SlideShare a Scribd company logo
R E S U M E
NAME : Eduarde P. Lopez
DATE OF BIRTH : 17-11-1964
SEX : Male
MARITAL STATUS : Married
NATIONALITY : Filipino
CONTACT NO. : (Malaysia) 0060167682301
EMAIL ADDRESS : ardie.l2225@yahoo.com (personal)
EDUCATIONAL ATTAINMENT
 Polytechnic University of the Philippines
Bachelor of Science in Electrical Engineering
SEMINARS ATTENDED
 Fluor Daniel/AG&P Inc.
Computer Aide Drafting and Design/Facet
 Atlantic Gulf & Pacific Co. Inc.
Design & Engineering Training Program Electro-Mechanical Works
SUMMARY OF WORK EXPERIENCE
More than 27 years of experience in Instrument and Electrical Engineering Design and
Construction in Oil & Gas, Refineries, Cement Plant, Petrochemical and Power Plant
projects.
WORK EXPERIENCE
POSITION : Instrument Engineer
COMPANY/PERIOD: RAPID-PMC/ Dec’15 – June 16; AMEC-PMC/Apr’03-Nov’03
PROJECT : Petronas Rapid Project; Malaysian NPK Fertilizer Plant
RESPONSIBILITIES
 Review and Approve the EPCC Contractor Engineering and Vendor Document.
 Participation on the Engineering and Safety Reviews.
 Coordination of Interface within EPCC Contractors.
 Technical assessment of EPCC Contractor design changes or deviation request from
EPCC Contractor for IPMT further management.
 Ensure Design and Engineering Integrity.
 Participate in the Performance Tests and provide evaluation to the test report issued by
EPCC Contractor.
POSITION : Instrument Field Engineer
COMPANY/PERIOD: Technip Malaysia/Aug’12 - Mar’13; Oil Line Engineering &
Associates Sdn. Bhd Seconded to SAIBOS (Technip/Saipem)/
Mar‘05 - Aug’06; Oil Line Engineering & Associates Sdn. Bhd.
Seconded to Technip Geoproduction Sdn. Bhd/ Aug’01-Nov’01;
Atlantic Gulf & Pacific Company of Manila, Inc./ May’88-Aug’89
PROJECT : Gumusut Kakap Semi FPS – (Shell/MISC/MMHE); AKOGEP
Phase 2 Amenam 2 Topside; LDPE Plant-Kerteh, Malaysia; ONGC
Project (Bauan, Batangas)
RESPONSIBILITIES
 Responsible to answer the site query regarding instrumentation that has been raised by
client.
 Review and prepare a red line mark-up for all instrumentation related on the package
vendor document.
 Responsible to answer the SDM, STQ and Waiver regarding instrumentation that have
been raised by the subcontractor.
 Review and endorsed the instrument deliverables that have been modified by the
subcontractor to accommodate the site condition.
 Liaise with client and other department, not limited to, such & quality control, project
management team for necessary interface control and coordination to attain.
 Attend factory acceptance test to check if the vendor compliance with our specification,
design and requirement.
 Review together with the subcontractor on the PDS model to check if any clashing of
instrument design with other discipline design.
 Prepare fabrication drawings for instrument, telecommunication and fire & gas.
 Monitor weekly/monthly progress of Instrument subcontractor.
 Responsible to close all the instrument punch list items and prepare the close out report.
 Prepare a change order list to be send to the project management that have been encounter
during the design development.
 Prepare documents and supporting papers on change orders/extra works.
 Supervise group of workers in various instrumentation works such as instrument
installation loop checking, cable filling, control room works and pre-commissioning job.
POSITION : Instrument Design Engineer
COMPANY/PERIOD: Plant and Offshore Technology Sdn. Bhd/Sept’06-Sept’07; Oil
Line Engineering & Associates Sdn. Bhd Seconded to TPK
Engineering & Construction (M) Sdn Bhd/Dec’01-Jan’03; Oil Line
Engineering & Associates Sdn. Bhd/Apr-’04-Feb’05
PROJECT : Chermingat A- Topside & Jacket;100,000MTPY Plant Biofuels
Biodiesel Plant; 350MW Prai Power Plant; Putrajaya Precinct 1
Cogen/DCS Annex Plant
RESPONSIBILITIES
 Review and comment on the instrument deliverables prepared by the engineering
contractor such as Instrument and Fire & Gas Location Layout, Hook-up, Material Take-
off, Instrument List, Datasheet and Specification.
 Review instrument vendor quotation and prepare technical clarification to the vendor.
 Attend factory acceptance test to check if the vendor compliance with our specification,
design and requirement.
 Prepare technical bid evaluation of the instrument vendor and to recommend which
vendor compliance to the project specification.
 Review and comment on other discipline drawings related to instrumentation.
 Liaise with project management team and other department, not limiting to such and
quality control, for necessary interface control and coordination to attain the best result of
