NABCEP Exam Prep Review for PV
Installation & Tech Sales
A Review of Need-to-Know Key Concepts for NABCEP Exams
Sarah Raymer, AKA Ms. MOOC
Tips
Timing is everything
Get some sleep- what studies show
about retention
“Shake it off, Champ!”
Topics for today:
 Online tools for site assessment
 Performing "ball-park estimates”- the risks
 Grid Direct VS. battery-based systems
 Site Analysis: system layout and installation-
component location, NEC requirements, & effects on
performance and cost
 Equipment selection- component matching and utility
interconnection requirements
Resource will be provided:
 Array string calculations: effects of temperature, inverter
matching
 Solar resource assessment: Azimuth, magnetic declination
 Array sizing: by area, budget, energy demand
 Online resources for solar resource assessment (Peak Sun
Hours)
 Determining useable roof area and attachment points
required
 Trigonometry : tilt angles, shading obstructions
#SolarMOOC Resources
 Subject Matter Experts
 #SolarMOOC Academy dropdown menu option is
Subject Matter Experts
 ARCHIVE: #SolarMOOC Academy dropdown menu
 Most Recent Lessons2012 / 2013 Archive
Online tools for site assessment
 Google Earth - ruler and Azimuth tool
 Google Maps -
 “Classic maps” - ruler for rough estimate on sizing under
“Maps Labs”
 LIMITATIONS of tools and virtual assessment
 Trees grow
 Roof - hard to determine age / structural integrity
 Can not see obstructions - vents/pipes
 Can not achieve true shading analysis
Online tools for site assessment
 NREL PV Watts Calculator - multiple versions
 Solar resource
 Performance estimate
 ROI
 Google it: ”PV WATTS”
 Other professional proposal software will calculate more
accurate costs and ROI specific to the customer
 Ex. Rebates from utility & financing (effects ROI)
 Ex. Of programs- Energy Periscope, OnGrid Solar
Google Earth
• Measure lines, save for later viewing and sharing
• Measure azimuth degrees instantly, declination
preconfigured
Google- ruler tool and street view
• Measurements
• Azimuths
• Roof pitch
• Building height
PVWATTS from NREL
FREE online tool
NREL's PVWatts calculator determines the energy
production and cost savings of grid-connected PV
Systems.
Select your location...
& click "send to PVWatts".
Tweek a few things, click to calculate, and viola!
PV Watts Version 4 BETA
Site Analysis:
Solar resource and shading
 RESOURCES
 NREL - Data tables (PSH)
 Trig for shading analysis-
 Go to solpowerpeople.com
 Search for “trigonometry”:
Site Analysis:
Solar resource and shading
 Resources:
 Azimuth - production, shading
 Altitude - production, shading
 Solar window - year round production assessment
 Magnetic declination - accurate production and shading
Site assessment
fundamentals
Performing "ball-park estimates"-
the risks
 Online calculated area is not an accurate
calculation of system size potential
 Must visit site-
 Obstructions
 Shade
 Mechanical considerations- roof trusses
 Area efficiency not same as module efficiency
 Power (kW), Area (m2), Efficiency
 DC vs. AC
Performing "ball-park estimates"-
the risks
 Costs may change depending on site specific
conditions
 Roof mount - type and age
 Pole or Ground mount - soil- rock?
 Roof tilt - not easy to determine online
 Be sure customer is aware of utility charges when
considering expected bills
 Return on Investment (ROI)
 Utility buyback policies
Performing "ball-park estimates"-
the risks
 Resources:
 #SolarMOOC Subject Matter Experts page:
 Determine required attachments
 Determine # of modules that will fit in area
 Area, Budget and Energy demand sizing estimates
Ball park
estimates
Grid Direct VS. battery-based systems
 Grid direct- requires anti islanding
 DOES NOT function when grid is down
 Net-metering/ dual metering potential
 Grid offers “free storage”
 More efficient than batteries
 Inverter selection
 Battery based / Battery back-up
 Stand Alone - will function when grid is down if storage exists
 Grid tied with Battery Back-up- Critical load panel will function
when grid is down-
 limited capacity depending on battery bank size (autonomy)
 More reliable = more storage = more expensive
 Inverter selection, additional components
 Conductors, OCPDs, charge controller, batteries, critical load
panel, extra inverter if AC Coupled (battery backup)
 NEC 690 Part VIII - Storage Batteries
 NEC 480 - Storage Batteries
Grid Direct VS. battery-based systems
Battery-based systems
Site Assessment: Layout & Install
 Component location
 NEC requirements
 Effects on performance and cost
2011 NEC
Component Location
& NEC Requirements
