SlideShare a Scribd company logo
1
Richard R. Reville
14596 40th St. North
Loxahatchee,FL 33470
Phone: (561)255-6571
E-mail: Richreville@gmail.com
Objective
To obtain a position as a Electrical Project Manager/Superintendent that will provide a career opportunity
to maximize my skills acquired through educational and work experiences.
Education
Contractors Exam School - June, 1992
ABCI 4 Year Electrical Program - July, 1988
United States Army NCO Academy - August, 1985
Professional Certifications
Osha 10 - September, 1992
Palm Beach Electrical Masters - September, 1992
Duval County Journeyman’s - June, 1990
Broward County Journeyman’s - October, 1988
Positions Held / Work Ethic
Commercial/Industrial Electrical Construction all phases of electrical industry.
January, 2013 - Present - Electrical Superintendent
Power Design Inc.
Job Responsibilities:
 Work as Electrical Superintendent overseeing various Garden styler and high density Multi-family
dwellings.
 Project Functions include: Development of Electrical systems & material procurement.
 Maintain job specific budgets, projected manpower requirements.
 Responsible for establishing the project schedule and achieving goals set forth.
 Responsible for reviewing work, design build, design assist and as built drawings.
 Negotiate procurement of budgeted equipment & materials utilized on project.
 Review Engineered Drawings for any changes is scope or potential cost impacts.
 Responsible for building customer relationships.
2
RichardR.Reville
Enclave (Royal Palm Beach,FL)
This was a Design Assist Garden style multifamily project, consisting of 12 - Three Story Buildings, 3
Enclosed parking facilities, and amenity area.
Jefferson Montera (Cooper City, FL)
This was a design assist garden style multifamily project consisting of Three stories with 11 buildings and
amenity area.
Vintage Park (Pompano Beach,FL)
This was a design assist, high density multifamily project consisting of 4 - Six story buildings, Six story
covered parking and amenity area.
Mizner Lakes (West Palm Beach,FL)
This was a design assist garden style multifamily project consisting of 4 - Two story, 4 - Three story and
8 - Four story buildings, amenity area with bowling alley, movie theater and tennis court.
September, 2010 - September, 2012 - Electrical Superintendent
Loveland Electric, Inc.
Job Responsibilities:
 Work as Electrical Superintendent overseeing various water management, waste water and hotel hard
bid projects.
 Project Functions include: Development of Electrical systems & material procurement.
 Maintain job specific budgets, projected manpower requirements.
 Responsible for establishing the project schedule and achieving goals set forth.
 Responsible for reviewing working & AS built drawings.
 Negotiate procurement of budgeted equipment & materials utilized on project.
 Review Engineered Drawings for any changes is scope or potential cost impacts.
 Responsible for building customer relationships.
GT Lohemeyer - (Port Everglades, FL)
This was a complete communications upgrade and equipment change out. Utilizing all PRC coated &
explosion proof products.
Sta 5 - (Clewiston, FL)
This was a new water remediation project & pumping sation for South Florida Water Management,
consisting of 21 miles of district levy with 23 gate stations and Two pumping stations.
Hyutt Hotel (Delray Beach,FL)
This was a 134 room hotel, consisting of luxury rooms, amenity area,environmental control systems, and
Leviton Greenmar lighting control.
September, 2005 - September, 2010 - Manager
Nasco ofPBC Inc. Phone Number: (561)793-5243
Job Responsibilities:
 Work as project manager overseeing 2 to 3 design build & hard bid projects.
 Project functions include; estimating & development of electrical systems.
 Establish and maintain job specific budgets, projected manpower requirements.
 Responsible for compiling, billing & collection of accounts receivables.
 Responsible for establishing the project schedule and achieving the goals set forth.
3
RichardR.Reville
 Responsible for reviewing working & AS built drawings.
 Negotiate procurement of budgeted equipment & materials utilized on project.
 Review Engineered Drawings for any changes is scope or potential cost impacts.
 Responsible for estimating project cost and any associated changes.
 Responsible for building customer relationships.
September, 1992 - August, 2005 - Operating Owner
North American Electric
Job Responsibilities:
 Worked as owner overseeing various hard bid projects.
 Project Functions include: Estimating & Development of electrical systems.
 Establish and Maintain job specific budgets, projected manpower requirements & forecasted budgetary
cost.
 Responsible for establishing the project schedule and achieving goals set forth.
 Responsible for compiling, billing & collection of payment application.
 Negotiate procurement of budgeted equipment & materials utilized on project.
 Review Engineered Drawings for any changes is scope or potential cost impacts.
 Responsible for building customer relationships.
 Responsible for estimating project cost and any associated changes.
February, 1992 – September, 1992 – CrewSupervisor
John Watson Landscape Illumation Phone Number 800-225-0728
Job Responsibilities:
Worked as crew supervisoroverseeing various design build lighting projects, where our scope ranged from $5K –
$500K.
 Project Functions include: Estimating & Development of electrical systems.
 Establish and Maintain job specific budgets, projected manpower requirements & forecasted budgetary
cost.
 Responsible for establishing the project schedule and achieving goals set forth.
Responsible for drafting As-Built Drawings.
Negotiate procurement of budgeted equipment & material utilized on projects.
Review Engineered drawings for any changes in scope.
January, 1982 – February, - 1992 – Journeyman Electrician
United ofBroward – Business closed in 1992
Job Responsibilities:
Worked as supervisor overseeing various hard bid Commercial / Industrial Electrical projects where our
scope ranged from $50K – $1.5K.
Maintain job specific budgets, projected manpower requirements & Forecasted Budgetary costs.
Project Functions include: Development of Electrical systems.
Responsible for establishing the project schedule and achieving goals set forth.
 Responsible for drafting As-Built Drawings.
Negotiate procurement of budgeted equipment & material utilized on projects.
Review Engineered drawings for any changes in scope.
January, 1982 – January, 1986 – Combat Medic
United States Army – 10 Special Forces group
June, 1980 – Student at Deerfield Beach High School
4
RichardR.Reville

