PSE&G, Northeast Grid Reliability Project 2014 
The Northeast Grid Reliability Project will upgrade 138kV to 230kV on existing overhead transmission lines and will add 
a 230kV underground transmission circuit throughout Northern New Jersey. The upgrade will deliver increased electric 
capacity required by New Jersey business and residents, increase transfer capability, provide better power quality, and 
reduce transmission system congestion. 
As the Senior Contracts Manager for PSE&G's Northeast Grid Reliability Project in Northern New Jersey, I was recruited 
to help coach, mentor and train my four direct reports (each contract managers with little or no experience in commercial 
or construction contracting) on commercial contracting, construction contracting, and the negotiation of commercial terms 
and conditions, as well as improving the coordination of contract negotiations with PSE&G’s outside legal counsel. Their 
working relationships with internal stakeholders and the outside legal counsel were poor and crucial negotiation deadlines 
and program milestones for contract execution were not being met. 
At the end of my assignment: 
o We met 100% of all contract negotiation and contract execution milestones for that month 
o A new sense of urgency and efficiency in responding to stakeholder needs was now in place 
o My direct reports had received intensive training on time management, commercial contracting, 
construction contracting, and the negotiation of contract terms and conditions 
o The working relationship with PSE&G’s outside legal counsel was improved and the amount of 
contract language re-writes was down by 60%. 
Various Projects 2013 
Lead Project Procurement Manager for various EPC Design Build projects in the USA. Led procurement efforts 
on materials and services on a major utility power plant expansion project and an ethanol plant. 
I was recruited to be the Purchasing Director for Future Projects. As such, I: 
o Reduced backlog of contracts and purchase orders waiting to be issued by 30% 
o Sourced and located second and third vendors for needed supplies and services; increased 
competition and lowered prices by 30% as we moved away from sole source suppliers. 
o Coached, mentored, and trained new buyers in commercial and construction contracting. 
James W. Kendrick Project List Page 1 of 10
SunPower Corporation, Antelope Valley Solar Project in California 
July 2012 – September 2012 
Services Commodity Manager – Antelope Valley Solar Project (AVSP) Procurement Leader, managing all 
Services Procurement for SunPower's EPC Procurement team, including sales support, strategic sourcing, 
strategic planning, contract and subcontract negotiations, and pre-award and post-award contract and 
subcontract management on large scale solar array EPC projects in the Mohave Desert's Antelope Valley near 
Los Angeles. The 579-megawatt Antelope Valley Solar Projects (AVSP) consist of two co-located projects in 
Kern and Los Angeles Counties in California, that together, form the largest permitted solar photovoltaic power 
development in the world. 
Rio Tinto, Resolution Copper Mining LLC, Superior, AZ Aug. 
2011 – January 2012 
Superintendent – Project Contracts – EPCM project procurement and contract management in 
support of Resolution Copper Mining Company's mining operations in Superior Arizona. 
James W. Kendrick Project List Page 2 of 10
Westinghouse Electric Company, Cranberry Township, PA Jan. 
2010 – July 2010 
Senior Contract Review Analyst – provided contract review support and 
negotiations for Westinghouse’s nuclear construction projects: 
Southern Company / Georgia Power Vogtle 3 & 4 Units at the existing 
Vogtle Electric Generating Plant site near Augusta, Ga. 
James W. Kendrick Project List Page 3 of 10
Sanmen Nuclear Power Company, Sanmen Units 1 & 2 near Sanmen, 
China 
Shandong Nuclear Power Company, Haiyang Units 1 & 2 
James W. Kendrick Project List Page 4 of 10
Lower Colorado River Authority, Austin, Texas 
June 2007 – June 2009 
Senior Contract Specialist – provided contract negotiation and procurement in 
support of the following LCRA projects: 
Winchester Power Park, Winchester, Texas 
$400M Scrubber project to install a Flue Gas Distribution (FGD) air 
pollution control system and equipment at LCRA’s Fayette Power 
Project coal-fired power plant in La Grange, Texas 
Negotiated and managed the General Works contract with BE& K 
Construction, including all electrical work. 
Occasional procurement of T&D products, equipment, and services. 
James W. Kendrick Project List Page 5 of 10
CH2M Hill Lockwood Greene, Dallas, Texas 
Sept. 2006 – June 2007 
Senior Procurement Specialist 2 – provided contract and subcontract 
management and project management in support of CH2M Hill Lockwood 
Greene’s project: 
GAF Materials Corporation Gainesville Manufacturing Plant 
Renovation at Gainesville, Texas 
Kellogg Brown & Root (KBR), Houston, Texas 
March 2005 – Sept. 2006 
Senior Subcontract Administrator (Lead) – provided contract and subcontract 
management and project management in support of various “on demand, on call” and 
emergency design-and-build construction projects at Guam, 
Vandenberg AFB, and Cape Canaveral for the United States Air Force 
National Reconnaissance Office (NRO). Supervised and mentored two 
direct reports stationed at the Cape Canaveral site. 
200,000 square foot Eastern Processing Facility project at 
Cape Canaveral for NRO space projects 
(All facility photos are classified) 