 Installed in neat and workmanlike manner - NEC
110.12
 Installed as listed or labeled - NEC 110.3(B)
 Spaces required - NEC 110.26
 Depends on location, voltage, etc.
Component Location
 MODULES:
 IFC regulations - becoming a standard
 Not mandated in 2012 NEC
 Look for it in 2014
 Attachments - framing considerations (roof)
 Shading - again and again
Inverter Location
 Inverter - Distance from load center
 Locate inverter near installation to avoid voltage drop
 Potential shut down (design for inverter voltage range)
 Prevent extra installation costs
 Power loss, reduced ROI
 Conductors
 Conduit runs
 Expansion fittings
 Design time
 Labor time
 Chosen to match electrical connection
 Component functionality/treatment:
 Out of sun
 Consider temperature
 Requirements for equipment installation
 NEC 110.13 - mounting and cooling
 NEC 110.12 - neat and workmanlike
 NEC 110.26 - working spaces
 NEC 110.27 - live parts
 Equipment manual - NEC 110.3(B)
 Installed as listed and labeled
Inverter Location
Component Selection / Location
Resources
 Resources:
 Voltage drop - #SolarMOOC with Raymer and Stovall
 String sizing: Jeff Gilbert #SolarMOOC
 Verifying System Design- voltage considerations, inverter
matching, string sizing
Component Selection / Location
 DC rated- NEC 690.4(D)
 Disconnects, OCPDs
 Disconnecting means- NEC 690 Part III
 DC disconnect must be in an accessible location
 AHJ may require additional external DC disconnect even if
integrated into Inverter
 AC modules/microinverters: NEC 690.6
 Batteries: NEC Article 480 & Article 690 Part VIII
 NEC 480.9: Battery locations (NEC 110)
 NEC 480.8: Racks and trays
 NEC 690.71(B): dwellings = <50V Nominal
 NEC 690.71(D): Nonconductive racks
Effects on Performance
and Cost
 Performance
 SHADE!- needs to be taken seriously- a tiny amount could kill
production, and ROI for customer
 Consider microinverters for potential solution
 Geographical site considerations for production-
smog, elevation, & Peak Sun Hours
 High temperatures effect voltage (lowers)
 High temperatures can effect equipment
 Costs
 Roof type and tilt or soil determines ease of installation
 Requirements of interconnection- may require electrical
upgrade
Equipment selection:
component matching
 Grid Direct Systems:
 Inverter to Voltage (string design of array)
 Match the inverter voltage window
 Start voltage
 Max of inverter as well as 600V DC limit per NEC code
 Consider MPPT range
Equipment selection:
component matching
 Grid Direct Systems:
 Inverter to Voltage (string design of array)
 Match the inverter voltage window
 Start voltage
 Max of inverter as well as 600V DC limit per NEC code
 Consider MPPT range
 Conductor chosen for ampacity and conditions
 Mike Holt- Verifying System Design
Other BOS components…
 Conduit and conductors chosen for conditions and NEC
requirements
 Ex.: NEC requires metal conduit for DC conductors run inside of
a building - NEC 690.31(E)
 Ex.: PV Source conductors must be USE-2 or PV wire- NEC
690.31(B)
 All equipment must be DC rated (unless dealing with AC
modules/microinverters)
Component Selection:
utility interconnection requirements
 Make sure panel is not overloaded
 NEC705.12(A) - Supply side connections possible
 Treated as service connections- reference to NEC 230
 NEC 705.12(D)(5) - Circuit breakers must be “suitable
for backfeed” - if marked line and load, not suitable for
load side connection
Component Selection:
utility interconnection requirements
 NEC 705.12(D) - Utility Interactive inverters
 NEC 705.12(D)(2) - load side connection- 120% rule allowed
 Sum of amp rating of OCPDs connected must not exceed 120%
of rating of busbar
 Ex. 200A bus bar x 1.2 = allowable 240A OCPDs
 240A - 170A = 70A
 170A in use, then max load side connection is 70A
 Exception - with battery bank- can use inverter output
current:
 Ex. 30A output from inverter = 30 x 1.25 = 37.5A, 40A OCPD
Component Selection:
utility interconnection requirements
 Resource:
 http://solarprofessional.com/articles/design-
installation/nec-section-70512-and-utility-
interconnections
 Google: Supply side connection PV, or search SolarPro
Component Selection:
utility interconnection requirements
 120% rule: #SolarMOOC w/ Richard Stovall,
SolPowerPeople CEO and IREC Certified Master
Trainer
A favorite resource
Who are we, and who am I?
 SolPowerPeople, Inc.
 IREC Accredited Continuing Education Provider
 Offering Solar Training, in person and online
 Sarah Raymer
 Director of Education and Training
 Asst. Instructor, #SolarMOOC host
 NABCEP Certified PV Installation Professional
 sraymer@solpowerpeople.com

