SlideShare a Scribd company logo
Wael Azmy || +201212980580 || w.azmy31@gmail.com || Page 1 of 4
Wael Azmy
AREAS OF EXPERTISE
A self-managed and result-oriented Project Manager/Construction with 14 plus years, during this period
of career, worked in major projects such as Oil Refinery, Combined-Cycle Power Generation Plants,
Military Structures and State-of-Art residential and Commercial Complexes.
 Develop full scale plan, direct, coordinate and manage construction projects activities to ensure project
progress and completion in accordance with overall project plan.
 Ensure corporate construction procedures are followed.
 Coordinate consultants and contractors in the assigned area to keep project compliant with budget,
schedule, and quality and HSE requirements.
 Deliver all construction projects on time and in conformity with industry regulatory and company's
standards.
 Maintains safe and clean working environment by applying procedures, rules, and regulations.
 Inspect construction site with QA/QC Engineers, HSE Managers to ensure policies and Client
specifications are adhered.
 Prepare the Weekly Status Reports and Look Ahead Program.
 Oversee the project closure process and ensure proper verification is done along with the final handover
is carried out smoothly.
 Allocate resources for construction
 Implement safe working practices as per the Company's Health and Safety procedures
 Facilitate request of materials based on the approved material and to verify quantities with QS
department
 Ensure that an installation conforms to product performance specifications, conducting field tests as
required.
 Maintain project schedule by monitoring project progress; coordinating activities; resolving problems.
 Verify the deliverables of materials to the site are in order and all records are logged.
Professional Experience
WAZANAT, Project Management Unit of the UAE
Coordination Office of the Development projects in Egypt
Mar2015 - Present
Project Manager
 Financial and budget management and making sure that the project is completed within a financial
budget.
 Oversee change control procedures.
 Create budgets for quotations and develop proposals in response to request-for-proposals (RFP) and
studying biddings.
 Manage projects from concepts through to successful installations, which include liaison with both
internal and external clients, contract and project administration, monthly cash flow and planning and
scheduling construction crews
 Revising BOQ & drawings, validate payments.
 Monitoring subcontractor’s performance.
 Cost Estimation & price break down.
 Coordinate and review the contracts as required
 Manage the administrative process of contracts for the Funder.
Cairo,
Egypt
+201212980580
w.azmy31@gmail.com
Wael Azmy || +201212980580 || w.azmy31@gmail.com || Page 2 of 4
Hassan Allam Construction. (HAC) Oct 2014 – Mar 2015
Section Manager
The Project: ERC Refinery Project, Mostorod, EGYPT
Main Contractor: GS Engineering and Construction Corp
 In charge for the overall construction activities for DCU area, including coke package (coke drum, coke
basin, coke pad).
 Arrange, coordinate, follow-up all work related to my section.
American International Contractors Inc. (AICI) Feb 2013 – Sep2014
Site superintendent/site Manger
The Project: construction of the FY11 NAVY MILCON Project P-908, Bahrain
Project Engineer: U.S corps of Engineer
 Responsible for the overall construction activities at the site, including quality and production for
Buildings and supporting facilities on the Waterfront Site at NSA2,
 Monitor and manage construction team’s workforce of plus 200 personnel.
ARCHIRODON Construction (Overseas) Aug 2008 – Feb 2013
Section head Jan 2012 – Feb 2013
The Project: Civil Works for BANHA POWER STATION 750 MW COMBINED CYCLE, Egypt
 Responsible for Performing, execution, monitoring of dewatering system for pump house and intake
structure (draw down 7m of ground water level) also surface dewatering all over the site
 Furnish and install, the portion of the 2500 mm Tunneling using pipe jacking under the road.
 Responsible for erection of main turbine steel structure and miscellaneous steel work.
Construction support Dec 2010 – Dec 2011
The Project: Civil Works for Damietta 500 MW Simple Cycle Gas Turbine, Egypt
Main Contractor: Kharafi National for Mechanical & Electrical Works S.A.E
 Responsible for project analysis, logistics (cranes, man-lifts, material handling), execution methods and
procedures, technical understanding.
 Supervision for - all civil work for main turbines and its auxiliary pedestals
 Finishing work for buildings (GIS, Substation…).
 Closing punch list items and handing over for client.