More Related Content

What's hot

Dan Welch R 2012
Dan Welch R 2012Dan Welch R 2012
Dan Welch R 2012DanWelch
 
Resume Oct 2015 Revision 2
Resume Oct 2015 Revision 2Resume Oct 2015 Revision 2
Resume Oct 2015 Revision 2David Seaward
 
Todd F Burns new resume
Todd F Burns new resumeTodd F Burns new resume
Todd F Burns new resumeTodd Burns
 
Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin Jose
 
Construction Management Resume 9.30.12
Construction Management Resume 9.30.12Construction Management Resume 9.30.12
Construction Management Resume 9.30.12cdelisi3386
 
Todd Smith 2016 (Resume))
Todd Smith 2016 (Resume))Todd Smith 2016 (Resume))
Todd Smith 2016 (Resume))Todd Smith
 
Ankineedu resume(Business Development: - Sales, Customer Support and expert a...
Ankineedu resume(Business Development: - Sales, Customer Support and expert a...Ankineedu resume(Business Development: - Sales, Customer Support and expert a...
Ankineedu resume(Business Development: - Sales, Customer Support and expert a...Kumbham Ankineedu
 
Saikat 07-profile
Saikat 07-profileSaikat 07-profile
Saikat 07-profileSaikat Roy
 
Dale buck jr. resume 2016
Dale buck jr. resume 2016Dale buck jr. resume 2016
Dale buck jr. resume 2016Dale Buck Jr.
 
Bryant scott-resume-2016
Bryant scott-resume-2016Bryant scott-resume-2016
Bryant scott-resume-2016Scott Bryant
 
Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Ray Freiha
 
Scott M Tidwell Resume word document 030415
Scott M Tidwell Resume word document 030415Scott M Tidwell Resume word document 030415
Scott M Tidwell Resume word document 030415Scott M. Tidwell, Sr.
 

What's hot (20)

Brijesh cv
Brijesh cvBrijesh cv
Brijesh cv
 
Dan Welch R 2012
Dan Welch R 2012Dan Welch R 2012
Dan Welch R 2012
 
DCs CV
DCs CVDCs CV
DCs CV
 
Resume Oct 2015 Revision 2
Resume Oct 2015 Revision 2Resume Oct 2015 Revision 2
Resume Oct 2015 Revision 2
 
Todd F Burns new resume
Todd F Burns new resumeTodd F Burns new resume
Todd F Burns new resume
 
Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.
 
