Mr. Sleep has over 31 years of experience that has focused on the design and delivery of a wide variety of
capital improvement projects in commercial and industrial settings. His technical background includes
project management of both construction and design projects as well as estimating, commissioning,
construction management, and systems qualification/validation. Area of expertise is concurrent with
management of multiple capital improvement projects from concept through final product delivery,
reflecting PMP industries best practices.
Experience (cont’d)
1984 – November
Hired into General Motors Facility Engineering
1985 – $900K
Apprentice, Oldsmobile V8 Motor line Retooling
Project, New tooling to replace out dated
Machinery, GM Plant 1 Building 33, Lansing,
MI
1986 - $1.1MM
Apprentice, BOC V6 Motor line New
Installation Project, GM Plant 1 Building 36,
Lansing, MI
1987 - $850K
Apprentice, Final Assembly Retooling Project,
New installation of DVT test pit equipment and
controllers, GM Plant 1 Building 90, Lansing,
MI
1988 - $1.2MM
Apprentice, Decommission Plating Process, all
equipment and processes removed.
Environmentally cleaned and disposed of per
MIOSIHA requirements. Site prep for new press
metal line, GM Plant 3 Building 301, Lansing,
MI
1989 - $1.9MM
Journeyman, Press Metal Line Installation,
Foundation prep, Base Steel work, Press Install,
GM Plant 3 Building 301, Lansing, MI
1990 - $1.2MM
Journeyman, Press Metal Line Installation, Final
equipment and processes installed for start up,
GM Plant 3 Building 301, Lansing, MI
$800K - Journeyman, Relocation of Press Line,
Decommission existing Pres Line for install and
operation at Plant 3, Plant 1 Bldg 56 to Plant 3
Bldg 405, Lansing, MI
1991 - $1.3MM
Journeyman, New 100K plus CFM HVAC air
handling systems, installation for existing
building ventilation and future project works. 10
roof top mounted self contained module systems.
Steel fabrication and install per site/module.
Helicopter lift and set in place, steel support
structure and then HVAC modules after.
1992- $4.5MM
GENERAL MOTORS, LLC Douglas E Sleep,Jr, MBA
Manager/Project Engineering
Team Leader, SMC Mix Room and Press Line
Manufacturing Project, GM Plant 1, Building 46,
Lansing, MI
1993 - $2.1MM
Team Leader, Building 66 Additions and
Renovation Project- New site for Engineering,
Training and Management, Plant 1, Lansing, MI
1994 – $2.1MM Continued
Team Leader, Building 66 Additions and
Renovation Project- New site for Engineering,
Training and Management, Plant 1, Lansing, MI
1995 – $1.6MM
Team Leader, Decommission and Salvage of
Capital Equipment from Motor Plant Facility, 1
Million Square Feet- for New GM Facility LGR
on site of Plant 1, Lansing, MI
1996 - $800K
Team Leader, Decommission High Voltage
13KV Substations and power transfers (4
Locations). Reroute power supplies to new
locations for future use and Salvage of Capital
Equipment, Motor Plant Facility. GM Plant 1,
Lansing, MI
1997 - $1.0MM
Team Leader, Decommission, Salvage of Capital
Equipment, and Engineering Buildings 62/64-
for New GM Facility LGR on site of Plant 1,
Lansing, MI
1998 - $900K
Team Leader, Decommission Building 40,
Relocate Tool Room Facility and Equipment to
offsite at Demmer Fabrication Center, Lansing,
MI
1999 - $1.5MM
Team Leader, Underground water sewer project,
tank farm project, part of plant 1 decommission
project. Per E.P.A. regulations, new installation
of drain lines to divert direct lines leading into
The Grand River from GM property. Redirecting
all ground and street water through a processing
facility first to prevent any contaminants
reaching the river. Plant 1, Lansing, MI
2000 - $2.3MM
Group Leader, Tank farm project continued to
run exiting assembly plant and new assembly
plant LGR under construction. Plant 1, Lansing,
MI
2001 -$900K
Group Leader, Building and grounds renovation
project for New GM Facility LGR on site of
Plant 1. Ground water drains and parking lots
2002 - $950K
Group Leader, Decommission and salvage of
remaining buildings and site management,
Electric and Gas shut downs and stabilized.