Senior Civil Engineer Mar2009 – Nov 2010
The Project: Cairo West Thermal Power Plant Unit 7 & 8, Egypt
 Responsible for all civil work of water & waste water treatment area like miscellaneous foundation, tanks
and its underground utilities.
 Responsible for all architectural work for control building and pump house
 Responsible for installation of reinforced concrete cylinder circulating water pipe
Wael Azmy || +201212980580 || w.azmy31@gmail.com || Page 3 of 4
Civil Site Engineer Aug 2008 – Feb 2009
The Project: New Container Terminal at Damietta Port, Egypt
Off shore constriction / civil department
The works include the construction of approximately 2,600 m of quay wall, fully equipped to
accommodate largest container vessels. The main elements of the works are:
 Fabrication of reinforced cages for diaphragm walls and piles.
 Construction of capping and rear crane beams including quay furniture as bollards, fenders,
 Installing of all necessary temporary works such as platform and guide wall.
ORASCOM for Construction, Industries (OCI) Jul 2007 – Aug 2008
Civil Site Engineer
The Project: BORG EL ARAB International AIRPORT – Alexandria, Egypt
Project Engineer: ECG
 All civil work for administration building, ATC utility building, and ATC storage building.
 Full supervision and follow-up work according to - shop drawing, work procedure,
 Technical specifications, method of statement for (earth work, scaffolding, form work, concrete works,
CMU, plastering, painting, thermal, moisture protection and general finishes)
KIROSIEZ for Construction and Trading Jan 2007 – Jul 2007
Site superintendent/ Civil Engineer
The Project: Somouha Towers – Alexandria (High Rise Buildings (17 levels / 6000 m2)
 Full supervision and follow-up work according to workshop drawing for:-
Pile Foundation (auger cast), piles capping, concrete works, details of reinforced, masonry, plastering,
painting, the insulation, plumbing, general finishes.
 Quantity survey for the various items of work
 Preparing and writing reports
 Prepare and review payments for subcontractors
The Consultative Group for Architecture and Planning (APG) Dec 2006 – Jan 2007
Consulting Engineer
The Project: SUMED 2 High Rise Buildings 12 levels / 10000 m2 – Alexandria
 Inspection for the different items of work according to project drawing/specification
EL HADAF for Public Construction Company Mar 2005 – Oct 2006
Civil Engineer
The Project: The process of resorts and tourist villages in Sharm El-Sheikh & Nuweiba).
 Full supervision over the (concrete works, masonry, Plumbing, Insulation, work finishes, and water tanks)
according to workshop drawing &technical specifications.
 Inventory requirements for the site of various materials (steel – concrete –…..etc.).
 Quantity survey for the various items of work and prepare payments for subcontractors.
Wael Azmy || +201212980580 || w.azmy31@gmail.com || Page 4 of 4
ARMED FORCES Corps of Engineers Jan 2003 – Mar 2004
Mandatory service
 Metallic floating bridges and barge department duties include the construction and maintenance of such
type.
 Installation and operation of utilities and services building.
Education
Asyut University Sep 1997 – May 2002
Bachelor Degree of Science in Civil Engineering
 Graduation Project: Analysis and design of concrete structure,
 Graduation Grade: Good
 Project Grade: Excellent
Skills
Engineering skills
 Be able to analyze and focus on details, ability to incorporate work breakdown structure and estimate
budget amount for project activity. (may work as part of team)
 projects planning and managing schedules, using primavera project management(P6)
 Analysis, design, preparation and review shop drawing of the structures.
 Can perform basic estimation and formulate bill of quantities if required.
 Cost analysis and prepare payments.
 can perform basic estimation and formulate bill of quantities if required
 Inventory requirements for the site of various materials and equipment.
 The preparation of reports for upper level.
Computer Skills
 Proficient with computers and have skills in programs
 Primavera project management (P6)
 Microsoft programs (Excel - Word- Power Point).
 AutoCAD drawing programs. (2d, 3d).
 Analysis and design programs (Sap2000 - Stad III).
Personal skills
 Excellent problem solving and deductive reasoning skills
 Ability to listen, see the big picture and resolve conflicts
 Excellent organizational ability with a high attention to detail
 Innovative, creativity and a strategic thinker
 Capacity to make decisions and think on my feet
 Ability to work independently and as a team player
Wael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp Letters

