.pdf
VENTILATION.pdfVENTILATION.pdf
VENTILATION.pdf
 
HVAC Cent vs decent ac systems
HVAC Cent vs decent ac systemsHVAC Cent vs decent ac systems
HVAC Cent vs decent ac systems
 
Design options for hvac distribution systems
Design options for hvac distribution systemsDesign options for hvac distribution systems
Design options for hvac distribution systems
 
Design of HVAC system for commercial building
Design of HVAC system for commercial buildingDesign of HVAC system for commercial building
Design of HVAC system for commercial building
 
HVAC AUDIT.pdf
HVAC AUDIT.pdfHVAC AUDIT.pdf
HVAC AUDIT.pdf
 
HVAC AUDIT.pdf
HVAC AUDIT.pdfHVAC AUDIT.pdf
HVAC AUDIT.pdf
 
ENERGY, ECONOMIC AND ENVIRONMENTAL ISSUES OF POWER PLANTS(UNIT-5).pptx
ENERGY, ECONOMIC AND ENVIRONMENTAL ISSUES OF POWER PLANTS(UNIT-5).pptxENERGY, ECONOMIC AND ENVIRONMENTAL ISSUES OF POWER PLANTS(UNIT-5).pptx
ENERGY, ECONOMIC AND ENVIRONMENTAL ISSUES OF POWER PLANTS(UNIT-5).pptx
 
Epbd issues in relation to iIAQ and ventilation
Epbd issues in relation to iIAQ and ventilation Epbd issues in relation to iIAQ and ventilation
Epbd issues in relation to iIAQ and ventilation
 
Basics of HVAC - Part 1 (Heating Ventilation Air Conditioning)
Basics of HVAC - Part 1 (Heating Ventilation Air Conditioning)Basics of HVAC - Part 1 (Heating Ventilation Air Conditioning)
Basics of HVAC - Part 1 (Heating Ventilation Air Conditioning)
 
Engineering HVAC
Engineering HVACEngineering HVAC
Engineering HVAC
 
report.docx
report.docxreport.docx
report.docx
 
HVAC for Data Centers
HVAC for Data CentersHVAC for Data Centers
HVAC for Data Centers
 
Term Project Building Energy audit-methodology.pptx
Term Project  Building Energy audit-methodology.pptxTerm Project  Building Energy audit-methodology.pptx
Term Project Building Energy audit-methodology.pptx
 
ch.9.pptx
ch.9.pptxch.9.pptx
ch.9.pptx
 
Building Services
Building ServicesBuilding Services
Building Services
 
IRJET- AC Room Design on HVAC
IRJET- AC Room Design on HVACIRJET- AC Room Design on HVAC
IRJET- AC Room Design on HVAC
 

Recently uploaded

COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 

Recently uploaded (20)

COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 

Nbc hvac ppt

  • 2. Introduction • This code deals with the planning, selection, design considerations and installation of air conditioning, heating and mechanical ventilation system. • Computerized weather data is now available and has been included for around 60 locations across the country covering all 5 climatic zones. • Since the last revision of the Code in 2005, there has seen tremendous emphasis on energy conservation to meet the challenges posed by the climatic change.
  • 3. Scope • This code aims to ensure an air conditioning, heating and mechanical ventilation system by managing air temperature, humidity, indoor air quality. • Distribution of conditional air for specific use. • Occupancy of built space while giving consideration to minimizing energy consumption and other resources.
  • 4. Refrigerants Refrigerants are mainly classified as follows:- • Based on toxicity they are classified into two types namely class A, class B. • Based on flammability they are classified into four types namely class 1, class 2L, class 2, class 3. Matrix Diagram of Safety Group Classification System of refregirents
  • 5. Planning The planning includes the following considerations: • Fundamental requirements. • Design considerations. • Equipment room for central air conditioning plant. • Pipe shafts. • Supply air ducts and return air ducts. • Cooling tower. • Energy efficiency.(Designers shall aim for energy efficiency in buildings with the right blend of passive and active design strategies )
  • 6. Outdoor design conditions • The outdoor design considerations are taken from table 2. For cities not provided in the table interpolations are used considering the climatic conditions. • For normal comfort conditions, values under 1% column should be used for cooling loads and 99% percent for heating loads. • For critical applications, values under 0.4% column should be considered for cooling loads and 99.6% column for heating loads.
  • 8. Indoor design conditions • One of the primary objective of designing indoor environment is to ensure thermal comfort of all occupants. • HVAC is employed for same purpose only though building design is limited. • The following are the 4 environmental parameters which are controlled by HVAC systems and are also controlled by it 1.Air temperature(C0). 2.Radiant temperature (C0). 3.Air speed (m/s). 4.Relative humidity (percent). • The following are the 2 additional parameters which affect thermal comfort but are not controllable 1.Activity rate (W/m2). 2.Clothing insulation (m2.K/W).
  • 9. Design of air conditioning • General. • Design considerations. • Factors to be considered for different applications.
  • 10. Refrigeration for cold stores • Key elements and components of cold room. • Typical design inputs for a standard cold room. • Importance of heat loads. • Considerations for cold room selections. • Installation and maintenance of cold room. • Cold room safety.
  • 11. Heating • Various heating equipment / systems are: • Hot water heated coils. • Electrical heating. • Solar water heating systems. • Condenser heat recovery system. • Heat pump. • Ground source Heat pump.
  • 12. Mechanical Ventilation Tunnel ventilation system Underground car park ventilation system Commercial kitchen ventilation.Industrial ventilation system
  • 13. Installation of HVAC systems • Installation of air conditioning systems. • Installation of split air conditioners. • Installation if VRF systems. • Installation of mechanical ventilation system.
  • 14. Symbols, units , color codes and identification of services • Color code is required for easy identification of various items in an air conditioning installation for correct identification and interpretation.