James W. Kendrick Project List Page 6 of 10
CAPE Environmental Management Technologies, Inc., San Antonio, 
Texas 
Oct. 2004 – March 2005 
Senior Subcontract Administrator - provided contract and subcontract 
management and project management in support of various environmental 
remediation projects under Indefinite Delivery / Indefinite quality (IDIQ) 
task orders with the United States Army Corps of Engineers (USACOE) and the United 
States Air Force Center for Environmental Excellence (AFCEE). 
Resources Connection / Reliant Energy November 2001 – 
April 2002 
EPC Joint Venture / Prime Contract / Subcontract Manager - provided 
prime contract, joint venture, contract and subcontract management and 
project management in support of a 650MW natural gas EPC project (the 
Bighorn project) for the Owner, Reliant Energy. 
James W. Kendrick Project List Page 7 of 10
Duke Fluor Daniel, Aliso Viejo, California, Odessa, Texas, and 
Houston, Texas April 2000 – October 2001 
Senior Manager, Contracts & Procurement – provided contract and 
subcontract management and project management in support of Duke 
Fluor Daniel’s project: 
Odessa Ector Power Project, an EPC turnkey combined cycle 1000MW IPP power plant 
for Panda Energy at Odessa, Texas. Supervised four direct reports: one Secretary / 
Engineering Aide, Two Buyers, and a Ware house Manager. Solicited, received, 
evaluated, awarded, negotiated, and managed to final close-out 38 subcontracts totaling 
$72M for construction and services. Plant was completed successfully two months ahead 
of schedule and $4M under budget. 
Transmission and Distribution Contracts and Procurement Support 
Worked closely with MMR of Baton Rouge, Louisiana (the primary 
electrical subcontractor) on the contract and all change orders for 
installation of the electrical balance of the plant and the switchyard. 
Worked closely with the Start-up and Commissioning Manager and his 
team on meeting their contract and procurement needs , including the 
switchyard and transmission and distribution equipment, products, and 
software, such as: 
Power transformers 
Distribution transformers 
Control Room Equipment and Software 
SCADA/CMS/DMS Software 
Substation Automation Products and Software 
Meters and Metering Systems 
Valves 
Switchgears 
Transformer Management Systems 
Transformer Repairs and Refurbishment 
Monitoring Instruments and Systems 
T & D Operations Management Software 
Substation Controllers 
Flow Meters 
Capacitors 
Voltage Regulators 
Poles, Wires, Cables 
Tower Installation 
James W. Kendrick Project List Page 8 of 10
Central and South West (now part of American Electric Power 
(AEP), Dallas, Texas 
Jan. 1995 – April 2000 
Senior Contract Specialist, 1995 - 2000 - Performed comprehensive commercial 
contract and purchase order creative and administrative functions servicing 4 utility operating 
companies and all corporate bodies in Southwest region. Conducted supplies, services, 
commodities, IT, HR, MRO, and environmental remediation project contract negotiations 
with Fortune 500 companies. Handled all aspects of procurement and contract development 
and execution, and periodically oversaw plant modification EPC projects. Analyzed and 
evaluated market landscape, cost and pricing, and supplier financial standings, and provided 
supply chain expertise as needed. 
· Catalyzed $1.2M+ in savings by playing leadership role in merging and centralizing 
procurement operations of 4 utility companies into 1 system within 18 months. New 
supply chain department subsequently recognized by Edison Electric Institute as top 
utility in the nation. 
Contracts Manager, West Texas Utilities Company 
(WTU) , 1995 -2000 
Performed comprehensive commercial contract and purchase order 
management functions servicing all the procurement needs of all the power 
generation plants of West Texas Utilities Company. 
Contracts Manager, Public Service Company of 
James W. Kendrick Project List Page 9 of 10
Oklahoma (PSO), 1995 -2000 
Performed comprehensive commercial contract and purchase order 
management functions servicing all the procurement needs of all the power 
generation plants of Public Service Company of Oklahoma (PSO). 
Contracts Manager, CSW Engineering, 1995 -2000 
Performed comprehensive commercial bids, proposals, and contract 
management functions in support of civil, structural, and mechanical 
engineering services offered to power industry clients by CSW Engineering. 
Transmission and Distribution Contracts and Procurement Support, 
1995 -2000 for Switchyards and Substations 
Worked closely with the WTU and PSO Power Generation Plant 
Managers and their teams, on meeting their contract and procurement needs , including 
the switchyard and transmission and distribution equipment, products, and software, such 
as: 
Power transformers 
Distribution transformers 
Sensors and Transducers 
Control Room Equipment and Software 
SCADA/CMS/DMS Software 
Substation Automation Products and Software 
Meters and Metering Systems 
Valves 
Switchgears 
Transformer Management Systems 
Transformer Repairs and Refurbishment 
Monitoring Instruments and Systems 
T & D Operations Management Software 
Substation Controllers 
Flow Meters 
Capacitors 
Voltage Regulators, etc. 
I performed various other projects and duties in Contracts and Procurement in the Environment, 
Defense, Management Consulting, and Telecommunication Industries and in the Public Sector, 1978 – 
1995. Details available upon request 
James W. Kendrick Project List Page 10 of 10