More Related Content

What's hot (20)

Mina Updated Resume
Mina Updated ResumeMina Updated Resume
Mina Updated Resume
 
Khaled Naguib
Khaled NaguibKhaled Naguib
Khaled Naguib
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816
 
CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.
 
amrocvEN1-updated 15
amrocvEN1-updated 15amrocvEN1-updated 15
amrocvEN1-updated 15
 
Chandan
ChandanChandan
Chandan
 
Sheraz Mahdi New CV
Sheraz Mahdi New CVSheraz Mahdi New CV
Sheraz Mahdi New CV
 
012741
012741012741
012741
 
Ahmed Aboul Azm
Ahmed Aboul AzmAhmed Aboul Azm
Ahmed Aboul Azm
 
Curriculum_Vitae_R. Schroedter April 2016
Curriculum_Vitae_R. Schroedter April 2016Curriculum_Vitae_R. Schroedter April 2016
Curriculum_Vitae_R. Schroedter April 2016
 
hikal CV June 2016
hikal CV June 2016hikal CV June 2016
hikal CV June 2016
 
Mahmoud CV 11-2015
Mahmoud CV 11-2015Mahmoud CV 11-2015
Mahmoud CV 11-2015
 
OMRAN CV
OMRAN CVOMRAN CV
OMRAN CV
 
Bassam Shamkhi - UAE
Bassam Shamkhi - UAEBassam Shamkhi - UAE
Bassam Shamkhi - UAE
 
gomaa tawfik.Elec.Draftsman
gomaa tawfik.Elec.Draftsmangomaa tawfik.Elec.Draftsman
gomaa tawfik.Elec.Draftsman
 
cv2015march
cv2015marchcv2015march
cv2015march
 
cv 8-8-2016
cv 8-8-2016cv 8-8-2016
cv 8-8-2016
 
CV
CVCV
CV
 
Sr. Estimation engineer
Sr. Estimation engineerSr. Estimation engineer
Sr. Estimation engineer
 
EidHarb
EidHarbEidHarb
EidHarb
 

Viewers also liked

Crooke CWF Keynote FINAL final platinum
Crooke CWF Keynote FINAL final platinumCrooke CWF Keynote FINAL final platinum
Crooke CWF Keynote FINAL final platinumAlan Frost
 
Be Aware Webinar - Asegure office 365
Be Aware Webinar - Asegure office 365Be Aware Webinar - Asegure office 365
Be Aware Webinar - Asegure office 365
Symantec LATAM
 
Tao mui khoan
Tao mui khoanTao mui khoan
Tao mui khoan
haothien1111
 
New Approaches for Selling to the Military
New Approaches for Selling to the MilitaryNew Approaches for Selling to the Military
New Approaches for Selling to the MilitaryMike Zimmer
 
Ahmed Naeim Kamel CV 5-2-2016
Ahmed Naeim Kamel  CV 5-2-2016Ahmed Naeim Kamel  CV 5-2-2016
Ahmed Naeim Kamel CV 5-2-2016AHMED NAEIM
 
Acueoductos
AcueoductosAcueoductos
Acueoductos
victor-x
 
HMC
HMCHMC
по лесным тропинкам 2
по лесным тропинкам 2по лесным тропинкам 2
по лесным тропинкам 2
yakushenkova
 
Hotel F&B Bistro C Article
Hotel F&B Bistro C ArticleHotel F&B Bistro C Article
Hotel F&B Bistro C ArticleDan Sweiger
 
Ambiente planeado marzo 29. las frutas
Ambiente planeado marzo 29. las frutasAmbiente planeado marzo 29. las frutas
Ambiente planeado marzo 29. las frutas
clau300980
 

Viewers also liked (12)