the project completion.
 Prepare instrument deliverables such as Instrument Location Layout, Hook-up, Material
Take-off, Instrument List, Datasheet and Specification.
 Prepare requisition on bulk materials and field instrument.
 Ensure all drawings, technical specifications and other document in orderly manner.
 Maintain complete files of correspondence and updated drawing regarding all
classifications of various disciplines.
POSITION : Instrument Lead Senior Designer
COMPANY/PERIOD: Technip Malaysia/Apr’13-Sept’15/Sept’07-Jul’12; Oil Line
Engineering & Associates Sdn. Bhd. Seconded to Technip/Jul’95-
Jul’01; Sime Sembawang Engineering Sdn. Bhd./Jun’93-May’95
PROJECT : Maharaja Lela Project; Martin Linge Project; Petronas Rapid Feed
Project; Detail Design Tukau Platform; Turmenistan Block 1 Field
Development; Optimal Tail gas Compressor; Petronas-UCC OSBL;
D-35JT-C Detail Design and Tie-In; Lemai Satellite Paltform; F6
Complex modification; Polyethylene Merak Work; Butson Cement
Plant; M3PQ TOPSIDE-Shell; Jerneh A-EPMI
RESPONSIBILITIES
 Assign Work to individual Designer and Drafting personnel.
 Review and comment on the instrument deliverables such as Instrument and Fire & Gas
Location Layout, Cable Routing, Cable Schedule, Wiring Diagram, Loop Diagram Hook-
up, Material Take-off, Field Instrument List and etc.
 Prepare specification and requisition for instrument bulk materials such as cables, cable
ladder/tray, junction boxes & cable gland, tubing & fittings and etc.
 Review instrument vendor quotation and prepare technical clarification to the vendor.
 Prepare technical bid evaluation of the instrument vendor and to recommend which
vendor compliance to the project specification.
 Attend factory acceptance test to check if the vendor compliance with our specification,
design and requirement.
 Prepare weekly and monthly progress report.
 Prepare a change order list to be send to the project management that have been encounter
during the design development.
 Prepare lesson & learn upon completion of the project for future reference to the
upcoming new project.
 Review and comment on inter discipline documents/drawings.
 Review and comment on package vendor document related to the designer scope.
POSITION : Instrument Designer
COMPANY/PERIOD: Fluor Daniel/AG&P Inc./Aug’90-Jun’93
PROJECT : Valero I & II; Star Project-Shell Phils;Enron Power Plant I & II
RESPONSIBILITIES
 Prepare instrument deliverables such as Instrument Location Layout, Hook-up, Electrical
Equipment Layout, Material Take-off, Instrument & Electicral Equipment List, Datasheet
and Specification.
 Studies and interpret specifications, process engineering flow schemes prior to design and
detailing works.
 Coordinate with other discipline about the progress of the project during weekly task
force meeting.
 Perform design layout of cable and conduit by the use of AutoCad
 Prepare necessary data and information for the project.
 Develop basic electrical engineering design criteria on assigned contract.
 Prepare calculations, sketches and wiring diagram.
 Provide technical information and data design.
 Responsible for review of vendor data.
POSITION : Electrical Engineer
COMPANY/PERIOD: Atlantic Gulf & Pacific Company of Manila, Inc./Sept’88-
Feb’89/Jan’90-Aug’90
PROJECT : Manila International Container Terminal Phase II Project; Asahi
Glass Phils. Inc.
RESPONSIBILITIES
 Design electrical system for commercial buildings and industrial plants.
 Established electrical equipment location and draft it for electrical location plan.
 Perform design layout of cable, conduit and cable tray.
 Prepare quantity take-off and price estimates.
 Analyze and interpret plans and design for purposes of revision and estimating.
 Undertake field assignments and inspections of electrical equipment to insure compliance
to specification.
 Initiate electrical equipment quotations, purchase request and prepare bid summary.
POSITION : Electrical Field Engineer
COMPANY : Atlantic Gulf & Pacific Company of Manila, Inc./Feb’89-Oct’89
PROJECT : Red Dog Project (Bauan, Batangas)
RESPONSIBILITIES
 Prepare preliminary and final bill of quantity for procurement.
 Prepare a change order list to be send to the project management that have been encounter
during the design development.
 Prepare documents and supporting papers on change orders/extra works.
 Monitor daily and monthly work progress.
 Prepare as-built drawings and detailed drawings for construction.
 Coordinate with other discipline regarding any problem that may affect work progress.
 Maintain records of all inspection and other correspondence in the office.