Construction Management Resume 9.30.12
Construction Management Resume 9.30.12Construction Management Resume 9.30.12
Construction Management Resume 9.30.12
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Todd Smith 2016 (Resume))
Todd Smith 2016 (Resume))Todd Smith 2016 (Resume))
Todd Smith 2016 (Resume))
 
Richard Bates
Richard BatesRichard Bates
Richard Bates
 
Travis Sharrard
Travis Sharrard Travis Sharrard
Travis Sharrard
 
Charles Riha
Charles RihaCharles Riha
Charles Riha
 
Ankineedu resume(Business Development: - Sales, Customer Support and expert a...
Ankineedu resume(Business Development: - Sales, Customer Support and expert a...Ankineedu resume(Business Development: - Sales, Customer Support and expert a...
Ankineedu resume(Business Development: - Sales, Customer Support and expert a...
 
Saikat 07-profile
Saikat 07-profileSaikat 07-profile
Saikat 07-profile
 
Dale buck jr. resume 2016
Dale buck jr. resume 2016Dale buck jr. resume 2016
Dale buck jr. resume 2016
 
Rajbir Singh-2
Rajbir Singh-2Rajbir Singh-2
Rajbir Singh-2
 
Resume - Celieto Rey Suarez
Resume - Celieto Rey SuarezResume - Celieto Rey Suarez
Resume - Celieto Rey Suarez
 
Bryant scott-resume-2016
Bryant scott-resume-2016Bryant scott-resume-2016
Bryant scott-resume-2016
 
Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016
 
Scott M Tidwell Resume word document 030415
Scott M Tidwell Resume word document 030415Scott M Tidwell Resume word document 030415
Scott M Tidwell Resume word document 030415
 

Viewers also liked

Innovation handbook
Innovation handbookInnovation handbook
Innovation handbookCegos UK
 
ORÇAMENTO DE CULTURA NA SUBPREFEITURA 2016 forumhiphopeopoderpublico.blogspot...
ORÇAMENTO DE CULTURA NA SUBPREFEITURA 2016 forumhiphopeopoderpublico.blogspot...ORÇAMENTO DE CULTURA NA SUBPREFEITURA 2016 forumhiphopeopoderpublico.blogspot...
ORÇAMENTO DE CULTURA NA SUBPREFEITURA 2016 forumhiphopeopoderpublico.blogspot...RAPPER PIRATA
 
Hero archetypes2
Hero archetypes2Hero archetypes2
Hero archetypes2johare7
 
O genocídio mes hip hop 2016 sp
O genocídio mes hip hop 2016 spO genocídio mes hip hop 2016 sp
O genocídio mes hip hop 2016 spRAPPER PIRATA
 
8 bước cần lưu ý trước khi mua nhà trả góp
8 bước cần lưu ý trước khi mua nhà trả góp8 bước cần lưu ý trước khi mua nhà trả góp
8 bước cần lưu ý trước khi mua nhà trả gópThi công sơn giá rẻ
 
How AI Is Accelerating Retail Transformation
How AI Is Accelerating Retail TransformationHow AI Is Accelerating Retail Transformation
How AI Is Accelerating Retail TransformationNVIDIA
 

Viewers also liked (11)

Innovation handbook
Innovation handbookInnovation handbook
Innovation handbook
 
Los simbolos patrios
Los simbolos patriosLos simbolos patrios
Los simbolos patrios
 
ORÇAMENTO DE CULTURA NA SUBPREFEITURA 2016 forumhiphopeopoderpublico.blogspot...
ORÇAMENTO DE CULTURA NA SUBPREFEITURA 2016 forumhiphopeopoderpublico.blogspot...ORÇAMENTO DE CULTURA NA SUBPREFEITURA 2016 forumhiphopeopoderpublico.blogspot...
ORÇAMENTO DE CULTURA NA SUBPREFEITURA 2016 forumhiphopeopoderpublico.blogspot...
 
Hero archetypes2
Hero archetypes2Hero archetypes2
Hero archetypes2
 
O genocídio mes hip hop 2016 sp
O genocídio mes hip hop 2016 spO genocídio mes hip hop 2016 sp
O genocídio mes hip hop 2016 sp
 
COMPUTACION II
COMPUTACION IICOMPUTACION II
COMPUTACION II
 
Sistema
SistemaSistema
Sistema
 
8 bước cần lưu ý trước khi mua nhà trả góp
8 bước cần lưu ý trước khi mua nhà trả góp8 bước cần lưu ý trước khi mua nhà trả góp
8 bước cần lưu ý trước khi mua nhà trả góp
 