Crooke CWF Keynote FINAL final platinum
Crooke CWF Keynote FINAL final platinumCrooke CWF Keynote FINAL final platinum
Crooke CWF Keynote FINAL final platinum
 
Be Aware Webinar - Asegure office 365
Be Aware Webinar - Asegure office 365Be Aware Webinar - Asegure office 365
Be Aware Webinar - Asegure office 365
 
POPBOX USA 2015
POPBOX USA 2015POPBOX USA 2015
POPBOX USA 2015
 
Tao mui khoan
Tao mui khoanTao mui khoan
Tao mui khoan
 
Curricullum Vitaé Hanna De Leon
Curricullum Vitaé Hanna De LeonCurricullum Vitaé Hanna De Leon
Curricullum Vitaé Hanna De Leon
 
New Approaches for Selling to the Military
New Approaches for Selling to the MilitaryNew Approaches for Selling to the Military
New Approaches for Selling to the Military
 
Ahmed Naeim Kamel CV 5-2-2016
Ahmed Naeim Kamel  CV 5-2-2016Ahmed Naeim Kamel  CV 5-2-2016
Ahmed Naeim Kamel CV 5-2-2016
 
Acueoductos
AcueoductosAcueoductos
Acueoductos
 
HMC
HMCHMC
HMC
 
по лесным тропинкам 2
по лесным тропинкам 2по лесным тропинкам 2
по лесным тропинкам 2
 
Hotel F&B Bistro C Article
Hotel F&B Bistro C ArticleHotel F&B Bistro C Article
Hotel F&B Bistro C Article
 
Ambiente planeado marzo 29. las frutas
Ambiente planeado marzo 29. las frutasAmbiente planeado marzo 29. las frutas
Ambiente planeado marzo 29. las frutas
 

Similar to Wael Azmy_CV + Exp Letters

Ehab A-Azeem C V
Ehab A-Azeem C VEhab A-Azeem C V
Ehab A-Azeem C V
Ehab A. Azeem
 
Romany resume 2016
Romany resume 2016Romany resume 2016
Romany resume 2016Romany Fayez
 
CV - Emad Fathi CM
CV - Emad Fathi CMCV - Emad Fathi CM
CV - Emad Fathi CMemad salim
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015Aminul Haque
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.
Ayman Mitkees
 
2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص
Mohamed Hablas
 
My CV with Exp.26-11-2016
My CV with Exp.26-11-2016My CV with Exp.26-11-2016
My CV with Exp.26-11-2016Ayman Alhaggar
 

Similar to Wael Azmy_CV + Exp Letters (20)

Ehab A-Azeem C V
Ehab A-Azeem C VEhab A-Azeem C V
Ehab A-Azeem C V
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
Cv @Ali maruoof
Cv @Ali maruoofCv @Ali maruoof
Cv @Ali maruoof
 
Romany resume 2016
Romany resume 2016Romany resume 2016
Romany resume 2016
 
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
 
M.Salamony's_updated 2016
M.Salamony's_updated 2016M.Salamony's_updated 2016
M.Salamony's_updated 2016
 
CV - Emad Fathi CM
CV - Emad Fathi CMCV - Emad Fathi CM
CV - Emad Fathi CM
 
mona
monamona
mona
 
AYMAN HELMY_CV
AYMAN HELMY_CVAYMAN HELMY_CV
AYMAN HELMY_CV
 
السي في
السي فيالسي في
السي في
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015
 
hatim marouf 4
hatim marouf 4hatim marouf 4
hatim marouf 4
 
C.V,,,,,,
C.V,,,,,,C.V,,,,,,
C.V,,,,,,
 
IssakakishC.V
IssakakishC.VIssakakishC.V
IssakakishC.V
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.
 