More Related Content

What's hot

jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
jafar hussain
 
MY CV AB - Lng-2014
MY  CV AB - Lng-2014MY  CV AB - Lng-2014
MY CV AB - Lng-2014
ALBERT AUDU
 
edwin cv for QA-QC Manager
edwin cv for QA-QC Manageredwin cv for QA-QC Manager
edwin cv for QA-QC Manager
Edwin Aguinaldo
 
Giri Rao CV-Mech Design engineer
Giri Rao CV-Mech Design engineerGiri Rao CV-Mech Design engineer
Giri Rao CV-Mech Design engineer
Giri Rao
 
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale
 
CV - Rufino B.Cada
CV - Rufino B.CadaCV - Rufino B.Cada
CV - Rufino B.Cada
ruffy cada
 
CV - MEP Inspector Engineer Froilan Ramos Balanao
CV -  MEP Inspector Engineer  Froilan Ramos BalanaoCV -  MEP Inspector Engineer  Froilan Ramos Balanao
CV - MEP Inspector Engineer Froilan Ramos Balanao
Froilan Balanao
 
CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016
Kirana Devasya
 
Vipin Resume new qc
Vipin Resume new qcVipin Resume new qc
Vipin Resume new qc
vipin joy
 
Francisco Cortez Resume 2015
Francisco Cortez Resume 2015Francisco Cortez Resume 2015
Francisco Cortez Resume 2015
Francisco Cortez
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY AROKIAM
 
Mirasol Resume 10-14-14
Mirasol Resume 10-14-14Mirasol Resume 10-14-14
Mirasol Resume 10-14-14
Mirasol Villa
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping Engineer
Jitendra Shende
 
Richard Kildea. CV October 2016
Richard Kildea. CV October 2016Richard Kildea. CV October 2016
Richard Kildea. CV October 2016
Richard Kildea
 

What's hot (20)

jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
MY CV AB - Lng-2014
MY  CV AB - Lng-2014MY  CV AB - Lng-2014
MY CV AB - Lng-2014
 
edwin cv for QA-QC Manager
edwin cv for QA-QC Manageredwin cv for QA-QC Manager
edwin cv for QA-QC Manager
 
ARIVUPPAVALAN RESUME
ARIVUPPAVALAN RESUMEARIVUPPAVALAN RESUME
ARIVUPPAVALAN RESUME
 
Giri Rao CV-Mech Design engineer
Giri Rao CV-Mech Design engineerGiri Rao CV-Mech Design engineer
Giri Rao CV-Mech Design engineer
 
