SlideShare a Scribd company logo
Mohamed Ahmed Hamed E-Mail: moh_hamed06@yahoo.com
23 Zohny st,Alandalos,Haram,
Giza, Cairo, Egypt 202
Home Phone: (202) 35825846
Work Phone: (010) 08401745
OBJECTIVE To obtain a challenging and demanding job in construction site works as well
as technical work that will further enhance my knowledge and skills.
PERSONAL  Date of birth : 24th April 1984
 Nationality : Egyptian
 Marital status : Married
 Military status : Exempted
EXPERIENC
E
 Civil engineer
ECG (Engineering Consultants Group),Egypt, Cairo, July 2008-Present.
Working in ECG Company in the following projects in Cairo.
1- Oriana Villas, Cairo Festival City project, Cairo, Egypt.
(165 villas).
• Total cost of the project is 1,720,000,000 EGP
Responsibilities:-
• Shop drawing review
• Site work supervision (villas constructions, Infrastructure,
landscape and roads works).
• Assistance in preparing weekly, monthly reports; issuing
letters, NCR, JSI, WSIs.
2- Bel Air project, Beverly Hills,Shiekh Zayed city, 6 of October,Egypt.
(35 villas and 73 town house)
• Total cost of the project is 90,000,000 EGP
Responsibilities:-
• Shop drawing review
• Site work supervision (villas constructions, landscape, and
roads works)
3- MCDR (Misr for central clearing, Depository and Registry)
administration building in new cairo.
• Total cost of the project is 145,000,000 EGP.
Responsibilities:-
• Supervision of excavation, R.C works of building basement and five
floors with different slabs systems (solid, flat, hollow block and waffle
slabs) beside execution of retaining walls for basement and slab on
grade.
• Supervision of finishing works such as masonry, plaster and marble
works.
• Execution of large swimming pool.
 Civil engineer
TAV (Tepe Akfen), Egypt, Cairo, March 2007 – June 2008
working in TAV ( Tepe Akfen ) Cairo (Main Contractor) , project of the new
terminal building of Cairo Airport (TB3) as civil engineer.
 Total cost of the project is 350,000,000 USD.
Responsibilities:-
• Execution of the main utility tunnel (3*3m R.C rectangular tunnel)
including survey works, excavation and R.C works.
• Execution of power plant of the project as structural works.
• Execution of two special buildings for giant planes(Airbus 380) for
passengers translation.
• Execution of small watchtower(13m height) in airport runway.
• Supervision of electromechanical installation works (Travelators
,escalators and bridges connecting between planes and pier
building)
• Infrastructures works in the project such as electrical ducts and
manholes, water and fire pipelines and rain drain system(catch
basins).
 Survey engineer
BG Consulting Group, Egypt, Cairo, October 2006 - March 2007
 working in B.G. consulting group as a subcontractor of TAV ( Tepe
Akfen ) Cairo , project of the new terminal building of Cairo Airport (TB3),
Power Plant, tunnels and the two fingers (A,B) for airport as a surveying
engineer with Sokkia , Lieca total stations, level instruments and familiar
with computer surveying application.
 Graduation project(June-July 2006)
The graduation project included
• Making information maps for El Minia University Using surveying
instruments (GPS - the level – the theodolite - the total station )
• Hydrographic surveying for El-Ibrahimya canal using total station
• Treatment with surveying computer programs (Lieca GPS and total
station) ,surfer and ACAD2006
 Survey engineer(Training)
BG Consulting Group, Egypt, Cairo, July 2005 - Sep 2005
 working in B.G. consulting group as office engineer familiar with
computer programs (A Cad & surfer).
 Site engineer(Training)
Orascom Construction Company , Egypt, Cairo, July 2004 – August 2004
Training in project of the new Communication Ministry Building in The Smart
Village (Steel & Finishing works).
EDUCATION  University of El-Minia, Bachelor in civil engineering, September 2002
- June 2006
 Graduation Project Title: Survey.
 Graduation Project Degree: Excellent
 Graduation project contained on using GPS techniques in triangular
network and hydrographic survey
SKILLS  Computer –
• MS Office
• Auto CAD/2D.
• Primavera P6.
 Languages –
• Arabic: Mother language.
• English: Very good both spoken & written.
Training
Courses
• PMP exam preparation course, PROMASTAR company.
• ACAD 2006 at Faculty of engineering, Cairo University, Egypt.
• Primavera P6 @ faculty of engineering, Cairo University, Egypt.
• Scope/Time management, ECG Academy, Cairo, Egypt.
• OSHA 30 hrs training course.
SUMMARY Solid understanding of the civil and survey techniques. Proficiency in a wide
range of survey tools.