MIOSHA and EPA requirements upheld for
Plant 1, Lansing, MI
2003 - $1.4MM
Group Leader, Decommission and Salvage of
Capital Equipment. Building and site
management per MIOSHA and EPA
requirements, at Fisher Body Plant 6, Lansing,
MI
2004 - $1.5MM
Group Leader, Relocating GM Skill Trades
Construction Crew Facility and Equipment from
Plant 1 to Plant 4 site, New Paint ventilation
system installed at Plant 4, Lansing, MI
2005 - $1.4MM
Project Engineer, Decommission of Plant 3 Press
Metal Fabrication Center, salvage of capital
equipment, building and site management per
MIOSHA and EPA requirements, Plant 3,
Lansing, MI
2006 - $2.6MM
Project Engineer, LGR Body Plant, building
expansion 200K Sq Ft, new utilities and new
capital equipment installation, Lansing, MI
2007 - $1.1MM
Project Engineer, LGR Body plant retooling and
salvage project of old equipment. New
equipment and processes installed. Lansing, MI
2008 - $1.2MM
Project Engineer, LGR Paint plant retooling and
salvage project of old equipment. New
equipment and processes installed. Lansing, MI
2009 - $1.4MM
GENERAL MOTORS, LLC Douglas E Sleep,Jr, MBA
Manager/Project Engineering
Project Engineer, LGR (GA) General Assembly,
retooling and salvage of old equipment, new
equipment and processes installed. Lansing, MI
2010 - $1.1MM
Project Manager/Project Engineer, LGR GA,
retooling and salvage project of old equipment.
New equipment and processes installed. Lansing,
MI
2011 - $2.1MM
Project Manager/Project Engineer, LGR Body
Plant, new commercial building expansion, new
capital equipment, and processes installed,
retooling for Alpha Project. Lansing, MI
2012 - $1.3MM
Project Manager/Project Engineer, LGR Body
Plant, A1LL Project. Retooling and salvage
project of old capital equipment. New robots,
tooling and processes installed. Lansing, MI
2013 - $1.0MM
Project Manager/Project Engineer, LGR Body
Plant, A1BL Project. Retooling and salvage
project of old equipment. New robots, tooling
and processes installed. Lansing, MI
2014 - $2.2MM
Project Manager/Project Engineer, LGR GA,
Camaro Product Line Project. Integration of new
Camaro line to existing Cadillac line. Retooling
and salvage project of old equipment. New
equipment and processes installed. Lansing, MI
2015 - $3.0MM
Project Manager/Project Engineer, LGR GA,
Continuation of Camaro Product Line
Integration Project. New equipment & processes
installed along with infrastructure updates- LAN
& WAN. Lansing, MI
2016 – Retired from General Motors, LLC

CV GM 050116

  • 1.
    GENERAL MOTORS, LLCDouglas E Sleep,Jr, MBA Manager/Project Engineering Curriculum Vitae Education MBA, Masters of Business Administration, Northwood University B.S. in Mechanical Engineering, Michigan State University ProfessionalCertifications PMP – PMI Project Management Professional ProfessionalAssociations ASME, member since 2005 SAE International since 2008 Experience Mr. Sleep has over 31 years of experience that has focused on the design and delivery of a wide variety of capital improvement projects in commercial and industrial settings. His technical background includes project management of both construction and design projects as well as estimating, commissioning, construction management, and systems qualification/validation. Area of expertise is concurrent with management of multiple capital improvement projects from concept through final product delivery, reflecting PMP industries best practices. Experience (cont’d) 1984 – November Hired into General Motors Facility Engineering 1985 – $900K Apprentice, Oldsmobile V8 Motor line Retooling Project, New tooling to replace out dated Machinery, GM Plant 1 Building 33, Lansing, MI 1986 - $1.1MM Apprentice, BOC V6 Motor line New Installation Project, GM Plant 1 Building 36, Lansing, MI 1987 - $850K Apprentice, Final Assembly Retooling Project, New installation of DVT test pit equipment and controllers, GM Plant 1 Building 90, Lansing, MI 1988 - $1.2MM Apprentice, Decommission Plating Process, all equipment and processes removed. Environmentally cleaned and disposed of per MIOSIHA requirements. Site prep for new press metal line, GM Plant 3 Building 301, Lansing, MI 1989 - $1.9MM Journeyman, Press Metal Line Installation, Foundation prep, Base Steel work, Press Install, GM Plant 3 Building 301, Lansing, MI 1990 - $1.2MM Journeyman, Press Metal Line Installation, Final equipment and processes installed for start up, GM Plant 3 Building 301, Lansing, MI $800K - Journeyman, Relocation of Press Line, Decommission existing Pres Line for install and operation at Plant 3, Plant 1 Bldg 56 to Plant 3 Bldg 405, Lansing, MI 1991 - $1.3MM Journeyman, New 100K plus CFM HVAC air handling systems, installation for existing building ventilation and future project works. 10 roof top mounted self contained module systems. Steel fabrication and install per site/module. Helicopter lift and set in place, steel support structure and then HVAC modules after. 1992- $4.5MM
  • 2.