More Related Content

What's hot

Pv Solar Grid Connect Solar Design
Pv Solar Grid Connect Solar DesignPv Solar Grid Connect Solar Design
Pv Solar Grid Connect Solar Design
Optimus Energy Philippines
 
9 system-sizing
9 system-sizing9 system-sizing
9 system-sizing
Zelalem Girma
 
Photovoltaic Training - Session 6 - Off-grid installations
Photovoltaic Training - Session 6 - Off-grid installationsPhotovoltaic Training - Session 6 - Off-grid installations
Photovoltaic Training - Session 6 - Off-grid installations
Leonardo ENERGY
 
performance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverterperformance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverter
Ashish Verma
 
Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...
Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...
Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...
Farming Futures
 
Hybrid Controller | Design 150KW PV with DG1:700KW
Hybrid  Controller | Design 150KW PV with DG1:700KWHybrid  Controller | Design 150KW PV with DG1:700KW
Hybrid Controller | Design 150KW PV with DG1:700KW
Eyad Adnan
 
Study of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantStudy of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plant
Shahbaz Makandar A.
 
Maximum Energy Case Studies - EUPVSEC
Maximum Energy Case Studies - EUPVSECMaximum Energy Case Studies - EUPVSEC
Maximum Energy Case Studies - EUPVSEC
SolarEdge Technologies
 
mohan.final
mohan.finalmohan.final
Performance analysis of mono crystalline silicon technology with different or...
Performance analysis of mono crystalline silicon technology with different or...Performance analysis of mono crystalline silicon technology with different or...
Performance analysis of mono crystalline silicon technology with different or...
Gaurav Kumar Sharma
 
Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)
Sunrator Technologies LLP
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and Standards
Solar Reference
 
Inspecting Photovoltaic (PV) Systems for Code Compliance
Inspecting Photovoltaic (PV) Systems for Code ComplianceInspecting Photovoltaic (PV) Systems for Code Compliance
Inspecting Photovoltaic (PV) Systems for Code Compliance
JLanka Technologies (Pvt) Limited
 
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Headway Solar
 
Designing Energy Harvesting Solar Powered Sensors
Designing Energy Harvesting Solar Powered SensorsDesigning Energy Harvesting Solar Powered Sensors
Designing Energy Harvesting Solar Powered Sensors
Dan Wright, MBA
 
Standalone Solar PV system design Example
Standalone Solar PV system design ExampleStandalone Solar PV system design Example
Standalone Solar PV system design Example
Dr Naim R Kidwai
 
Grid-connected PV system
Grid-connected PV systemGrid-connected PV system
Grid-connected PV system
Ramesh Adhikari
 
Steps to simulate grid connected solar pv project through PVSyst Software
 Steps to simulate grid connected solar pv project through PVSyst Software Steps to simulate grid connected solar pv project through PVSyst Software
Steps to simulate grid connected solar pv project through PVSyst Software
Ashish Verma
 
A Report on solar power plant installation
A Report on solar power plant installationA Report on solar power plant installation
A Report on solar power plant installation
Amitesh Kumar
 
Mini grid design manual
Mini grid design manualMini grid design manual
Mini grid design manual
SolarReference
 

What's hot (20)

Pv Solar Grid Connect Solar Design
Pv Solar Grid Connect Solar DesignPv Solar Grid Connect Solar Design
Pv Solar Grid Connect Solar Design
 
9 system-sizing
9 system-sizing9 system-sizing
9 system-sizing
 
Photovoltaic Training - Session 6 - Off-grid installations
Photovoltaic Training - Session 6 - Off-grid installationsPhotovoltaic Training - Session 6 - Off-grid installations
Photovoltaic Training - Session 6 - Off-grid installations
 
performance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverterperformance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverter
 
Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...
Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...
Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...
 
Hybrid Controller | Design 150KW PV with DG1:700KW
Hybrid  Controller | Design 150KW PV with DG1:700KWHybrid  Controller | Design 150KW PV with DG1:700KW
Hybrid Controller | Design 150KW PV with DG1:700KW
 
Study of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantStudy of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plant
 
Maximum Energy Case Studies - EUPVSEC
Maximum Energy Case Studies - EUPVSECMaximum Energy Case Studies - EUPVSEC
Maximum Energy Case Studies - EUPVSEC
 
mohan.final
mohan.finalmohan.final
mohan.final
 
Performance analysis of mono crystalline silicon technology with different or...
Performance analysis of mono crystalline silicon technology with different or...Performance analysis of mono crystalline silicon technology with different or...
Performance analysis of mono crystalline silicon technology with different or...
 
Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and Standards
 
Inspecting Photovoltaic (PV) Systems for Code Compliance
Inspecting Photovoltaic (PV) Systems for Code ComplianceInspecting Photovoltaic (PV) Systems for Code Compliance
Inspecting Photovoltaic (PV) Systems for Code Compliance
 
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
 
Designing Energy Harvesting Solar Powered Sensors
Designing Energy Harvesting Solar Powered SensorsDesigning Energy Harvesting Solar Powered Sensors
Designing Energy Harvesting Solar Powered Sensors
 
Standalone Solar PV system design Example
Standalone Solar PV system design ExampleStandalone Solar PV system design Example
Standalone Solar PV system design Example
 
Grid-connected PV system
Grid-connected PV systemGrid-connected PV system
Grid-connected PV system
 
Steps to simulate grid connected solar pv project through PVSyst Software
 Steps to simulate grid connected solar pv project through PVSyst Software Steps to simulate grid connected solar pv project through PVSyst Software
Steps to simulate grid connected solar pv project through PVSyst Software
 
A Report on solar power plant installation
A Report on solar power plant installationA Report on solar power plant installation
A Report on solar power plant installation
 
Mini grid design manual
Mini grid design manualMini grid design manual
Mini grid design manual
 

Viewers also liked

Changes to 2014 NEC Interconnection Rule 705.12
Changes to 2014 NEC Interconnection Rule 705.12Changes to 2014 NEC Interconnection Rule 705.12
Changes to 2014 NEC Interconnection Rule 705.12
solpowerpeople
 
Final trig problem solution
Final trig problem solutionFinal trig problem solution
Final trig problem solution
solpowerpeople
 
041813 rs 120 rule and test taking strat
041813 rs 120 rule and test taking strat 041813 rs 120 rule and test taking strat
041813 rs 120 rule and test taking strat
solpowerpeople
 
PV Monitoring Systems w/Arturo Zarate
PV Monitoring Systems w/Arturo ZaratePV Monitoring Systems w/Arturo Zarate
PV Monitoring Systems w/Arturo Zarate
solpowerpeople
 
#Solar mooc 2009 nabcep study guide solutions 1-29
#Solar mooc 2009 nabcep study guide solutions 1-29#Solar mooc 2009 nabcep study guide solutions 1-29
#Solar mooc 2009 nabcep study guide solutions 1-29
solpowerpeople
 