More Related Content

What's hot (20)

C V Eng_Hisham AlRefaey_ Senior Civil Eng.
C V Eng_Hisham AlRefaey_ Senior Civil Eng.C V Eng_Hisham AlRefaey_ Senior Civil Eng.
C V Eng_Hisham AlRefaey_ Senior Civil Eng.
 
Mina 2016
Mina 2016Mina 2016
Mina 2016
 
LAND SURVEYOR Resume 2013 legat
LAND SURVEYOR Resume 2013 legatLAND SURVEYOR Resume 2013 legat
LAND SURVEYOR Resume 2013 legat
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
C.V -moh-8-16
C.V -moh-8-16C.V -moh-8-16
C.V -moh-8-16
 
Senior Land surveyor
Senior Land surveyorSenior Land surveyor
Senior Land surveyor
 
Khaled-Fahmy
Khaled-FahmyKhaled-Fahmy
Khaled-Fahmy
 
Ahmed Mousa Resume
Ahmed Mousa ResumeAhmed Mousa Resume
Ahmed Mousa Resume
 
M Kamal
M Kamal M Kamal
M Kamal
 
Hossam_Elkholy_CV
Hossam_Elkholy_CVHossam_Elkholy_CV
Hossam_Elkholy_CV
 
ayman y7ia
ayman y7iaayman y7ia
ayman y7ia
 
Nazmy Nabil Nazmy
Nazmy Nabil NazmyNazmy Nabil Nazmy
Nazmy Nabil Nazmy
 
Hossam Hendawy 2016
Hossam Hendawy 2016Hossam Hendawy 2016
Hossam Hendawy 2016
 
C.V-Ayman
C.V-Ayman  C.V-Ayman
C.V-Ayman
 
amir cv
amir cvamir cv
amir cv
 
Amr El-Metwally CV
Amr El-Metwally CVAmr El-Metwally CV
Amr El-Metwally CV
 
Ahmed Gamal C.V
Ahmed Gamal C.VAhmed Gamal C.V
Ahmed Gamal C.V
 
CV Osama Salah Aug 2015
CV Osama Salah Aug 2015CV Osama Salah Aug 2015
CV Osama Salah Aug 2015
 
CV Amr Zaki - PMP®
CV Amr Zaki - PMP®CV Amr Zaki - PMP®
CV Amr Zaki - PMP®
 
Wael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp LettersWael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp Letters
 

Viewers also liked

How to Set Up a Total Station
How to Set Up a Total StationHow to Set Up a Total Station
How to Set Up a Total StationJustin Gabbard
 
Total Station Topographic Survey
Total Station Topographic Survey Total Station Topographic Survey
Total Station Topographic Survey haroldtaylor1113
 
Sokkia Total station setup and operation
Sokkia Total station setup and operationSokkia Total station setup and operation
Sokkia Total station setup and operation
Charitha Seneviratne
 
Total station
Total stationTotal station
Total station
Rushabh shah
 
Welcome to the presentation on ‘total station
Welcome to the presentation on ‘total stationWelcome to the presentation on ‘total station
Welcome to the presentation on ‘total stationShashank Javalagi
 
Total station
Total stationTotal station
Total station
abhi08121994
 
Total station and its application to civil engineering
Total station and its application to civil engineeringTotal station and its application to civil engineering
Total station and its application to civil engineering
Tushar Dholakia
 