My Resume
My ResumeMy Resume
My Resume
 
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
 
CV - Rufino B.Cada
CV - Rufino B.CadaCV - Rufino B.Cada
CV - Rufino B.Cada
 
CV - MEP Inspector Engineer Froilan Ramos Balanao
CV -  MEP Inspector Engineer  Froilan Ramos BalanaoCV -  MEP Inspector Engineer  Froilan Ramos Balanao
CV - MEP Inspector Engineer Froilan Ramos Balanao
 
NARESH 3+
NARESH 3+NARESH 3+
NARESH 3+
 
CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016
 
Vipin Resume new qc
Vipin Resume new qcVipin Resume new qc
Vipin Resume new qc
 
Francisco Cortez Resume 2015
Francisco Cortez Resume 2015Francisco Cortez Resume 2015
Francisco Cortez Resume 2015
 
QC Civil A. Afzal
QC Civil A. AfzalQC Civil A. Afzal
QC Civil A. Afzal
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
 
Nitin cv 25 07-16
Nitin cv 25 07-16Nitin cv 25 07-16
Nitin cv 25 07-16
 
Mirasol Resume 10-14-14
Mirasol Resume 10-14-14Mirasol Resume 10-14-14
Mirasol Resume 10-14-14
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping Engineer
 
Richard Kildea. CV October 2016
Richard Kildea. CV October 2016Richard Kildea. CV October 2016
Richard Kildea. CV October 2016
 
Resume of zahir hussain
Resume of zahir hussainResume of zahir hussain
Resume of zahir hussain
 

Viewers also liked

Blackbelt Renaissance Project-Powerpoint-Stegall-Master Thesis
Blackbelt Renaissance Project-Powerpoint-Stegall-Master ThesisBlackbelt Renaissance Project-Powerpoint-Stegall-Master Thesis
Blackbelt Renaissance Project-Powerpoint-Stegall-Master Thesis
LaTrease Rutland Stegall
 
Resume_MASTER_revised
Resume_MASTER_revisedResume_MASTER_revised
Resume_MASTER_revised
Caprice Brown
 
YOUMANITY 2015 - Terms & Conditions 1
YOUMANITY 2015 - Terms & Conditions 1YOUMANITY 2015 - Terms & Conditions 1
YOUMANITY 2015 - Terms & Conditions 1
Angelo Iudice
 
Fengkun Du CV-Ind (2016.04)
Fengkun Du CV-Ind (2016.04)Fengkun Du CV-Ind (2016.04)
Fengkun Du CV-Ind (2016.04)
Fengkun Du
 

Viewers also liked (11)

Blackbelt Renaissance Project-Powerpoint-Stegall-Master Thesis
Blackbelt Renaissance Project-Powerpoint-Stegall-Master ThesisBlackbelt Renaissance Project-Powerpoint-Stegall-Master Thesis
Blackbelt Renaissance Project-Powerpoint-Stegall-Master Thesis
 
Be a leader
Be a leaderBe a leader
Be a leader
 
Learning Theories PBL
Learning Theories PBLLearning Theories PBL
Learning Theories PBL
 
Programa del curso Practicas sociales del lenguaje
Programa del curso Practicas sociales del lenguajePrograma del curso Practicas sociales del lenguaje
Programa del curso Practicas sociales del lenguaje
 
Practicas sociales del lenguaje
Practicas sociales del lenguajePracticas sociales del lenguaje
Practicas sociales del lenguaje
 
Resume_MASTER_revised
Resume_MASTER_revisedResume_MASTER_revised
Resume_MASTER_revised
 
Presentación del programa de estudios del curso Practicas sociales del lenguaje
Presentación del programa de estudios del curso Practicas sociales del lenguajePresentación del programa de estudios del curso Practicas sociales del lenguaje
Presentación del programa de estudios del curso Practicas sociales del lenguaje
 
