SlideShare a Scribd company logo
1 of 3
GENERAL MOTORS, LLC Douglas E Sleep,Jr, MBA
Manager/Project Engineering
Curriculum Vitae
Education
MBA, Masters of Business Administration, Northwood University
B.S. in Mechanical Engineering, Michigan State University
ProfessionalCertifications
PMP – PMI Project Management Professional
ProfessionalAssociations
ASME, member since 2005
SAE International since 2008
Experience
Mr. Sleep has over 31 years of experience that has focused on the design and delivery of a wide variety of
capital improvement projects in commercial and industrial settings. His technical background includes
project management of both construction and design projects as well as estimating, commissioning,
construction management, and systems qualification/validation. Area of expertise is concurrent with
management of multiple capital improvement projects from concept through final product delivery,
reflecting PMP industries best practices.
Experience (cont’d)
1984 – November
Hired into General Motors Facility Engineering
1985 – $900K
Apprentice, Oldsmobile V8 Motor line Retooling
Project, New tooling to replace out dated
Machinery, GM Plant 1 Building 33, Lansing,
MI
1986 - $1.1MM
Apprentice, BOC V6 Motor line New
Installation Project, GM Plant 1 Building 36,
Lansing, MI
1987 - $850K
Apprentice, Final Assembly Retooling Project,
New installation of DVT test pit equipment and
controllers, GM Plant 1 Building 90, Lansing,
MI
1988 - $1.2MM
Apprentice, Decommission Plating Process, all
equipment and processes removed.
Environmentally cleaned and disposed of per
MIOSIHA requirements. Site prep for new press
metal line, GM Plant 3 Building 301, Lansing,
MI
1989 - $1.9MM
Journeyman, Press Metal Line Installation,
Foundation prep, Base Steel work, Press Install,
GM Plant 3 Building 301, Lansing, MI
1990 - $1.2MM
Journeyman, Press Metal Line Installation, Final
equipment and processes installed for start up,
GM Plant 3 Building 301, Lansing, MI
$800K - Journeyman, Relocation of Press Line,
Decommission existing Pres Line for install and
operation at Plant 3, Plant 1 Bldg 56 to Plant 3
Bldg 405, Lansing, MI
1991 - $1.3MM
Journeyman, New 100K plus CFM HVAC air
handling systems, installation for existing
building ventilation and future project works. 10
roof top mounted self contained module systems.
Steel fabrication and install per site/module.
Helicopter lift and set in place, steel support
structure and then HVAC modules after.
1992- $4.5MM
GENERAL MOTORS, LLC Douglas E Sleep,Jr, MBA
Manager/Project Engineering
Team Leader, SMC Mix Room and Press Line
Manufacturing Project, GM Plant 1, Building 46,
Lansing, MI
1993 - $2.1MM
Team Leader, Building 66 Additions and
Renovation Project- New site for Engineering,
Training and Management, Plant 1, Lansing, MI
1994 – $2.1MM Continued
Team Leader, Building 66 Additions and
Renovation Project- New site for Engineering,
Training and Management, Plant 1, Lansing, MI
1995 – $1.6MM
Team Leader, Decommission and Salvage of
Capital Equipment from Motor Plant Facility, 1
Million Square Feet- for New GM Facility LGR
on site of Plant 1, Lansing, MI
1996 - $800K
Team Leader, Decommission High Voltage
13KV Substations and power transfers (4
Locations). Reroute power supplies to new
locations for future use and Salvage of Capital
Equipment, Motor Plant Facility. GM Plant 1,
Lansing, MI
1997 - $1.0MM
Team Leader, Decommission, Salvage of Capital
Equipment, and Engineering Buildings 62/64-