Viewers also liked (8)

How to Set Up a Total Station
How to Set Up a Total StationHow to Set Up a Total Station
How to Set Up a Total Station
 
Total Station Topographic Survey
Total Station Topographic Survey Total Station Topographic Survey
Total Station Topographic Survey
 
Sokkia Total station setup and operation
Sokkia Total station setup and operationSokkia Total station setup and operation
Sokkia Total station setup and operation
 
Total station
Total stationTotal station
Total station
 
EDM and Total Stations
EDM and Total StationsEDM and Total Stations
EDM and Total Stations
 
Welcome to the presentation on ‘total station
Welcome to the presentation on ‘total stationWelcome to the presentation on ‘total station
Welcome to the presentation on ‘total station
 
Total station
Total stationTotal station
Total station
 
Total station and its application to civil engineering
Total station and its application to civil engineeringTotal station and its application to civil engineering
Total station and its application to civil engineering
 

Similar to Mohamed ahmed hamed 2013 (1) (1)

MOHAMED ATEF C.V. (updated Sept. 2015)
MOHAMED ATEF C.V. (updated Sept. 2015)MOHAMED ATEF C.V. (updated Sept. 2015)
MOHAMED ATEF C.V. (updated Sept. 2015)mohamed atef
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.
Ayman Mitkees
 
Amgad Joseph Labeb ( CV )
Amgad Joseph Labeb ( CV )Amgad Joseph Labeb ( CV )
Amgad Joseph Labeb ( CV )Amgad Joseph
 
Khaled fahmy cv
Khaled fahmy cvKhaled fahmy cv
Khaled fahmy cv
KHALED FAHMY
 
Omar Alani CV 20160410
Omar Alani CV 20160410Omar Alani CV 20160410
Omar Alani CV 20160410
Omar Alani
 
Aftab_14-06-15
Aftab_14-06-15Aftab_14-06-15
Aftab_14-06-15Alam Aftab
 
Ahmed el gohary cv
Ahmed el gohary cvAhmed el gohary cv
Ahmed el gohary cv
Ahmed El gohary
 
doaa mohamed cv -1
doaa mohamed  cv -1doaa mohamed  cv -1
doaa mohamed cv -1doaa saber
 
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )Ahmed Naeim
 
Fady Samy -Quantity Surveyor
Fady Samy -Quantity SurveyorFady Samy -Quantity Surveyor
Fady Samy -Quantity Surveyorfady qezman
 

Similar to Mohamed ahmed hamed 2013 (1) (1) (20)

CV
CVCV
CV
 
MOHAMED ATEF C.V. (updated Sept. 2015)
MOHAMED ATEF C.V. (updated Sept. 2015)MOHAMED ATEF C.V. (updated Sept. 2015)
MOHAMED ATEF C.V. (updated Sept. 2015)
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.
 
Amgad Joseph Labeb ( CV )
Amgad Joseph Labeb ( CV )Amgad Joseph Labeb ( CV )
Amgad Joseph Labeb ( CV )
 
Sr Civil Engineer
Sr Civil EngineerSr Civil Engineer
Sr Civil Engineer
 
yasser radwan
yasser radwanyasser radwan
yasser radwan
 
Khaled fahmy cv
Khaled fahmy cvKhaled fahmy cv
Khaled fahmy cv
 
mohamed solyman Cv22
mohamed solyman Cv22 mohamed solyman Cv22
mohamed solyman Cv22
 
A.Hussein - C.V
A.Hussein - C.VA.Hussein - C.V
A.Hussein - C.V
 
cv
cvcv
cv
 
Summery
SummerySummery
Summery
 
Omar Alani CV 20160410
Omar Alani CV 20160410Omar Alani CV 20160410
Omar Alani CV 20160410
 