Using sohcahtoa
Using sohcahtoaUsing sohcahtoa
Using sohcahtoa
solpowerpeople
 
012413 passive solar design
012413 passive solar design012413 passive solar design
012413 passive solar design
solpowerpeople
 
#Solar mooc voltage drop calculations
#Solar mooc voltage drop calculations#Solar mooc voltage drop calculations
#Solar mooc voltage drop calculations
solpowerpeople
 
053013 pv system site assessment (1)
053013 pv system site assessment (1)053013 pv system site assessment (1)
053013 pv system site assessment (1)
solpowerpeople
 
10 important safety changes in 2014 nec
10 important safety changes in 2014 nec10 important safety changes in 2014 nec
10 important safety changes in 2014 nec
John Newquist
 
Halim Hani - HHFSD001-The Floating Solar Dome
Halim Hani - HHFSD001-The Floating Solar DomeHalim Hani - HHFSD001-The Floating Solar Dome
Halim Hani - HHFSD001-The Floating Solar Dome
Halim Hani
 
Photovoltaic Training - Session 3 - Plant Operation
Photovoltaic Training - Session 3 - Plant OperationPhotovoltaic Training - Session 3 - Plant Operation
Photovoltaic Training - Session 3 - Plant Operation
Leonardo ENERGY
 
Photovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant MaintenancePhotovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant Maintenance
Leonardo ENERGY
 
Photovoltaic Training - Session 5 - Economic and Financial Analysis
Photovoltaic Training - Session 5 - Economic and Financial AnalysisPhotovoltaic Training - Session 5 - Economic and Financial Analysis
Photovoltaic Training - Session 5 - Economic and Financial Analysis
Leonardo ENERGY
 
Photovoltaic Training - Session 2 - Construction and Start-Up
Photovoltaic Training - Session 2 - Construction and Start-UpPhotovoltaic Training - Session 2 - Construction and Start-Up
Photovoltaic Training - Session 2 - Construction and Start-Up
Leonardo ENERGY
 
Design Aspect of Standalone PV system
Design Aspect of Standalone PV systemDesign Aspect of Standalone PV system
Design Aspect of Standalone PV system
Malik Sameeullah
 
PV solar Design and Installtion
PV solar Design and InstalltionPV solar Design and Installtion
PV solar Design and Installtion
Eli Israeli
 
Phoenix_Research_Power_Point
Phoenix_Research_Power_PointPhoenix_Research_Power_Point
Phoenix_Research_Power_Point
rjenkins5429
 
Цікаві факти із життя Хемінгуея
Цікаві факти із життя ХемінгуеяЦікаві факти із життя Хемінгуея
Цікаві факти із життя Хемінгуея
dtamara123
 
Photography
PhotographyPhotography
Photography
albanbytyqi
 

Viewers also liked (20)

Changes to 2014 NEC Interconnection Rule 705.12
Changes to 2014 NEC Interconnection Rule 705.12Changes to 2014 NEC Interconnection Rule 705.12
Changes to 2014 NEC Interconnection Rule 705.12
 
Final trig problem solution
Final trig problem solutionFinal trig problem solution
Final trig problem solution
 
041813 rs 120 rule and test taking strat
041813 rs 120 rule and test taking strat 041813 rs 120 rule and test taking strat
041813 rs 120 rule and test taking strat
 
PV Monitoring Systems w/Arturo Zarate
PV Monitoring Systems w/Arturo ZaratePV Monitoring Systems w/Arturo Zarate
PV Monitoring Systems w/Arturo Zarate
 
#Solar mooc 2009 nabcep study guide solutions 1-29
#Solar mooc 2009 nabcep study guide solutions 1-29#Solar mooc 2009 nabcep study guide solutions 1-29
#Solar mooc 2009 nabcep study guide solutions 1-29
 
Using sohcahtoa
Using sohcahtoaUsing sohcahtoa
Using sohcahtoa
 
012413 passive solar design
012413 passive solar design012413 passive solar design
012413 passive solar design
 
#Solar mooc voltage drop calculations
#Solar mooc voltage drop calculations#Solar mooc voltage drop calculations
#Solar mooc voltage drop calculations
 
053013 pv system site assessment (1)
053013 pv system site assessment (1)053013 pv system site assessment (1)
053013 pv system site assessment (1)
 
10 important safety changes in 2014 nec
10 important safety changes in 2014 nec10 important safety changes in 2014 nec
10 important safety changes in 2014 nec
 
Halim Hani - HHFSD001-The Floating Solar Dome
Halim Hani - HHFSD001-The Floating Solar DomeHalim Hani - HHFSD001-The Floating Solar Dome
Halim Hani - HHFSD001-The Floating Solar Dome
 
Photovoltaic Training - Session 3 - Plant Operation
Photovoltaic Training - Session 3 - Plant OperationPhotovoltaic Training - Session 3 - Plant Operation
Photovoltaic Training - Session 3 - Plant Operation
 
Photovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant MaintenancePhotovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant Maintenance
 
Photovoltaic Training - Session 5 - Economic and Financial Analysis
Photovoltaic Training - Session 5 - Economic and Financial AnalysisPhotovoltaic Training - Session 5 - Economic and Financial Analysis
Photovoltaic Training - Session 5 - Economic and Financial Analysis
 