    GENERAL MOTORS, LLCDouglas E Sleep,Jr, MBA Manager/Project Engineering Team Leader, SMC Mix Room and Press Line Manufacturing Project, GM Plant 1, Building 46, Lansing, MI 1993 - $2.1MM Team Leader, Building 66 Additions and Renovation Project- New site for Engineering, Training and Management, Plant 1, Lansing, MI 1994 – $2.1MM Continued Team Leader, Building 66 Additions and Renovation Project- New site for Engineering, Training and Management, Plant 1, Lansing, MI 1995 – $1.6MM Team Leader, Decommission and Salvage of Capital Equipment from Motor Plant Facility, 1 Million Square Feet- for New GM Facility LGR on site of Plant 1, Lansing, MI 1996 - $800K Team Leader, Decommission High Voltage 13KV Substations and power transfers (4 Locations). Reroute power supplies to new locations for future use and Salvage of Capital Equipment, Motor Plant Facility. GM Plant 1, Lansing, MI 1997 - $1.0MM Team Leader, Decommission, Salvage of Capital Equipment, and Engineering Buildings 62/64- for New GM Facility LGR on site of Plant 1, Lansing, MI 1998 - $900K Team Leader, Decommission Building 40, Relocate Tool Room Facility and Equipment to offsite at Demmer Fabrication Center, Lansing, MI 1999 - $1.5MM Team Leader, Underground water sewer project, tank farm project, part of plant 1 decommission project. Per E.P.A. regulations, new installation of drain lines to divert direct lines leading into The Grand River from GM property. Redirecting all ground and street water through a processing facility first to prevent any contaminants reaching the river. Plant 1, Lansing, MI 2000 - $2.3MM Group Leader, Tank farm project continued to run exiting assembly plant and new assembly plant LGR under construction. Plant 1, Lansing, MI 2001 -$900K Group Leader, Building and grounds renovation project for New GM Facility LGR on site of Plant 1. Ground water drains and parking lots 2002 - $950K Group Leader, Decommission and salvage of remaining buildings and site management, Electric and Gas shut downs and stabilized. MIOSHA and EPA requirements upheld for Plant 1, Lansing, MI 2003 - $1.4MM Group Leader, Decommission and Salvage of Capital Equipment. Building and site management per MIOSHA and EPA requirements, at Fisher Body Plant 6, Lansing, MI 2004 - $1.5MM Group Leader, Relocating GM Skill Trades Construction Crew Facility and Equipment from Plant 1 to Plant 4 site, New Paint ventilation system installed at Plant 4, Lansing, MI 2005 - $1.4MM Project Engineer, Decommission of Plant 3 Press Metal Fabrication Center, salvage of capital equipment, building and site management per MIOSHA and EPA requirements, Plant 3, Lansing, MI 2006 - $2.6MM Project Engineer, LGR Body Plant, building expansion 200K Sq Ft, new utilities and new capital equipment installation, Lansing, MI 2007 - $1.1MM Project Engineer, LGR Body plant retooling and salvage project of old equipment. New equipment and processes installed. Lansing, MI 2008 - $1.2MM Project Engineer, LGR Paint plant retooling and salvage project of old equipment. New equipment and processes installed. Lansing, MI 2009 - $1.4MM
  • 3.
    GENERAL MOTORS, LLCDouglas E Sleep,Jr, MBA Manager/Project Engineering Project Engineer, LGR (GA) General Assembly, retooling and salvage of old equipment, new equipment and processes installed. Lansing, MI 2010 - $1.1MM Project Manager/Project Engineer, LGR GA, retooling and salvage project of old equipment. New equipment and processes installed. Lansing, MI 2011 - $2.1MM Project Manager/Project Engineer, LGR Body Plant, new commercial building expansion, new capital equipment, and processes installed, retooling for Alpha Project. Lansing, MI 2012 - $1.3MM Project Manager/Project Engineer, LGR Body Plant, A1LL Project. Retooling and salvage project of old capital equipment. New robots, tooling and processes installed. Lansing, MI 2013 - $1.0MM Project Manager/Project Engineer, LGR Body Plant, A1BL Project. Retooling and salvage project of old equipment. New robots, tooling and processes installed. Lansing, MI 2014 - $2.2MM Project Manager/Project Engineer, LGR GA, Camaro Product Line Project. Integration of new Camaro line to existing Cadillac line. Retooling and salvage project of old equipment. New equipment and processes installed. Lansing, MI 2015 - $3.0MM Project Manager/Project Engineer, LGR GA, Continuation of Camaro Product Line Integration Project. New equipment & processes installed along with infrastructure updates- LAN & WAN. Lansing, MI 2016 – Retired from General Motors, LLC