C V
C VC V
C V
 
2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص
 
My CV with Exp.26-11-2016
My CV with Exp.26-11-2016My CV with Exp.26-11-2016
My CV with Exp.26-11-2016
 
Mohaideen CV
Mohaideen CVMohaideen CV
Mohaideen CV
 

Wael Azmy_CV + Exp Letters

  • 1. Wael Azmy || +201212980580 || w.azmy31@gmail.com || Page 1 of 4 Wael Azmy AREAS OF EXPERTISE A self-managed and result-oriented Project Manager/Construction with 14 plus years, during this period of career, worked in major projects such as Oil Refinery, Combined-Cycle Power Generation Plants, Military Structures and State-of-Art residential and Commercial Complexes.  Develop full scale plan, direct, coordinate and manage construction projects activities to ensure project progress and completion in accordance with overall project plan.  Ensure corporate construction procedures are followed.  Coordinate consultants and contractors in the assigned area to keep project compliant with budget, schedule, and quality and HSE requirements.  Deliver all construction projects on time and in conformity with industry regulatory and company's standards.  Maintains safe and clean working environment by applying procedures, rules, and regulations.  Inspect construction site with QA/QC Engineers, HSE Managers to ensure policies and Client specifications are adhered.  Prepare the Weekly Status Reports and Look Ahead Program.  Oversee the project closure process and ensure proper verification is done along with the final handover is carried out smoothly.  Allocate resources for construction  Implement safe working practices as per the Company's Health and Safety procedures  Facilitate request of materials based on the approved material and to verify quantities with QS department  Ensure that an installation conforms to product performance specifications, conducting field tests as required.  Maintain project schedule by monitoring project progress; coordinating activities; resolving problems.  Verify the deliverables of materials to the site are in order and all records are logged. Professional Experience WAZANAT, Project Management Unit of the UAE Coordination Office of the Development projects in Egypt Mar2015 - Present Project Manager  Financial and budget management and making sure that the project is completed within a financial budget.  Oversee change control procedures.  Create budgets for quotations and develop proposals in response to request-for-proposals (RFP) and studying biddings.  Manage projects from concepts through to successful installations, which include liaison with both internal and external clients, contract and project administration, monthly cash flow and planning and scheduling construction crews  Revising BOQ & drawings, validate payments.  Monitoring subcontractor’s performance.  Cost Estimation & price break down.  Coordinate and review the contracts as required  Manage the administrative process of contracts for the Funder. Cairo, Egypt +201212980580 w.azmy31@gmail.com
  • 2. Wael Azmy || +201212980580 || w.azmy31@gmail.com || Page 2 of 4 Hassan Allam Construction. (HAC) Oct 2014 – Mar 2015 Section Manager The Project: ERC Refinery Project, Mostorod, EGYPT Main Contractor: GS Engineering and Construction Corp  In charge for the overall construction activities for DCU area, including coke package (coke drum, coke basin, coke pad).  Arrange, coordinate, follow-up all work related to my section. American International Contractors Inc. (AICI) Feb 2013 – Sep2014 Site superintendent/site Manger The Project: construction of the FY11 NAVY MILCON Project P-908, Bahrain Project Engineer: U.S corps of Engineer  Responsible for the overall construction activities at the site, including quality and production for Buildings and supporting facilities on the Waterfront Site at NSA2,  Monitor and manage construction team’s workforce of plus 200 personnel. ARCHIRODON Construction (Overseas) Aug 2008 – Feb 2013 Section head Jan 2012 – Feb 2013 The Project: Civil Works for BANHA POWER STATION 750 MW COMBINED CYCLE, Egypt  Responsible for Performing, execution, monitoring of dewatering system for pump house and intake structure (draw down 7m of ground water level) also surface dewatering all over the site  Furnish and install, the portion of the 2500 mm Tunneling using pipe jacking under the road.  Responsible for erection of main turbine steel structure and miscellaneous steel work. Construction support Dec 2010 – Dec 2011 The Project: Civil Works for Damietta 500 MW Simple Cycle Gas Turbine, Egypt Main Contractor: Kharafi National for Mechanical & Electrical Works S.A.E  Responsible for project analysis, logistics (cranes, man-lifts, material handling), execution methods and procedures, technical understanding.  Supervision for - all civil work for main turbines and its auxiliary pedestals  Finishing work for buildings (GIS, Substation…).  Closing punch list items and handing over for client. Senior Civil Engineer Mar2009 – Nov 2010 The Project: Cairo West Thermal Power Plant Unit 7 & 8, Egypt  Responsible for all civil work of water & waste water treatment area like miscellaneous foundation, tanks and its underground utilities.  Responsible for all architectural work for control building and pump house  Responsible for installation of reinforced concrete cylinder circulating water pipe