Photovoltaic Training - Session 2 - Construction and Start-Up
Photovoltaic Training - Session 2 - Construction and Start-UpPhotovoltaic Training - Session 2 - Construction and Start-Up
Photovoltaic Training - Session 2 - Construction and Start-Up
 
Design Aspect of Standalone PV system
Design Aspect of Standalone PV systemDesign Aspect of Standalone PV system
Design Aspect of Standalone PV system
 
PV solar Design and Installtion
PV solar Design and InstalltionPV solar Design and Installtion
PV solar Design and Installtion
 
Phoenix_Research_Power_Point
Phoenix_Research_Power_PointPhoenix_Research_Power_Point
Phoenix_Research_Power_Point
 
Цікаві факти із життя Хемінгуея
Цікаві факти із життя ХемінгуеяЦікаві факти із життя Хемінгуея
Цікаві факти із життя Хемінгуея
 
Photography
PhotographyPhotography
Photography
 

Similar to NABCEP Exam Prep Review for PV Installation & Tech Sales 

Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and Standards
SolarReference
 
Classification of electric motors
Classification of electric motors Classification of electric motors
Classification of electric motors
Sudhanshu Tripathi
 
IEEE substation design
IEEE substation designIEEE substation design
IEEE substation design
Vincent Wedelich, PE MBA
 
Infrastructure Presentation 000000000000
Infrastructure Presentation 000000000000Infrastructure Presentation 000000000000
Infrastructure Presentation 000000000000
AbdoEssa5
 
Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...
Ashish Verma
 
Presentation 1
Presentation 1Presentation 1
Solar rooftop projects primotech
Solar rooftop projects primotechSolar rooftop projects primotech
Solar rooftop projects primotech
vimalranaprimotech
 
final design
final designfinal design
final design
Colston Cooper
 
Nabcep techincal-sales-jta-guide-9-30-10 web
Nabcep techincal-sales-jta-guide-9-30-10 webNabcep techincal-sales-jta-guide-9-30-10 web
Nabcep techincal-sales-jta-guide-9-30-10 web
moeshahram
 
Solar Fundametals - K. Jayaweera May 2022.pdf
Solar Fundametals - K. Jayaweera May 2022.pdfSolar Fundametals - K. Jayaweera May 2022.pdf
Solar Fundametals - K. Jayaweera May 2022.pdf
ssuserfd91eb
 
equipments like CT,PT SUBSTATION PPT.ppt
equipments like CT,PT SUBSTATION PPT.pptequipments like CT,PT SUBSTATION PPT.ppt
equipments like CT,PT SUBSTATION PPT.ppt
srinjayjha
 
Inspecting pv systems_for_code_compliance
Inspecting pv systems_for_code_complianceInspecting pv systems_for_code_compliance
Inspecting pv systems_for_code_compliance
Ankit Saxena
 
3.17.15 commercial solar_design_training
3.17.15 commercial solar_design_training3.17.15 commercial solar_design_training
3.17.15 commercial solar_design_training
melanie_bissonnette
 
Pp&amp;B
Pp&amp;BPp&amp;B
Pp&amp;B
Deepak Sharma
 
[February 2017 - Ph.D. Final Dissertation] Enabling Power-awareness For Multi...
[February 2017 - Ph.D. Final Dissertation] Enabling Power-awareness For Multi...[February 2017 - Ph.D. Final Dissertation] Enabling Power-awareness For Multi...
[February 2017 - Ph.D. Final Dissertation] Enabling Power-awareness For Multi...
Matteo Ferroni
 
DeployingAnAdvancedDistribution.pdf
DeployingAnAdvancedDistribution.pdfDeployingAnAdvancedDistribution.pdf
DeployingAnAdvancedDistribution.pdf
bayu162365
 
EE Reports Submetering 102 Guide
EE Reports Submetering 102 GuideEE Reports Submetering 102 Guide
EE Reports Submetering 102 Guide
EEReports.com
 
INNOVATIVE SOLUTIONS FOR HIGH-POWER-DENSITY E-MOTORS FOR AEROSPACE PROPULSION
INNOVATIVE SOLUTIONS FOR HIGH-POWER-DENSITY E-MOTORS FOR AEROSPACE PROPULSIONINNOVATIVE SOLUTIONS FOR HIGH-POWER-DENSITY E-MOTORS FOR AEROSPACE PROPULSION
INNOVATIVE SOLUTIONS FOR HIGH-POWER-DENSITY E-MOTORS FOR AEROSPACE PROPULSION
iQHub
 
Electronic circuit design and component selection.pptx
Electronic circuit design and component selection.pptxElectronic circuit design and component selection.pptx
Electronic circuit design and component selection.pptx
maheshmp16
 
Conducting a Site Assessment and PV System Field Survey
Conducting a Site Assessment and   PV System Field SurveyConducting a Site Assessment and   PV System Field Survey
Conducting a Site Assessment and PV System Field Survey
Eyad Adnan
 

Similar to NABCEP Exam Prep Review for PV Installation & Tech Sales  (20)

Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and Standards
 
Classification of electric motors
Classification of electric motors Classification of electric motors
Classification of electric motors
 
IEEE substation design
IEEE substation designIEEE substation design
IEEE substation design
 
Infrastructure Presentation 000000000000
Infrastructure Presentation 000000000000Infrastructure Presentation 000000000000
Infrastructure Presentation 000000000000
 
Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...
 