More Related Content

What's hot

Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016Larry Wicker
 
PMR Career Experience 2016
PMR Career Experience 2016PMR Career Experience 2016
PMR Career Experience 2016Pedro Rosario
 
JJ Permuy Res80
JJ Permuy Res80JJ Permuy Res80
JJ Permuy Res80
JJPermuy
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Randy Seperak
 
Gregory J Krall Resume Master
Gregory J Krall Resume MasterGregory J Krall Resume Master
Gregory J Krall Resume MasterGreg Krall
 
G Alex Gerritsen Resume 02152016
G  Alex Gerritsen Resume 02152016G  Alex Gerritsen Resume 02152016
G Alex Gerritsen Resume 02152016Alex Gerritsen
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2Rodney Taylor
 
Mailhot Resume_2016
Mailhot Resume_2016Mailhot Resume_2016
Mailhot Resume_2016Ron Mailhot
 
Scott Kursevich Resume 161114
Scott Kursevich Resume 161114Scott Kursevich Resume 161114
Scott Kursevich Resume 161114Scott Kursevich
 
SKHOWARD Resume 9-17-16
SKHOWARD Resume 9-17-16SKHOWARD Resume 9-17-16
SKHOWARD Resume 9-17-16Kevin Howard
 
Ardie cv
Ardie cvArdie cv
Ardie cv
Eduarde Lopez
 

What's hot (20)

Shiva-CV
Shiva-CVShiva-CV
Shiva-CV
 
Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016
 
CV GM 050116
CV GM 050116CV GM 050116
CV GM 050116
 
PMR Career Experience 2016
PMR Career Experience 2016PMR Career Experience 2016
PMR Career Experience 2016
 
Martin L Reetz Resume 092215
Martin L Reetz Resume 092215Martin L Reetz Resume 092215
Martin L Reetz Resume 092215
 
JJ Permuy Res80
JJ Permuy Res80JJ Permuy Res80
JJ Permuy Res80
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16
 
Gregory J Krall Resume Master
Gregory J Krall Resume MasterGregory J Krall Resume Master
Gregory J Krall Resume Master
 
Word Doc CV
Word Doc CVWord Doc CV
Word Doc CV
 
G Alex Gerritsen Resume 02152016
G  Alex Gerritsen Resume 02152016G  Alex Gerritsen Resume 02152016
G Alex Gerritsen Resume 02152016
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2
 
Francis' CV
Francis' CVFrancis' CV
Francis' CV
 
Mailhot Resume_2016
Mailhot Resume_2016Mailhot Resume_2016
Mailhot Resume_2016
 
Scott Kursevich Resume 161114
Scott Kursevich Resume 161114Scott Kursevich Resume 161114
Scott Kursevich Resume 161114
 
S&B Resume
S&B ResumeS&B Resume
S&B Resume
 
SKHOWARD Resume 9-17-16
SKHOWARD Resume 9-17-16SKHOWARD Resume 9-17-16
SKHOWARD Resume 9-17-16
 
Ardie cv
Ardie cvArdie cv
Ardie cv
 
resume2016kaaa
resume2016kaaaresume2016kaaa
resume2016kaaa
 
Randall-Sheldon
Randall-SheldonRandall-Sheldon
Randall-Sheldon
 
Madhankumar 1984..
Madhankumar 1984..Madhankumar 1984..
Madhankumar 1984..
 

Viewers also liked

Internety Profile
Internety ProfileInternety Profile
Internety Profilekenanbr
 
Finger Injuries in Sport Climbing
Finger Injuries in Sport ClimbingFinger Injuries in Sport Climbing
Finger Injuries in Sport Climbingsomahealthcare
 
How Stupid Can We Get_Notes
How Stupid Can We Get_NotesHow Stupid Can We Get_Notes
How Stupid Can We Get_Notesguest714139
 
embeddedmarketing
embeddedmarketingembeddedmarketing
embeddedmarketingguestdf8cba
 
Jay & Aleemah
Jay &  AleemahJay &  Aleemah
Jay & Aleemahjaleema
 
Connective Tissue, Cortisol & HPA Axis
Connective Tissue, Cortisol & HPA AxisConnective Tissue, Cortisol & HPA Axis
Connective Tissue, Cortisol & HPA Axis
somahealthcare
 
Brand Equity Measures
Brand Equity MeasuresBrand Equity Measures
Brand Equity Measures
sat2coolguy
 
WESOŁYCH ŚWIĄT
WESOŁYCH ŚWIĄTWESOŁYCH ŚWIĄT
WESOŁYCH ŚWIĄT
guest28066d
 
M07 10 g_kegel_ff_topologies_for_is_5.12.07
M07 10 g_kegel_ff_topologies_for_is_5.12.07M07 10 g_kegel_ff_topologies_for_is_5.12.07
M07 10 g_kegel_ff_topologies_for_is_5.12.07
Achmad Rizky W
 