  • 3. Wael Azmy || +201212980580 || w.azmy31@gmail.com || Page 3 of 4 Civil Site Engineer Aug 2008 – Feb 2009 The Project: New Container Terminal at Damietta Port, Egypt Off shore constriction / civil department The works include the construction of approximately 2,600 m of quay wall, fully equipped to accommodate largest container vessels. The main elements of the works are:  Fabrication of reinforced cages for diaphragm walls and piles.  Construction of capping and rear crane beams including quay furniture as bollards, fenders,  Installing of all necessary temporary works such as platform and guide wall. ORASCOM for Construction, Industries (OCI) Jul 2007 – Aug 2008 Civil Site Engineer The Project: BORG EL ARAB International AIRPORT – Alexandria, Egypt Project Engineer: ECG  All civil work for administration building, ATC utility building, and ATC storage building.  Full supervision and follow-up work according to - shop drawing, work procedure,  Technical specifications, method of statement for (earth work, scaffolding, form work, concrete works, CMU, plastering, painting, thermal, moisture protection and general finishes) KIROSIEZ for Construction and Trading Jan 2007 – Jul 2007 Site superintendent/ Civil Engineer The Project: Somouha Towers – Alexandria (High Rise Buildings (17 levels / 6000 m2)  Full supervision and follow-up work according to workshop drawing for:- Pile Foundation (auger cast), piles capping, concrete works, details of reinforced, masonry, plastering, painting, the insulation, plumbing, general finishes.  Quantity survey for the various items of work  Preparing and writing reports  Prepare and review payments for subcontractors The Consultative Group for Architecture and Planning (APG) Dec 2006 – Jan 2007 Consulting Engineer The Project: SUMED 2 High Rise Buildings 12 levels / 10000 m2 – Alexandria  Inspection for the different items of work according to project drawing/specification EL HADAF for Public Construction Company Mar 2005 – Oct 2006 Civil Engineer The Project: The process of resorts and tourist villages in Sharm El-Sheikh & Nuweiba).  Full supervision over the (concrete works, masonry, Plumbing, Insulation, work finishes, and water tanks) according to workshop drawing &technical specifications.  Inventory requirements for the site of various materials (steel – concrete –…..etc.).  Quantity survey for the various items of work and prepare payments for subcontractors.
  • 4. Wael Azmy || +201212980580 || w.azmy31@gmail.com || Page 4 of 4 ARMED FORCES Corps of Engineers Jan 2003 – Mar 2004 Mandatory service  Metallic floating bridges and barge department duties include the construction and maintenance of such type.  Installation and operation of utilities and services building. Education Asyut University Sep 1997 – May 2002 Bachelor Degree of Science in Civil Engineering  Graduation Project: Analysis and design of concrete structure,  Graduation Grade: Good  Project Grade: Excellent Skills Engineering skills  Be able to analyze and focus on details, ability to incorporate work breakdown structure and estimate budget amount for project activity. (may work as part of team)  projects planning and managing schedules, using primavera project management(P6)  Analysis, design, preparation and review shop drawing of the structures.  Can perform basic estimation and formulate bill of quantities if required.  Cost analysis and prepare payments.  can perform basic estimation and formulate bill of quantities if required  Inventory requirements for the site of various materials and equipment.  The preparation of reports for upper level. Computer Skills  Proficient with computers and have skills in programs  Primavera project management (P6)  Microsoft programs (Excel - Word- Power Point).  AutoCAD drawing programs. (2d, 3d).  Analysis and design programs (Sap2000 - Stad III). Personal skills  Excellent problem solving and deductive reasoning skills  Ability to listen, see the big picture and resolve conflicts  Excellent organizational ability with a high attention to detail  Innovative, creativity and a strategic thinker  Capacity to make decisions and think on my feet  Ability to work independently and as a team player