Presentation 1
Presentation 1Presentation 1
Presentation 1
 
Solar rooftop projects primotech
Solar rooftop projects primotechSolar rooftop projects primotech
Solar rooftop projects primotech
 
final design
final designfinal design
final design
 
Nabcep techincal-sales-jta-guide-9-30-10 web
Nabcep techincal-sales-jta-guide-9-30-10 webNabcep techincal-sales-jta-guide-9-30-10 web
Nabcep techincal-sales-jta-guide-9-30-10 web
 
Solar Fundametals - K. Jayaweera May 2022.pdf
Solar Fundametals - K. Jayaweera May 2022.pdfSolar Fundametals - K. Jayaweera May 2022.pdf
Solar Fundametals - K. Jayaweera May 2022.pdf
 
equipments like CT,PT SUBSTATION PPT.ppt
equipments like CT,PT SUBSTATION PPT.pptequipments like CT,PT SUBSTATION PPT.ppt
equipments like CT,PT SUBSTATION PPT.ppt
 
Inspecting pv systems_for_code_compliance
Inspecting pv systems_for_code_complianceInspecting pv systems_for_code_compliance
Inspecting pv systems_for_code_compliance
 
3.17.15 commercial solar_design_training
3.17.15 commercial solar_design_training3.17.15 commercial solar_design_training
3.17.15 commercial solar_design_training
 
Pp&amp;B
Pp&amp;BPp&amp;B
Pp&amp;B
 
[February 2017 - Ph.D. Final Dissertation] Enabling Power-awareness For Multi...
[February 2017 - Ph.D. Final Dissertation] Enabling Power-awareness For Multi...[February 2017 - Ph.D. Final Dissertation] Enabling Power-awareness For Multi...
[February 2017 - Ph.D. Final Dissertation] Enabling Power-awareness For Multi...
 
DeployingAnAdvancedDistribution.pdf
DeployingAnAdvancedDistribution.pdfDeployingAnAdvancedDistribution.pdf
DeployingAnAdvancedDistribution.pdf
 
EE Reports Submetering 102 Guide
EE Reports Submetering 102 GuideEE Reports Submetering 102 Guide
EE Reports Submetering 102 Guide
 
INNOVATIVE SOLUTIONS FOR HIGH-POWER-DENSITY E-MOTORS FOR AEROSPACE PROPULSION
INNOVATIVE SOLUTIONS FOR HIGH-POWER-DENSITY E-MOTORS FOR AEROSPACE PROPULSIONINNOVATIVE SOLUTIONS FOR HIGH-POWER-DENSITY E-MOTORS FOR AEROSPACE PROPULSION
INNOVATIVE SOLUTIONS FOR HIGH-POWER-DENSITY E-MOTORS FOR AEROSPACE PROPULSION
 
Electronic circuit design and component selection.pptx
Electronic circuit design and component selection.pptxElectronic circuit design and component selection.pptx
Electronic circuit design and component selection.pptx
 
Conducting a Site Assessment and PV System Field Survey
Conducting a Site Assessment and   PV System Field SurveyConducting a Site Assessment and   PV System Field Survey
Conducting a Site Assessment and PV System Field Survey
 

More from solpowerpeople

Inter row shading 4-19-12
Inter row shading 4-19-12Inter row shading 4-19-12
Inter row shading 4-19-12
solpowerpeople
 
PV Installations & Errors
PV Installations & ErrorsPV Installations & Errors
PV Installations & Errors
solpowerpeople
 
Webinar 03 electrical installation of pv system
Webinar 03 electrical installation of pv system Webinar 03 electrical installation of pv system
Webinar 03 electrical installation of pv system
solpowerpeople
 
#SolarMOOC: Webinar on Project Management of Solar PV with Jeffery Lee Johnso...
#SolarMOOC: Webinar on Project Management of Solar PV with Jeffery Lee Johnso...#SolarMOOC: Webinar on Project Management of Solar PV with Jeffery Lee Johnso...
#SolarMOOC: Webinar on Project Management of Solar PV with Jeffery Lee Johnso...
solpowerpeople
 
What is a triangle
What is a triangleWhat is a triangle
What is a triangle
solpowerpeople
 
#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE
#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE
#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE
solpowerpeople
 
#Solarmooc Arctan Solution
#Solarmooc Arctan Solution#Solarmooc Arctan Solution
#Solarmooc Arctan Solution
solpowerpeople
 
#Solar mooc problem set 1 alternate exercise 1 solution.
#Solar mooc problem set 1 alternate exercise 1 solution.#Solar mooc problem set 1 alternate exercise 1 solution.
#Solar mooc problem set 1 alternate exercise 1 solution.
solpowerpeople
 

More from solpowerpeople (8)

Inter row shading 4-19-12
Inter row shading 4-19-12Inter row shading 4-19-12
Inter row shading 4-19-12
 
PV Installations & Errors
PV Installations & ErrorsPV Installations & Errors
PV Installations & Errors
 
Webinar 03 electrical installation of pv system
Webinar 03 electrical installation of pv system Webinar 03 electrical installation of pv system
Webinar 03 electrical installation of pv system
 
#SolarMOOC: Webinar on Project Management of Solar PV with Jeffery Lee Johnso...
#SolarMOOC: Webinar on Project Management of Solar PV with Jeffery Lee Johnso...#SolarMOOC: Webinar on Project Management of Solar PV with Jeffery Lee Johnso...
#SolarMOOC: Webinar on Project Management of Solar PV with Jeffery Lee Johnso...
 