Weosłych Świąt!!!
Weosłych Świąt!!!Weosłych Świąt!!!
Weosłych Świąt!!!guest28066d
 
Athletes, The Immune System & Massage
Athletes, The Immune System & MassageAthletes, The Immune System & Massage
Athletes, The Immune System & Massage
somahealthcare
 

Viewers also liked (14)

Internety Profile
Internety ProfileInternety Profile
Internety Profile
 
Finger Injuries in Sport Climbing
Finger Injuries in Sport ClimbingFinger Injuries in Sport Climbing
Finger Injuries in Sport Climbing
 
How Stupid Can We Get_Notes
How Stupid Can We Get_NotesHow Stupid Can We Get_Notes
How Stupid Can We Get_Notes
 
Foodart.ppt2
Foodart.ppt2Foodart.ppt2
Foodart.ppt2
 
embeddedmarketing
embeddedmarketingembeddedmarketing
embeddedmarketing
 
Jay & Aleemah
Jay &  AleemahJay &  Aleemah
Jay & Aleemah
 
Connective Tissue, Cortisol & HPA Axis
Connective Tissue, Cortisol & HPA AxisConnective Tissue, Cortisol & HPA Axis
Connective Tissue, Cortisol & HPA Axis
 
Richeng
RichengRicheng
Richeng
 
Brand Equity Measures
Brand Equity MeasuresBrand Equity Measures
Brand Equity Measures
 
WESOŁYCH ŚWIĄT
WESOŁYCH ŚWIĄTWESOŁYCH ŚWIĄT
WESOŁYCH ŚWIĄT
 
M07 10 g_kegel_ff_topologies_for_is_5.12.07
M07 10 g_kegel_ff_topologies_for_is_5.12.07M07 10 g_kegel_ff_topologies_for_is_5.12.07
M07 10 g_kegel_ff_topologies_for_is_5.12.07
 
Weosłych Świąt!!!
Weosłych Świąt!!!Weosłych Świąt!!!
Weosłych Świąt!!!
 
Athletes, The Immune System & Massage
Athletes, The Immune System & MassageAthletes, The Immune System & Massage
Athletes, The Immune System & Massage
 
Virxilio vieitez
Virxilio vieitezVirxilio vieitez
Virxilio vieitez
 

Similar to My project list - James W. Kendrick

Kendrick james exec_bio_r1[1]
Kendrick james exec_bio_r1[1]Kendrick james exec_bio_r1[1]
Kendrick james exec_bio_r1[1]
James W. Kendrick, CSI, CDT
 
Rusty McEacern Project Manager
Rusty McEacern Project ManagerRusty McEacern Project Manager
Rusty McEacern Project ManagerMalcolm McEachern
 
Electrical Resume Michael L Roesch 4Jan16 - Copy
Electrical Resume Michael L Roesch 4Jan16 - CopyElectrical Resume Michael L Roesch 4Jan16 - Copy
Electrical Resume Michael L Roesch 4Jan16 - CopyMichael Roesch
 
Edward E calder CV 2014
Edward E calder CV 2014Edward E calder CV 2014
Edward E calder CV 2014Edward Calder
 
Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resumeDerek Dhonau
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager ResumeJack Dickerson
 
Energy Consulting SDVOSB Projects
Energy Consulting SDVOSB ProjectsEnergy Consulting SDVOSB Projects
Energy Consulting SDVOSB Projects
gasanden
 
Energy Consulting SDVOSB Projects
Energy Consulting SDVOSB ProjectsEnergy Consulting SDVOSB Projects
Energy Consulting SDVOSB Projects
Link Resources
 
Energy Consulting SDVOSB Projects
Energy Consulting SDVOSB ProjectsEnergy Consulting SDVOSB Projects
Energy Consulting SDVOSB Projects
natalyabelmont
 
RICHARD REVILLE RESUME 9-28-15
RICHARD REVILLE RESUME 9-28-15RICHARD REVILLE RESUME 9-28-15
RICHARD REVILLE RESUME 9-28-15Richard Reville
 
diruhi-lilly-korkukluoglu Resume (3)
diruhi-lilly-korkukluoglu Resume (3)diruhi-lilly-korkukluoglu Resume (3)
diruhi-lilly-korkukluoglu Resume (3)Lilly K
 
Brenco Company Resume
Brenco Company ResumeBrenco Company Resume
Brenco Company Resume
Brenco
 

Similar to My project list - James W. Kendrick (20)

Kendrick james exec_bio_r1[1]
Kendrick james exec_bio_r1[1]Kendrick james exec_bio_r1[1]
Kendrick james exec_bio_r1[1]
 
Rusty McEacern Project Manager
Rusty McEacern Project ManagerRusty McEacern Project Manager
Rusty McEacern Project Manager
 
KENDRICK_James_ExecBio
KENDRICK_James_ExecBioKENDRICK_James_ExecBio
KENDRICK_James_ExecBio
 