for New GM Facility LGR on site of Plant 1,
Lansing, MI
1998 - $900K
Team Leader, Decommission Building 40,
Relocate Tool Room Facility and Equipment to
offsite at Demmer Fabrication Center, Lansing,
MI
1999 - $1.5MM
Team Leader, Underground water sewer project,
tank farm project, part of plant 1 decommission
project. Per E.P.A. regulations, new installation
of drain lines to divert direct lines leading into
The Grand River from GM property. Redirecting
all ground and street water through a processing
facility first to prevent any contaminants
reaching the river. Plant 1, Lansing, MI
2000 - $2.3MM
Group Leader, Tank farm project continued to
run exiting assembly plant and new assembly
plant LGR under construction. Plant 1, Lansing,
MI
2001 -$900K
Group Leader, Building and grounds renovation
project for New GM Facility LGR on site of
Plant 1. Ground water drains and parking lots
2002 - $950K
Group Leader, Decommission and salvage of
remaining buildings and site management,
Electric and Gas shut downs and stabilized.
MIOSHA and EPA requirements upheld for
Plant 1, Lansing, MI
2003 - $1.4MM
Group Leader, Decommission and Salvage of
Capital Equipment. Building and site
management per MIOSHA and EPA
requirements, at Fisher Body Plant 6, Lansing,
MI
2004 - $1.5MM
Group Leader, Relocating GM Skill Trades
Construction Crew Facility and Equipment from
Plant 1 to Plant 4 site, New Paint ventilation
system installed at Plant 4, Lansing, MI
2005 - $1.4MM
Project Engineer, Decommission of Plant 3 Press
Metal Fabrication Center, salvage of capital
equipment, building and site management per
MIOSHA and EPA requirements, Plant 3,
Lansing, MI
2006 - $2.6MM
Project Engineer, LGR Body Plant, building
expansion 200K Sq Ft, new utilities and new
capital equipment installation, Lansing, MI
2007 - $1.1MM
Project Engineer, LGR Body plant retooling and
salvage project of old equipment. New
equipment and processes installed. Lansing, MI
2008 - $1.2MM
Project Engineer, LGR Paint plant retooling and
salvage project of old equipment. New
equipment and processes installed. Lansing, MI
2009 - $1.4MM
GENERAL MOTORS, LLC Douglas E Sleep,Jr, MBA
Manager/Project Engineering
Project Engineer, LGR (GA) General Assembly,
retooling and salvage of old equipment, new
equipment and processes installed. Lansing, MI
2010 - $1.1MM
Project Manager/Project Engineer, LGR GA,
retooling and salvage project of old equipment.
New equipment and processes installed. Lansing,
MI
2011 - $2.1MM
Project Manager/Project Engineer, LGR Body
Plant, new commercial building expansion, new
capital equipment, and processes installed,
retooling for Alpha Project. Lansing, MI
2012 - $1.3MM
Project Manager/Project Engineer, LGR Body
Plant, A1LL Project. Retooling and salvage
project of old capital equipment. New robots,
tooling and processes installed. Lansing, MI
2013 - $1.0MM
Project Manager/Project Engineer, LGR Body
Plant, A1BL Project. Retooling and salvage
project of old equipment. New robots, tooling
and processes installed. Lansing, MI
2014 - $2.2MM
Project Manager/Project Engineer, LGR GA,
Camaro Product Line Project. Integration of new
Camaro line to existing Cadillac line. Retooling
and salvage project of old equipment. New
equipment and processes installed. Lansing, MI
2015 - $3.0MM
Project Manager/Project Engineer, LGR GA,
Continuation of Camaro Product Line
Integration Project. New equipment & processes
installed along with infrastructure updates- LAN
& WAN. Lansing, MI
2016 – Retired from General Motors, LLC