Excellentietraject Research on Innovating Organisations
Excellentietraject Research on Innovating OrganisationsExcellentietraject Research on Innovating Organisations
Excellentietraject Research on Innovating Organisations
 
How AI Is Accelerating Retail Transformation
How AI Is Accelerating Retail TransformationHow AI Is Accelerating Retail Transformation
How AI Is Accelerating Retail Transformation
 
Motor Control Using PLC
Motor Control Using PLCMotor Control Using PLC
Motor Control Using PLC
 

Similar to RICHARD REVILLE RESUME 9-28-15

Similar to RICHARD REVILLE RESUME 9-28-15 (20)

Cameron dipple resume
Cameron dipple resumeCameron dipple resume
Cameron dipple resume
 
Caro, Jose J 11 9
Caro, Jose J 11 9Caro, Jose J 11 9
Caro, Jose J 11 9
 
Michael Mueller _04.30.15
Michael Mueller _04.30.15Michael Mueller _04.30.15
Michael Mueller _04.30.15
 
Resume for Scott McKeen 2016 -REV1
Resume for Scott McKeen 2016 -REV1Resume for Scott McKeen 2016 -REV1
Resume for Scott McKeen 2016 -REV1
 
Michael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-naMichael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-na
 
Lou Houlemarde
Lou HoulemardeLou Houlemarde
Lou Houlemarde
 
Martin L Reetz Resume 092215
Martin L Reetz Resume 092215Martin L Reetz Resume 092215
Martin L Reetz Resume 092215
 
Darrell Resume2014
Darrell Resume2014Darrell Resume2014
Darrell Resume2014
 
Resume_JacobPhillips_2015
Resume_JacobPhillips_2015Resume_JacobPhillips_2015
Resume_JacobPhillips_2015
 
My project list - James W. Kendrick
My project list - James W. KendrickMy project list - James W. Kendrick
My project list - James W. Kendrick
 
A P Rolfe CV March 2016
A P Rolfe  CV March 2016A P Rolfe  CV March 2016
A P Rolfe CV March 2016
 
CV OF MVV
CV OF MVVCV OF MVV
CV OF MVV
 
Resume(1)
Resume(1)Resume(1)
Resume(1)
 
RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15
 
James Nolan experience in Energy, renewables, Waste to Energy and Waste to Oil
James Nolan experience in Energy, renewables, Waste to Energy and Waste to OilJames Nolan experience in Energy, renewables, Waste to Energy and Waste to Oil
James Nolan experience in Energy, renewables, Waste to Energy and Waste to Oil
 
Maulik_Mistri_1
Maulik_Mistri_1Maulik_Mistri_1
Maulik_Mistri_1
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016
 