What is a triangle
What is a triangleWhat is a triangle
What is a triangle
 
#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE
#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE
#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE
 
#Solarmooc Arctan Solution
#Solarmooc Arctan Solution#Solarmooc Arctan Solution
#Solarmooc Arctan Solution
 
#Solar mooc problem set 1 alternate exercise 1 solution.
#Solar mooc problem set 1 alternate exercise 1 solution.#Solar mooc problem set 1 alternate exercise 1 solution.
#Solar mooc problem set 1 alternate exercise 1 solution.
 

Recently uploaded

Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
amberjdewit93
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
Dr. Mulla Adam Ali
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
TechSoup
 
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
haiqairshad
 
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
Nguyen Thanh Tu Collection
 
How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience
Wahiba Chair Training & Consulting
 
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
สมใจ จันสุกสี
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
Jyoti Chand
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Fajar Baskoro
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
heathfieldcps1
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
Colégio Santa Teresinha
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
GeorgeMilliken2
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
Jean Carlos Nunes Paixão
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
RAHUL
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
HajraNaeem15
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
paigestewart1632
 

Recently uploaded (20)

Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
 
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
 
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
 
How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience How to Create a More Engaging and Human Online Learning Experience
How to Create a More Engaging and Human Online Learning Experience
 
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
คำศัพท์ คำพื้นฐานการอ่าน ภาษาอังกฤษ ระดับชั้น ม.1
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
 
Cognitive Development Adolescence Psychology
Cognitive Development Adolescence PsychologyCognitive Development Adolescence Psychology
Cognitive Development Adolescence Psychology
 