More Related Content

What's hot (20)

KBE Laboratories 2011
KBE Laboratories 2011 KBE Laboratories 2011
KBE Laboratories 2011
 
Linkeden files
Linkeden filesLinkeden files
Linkeden files
 
Sandher Updated Resume15
Sandher Updated Resume15Sandher Updated Resume15
Sandher Updated Resume15
 
SKHOWARD Resume 9-17-16
SKHOWARD Resume 9-17-16SKHOWARD Resume 9-17-16
SKHOWARD Resume 9-17-16
 
Resup2016
Resup2016Resup2016
Resup2016
 
Brian Nicholls profesional profile 2016 08-11
Brian Nicholls profesional profile  2016 08-11Brian Nicholls profesional profile  2016 08-11
Brian Nicholls profesional profile 2016 08-11
 
Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resume
 
RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15
 
Resume 3-16-15docx
Resume 3-16-15docxResume 3-16-15docx
Resume 3-16-15docx
 
Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015
 
Sean Cody - Resume
Sean Cody - ResumeSean Cody - Resume
Sean Cody - Resume
 
CV_Anup
CV_AnupCV_Anup
CV_Anup
 
MOHAN_Final
MOHAN_FinalMOHAN_Final
MOHAN_Final
 
Resume
ResumeResume
Resume
 
Revised Tom Nuc. Res. #1
Revised Tom Nuc. Res. #1Revised Tom Nuc. Res. #1
Revised Tom Nuc. Res. #1
 
Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_
 
Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16
 
Kerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum VitaeKerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum Vitae
 
Resume / Project List
Resume / Project ListResume / Project List
Resume / Project List
 
CM Resume
CM Resume CM Resume
CM Resume
 

Similar to CV GM 050116

Overholser, James Project Mgr E Resume
Overholser, James Project Mgr E ResumeOverholser, James Project Mgr E Resume
Overholser, James Project Mgr E Resume
jimoverholser
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
John Adams
 
_Phillip L Ursery Resume
_Phillip L Ursery Resume_Phillip L Ursery Resume
_Phillip L Ursery Resume
pursery
 
michael-eldorado---resume-r2 MCE 120716
michael-eldorado---resume-r2 MCE 120716michael-eldorado---resume-r2 MCE 120716
michael-eldorado---resume-r2 MCE 120716
Michael ElDorado
 
Bill Parker PDM - 2015
Bill Parker PDM - 2015Bill Parker PDM - 2015
Bill Parker PDM - 2015
Bill Parker
 
Mark Brock Project list
Mark Brock Project listMark Brock Project list
Mark Brock Project list
Mark Brock
 
Edward E calder CV 2014
Edward E calder CV 2014Edward E calder CV 2014
Edward E calder CV 2014
Edward Calder
 
John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resume
John Snyder
 
Personal_Resume_11_2013
Personal_Resume_11_2013Personal_Resume_11_2013
Personal_Resume_11_2013
Stephen Ciulla
 
James F BurtonII Resume 2016
James F BurtonII Resume 2016James F BurtonII Resume 2016
James F BurtonII Resume 2016
Frank Burton
 
CV - Wright, James R
CV - Wright, James RCV - Wright, James R
CV - Wright, James R
James Wright
 
John Sinclair III Resume 2-18-15
John Sinclair III Resume 2-18-15John Sinclair III Resume 2-18-15
John Sinclair III Resume 2-18-15
John Sinclair
 

Similar to CV GM 050116 (20)

Overholser, James Project Mgr E Resume
Overholser, James Project Mgr E ResumeOverholser, James Project Mgr E Resume
Overholser, James Project Mgr E Resume
 
Gary_Knurbein
Gary_KnurbeinGary_Knurbein
Gary_Knurbein
 
Resume 2015
Resume 2015Resume 2015
Resume 2015
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
_Phillip L Ursery Resume
_Phillip L Ursery Resume_Phillip L Ursery Resume
_Phillip L Ursery Resume
 
Dennis Resume
Dennis ResumeDennis Resume
Dennis Resume
 
michael-eldorado---resume-r2 MCE 120716
michael-eldorado---resume-r2 MCE 120716michael-eldorado---resume-r2 MCE 120716
michael-eldorado---resume-r2 MCE 120716
 
Bill Parker PDM - 2015
Bill Parker PDM - 2015Bill Parker PDM - 2015
Bill Parker PDM - 2015
 
Mark Brock Project list
Mark Brock Project listMark Brock Project list
Mark Brock Project list
 
Edward E calder CV 2014
Edward E calder CV 2014Edward E calder CV 2014
Edward E calder CV 2014
 
Linkedin-Doc
Linkedin-DocLinkedin-Doc
Linkedin-Doc
 
James Hoove1 (1)
James Hoove1 (1)James Hoove1 (1)
James Hoove1 (1)
 