ZeroAcoso
ZeroAcosoZeroAcoso
ZeroAcoso
 
YOUMANITY 2015 - Terms & Conditions 1
YOUMANITY 2015 - Terms & Conditions 1YOUMANITY 2015 - Terms & Conditions 1
YOUMANITY 2015 - Terms & Conditions 1
 
Fengkun Du CV-Ind (2016.04)
Fengkun Du CV-Ind (2016.04)Fengkun Du CV-Ind (2016.04)
Fengkun Du CV-Ind (2016.04)
 
Be a leader
Be a leaderBe a leader
Be a leader
 

Similar to Ardie cv

Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_Resume
Jaime Navarro
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_Resume
Jaime Navarro
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_Resume
Jaime Navarro
 
CV - Waseem Odeh - EE
CV - Waseem Odeh - EECV - Waseem Odeh - EE
CV - Waseem Odeh - EE
waseem odeh
 
Instrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobInstrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin Jacob
Jibin Jacob
 
DEEPES - Copy (2)
DEEPES - Copy (2)DEEPES - Copy (2)
DEEPES - Copy (2)
deepesh s
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
jafar hussain
 

Similar to Ardie cv (20)

nestor
nestornestor
nestor
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_Resume
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_Resume
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_Resume
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
MPK - Resume
MPK - ResumeMPK - Resume
MPK - Resume
 
mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
CV - Waseem Odeh - EE
CV - Waseem Odeh - EECV - Waseem Odeh - EE
CV - Waseem Odeh - EE
 
Instrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobInstrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin Jacob
 
DEEPES - Copy (2)
DEEPES - Copy (2)DEEPES - Copy (2)
DEEPES - Copy (2)
 
Mechanical engineer 8 years projects
Mechanical engineer  8 years projectsMechanical engineer  8 years projects
Mechanical engineer 8 years projects
 
Selvakumar Resume
Selvakumar ResumeSelvakumar Resume
Selvakumar Resume
 
Pugazhenthi Mathuramuthu CV
Pugazhenthi Mathuramuthu CVPugazhenthi Mathuramuthu CV
Pugazhenthi Mathuramuthu CV
 
ptsresume[1]
ptsresume[1]ptsresume[1]
ptsresume[1]
 
CV_Sukumar
CV_SukumarCV_Sukumar
CV_Sukumar
 
Tandur_Poornima_CV
Tandur_Poornima_CVTandur_Poornima_CV
Tandur_Poornima_CV
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
F. CV
F. CVF. CV
F. CV
 

Recently uploaded

Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
Kamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
Kamal Acharya
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 

Recently uploaded (20)

Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisIT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdf
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
 