C.V.UP DATE
C.V.UP DATEC.V.UP DATE
C.V.UP DATE
 
Mohamed_Quandeel_Quandeel
Mohamed_Quandeel_QuandeelMohamed_Quandeel_Quandeel
Mohamed_Quandeel_Quandeel
 
Aftab_14-06-15
Aftab_14-06-15Aftab_14-06-15
Aftab_14-06-15
 
Ahmed el gohary cv
Ahmed el gohary cvAhmed el gohary cv
Ahmed el gohary cv
 
doaa mohamed cv -1
doaa mohamed  cv -1doaa mohamed  cv -1
doaa mohamed cv -1
 
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
 
cv amr
cv amrcv amr
cv amr
 
Fady Samy -Quantity Surveyor
Fady Samy -Quantity SurveyorFady Samy -Quantity Surveyor
Fady Samy -Quantity Surveyor
 

More from Mohamed Ahmed

Parkville strategic project final-converted
Parkville   strategic project final-convertedParkville   strategic project final-converted
Parkville strategic project final-converted
Mohamed Ahmed
 
Oracle final project
Oracle   final projectOracle   final project
Oracle final project
Mohamed Ahmed
 
Miu final exam
Miu   final examMiu   final exam
Miu final exam
Mohamed Ahmed
 
Lecico final exam
Lecico   final examLecico   final exam
Lecico final exam
Mohamed Ahmed
 
Giza systems group d - giza systems
Giza systems   group d - giza systemsGiza systems   group d - giza systems
Giza systems group d - giza systems
Mohamed Ahmed
 
Elaj group strategic project (1)
Elaj group strategic project (1)Elaj group strategic project (1)
Elaj group strategic project (1)
Mohamed Ahmed
 
Edita final project - mba - s3 - group f
Edita   final project - mba - s3 - group fEdita   final project - mba - s3 - group f
Edita final project - mba - s3 - group f
Mohamed Ahmed
 
Comprehensive exam case
Comprehensive exam caseComprehensive exam case
Comprehensive exam case
Mohamed Ahmed
 
Coca cola final project- mba- s3 -group (group a )
Coca cola    final project- mba- s3 -group  (group a )Coca cola    final project- mba- s3 -group  (group a )
Coca cola final project- mba- s3 -group (group a )
Mohamed Ahmed
 

More from Mohamed Ahmed (9)

Parkville strategic project final-converted
Parkville   strategic project final-convertedParkville   strategic project final-converted
Parkville strategic project final-converted
 
Oracle final project
Oracle   final projectOracle   final project
Oracle final project
 
Miu final exam
Miu   final examMiu   final exam
Miu final exam
 
Lecico final exam
Lecico   final examLecico   final exam
Lecico final exam
 
Giza systems group d - giza systems
Giza systems   group d - giza systemsGiza systems   group d - giza systems
Giza systems group d - giza systems
 
Elaj group strategic project (1)
Elaj group strategic project (1)Elaj group strategic project (1)
Elaj group strategic project (1)
 
Edita final project - mba - s3 - group f
Edita   final project - mba - s3 - group fEdita   final project - mba - s3 - group f
Edita final project - mba - s3 - group f
 
Comprehensive exam case
Comprehensive exam caseComprehensive exam case
Comprehensive exam case
 
Coca cola final project- mba- s3 -group (group a )
Coca cola    final project- mba- s3 -group  (group a )Coca cola    final project- mba- s3 -group  (group a )
Coca cola final project- mba- s3 -group (group a )
 

Recently uploaded

Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 

Recently uploaded (20)

Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 

Mohamed ahmed hamed 2013 (1) (1)