Project List 1
Project List 1Project List 1
Project List 1
 
Electrical Resume Michael L Roesch 4Jan16 - Copy
Electrical Resume Michael L Roesch 4Jan16 - CopyElectrical Resume Michael L Roesch 4Jan16 - Copy
Electrical Resume Michael L Roesch 4Jan16 - Copy
 
Edward E calder CV 2014
Edward E calder CV 2014Edward E calder CV 2014
Edward E calder CV 2014
 
Tringale Resume 9-2-14
Tringale Resume 9-2-14Tringale Resume 9-2-14
Tringale Resume 9-2-14
 
SaifMogriResume (2)
SaifMogriResume (2)SaifMogriResume (2)
SaifMogriResume (2)
 
Resume
ResumeResume
Resume
 
Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resume
 
Roger Berryment Resume
Roger Berryment ResumeRoger Berryment Resume
Roger Berryment Resume
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager Resume
 
Energy Consulting SDVOSB Projects
Energy Consulting SDVOSB ProjectsEnergy Consulting SDVOSB Projects
Energy Consulting SDVOSB Projects
 
Energy Consulting SDVOSB Projects
Energy Consulting SDVOSB ProjectsEnergy Consulting SDVOSB Projects
Energy Consulting SDVOSB Projects
 
Energy Consulting SDVOSB Projects
Energy Consulting SDVOSB ProjectsEnergy Consulting SDVOSB Projects
Energy Consulting SDVOSB Projects
 
Lee Bragan's Resume
Lee Bragan's ResumeLee Bragan's Resume
Lee Bragan's Resume
 
RICHARD REVILLE RESUME 9-28-15
RICHARD REVILLE RESUME 9-28-15RICHARD REVILLE RESUME 9-28-15
RICHARD REVILLE RESUME 9-28-15
 
AMC CEM CDSM
AMC CEM CDSMAMC CEM CDSM
AMC CEM CDSM
 
diruhi-lilly-korkukluoglu Resume (3)
diruhi-lilly-korkukluoglu Resume (3)diruhi-lilly-korkukluoglu Resume (3)
diruhi-lilly-korkukluoglu Resume (3)
 
Brenco Company Resume
Brenco Company ResumeBrenco Company Resume
Brenco Company Resume
 

Recently uploaded

太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】
太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】
太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】
foismail170
 
Resumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying OnlineResumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying Online
Bruce Bennett
 
一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理
yuhofha
 
'Guidance and counselling- role of Psychologist in Guidance and Counselling.
'Guidance and counselling- role of Psychologist in Guidance and Counselling.'Guidance and counselling- role of Psychologist in Guidance and Counselling.
'Guidance and counselling- role of Psychologist in Guidance and Counselling.
PaviBangera
 
How Mentoring Elevates Your PM Career | PMI Silver Spring Chapter
How Mentoring Elevates Your PM Career | PMI Silver Spring ChapterHow Mentoring Elevates Your PM Career | PMI Silver Spring Chapter
How Mentoring Elevates Your PM Career | PMI Silver Spring Chapter
Hector Del Castillo, CPM, CPMM
 
lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789
Ghh
 
Exploring Career Paths in Cybersecurity for Technical Communicators
Exploring Career Paths in Cybersecurity for Technical CommunicatorsExploring Career Paths in Cybersecurity for Technical Communicators
Exploring Career Paths in Cybersecurity for Technical Communicators
Ben Woelk, CISSP, CPTC
 
DOC-20240602-WA0001..pdf DOC-20240602-WA0001..pdf
DOC-20240602-WA0001..pdf DOC-20240602-WA0001..pdfDOC-20240602-WA0001..pdf DOC-20240602-WA0001..pdf
DOC-20240602-WA0001..pdf DOC-20240602-WA0001..pdf
Pushpendra Kumar
 
New Explore Careers and College Majors 2024.pdf
New Explore Careers and College Majors 2024.pdfNew Explore Careers and College Majors 2024.pdf
New Explore Careers and College Majors 2024.pdf
Dr. Mary Askew
 
Andrea Kate Portfolio Presentation.pdf
Andrea Kate  Portfolio  Presentation.pdfAndrea Kate  Portfolio  Presentation.pdf
Andrea Kate Portfolio Presentation.pdf
andreakaterasco
 
labb123456789123456789123456789123456789
labb123456789123456789123456789123456789labb123456789123456789123456789123456789
labb123456789123456789123456789123456789
Ghh
 
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdfRECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
AlessandroMartins454470
 
Personal Brand exploration KE.pdf for assignment
Personal Brand exploration KE.pdf for assignmentPersonal Brand exploration KE.pdf for assignment
Personal Brand exploration KE.pdf for assignment
ragingokie
 
Luke Royak's Personal Brand Exploration!
Luke Royak's Personal Brand Exploration!Luke Royak's Personal Brand Exploration!
Luke Royak's Personal Brand Exploration!
LukeRoyak
 