Ardie cv

  • 1. R E S U M E NAME : Eduarde P. Lopez DATE OF BIRTH : 17-11-1964 SEX : Male MARITAL STATUS : Married NATIONALITY : Filipino CONTACT NO. : (Malaysia) 0060167682301 EMAIL ADDRESS : ardie.l2225@yahoo.com (personal) EDUCATIONAL ATTAINMENT  Polytechnic University of the Philippines Bachelor of Science in Electrical Engineering SEMINARS ATTENDED  Fluor Daniel/AG&P Inc. Computer Aide Drafting and Design/Facet  Atlantic Gulf & Pacific Co. Inc. Design & Engineering Training Program Electro-Mechanical Works SUMMARY OF WORK EXPERIENCE More than 27 years of experience in Instrument and Electrical Engineering Design and Construction in Oil & Gas, Refineries, Cement Plant, Petrochemical and Power Plant projects.
  • 2. WORK EXPERIENCE POSITION : Instrument Engineer COMPANY/PERIOD: RAPID-PMC/ Dec’15 – June 16; AMEC-PMC/Apr’03-Nov’03 PROJECT : Petronas Rapid Project; Malaysian NPK Fertilizer Plant RESPONSIBILITIES  Review and Approve the EPCC Contractor Engineering and Vendor Document.  Participation on the Engineering and Safety Reviews.  Coordination of Interface within EPCC Contractors.  Technical assessment of EPCC Contractor design changes or deviation request from EPCC Contractor for IPMT further management.  Ensure Design and Engineering Integrity.  Participate in the Performance Tests and provide evaluation to the test report issued by EPCC Contractor. POSITION : Instrument Field Engineer COMPANY/PERIOD: Technip Malaysia/Aug’12 - Mar’13; Oil Line Engineering & Associates Sdn. Bhd Seconded to SAIBOS (Technip/Saipem)/ Mar‘05 - Aug’06; Oil Line Engineering & Associates Sdn. Bhd. Seconded to Technip Geoproduction Sdn. Bhd/ Aug’01-Nov’01; Atlantic Gulf & Pacific Company of Manila, Inc./ May’88-Aug’89 PROJECT : Gumusut Kakap Semi FPS – (Shell/MISC/MMHE); AKOGEP Phase 2 Amenam 2 Topside; LDPE Plant-Kerteh, Malaysia; ONGC Project (Bauan, Batangas) RESPONSIBILITIES  Responsible to answer the site query regarding instrumentation that has been raised by client.  Review and prepare a red line mark-up for all instrumentation related on the package vendor document.  Responsible to answer the SDM, STQ and Waiver regarding instrumentation that have been raised by the subcontractor.  Review and endorsed the instrument deliverables that have been modified by the subcontractor to accommodate the site condition.  Liaise with client and other department, not limited to, such & quality control, project management team for necessary interface control and coordination to attain.  Attend factory acceptance test to check if the vendor compliance with our specification, design and requirement.  Review together with the subcontractor on the PDS model to check if any clashing of instrument design with other discipline design.  Prepare fabrication drawings for instrument, telecommunication and fire & gas.  Monitor weekly/monthly progress of Instrument subcontractor.  Responsible to close all the instrument punch list items and prepare the close out report.  Prepare a change order list to be send to the project management that have been encounter during the design development.  Prepare documents and supporting papers on change orders/extra works.  Supervise group of workers in various instrumentation works such as instrument installation loop checking, cable filling, control room works and pre-commissioning job.
  • 3. POSITION : Instrument Design Engineer COMPANY/PERIOD: Plant and Offshore Technology Sdn. Bhd/Sept’06-Sept’07; Oil Line Engineering & Associates Sdn. Bhd Seconded to TPK Engineering & Construction (M) Sdn Bhd/Dec’01-Jan’03; Oil Line Engineering & Associates Sdn. Bhd/Apr-’04-Feb’05 PROJECT : Chermingat A- Topside & Jacket;100,000MTPY Plant Biofuels Biodiesel Plant; 350MW Prai Power Plant; Putrajaya Precinct 1 Cogen/DCS Annex Plant RESPONSIBILITIES  Review and comment on the instrument deliverables prepared by the engineering contractor such as Instrument and Fire & Gas Location Layout, Hook-up, Material Take- off, Instrument List, Datasheet and Specification.  Review instrument vendor quotation and prepare technical clarification to the vendor.  Attend factory acceptance test to check if the vendor compliance with our specification, design and requirement.  Prepare technical bid evaluation of the instrument vendor and to recommend which vendor compliance to the project specification.  Review and comment on other discipline drawings related to instrumentation.  Liaise with project management team and other department, not limiting to such and quality control, for necessary interface control and coordination to attain the best result of the project completion.  