  • 1. Mohamed Ahmed Hamed E-Mail: moh_hamed06@yahoo.com 23 Zohny st,Alandalos,Haram, Giza, Cairo, Egypt 202 Home Phone: (202) 35825846 Work Phone: (010) 08401745 OBJECTIVE To obtain a challenging and demanding job in construction site works as well as technical work that will further enhance my knowledge and skills. PERSONAL  Date of birth : 24th April 1984  Nationality : Egyptian  Marital status : Married  Military status : Exempted EXPERIENC E  Civil engineer ECG (Engineering Consultants Group),Egypt, Cairo, July 2008-Present. Working in ECG Company in the following projects in Cairo. 1- Oriana Villas, Cairo Festival City project, Cairo, Egypt. (165 villas). • Total cost of the project is 1,720,000,000 EGP Responsibilities:- • Shop drawing review • Site work supervision (villas constructions, Infrastructure, landscape and roads works). • Assistance in preparing weekly, monthly reports; issuing letters, NCR, JSI, WSIs. 2- Bel Air project, Beverly Hills,Shiekh Zayed city, 6 of October,Egypt. (35 villas and 73 town house) • Total cost of the project is 90,000,000 EGP Responsibilities:- • Shop drawing review • Site work supervision (villas constructions, landscape, and roads works) 3- MCDR (Misr for central clearing, Depository and Registry)
  • 2. administration building in new cairo. • Total cost of the project is 145,000,000 EGP. Responsibilities:- • Supervision of excavation, R.C works of building basement and five floors with different slabs systems (solid, flat, hollow block and waffle slabs) beside execution of retaining walls for basement and slab on grade. • Supervision of finishing works such as masonry, plaster and marble works. • Execution of large swimming pool.  Civil engineer TAV (Tepe Akfen), Egypt, Cairo, March 2007 – June 2008 working in TAV ( Tepe Akfen ) Cairo (Main Contractor) , project of the new terminal building of Cairo Airport (TB3) as civil engineer.  Total cost of the project is 350,000,000 USD. Responsibilities:- • Execution of the main utility tunnel (3*3m R.C rectangular tunnel) including survey works, excavation and R.C works. • Execution of power plant of the project as structural works. • Execution of two special buildings for giant planes(Airbus 380) for passengers translation. • Execution of small watchtower(13m height) in airport runway. • Supervision of electromechanical installation works (Travelators ,escalators and bridges connecting between planes and pier building) • Infrastructures works in the project such as electrical ducts and manholes, water and fire pipelines and rain drain system(catch basins).  Survey engineer BG Consulting Group, Egypt, Cairo, October 2006 - March 2007  working in B.G. consulting group as a subcontractor of TAV ( Tepe Akfen ) Cairo , project of the new terminal building of Cairo Airport (TB3), Power Plant, tunnels and the two fingers (A,B) for airport as a surveying engineer with Sokkia , Lieca total stations, level instruments and familiar
  • 3. with computer surveying application.  Graduation project(June-July 2006) The graduation project included • Making information maps for El Minia University Using surveying instruments (GPS - the level – the theodolite - the total station ) • Hydrographic surveying for El-Ibrahimya canal using total station • Treatment with surveying computer programs (Lieca GPS and total station) ,surfer and ACAD2006  Survey engineer(Training) BG Consulting Group, Egypt, Cairo, July 2005 - Sep 2005  working in B.G. consulting group as office engineer familiar with computer programs (A Cad & surfer).  Site engineer(Training) Orascom Construction Company , Egypt, Cairo, July 2004 – August 2004 Training in project of the new Communication Ministry Building in The Smart Village (Steel & Finishing works). EDUCATION  University of El-Minia, Bachelor in civil engineering, September 2002 - June 2006  Graduation Project Title: Survey.  Graduation Project Degree: Excellent  Graduation project contained on using GPS techniques in triangular network and hydrographic survey SKILLS  Computer – • MS Office • Auto CAD/2D. • Primavera P6.  Languages – • Arabic: Mother language. • English: Very good both spoken & written. Training Courses • PMP exam preparation course, PROMASTAR company. • ACAD 2006 at Faculty of engineering, Cairo University, Egypt. • Primavera P6 @ faculty of engineering, Cairo University, Egypt. • Scope/Time management, ECG Academy, Cairo, Egypt.
  • 4. • OSHA 30 hrs training course. SUMMARY Solid understanding of the civil and survey techniques. Proficiency in a wide range of survey tools.