Brand Identity For A Sportscaster Project and Portfolio I
Brand Identity For A Sportscaster Project and Portfolio IBrand Identity For A Sportscaster Project and Portfolio I
Brand Identity For A Sportscaster Project and Portfolio I
thomasaolson2000
 
How to Master LinkedIn for Career and Business
How to Master LinkedIn for Career and BusinessHow to Master LinkedIn for Career and Business
How to Master LinkedIn for Career and Business
ideatoipo
 
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
pxyhy
 
The Impact of Artificial Intelligence on Modern Society.pdf
The Impact of Artificial Intelligence on Modern Society.pdfThe Impact of Artificial Intelligence on Modern Society.pdf
The Impact of Artificial Intelligence on Modern Society.pdf
ssuser3e63fc
 
Personal Brand Exploration Comedy Jxnelle.
Personal Brand Exploration Comedy Jxnelle.Personal Brand Exploration Comedy Jxnelle.
Personal Brand Exploration Comedy Jxnelle.
alexthomas971
 
Interactive Dictionary AIDS-B.pptx aaaaaaaaaaaaaaaaaaaaaaaaaa
Interactive Dictionary AIDS-B.pptx aaaaaaaaaaaaaaaaaaaaaaaaaaInteractive Dictionary AIDS-B.pptx aaaaaaaaaaaaaaaaaaaaaaaaaa
Interactive Dictionary AIDS-B.pptx aaaaaaaaaaaaaaaaaaaaaaaaaa
23211a7274
 

Recently uploaded (20)

太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】
太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】
太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】
 
Resumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying OnlineResumes, Cover Letters, and Applying Online
Resumes, Cover Letters, and Applying Online
 
一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理
 
'Guidance and counselling- role of Psychologist in Guidance and Counselling.
'Guidance and counselling- role of Psychologist in Guidance and Counselling.'Guidance and counselling- role of Psychologist in Guidance and Counselling.
'Guidance and counselling- role of Psychologist in Guidance and Counselling.
 
How Mentoring Elevates Your PM Career | PMI Silver Spring Chapter
How Mentoring Elevates Your PM Career | PMI Silver Spring ChapterHow Mentoring Elevates Your PM Career | PMI Silver Spring Chapter
How Mentoring Elevates Your PM Career | PMI Silver Spring Chapter
 
lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789lab.123456789123456789123456789123456789
lab.123456789123456789123456789123456789
 
Exploring Career Paths in Cybersecurity for Technical Communicators
Exploring Career Paths in Cybersecurity for Technical CommunicatorsExploring Career Paths in Cybersecurity for Technical Communicators
Exploring Career Paths in Cybersecurity for Technical Communicators
 
DOC-20240602-WA0001..pdf DOC-20240602-WA0001..pdf
DOC-20240602-WA0001..pdf DOC-20240602-WA0001..pdfDOC-20240602-WA0001..pdf DOC-20240602-WA0001..pdf
DOC-20240602-WA0001..pdf DOC-20240602-WA0001..pdf
 
New Explore Careers and College Majors 2024.pdf
New Explore Careers and College Majors 2024.pdfNew Explore Careers and College Majors 2024.pdf
New Explore Careers and College Majors 2024.pdf
 
Andrea Kate Portfolio Presentation.pdf
Andrea Kate  Portfolio  Presentation.pdfAndrea Kate  Portfolio  Presentation.pdf
Andrea Kate Portfolio Presentation.pdf
 
labb123456789123456789123456789123456789
labb123456789123456789123456789123456789labb123456789123456789123456789123456789
labb123456789123456789123456789123456789
 
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdfRECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
RECOGNITION AWARD 13 - TO ALESSANDRO MARTINS.pdf
 
Personal Brand exploration KE.pdf for assignment
Personal Brand exploration KE.pdf for assignmentPersonal Brand exploration KE.pdf for assignment
Personal Brand exploration KE.pdf for assignment
 
Luke Royak's Personal Brand Exploration!
Luke Royak's Personal Brand Exploration!Luke Royak's Personal Brand Exploration!
Luke Royak's Personal Brand Exploration!
 
Brand Identity For A Sportscaster Project and Portfolio I
Brand Identity For A Sportscaster Project and Portfolio IBrand Identity For A Sportscaster Project and Portfolio I
Brand Identity For A Sportscaster Project and Portfolio I
 
How to Master LinkedIn for Career and Business
How to Master LinkedIn for Career and BusinessHow to Master LinkedIn for Career and Business
How to Master LinkedIn for Career and Business
 
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
一比一原版(UVic毕业证)维多利亚大学毕业证如何办理
 
The Impact of Artificial Intelligence on Modern Society.pdf
The Impact of Artificial Intelligence on Modern Society.pdfThe Impact of Artificial Intelligence on Modern Society.pdf
The Impact of Artificial Intelligence on Modern Society.pdf
 
Personal Brand Exploration Comedy Jxnelle.
Personal Brand Exploration Comedy Jxnelle.Personal Brand Exploration Comedy Jxnelle.
Personal Brand Exploration Comedy Jxnelle.
 