Resume
ResumeResume
Resume
 
Dudley 2-7-2017
Dudley 2-7-2017Dudley 2-7-2017
Dudley 2-7-2017
 
johnres2015
johnres2015johnres2015
johnres2015
 

RICHARD REVILLE RESUME 9-28-15

  • 1. 1 Richard R. Reville 14596 40th St. North Loxahatchee,FL 33470 Phone: (561)255-6571 E-mail: Richreville@gmail.com Objective To obtain a position as a Electrical Project Manager/Superintendent that will provide a career opportunity to maximize my skills acquired through educational and work experiences. Education Contractors Exam School - June, 1992 ABCI 4 Year Electrical Program - July, 1988 United States Army NCO Academy - August, 1985 Professional Certifications Osha 10 - September, 1992 Palm Beach Electrical Masters - September, 1992 Duval County Journeyman’s - June, 1990 Broward County Journeyman’s - October, 1988 Positions Held / Work Ethic Commercial/Industrial Electrical Construction all phases of electrical industry. January, 2013 - Present - Electrical Superintendent Power Design Inc. Job Responsibilities:  Work as Electrical Superintendent overseeing various Garden styler and high density Multi-family dwellings.  Project Functions include: Development of Electrical systems & material procurement.  Maintain job specific budgets, projected manpower requirements.  Responsible for establishing the project schedule and achieving goals set forth.  Responsible for reviewing work, design build, design assist and as built drawings.  Negotiate procurement of budgeted equipment & materials utilized on project.  Review Engineered Drawings for any changes is scope or potential cost impacts.  Responsible for building customer relationships.
  • 2. 2 RichardR.Reville Enclave (Royal Palm Beach,FL) This was a Design Assist Garden style multifamily project, consisting of 12 - Three Story Buildings, 3 Enclosed parking facilities, and amenity area. Jefferson Montera (Cooper City, FL) This was a design assist garden style multifamily project consisting of Three stories with 11 buildings and amenity area. Vintage Park (Pompano Beach,FL) This was a design assist, high density multifamily project consisting of 4 - Six story buildings, Six story covered parking and amenity area. Mizner Lakes (West Palm Beach,FL) This was a design assist garden style multifamily project consisting of 4 - Two story, 4 - Three story and 8 - Four story buildings, amenity area with bowling alley, movie theater and tennis court. September, 2010 - September, 2012 - Electrical Superintendent Loveland Electric, Inc. Job Responsibilities:  Work as Electrical Superintendent overseeing various water management, waste water and hotel hard bid projects.  Project Functions include: Development of Electrical systems & material procurement.  Maintain job specific budgets, projected manpower requirements.  Responsible for establishing the project schedule and achieving goals set forth.  Responsible for reviewing working & AS built drawings.  Negotiate procurement of budgeted equipment & materials utilized on project.  Review Engineered Drawings for any changes is scope or potential cost impacts.  Responsible for building customer relationships. GT Lohemeyer - (Port Everglades, FL) This was a complete communications upgrade and equipment change out. Utilizing all PRC coated & explosion proof products. Sta 5 - (Clewiston, FL) This was a new water remediation project & pumping sation for South Florida Water Management, consisting of 21 miles of district levy with 23 gate stations and Two pumping stations. Hyutt Hotel (Delray Beach,FL) This was a 134 room hotel, consisting of luxury rooms, amenity area,environmental control systems, and Leviton Greenmar lighting control. September, 2005 - September, 2010 - Manager Nasco ofPBC Inc. Phone Number: (561)793-5243 Job Responsibilities:  Work as project manager overseeing 2 to 3 design build & hard bid projects.  Project functions include; estimating & development of electrical systems.  Establish and maintain job specific budgets, projected manpower requirements.  Responsible for compiling, billing & collection of accounts receivables.  Responsible for establishing the project schedule and achieving the goals set forth.
  • 3. 3 RichardR.Reville  Responsible for reviewing working & AS built drawings.  Negotiate procurement of budgeted equipment & materials utilized on project.  Review Engineered Drawings for any changes is scope or potential cost impacts.  Responsible for estimating project cost and any associated changes.  Responsible for building customer relationships. September, 1992 - August, 2005 - Operating Owner North American Electric Job Responsibilities:  Worked as owner overseeing various hard bid projects.  Project Functions include: Estimating & Development of electrical systems.  Establish and Maintain job specific budgets, projected manpower requirements & forecasted budgetary cost.  Responsible for establishing the project schedule and achieving goals set forth.  Responsible for compiling, billing & collection of payment application.  Negotiate procurement of budgeted equipment & materials utilized on project.  Review Engineered Drawings for any changes is scope or potential cost impacts.  Responsible for building customer relationships.  Responsible for estimating project cost and any associated changes. February, 1992 – September, 1992 – CrewSupervisor John Watson Landscape Illumation Phone Number 800-225-0728 Job Responsibilities: Worked as crew supervisoroverseeing various design build lighting projects, where our scope ranged from $5K – $500K.  Project Functions include: Estimating & Development of electrical systems.  Establish and Maintain job specific budgets, projected manpower requirements & forecasted budgetary cost.  Responsible for establishing the project schedule and achieving goals set forth. Responsible for drafting As-Built Drawings. Negotiate procurement of budgeted equipment & material utilized on projects. Review Engineered drawings for any changes in scope. January, 1982 – February, - 1992 – Journeyman Electrician United ofBroward – Business closed in 1992 Job Responsibilities: Worked as supervisor overseeing various hard bid Commercial / Industrial Electrical projects where our scope ranged from $50K – $1.5K. Maintain job specific budgets, projected manpower requirements & Forecasted Budgetary costs. Project Functions include: Development of Electrical systems. Responsible for establishing the project schedule and achieving goals set forth.  Responsible for drafting As-Built Drawings. Negotiate procurement of budgeted equipment & material utilized on projects. Review Engineered drawings for any changes in scope. January, 1982 – January, 1986 – Combat Medic United States Army – 10 Special Forces group June, 1980 – Student at Deerfield Beach High School