NAME Fady Samy Shokrallah
DATE OF BIRTH March 22th , 1990
ADDRESS 6 Hassanen diab st.
Hadayek el kobba.
TELEPHONE (202)248 554 40
MOBILE 012 -85298385
E-mail FadyQezman@gmail.com
Eng_Fady_Qezman@yahoo.com
NATIONALITY Egyptian.
EDUCATION B.SC in architecture , May 2012
El Shorouk Academy
GRADUATION GRADE : Good
GRADUATION PROJECT : Architecture
Visualization Academy
PROJECT GRADE : GOOD
LANGUAGES Arabic excellent ( mother tonge)
English good
COMPYTER SKILLS Fully computer literate with distinguished
strong iT skills.
Professional experience in AutoCAD 2D & 3D.
Professional experience in Revit Architcure2013.
Professional experience in Primavera P6 8.1.
Excellent knowledge of adobe photoshop and
MS office.
Advanced experience in GIS.
Moderate knowledge of 3D MAX.
Very good usage of internet tools.
SPECIAL COURSES • PROFESSIONAL PROGRAM IN PROJECT
MANAGEMENT (PRMG) FROM AMERICAN UNIVERSITY
IN CAIRO “AUC”
1- PRMG010: PROJECT PLANNING AND
CONTROL TECHNIQUES.
2- PRMG020: MANAGEMENT OF PROJECT
RESOURCES.
3- PRMG030: PROJECT BUDGETING & FINANCIAL
CONTROL.
4- PRMG080: PROJECT BIDS AND CONTRACTS.
5- PRMG035: COST MANAGEMENT FOR
ENGINEERING PROJECTS.
6- PRMG025: PROJECT MANAGEMENT
INTERNATIONAL STANDARDS (PMP).
CURRICULUM VITAE
PERSONAL DATA
ALFA FOR CONSTRUCTION &REAL STSTES.
( Member of Alfa group for investments )
FROM AUGUST 2015 TILL NOW
Sinor Technical office Engineer: Head office
PROJECTS :
Aqua Marina Resort (Construction 18 Residential Building & (250 million LE).
Mini Hotel ) (Sharm El Sheikh)
Construction 10 Residential Building (New Cairo) (50 million LE).
Responsibilities :
Quantity Surveying
Cost Control.
Monitoring and Review Project Budget.
Preparing invoices.
Cost Estimation.
Sharing in Schedule Plans Revising.
Feasibility study for some project
Civil Work, Architectural Work
Preparing profile company.
ARABIAN CONSTRUCTION COMPANY "ACC" (EGYPT)
Web Site: http://www.accsal.com/
FROM MARCH 2013 TILL AUGUST 2015
PROJECTS :
Mivida (Construction of Parcel 8 & 17 Finished Villas) (460 million LE).
Nile Ritz Carlton Hotel , Cairo. with total contract amount (560 million LE).
Cairo Sheraton Public Areas Phase 2 with total contract amount (120 million LE).
Cairo Marriot Hotal and Omar Khayyam Casino Renovation – Main Kitchen
with total contract amount ( 70 million LE).
Mivida (Construction of Parcel 8 & 17 Finished Villas (460 million L.E ).
Quantity Surveying Engineer
Client: EMAAR
Project manager: Turner
Architectural consultant: AB Gruop
Architectural consultant: Ehaf
Architectural consultant: Al Amar
Member of the project management team has the following responsibilities:
Preparing quantities survey for project items.
Preparing and submitting invoices for the consultant.
Prepare the monthly statements for the whole executed works
Approve and release the interim payments for subcontractors.
Identify changes between ‘tender’ and ‘construction’ design information.
Assist in any contracts administration duties related to QS.
Monitoring and review project budget and actual cost of the project.
PROFESSIONAL HISTORY
Technical office
Nile Ritz Carlton Hotel , Cairo. (560 million L.E ).
Quantity Surveying Engineer
Client: Misr Hotels Co.
Project manager: Hill international
Architectural consultant: Ehaf
Member of the project management team has the following responsibilities:
Preparing quantities survey for project items.
Preparing and submitting invoices for the consultant.
Prepare the monthly statements for the whole executed works
Approve and release the interim payments for subcontractors.
keep track of any variations to the contract that may affect costs.
Evaluate variations and handle contractual correspondences.
Identify changes between ‘tender’ and ‘construction’ design information.
Prepares estimates by calculating complete takeoff of scope of work,
accurately quantifies and prices the labor,materials and equipment
needed to perform the work and determines cost effectiveness.
Researching historical data (Purchase Orders, Subcontracts, productivity
analysis reports, etc.) And compiling summary reports to develop
guidelines and precedence for future estimates.
Assist in any contracts administration duties related to QS.
Monitoring and review project budget and actual cost of the project.