Interactive Dictionary AIDS-B.pptx aaaaaaaaaaaaaaaaaaaaaaaaaa
Interactive Dictionary AIDS-B.pptx aaaaaaaaaaaaaaaaaaaaaaaaaaInteractive Dictionary AIDS-B.pptx aaaaaaaaaaaaaaaaaaaaaaaaaa
Interactive Dictionary AIDS-B.pptx aaaaaaaaaaaaaaaaaaaaaaaaaa
 

My project list - James W. Kendrick

  • 1. James W. Kendrick CSI, CDT Project List 1995 to Present PSE&G, Northeast Grid Reliability Project 2014 The Northeast Grid Reliability Project will upgrade 138kV to 230kV on existing overhead transmission lines and will add a 230kV underground transmission circuit throughout Northern New Jersey. The upgrade will deliver increased electric capacity required by New Jersey business and residents, increase transfer capability, provide better power quality, and reduce transmission system congestion. As the Senior Contracts Manager for PSE&G's Northeast Grid Reliability Project in Northern New Jersey, I was recruited to help coach, mentor and train my four direct reports (each contract managers with little or no experience in commercial or construction contracting) on commercial contracting, construction contracting, and the negotiation of commercial terms and conditions, as well as improving the coordination of contract negotiations with PSE&G’s outside legal counsel. Their working relationships with internal stakeholders and the outside legal counsel were poor and crucial negotiation deadlines and program milestones for contract execution were not being met. At the end of my assignment: o We met 100% of all contract negotiation and contract execution milestones for that month o A new sense of urgency and efficiency in responding to stakeholder needs was now in place o My direct reports had received intensive training on time management, commercial contracting, construction contracting, and the negotiation of contract terms and conditions o The working relationship with PSE&G’s outside legal counsel was improved and the amount of contract language re-writes was down by 60%. Various Projects 2013 Lead Project Procurement Manager for various EPC Design Build projects in the USA. Led procurement efforts on materials and services on a major utility power plant expansion project and an ethanol plant. I was recruited to be the Purchasing Director for Future Projects. As such, I: o Reduced backlog of contracts and purchase orders waiting to be issued by 30% o Sourced and located second and third vendors for needed supplies and services; increased competition and lowered prices by 30% as we moved away from sole source suppliers. o Coached, mentored, and trained new buyers in commercial and construction contracting. James W. Kendrick Project List Page 1 of 10
  • 2. SunPower Corporation, Antelope Valley Solar Project in California July 2012 – September 2012 Services Commodity Manager – Antelope Valley Solar Project (AVSP) Procurement Leader, managing all Services Procurement for SunPower's EPC Procurement team, including sales support, strategic sourcing, strategic planning, contract and subcontract negotiations, and pre-award and post-award contract and subcontract management on large scale solar array EPC projects in the Mohave Desert's Antelope Valley near Los Angeles. The 579-megawatt Antelope Valley Solar Projects (AVSP) consist of two co-located projects in Kern and Los Angeles Counties in California, that together, form the largest permitted solar photovoltaic power development in the world. Rio Tinto, Resolution Copper Mining LLC, Superior, AZ Aug. 2011 – January 2012 Superintendent – Project Contracts – EPCM project procurement and contract management in support of Resolution Copper Mining Company's mining operations in Superior Arizona. James W. Kendrick Project List Page 2 of 10
  • 3. Westinghouse Electric Company, Cranberry Township, PA Jan. 2010 – July 2010 Senior Contract Review Analyst – provided contract review support and negotiations for Westinghouse’s nuclear construction projects: Southern Company / Georgia Power Vogtle 3 & 4 Units at the existing Vogtle Electric Generating Plant site near Augusta, Ga. James W. Kendrick Project List Page 3 of 10
  • 4. Sanmen Nuclear Power Company, Sanmen Units 1 & 2 near Sanmen, China Shandong Nuclear Power Company, Haiyang Units 1 & 2 James W. Kendrick Project List Page 4 of 10
  • 5. Lower Colorado River Authority, Austin, Texas June 2007 – June 2009 Senior Contract Specialist – provided contract negotiation and procurement in support of the following LCRA projects: Winchester Power Park, Winchester, Texas $400M Scrubber project to install a Flue Gas Distribution (FGD) air pollution control system and equipment at LCRA’s Fayette Power Project coal-fired power plant in La Grange, Texas Negotiated and managed the General Works contract with BE& K Construction, including all electrical work. Occasional procurement of T&D products, equipment, and services. James W. Kendrick Project List Page 5 of 10
  • 6. CH2M Hill Lockwood Greene, Dallas, Texas Sept. 2006 – June 2007 Senior Procurement Specialist 2 – provided contract and subcontract management and project management in support of CH2M Hill Lockwood Greene’s project: GAF Materials Corporation Gainesville Manufacturing Plant Renovation at Gainesville, Texas Kellogg Brown & Root (KBR), Houston, Texas March 2005 – Sept. 2006 Senior Subcontract Administrator (Lead) – provided contract and subcontract management and project management in support of various “on demand, on call” and emergency design-and-build construction projects at Guam, Vandenberg AFB, and Cape Canaveral for the United States Air Force National Reconnaissance Office (NRO). Supervised and mentored two direct reports stationed at the Cape Canaveral site. 200,000 square foot Eastern Processing Facility project at Cape Canaveral for NRO space projects (All facility photos are classified) James W. Kendrick Project List Page 6 of 10