NABCEP Exam Prep Review for PV Installation & Tech Sales 

  • 1. NABCEP Exam Prep Review for PV Installation & Tech Sales A Review of Need-to-Know Key Concepts for NABCEP Exams Sarah Raymer, AKA Ms. MOOC
  • 2. Tips Timing is everything Get some sleep- what studies show about retention “Shake it off, Champ!”
  • 3. Topics for today:  Online tools for site assessment  Performing "ball-park estimates”- the risks  Grid Direct VS. battery-based systems  Site Analysis: system layout and installation- component location, NEC requirements, & effects on performance and cost  Equipment selection- component matching and utility interconnection requirements
  • 4. Resource will be provided:  Array string calculations: effects of temperature, inverter matching  Solar resource assessment: Azimuth, magnetic declination  Array sizing: by area, budget, energy demand  Online resources for solar resource assessment (Peak Sun Hours)  Determining useable roof area and attachment points required  Trigonometry : tilt angles, shading obstructions
  • 5. #SolarMOOC Resources  Subject Matter Experts  #SolarMOOC Academy dropdown menu option is Subject Matter Experts  ARCHIVE: #SolarMOOC Academy dropdown menu  Most Recent Lessons2012 / 2013 Archive
  • 6. Online tools for site assessment  Google Earth - ruler and Azimuth tool  Google Maps -  “Classic maps” - ruler for rough estimate on sizing under “Maps Labs”  LIMITATIONS of tools and virtual assessment  Trees grow  Roof - hard to determine age / structural integrity  Can not see obstructions - vents/pipes  Can not achieve true shading analysis
  • 7. Online tools for site assessment  NREL PV Watts Calculator - multiple versions  Solar resource  Performance estimate  ROI  Google it: ”PV WATTS”  Other professional proposal software will calculate more accurate costs and ROI specific to the customer  Ex. Rebates from utility & financing (effects ROI)  Ex. Of programs- Energy Periscope, OnGrid Solar
  • 8. Google Earth • Measure lines, save for later viewing and sharing • Measure azimuth degrees instantly, declination preconfigured
  • 9. Google- ruler tool and street view • Measurements • Azimuths • Roof pitch • Building height
  • 10. PVWATTS from NREL FREE online tool NREL's PVWatts calculator determines the energy production and cost savings of grid-connected PV Systems.
  • 11. Select your location... & click "send to PVWatts". Tweek a few things, click to calculate, and viola!
  • 13. Site Analysis: Solar resource and shading  RESOURCES  NREL - Data tables (PSH)  Trig for shading analysis-  Go to solpowerpeople.com  Search for “trigonometry”:
  • 14. Site Analysis: Solar resource and shading  Resources:  Azimuth - production, shading  Altitude - production, shading  Solar window - year round production assessment  Magnetic declination - accurate production and shading Site assessment fundamentals
  • 15. Performing "ball-park estimates"- the risks  Online calculated area is not an accurate calculation of system size potential  Must visit site-  Obstructions  Shade  Mechanical considerations- roof trusses  Area efficiency not same as module efficiency  Power (kW), Area (m2), Efficiency  DC vs. AC
  • 16. Performing "ball-park estimates"- the risks  Costs may change depending on site specific conditions  Roof mount - type and age  Pole or Ground mount - soil- rock?  Roof tilt - not easy to determine online  Be sure customer is aware of utility charges when considering expected bills  Return on Investment (ROI)  Utility buyback policies
  • 17. Performing "ball-park estimates"- the risks  Resources:  #SolarMOOC Subject Matter Experts page:  Determine required attachments  Determine # of modules that will fit in area  Area, Budget and Energy demand sizing estimates Ball park estimates
  • 18. Grid Direct VS. battery-based systems  Grid direct- requires anti islanding  DOES NOT function when grid is down  Net-metering/ dual metering potential  Grid offers “free storage”  More efficient than batteries  Inverter selection
  • 19.  Battery based / Battery back-up  Stand Alone - will function when grid is down if storage exists  Grid tied with Battery Back-up- Critical load panel will function when grid is down-  limited capacity depending on battery bank size (autonomy)  More reliable = more storage = more expensive  Inverter selection, additional components  Conductors, OCPDs, charge controller, batteries, critical load panel, extra inverter if AC Coupled (battery backup)  NEC 690 Part VIII - Storage Batteries  NEC 480 - Storage Batteries Grid Direct VS. battery-based systems
  • 21. Site Assessment: Layout & Install  Component location  NEC requirements  Effects on performance and cost 2011 NEC
  • 22. Component Location & NEC Requirements  Installed in neat and workmanlike manner - NEC 110.12  Installed as listed or labeled - NEC 110.3(B)  Spaces required - NEC 110.26  Depends on location, voltage, etc.
  • 23. Component Location  MODULES:  IFC regulations - becoming a standard  Not mandated in 2012 NEC  Look for it in 2014  Attachments - framing considerations (roof)  Shading - again and again
  • 24. Inverter Location  Inverter - Distance from load center  Locate inverter near installation to avoid voltage drop  Potential shut down (design for inverter voltage range)  Prevent extra installation costs  Power loss, reduced ROI  Conductors  Conduit runs  Expansion fittings  Design time  Labor time  Chosen to match electrical connection
  • 25.  Component functionality/treatment:  Out of sun  Consider temperature  Requirements for equipment installation  NEC 110.13 - mounting and cooling  NEC 110.12 - neat and workmanlike  NEC 110.26 - working spaces  NEC 110.27 - live parts  Equipment manual - NEC 110.3(B)  Installed as listed and labeled Inverter Location
  • 26. Component Selection / Location Resources  Resources:  Voltage drop - #SolarMOOC with Raymer and Stovall  String sizing: Jeff Gilbert #SolarMOOC  Verifying System Design- voltage considerations, inverter matching, string sizing
  • 27. Component Selection / Location  DC rated- NEC 690.4(D)  Disconnects, OCPDs  Disconnecting means- NEC 690 Part III  DC disconnect must be in an accessible location  AHJ may require additional external DC disconnect even if integrated into Inverter  AC modules/microinverters: NEC 690.6  Batteries: NEC Article 480 & Article 690 Part VIII  NEC 480.9: Battery locations (NEC 110)  NEC 480.8: Racks and trays  NEC 690.71(B): dwellings = <50V Nominal  NEC 690.71(D): Nonconductive racks
  • 28. Effects on Performance and Cost  Performance  SHADE!- needs to be taken seriously- a tiny amount could kill production, and ROI for customer  Consider microinverters for potential solution  Geographical site considerations for production- smog, elevation, & Peak Sun Hours  High temperatures effect voltage (lowers)  High temperatures can effect equipment  Costs  Roof type and tilt or soil determines ease of installation  Requirements of interconnection- may require electrical upgrade
  • 29. Equipment selection: component matching  Grid Direct Systems:  Inverter to Voltage (string design of array)  Match the inverter voltage window  Start voltage  Max of inverter as well as 600V DC limit per NEC code  Consider MPPT range
  • 30. Equipment selection: component matching  Grid Direct Systems:  Inverter to Voltage (string design of array)  Match the inverter voltage window  Start voltage  Max of inverter as well as 600V DC limit per NEC code  Consider MPPT range  Conductor chosen for ampacity and conditions  Mike Holt- Verifying System Design
  • 31. Other BOS components…  Conduit and conductors chosen for conditions and NEC requirements  Ex.: NEC requires metal conduit for DC conductors run inside of a building - NEC 690.31(E)  Ex.: PV Source conductors must be USE-2 or PV wire- NEC 690.31(B)  All equipment must be DC rated (unless dealing with AC modules/microinverters)
  • 32. Component Selection: utility interconnection requirements  Make sure panel is not overloaded  NEC705.12(A) - Supply side connections possible  Treated as service connections- reference to NEC 230  NEC 705.12(D)(5) - Circuit breakers must be “suitable for backfeed” - if marked line and load, not suitable for load side connection
  • 33. Component Selection: utility interconnection requirements  NEC 705.12(D) - Utility Interactive inverters  NEC 705.12(D)(2) - load side connection- 120% rule allowed  Sum of amp rating of OCPDs connected must not exceed 120% of rating of busbar  Ex. 200A bus bar x 1.2 = allowable 240A OCPDs  240A - 170A = 70A  170A in use, then max load side connection is 70A  Exception - with battery bank- can use inverter output current:  Ex. 30A output from inverter = 30 x 1.25 = 37.5A, 40A OCPD
  • 34. Component Selection: utility interconnection requirements  Resource:  http://solarprofessional.com/articles/design- installation/nec-section-70512-and-utility- interconnections  Google: Supply side connection PV, or search SolarPro
  • 35. Component Selection: utility interconnection requirements  120% rule: #SolarMOOC w/ Richard Stovall, SolPowerPeople CEO and IREC Certified Master Trainer
  • 37. Who are we, and who am I?  SolPowerPeople, Inc.  IREC Accredited Continuing Education Provider  Offering Solar Training, in person and online  Sarah Raymer  Director of Education and Training  Asst. Instructor, #SolarMOOC host  NABCEP Certified PV Installation Professional  sraymer@solpowerpeople.com