Prepare instrument deliverables such as Instrument Location Layout, Hook-up, Material Take-off, Instrument List, Datasheet and Specification.  Prepare requisition on bulk materials and field instrument.  Ensure all drawings, technical specifications and other document in orderly manner.  Maintain complete files of correspondence and updated drawing regarding all classifications of various disciplines. POSITION : Instrument Lead Senior Designer COMPANY/PERIOD: Technip Malaysia/Apr’13-Sept’15/Sept’07-Jul’12; Oil Line Engineering & Associates Sdn. Bhd. Seconded to Technip/Jul’95- Jul’01; Sime Sembawang Engineering Sdn. Bhd./Jun’93-May’95 PROJECT : Maharaja Lela Project; Martin Linge Project; Petronas Rapid Feed Project; Detail Design Tukau Platform; Turmenistan Block 1 Field Development; Optimal Tail gas Compressor; Petronas-UCC OSBL; D-35JT-C Detail Design and Tie-In; Lemai Satellite Paltform; F6 Complex modification; Polyethylene Merak Work; Butson Cement Plant; M3PQ TOPSIDE-Shell; Jerneh A-EPMI RESPONSIBILITIES  Assign Work to individual Designer and Drafting personnel.  Review and comment on the instrument deliverables such as Instrument and Fire & Gas Location Layout, Cable Routing, Cable Schedule, Wiring Diagram, Loop Diagram Hook- up, Material Take-off, Field Instrument List and etc.  Prepare specification and requisition for instrument bulk materials such as cables, cable ladder/tray, junction boxes & cable gland, tubing & fittings and etc.  Review instrument vendor quotation and prepare technical clarification to the vendor.  Prepare technical bid evaluation of the instrument vendor and to recommend which vendor compliance to the project specification.
  • 4.  Attend factory acceptance test to check if the vendor compliance with our specification, design and requirement.  Prepare weekly and monthly progress report.  Prepare a change order list to be send to the project management that have been encounter during the design development.  Prepare lesson & learn upon completion of the project for future reference to the upcoming new project.  Review and comment on inter discipline documents/drawings.  Review and comment on package vendor document related to the designer scope. POSITION : Instrument Designer COMPANY/PERIOD: Fluor Daniel/AG&P Inc./Aug’90-Jun’93 PROJECT : Valero I & II; Star Project-Shell Phils;Enron Power Plant I & II RESPONSIBILITIES  Prepare instrument deliverables such as Instrument Location Layout, Hook-up, Electrical Equipment Layout, Material Take-off, Instrument & Electicral Equipment List, Datasheet and Specification.  Studies and interpret specifications, process engineering flow schemes prior to design and detailing works.  Coordinate with other discipline about the progress of the project during weekly task force meeting.  Perform design layout of cable and conduit by the use of AutoCad  Prepare necessary data and information for the project.  Develop basic electrical engineering design criteria on assigned contract.  Prepare calculations, sketches and wiring diagram.  Provide technical information and data design.  Responsible for review of vendor data. POSITION : Electrical Engineer COMPANY/PERIOD: Atlantic Gulf & Pacific Company of Manila, Inc./Sept’88- Feb’89/Jan’90-Aug’90 PROJECT : Manila International Container Terminal Phase II Project; Asahi Glass Phils. Inc. RESPONSIBILITIES  Design electrical system for commercial buildings and industrial plants.  Established electrical equipment location and draft it for electrical location plan.  Perform design layout of cable, conduit and cable tray.  Prepare quantity take-off and price estimates.  Analyze and interpret plans and design for purposes of revision and estimating.  Undertake field assignments and inspections of electrical equipment to insure compliance to specification.  Initiate electrical equipment quotations, purchase request and prepare bid summary.
  • 5. POSITION : Electrical Field Engineer COMPANY : Atlantic Gulf & Pacific Company of Manila, Inc./Feb’89-Oct’89 PROJECT : Red Dog Project (Bauan, Batangas) RESPONSIBILITIES  Prepare preliminary and final bill of quantity for procurement.  Prepare a change order list to be send to the project management that have been encounter during the design development.  Prepare documents and supporting papers on change orders/extra works.  Monitor daily and monthly work progress.  Prepare as-built drawings and detailed drawings for construction.  Coordinate with other discipline regarding any problem that may affect work progress.  Maintain records of all inspection and other correspondence in the office.