  • 7. CAPE Environmental Management Technologies, Inc., San Antonio, Texas Oct. 2004 – March 2005 Senior Subcontract Administrator - provided contract and subcontract management and project management in support of various environmental remediation projects under Indefinite Delivery / Indefinite quality (IDIQ) task orders with the United States Army Corps of Engineers (USACOE) and the United States Air Force Center for Environmental Excellence (AFCEE). Resources Connection / Reliant Energy November 2001 – April 2002 EPC Joint Venture / Prime Contract / Subcontract Manager - provided prime contract, joint venture, contract and subcontract management and project management in support of a 650MW natural gas EPC project (the Bighorn project) for the Owner, Reliant Energy. James W. Kendrick Project List Page 7 of 10
  • 8. Duke Fluor Daniel, Aliso Viejo, California, Odessa, Texas, and Houston, Texas April 2000 – October 2001 Senior Manager, Contracts & Procurement – provided contract and subcontract management and project management in support of Duke Fluor Daniel’s project: Odessa Ector Power Project, an EPC turnkey combined cycle 1000MW IPP power plant for Panda Energy at Odessa, Texas. Supervised four direct reports: one Secretary / Engineering Aide, Two Buyers, and a Ware house Manager. Solicited, received, evaluated, awarded, negotiated, and managed to final close-out 38 subcontracts totaling $72M for construction and services. Plant was completed successfully two months ahead of schedule and $4M under budget. Transmission and Distribution Contracts and Procurement Support Worked closely with MMR of Baton Rouge, Louisiana (the primary electrical subcontractor) on the contract and all change orders for installation of the electrical balance of the plant and the switchyard. Worked closely with the Start-up and Commissioning Manager and his team on meeting their contract and procurement needs , including the switchyard and transmission and distribution equipment, products, and software, such as: Power transformers Distribution transformers Control Room Equipment and Software SCADA/CMS/DMS Software Substation Automation Products and Software Meters and Metering Systems Valves Switchgears Transformer Management Systems Transformer Repairs and Refurbishment Monitoring Instruments and Systems T & D Operations Management Software Substation Controllers Flow Meters Capacitors Voltage Regulators Poles, Wires, Cables Tower Installation James W. Kendrick Project List Page 8 of 10
  • 9. Central and South West (now part of American Electric Power (AEP), Dallas, Texas Jan. 1995 – April 2000 Senior Contract Specialist, 1995 - 2000 - Performed comprehensive commercial contract and purchase order creative and administrative functions servicing 4 utility operating companies and all corporate bodies in Southwest region. Conducted supplies, services, commodities, IT, HR, MRO, and environmental remediation project contract negotiations with Fortune 500 companies. Handled all aspects of procurement and contract development and execution, and periodically oversaw plant modification EPC projects. Analyzed and evaluated market landscape, cost and pricing, and supplier financial standings, and provided supply chain expertise as needed. · Catalyzed $1.2M+ in savings by playing leadership role in merging and centralizing procurement operations of 4 utility companies into 1 system within 18 months. New supply chain department subsequently recognized by Edison Electric Institute as top utility in the nation. Contracts Manager, West Texas Utilities Company (WTU) , 1995 -2000 Performed comprehensive commercial contract and purchase order management functions servicing all the procurement needs of all the power generation plants of West Texas Utilities Company. Contracts Manager, Public Service Company of James W. Kendrick Project List Page 9 of 10
  • 10. Oklahoma (PSO), 1995 -2000 Performed comprehensive commercial contract and purchase order management functions servicing all the procurement needs of all the power generation plants of Public Service Company of Oklahoma (PSO). Contracts Manager, CSW Engineering, 1995 -2000 Performed comprehensive commercial bids, proposals, and contract management functions in support of civil, structural, and mechanical engineering services offered to power industry clients by CSW Engineering. Transmission and Distribution Contracts and Procurement Support, 1995 -2000 for Switchyards and Substations Worked closely with the WTU and PSO Power Generation Plant Managers and their teams, on meeting their contract and procurement needs , including the switchyard and transmission and distribution equipment, products, and software, such as: Power transformers Distribution transformers Sensors and Transducers Control Room Equipment and Software SCADA/CMS/DMS Software Substation Automation Products and Software Meters and Metering Systems Valves Switchgears Transformer Management Systems Transformer Repairs and Refurbishment Monitoring Instruments and Systems T & D Operations Management Software Substation Controllers Flow Meters Capacitors Voltage Regulators, etc. I performed various other projects and duties in Contracts and Procurement in the Environment, Defense, Management Consulting, and Telecommunication Industries and in the Public Sector, 1978 – 1995. Details available upon request James W. Kendrick Project List Page 10 of 10