Resume S&B
Resume S&BResume S&B
Resume S&B
 
John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resume
 
Personal_Resume_11_2013
Personal_Resume_11_2013Personal_Resume_11_2013
Personal_Resume_11_2013
 
Daniel K Hom Resume And Projects 031611 Li
Daniel K Hom Resume And Projects 031611 LiDaniel K Hom Resume And Projects 031611 Li
Daniel K Hom Resume And Projects 031611 Li
 
Lou Houlemarde
Lou HoulemardeLou Houlemarde
Lou Houlemarde
 
James F BurtonII Resume 2016
James F BurtonII Resume 2016James F BurtonII Resume 2016
James F BurtonII Resume 2016
 
CV - Wright, James R
CV - Wright, James RCV - Wright, James R
CV - Wright, James R
 
John Sinclair III Resume 2-18-15
John Sinclair III Resume 2-18-15John Sinclair III Resume 2-18-15
John Sinclair III Resume 2-18-15
 

CV GM 050116

  • 1. GENERAL MOTORS, LLC Douglas E Sleep,Jr, MBA Manager/Project Engineering Curriculum Vitae Education MBA, Masters of Business Administration, Northwood University B.S. in Mechanical Engineering, Michigan State University ProfessionalCertifications PMP – PMI Project Management Professional ProfessionalAssociations ASME, member since 2005 SAE International since 2008 Experience Mr. Sleep has over 31 years of experience that has focused on the design and delivery of a wide variety of capital improvement projects in commercial and industrial settings. His technical background includes project management of both construction and design projects as well as estimating, commissioning, construction management, and systems qualification/validation. Area of expertise is concurrent with management of multiple capital improvement projects from concept through final product delivery, reflecting PMP industries best practices. Experience (cont’d) 1984 – November Hired into General Motors Facility Engineering 1985 – $900K Apprentice, Oldsmobile V8 Motor line Retooling Project, New tooling to replace out dated Machinery, GM Plant 1 Building 33, Lansing, MI 1986 - $1.1MM Apprentice, BOC V6 Motor line New Installation Project, GM Plant 1 Building 36, Lansing, MI 1987 - $850K Apprentice, Final Assembly Retooling Project, New installation of DVT test pit equipment and controllers, GM Plant 1 Building 90, Lansing, MI 1988 - $1.2MM Apprentice, Decommission Plating Process, all equipment and processes removed. Environmentally cleaned and disposed of per MIOSIHA requirements. Site prep for new press metal line, GM Plant 3 Building 301, Lansing, MI 1989 - $1.9MM Journeyman, Press Metal Line Installation, Foundation prep, Base Steel work, Press Install, GM Plant 3 Building 301, Lansing, MI 1990 - $1.2MM Journeyman, Press Metal Line Installation, Final equipment and processes installed for start up, GM Plant 3 Building 301, Lansing, MI $800K - Journeyman, Relocation of Press Line, Decommission existing Pres Line for install and operation at Plant 3, Plant 1 Bldg 56 to Plant 3 Bldg 405, Lansing, MI 1991 - $1.3MM Journeyman, New 100K plus CFM HVAC air handling systems, installation for existing building ventilation and future project works. 10 roof top mounted self contained module systems. Steel fabrication and install per site/module. Helicopter lift and set in place, steel support structure and then HVAC modules after. 1992- $4.5MM
  • 2. GENERAL MOTORS, LLC Douglas E Sleep,Jr, MBA Manager/Project Engineering Team Leader, SMC Mix Room and Press Line Manufacturing Project, GM Plant 1, Building 46, Lansing, MI 1993 - $2.1MM Team Leader, Building 66 Additions and Renovation Project- New site for Engineering, Training and Management, Plant 1, Lansing, MI 1994 – $2.1MM Continued Team Leader, Building 66 Additions and Renovation Project- New site for Engineering, Training and Management, Plant 1, Lansing, MI 1995 – $1.6MM Team Leader, Decommission and Salvage of Capital Equipment from Motor Plant Facility, 1 Million Square Feet- for New GM Facility LGR on site of Plant 1, Lansing, MI 1996 - $800K Team Leader, Decommission High Voltage 13KV Substations and power transfers (4 Locations). Reroute power supplies to new locations for future use and Salvage of Capital Equipment, Motor Plant Facility. GM Plant 1, Lansing, MI 1997 - $1.0MM Team Leader, Decommission, Salvage of Capital Equipment, and Engineering Buildings 62/64- for New GM Facility LGR on site of Plant 1, Lansing, MI 1998 - $900K Team Leader, Decommission Building 40, Relocate Tool Room Facility and Equipment to offsite at Demmer Fabrication Center, Lansing, MI 1999 - $1.5MM Team Leader, Underground water sewer project, tank farm project, part of plant 1 decommission project. Per E.P.A. regulations, new installation of drain lines to divert direct lines leading into The Grand River from GM property. Redirecting all ground and street water through a processing facility first to prevent any contaminants reaching the river. Plant 1, Lansing, MI 2000 - $2.3MM Group Leader, Tank farm project continued to run exiting assembly plant and new assembly plant LGR under construction. Plant 1, Lansing, MI 2001 -$900K Group Leader, Building and grounds renovation project for New GM Facility LGR on site of Plant 1. Ground water drains and parking lots 2002 - $950K Group Leader, Decommission and salvage of remaining buildings and site management, Electric and Gas shut downs and stabilized. MIOSHA and EPA requirements upheld for Plant 1, Lansing, MI 2003 - $1.4MM Group Leader, Decommission and Salvage of Capital Equipment. Building and site management per MIOSHA and EPA requirements, at Fisher Body Plant 6, Lansing, MI 2004 - $1.5MM Group Leader, Relocating GM Skill Trades Construction Crew Facility and Equipment from Plant 1 to Plant 4 site, New Paint ventilation system installed at Plant 4, Lansing, MI 2005 - $1.4MM Project Engineer, Decommission of Plant 3 Press Metal Fabrication Center, salvage of capital equipment, building and site management per MIOSHA and EPA requirements, Plant 3, Lansing, MI 2006 - $2.6MM Project Engineer, LGR Body Plant, building expansion 200K Sq Ft, new utilities and new capital equipment installation, Lansing, MI 2007 - $1.1MM Project Engineer, LGR Body plant retooling and salvage project of old equipment. New equipment and processes installed. Lansing, MI 2008 - $1.2MM Project Engineer, LGR Paint plant retooling and salvage project of old equipment. New equipment and processes installed. Lansing, MI 2009 - $1.4MM
  • 3. GENERAL MOTORS, LLC Douglas E Sleep,Jr, MBA Manager/Project Engineering Project Engineer, LGR (GA) General Assembly, retooling and salvage of old equipment, new equipment and processes installed. Lansing, MI 2010 - $1.1MM Project Manager/Project Engineer, LGR GA, retooling and salvage project of old equipment. New equipment and processes installed. Lansing, MI 2011 - $2.1MM Project Manager/Project Engineer, LGR Body Plant, new commercial building expansion, new capital equipment, and processes installed, retooling for Alpha Project. Lansing, MI 2012 - $1.3MM Project Manager/Project Engineer, LGR Body Plant, A1LL Project. Retooling and salvage project of old capital equipment. New robots, tooling and processes installed. Lansing, MI 2013 - $1.0MM Project Manager/Project Engineer, LGR Body Plant, A1BL Project. Retooling and salvage project of old equipment. New robots, tooling and processes installed. Lansing, MI 2014 - $2.2MM Project Manager/Project Engineer, LGR GA, Camaro Product Line Project. Integration of new Camaro line to existing Cadillac line. Retooling and salvage project of old equipment. New equipment and processes installed. Lansing, MI 2015 - $3.0MM Project Manager/Project Engineer, LGR GA, Continuation of Camaro Product Line Integration Project. New equipment & processes installed along with infrastructure updates- LAN & WAN. Lansing, MI 2016 – Retired from General Motors, LLC