Cairo Sheraton Public Areas Phase 2 (120 million L.E ).
Quantity Surveying Engineer
Responsibilities :
.Evaluation of proposals for subcontracrors
Preparing the contracts for subcontractors.
Cairo Marriot Hotal and Omar Khayyam Casino Renovation–Main Kitchen
(70 million L.E ).
Technical office Engineer
Site engineer
Client: Ecoth
Project manager: amaar
Architectural consultant: Dr. Sayed Madboli Office Engineering Consultants
Structural consultant: Dr. Ali Abdel -Rahman E.C.O
Responsibilities :
Quantity Surveying
Shop drawing
Material transmittals
Contracting/Invoices for sub contractors - and owners.
Civil Work, Architectural Work
Solving the construction problems.
responsible for reviewing the material submittals preparing
Technical office
Supervising the construction of high standard finishing
Executing base and columns and beams for project
"winter garden" .
Executing thermal and moisture protection .
Repair for slab,column, beam concrete and interval .
Executing concrete floor finishes and miscellaneous .
Executing masonry.
Executing cement plaster for walls .
Metal door installation .
Executing ceramic "wall" by cement .
Executing ceramic "floor" by duration paste .
Watering Epoxy for floor ceramic .
Executing false ceiling .
Executing gypsum board ceiling.
Executing gypsum board partition.
Executing work painting.
Marble installation .
Glass aluminum windows.
Executing Vinly wall covering.
FROM JULY 2010 TILL MARCH 2013
Technical office Engineer
Site engineer
Responsibilities :
Construction of a building Cabinet of the Ministry of Insurance
and Social Affairs – Agouza.
Construction of an apartment complex have Cooperative
Association for construction and housing Giza Security
Directorate and on an area of ​​35 acres with Sheikh Zayed
and develop models of villas and buildings and infrastructure works.
Development Project and the renovation of the entrance Tower
Zmallk and Jazeera Marriott Hotel Cairo
Draft development and renovation of the entrance to the palace
and the draft winter garden and prepare all the architectural drawings
and perspectives and interfaces.
project development and renewal of the hotel's service areas
such as the casino and nightclub summer concerts kitchen and
the main kitchen and the Egyptian night.
to participate in the preparation all working details for development
Site engineer
Dr. Sayed Madboli Office Engineering Consultants

Fady Samy -Quantity Surveyor

  • 1.
    NAME Fady SamyShokrallah DATE OF BIRTH March 22th , 1990 ADDRESS 6 Hassanen diab st. Hadayek el kobba. TELEPHONE (202)248 554 40 MOBILE 012 -85298385 E-mail FadyQezman@gmail.com Eng_Fady_Qezman@yahoo.com NATIONALITY Egyptian. EDUCATION B.SC in architecture , May 2012 El Shorouk Academy GRADUATION GRADE : Good GRADUATION PROJECT : Architecture Visualization Academy PROJECT GRADE : GOOD LANGUAGES Arabic excellent ( mother tonge) English good COMPYTER SKILLS Fully computer literate with distinguished strong iT skills. Professional experience in AutoCAD 2D & 3D. Professional experience in Revit Architcure2013. Professional experience in Primavera P6 8.1. Excellent knowledge of adobe photoshop and MS office. Advanced experience in GIS. Moderate knowledge of 3D MAX. Very good usage of internet tools. SPECIAL COURSES • PROFESSIONAL PROGRAM IN PROJECT MANAGEMENT (PRMG) FROM AMERICAN UNIVERSITY IN CAIRO “AUC” 1- PRMG010: PROJECT PLANNING AND CONTROL TECHNIQUES. 2- PRMG020: MANAGEMENT OF PROJECT RESOURCES. 3- PRMG030: PROJECT BUDGETING & FINANCIAL CONTROL. 4- PRMG080: PROJECT BIDS AND CONTRACTS. 5- PRMG035: COST MANAGEMENT FOR ENGINEERING PROJECTS. 6- PRMG025: PROJECT MANAGEMENT INTERNATIONAL STANDARDS (PMP). CURRICULUM VITAE PERSONAL DATA
  • 2.
    ALFA FOR CONSTRUCTION&REAL STSTES. ( Member of Alfa group for investments ) FROM AUGUST 2015 TILL NOW Sinor Technical office Engineer: Head office PROJECTS : Aqua Marina Resort (Construction 18 Residential Building & (250 million LE). Mini Hotel ) (Sharm El Sheikh) Construction 10 Residential Building (New Cairo) (50 million LE). Responsibilities : Quantity Surveying Cost Control. Monitoring and Review Project Budget. Preparing invoices. Cost Estimation. Sharing in Schedule Plans Revising. Feasibility study for some project Civil Work, Architectural Work Preparing profile company. ARABIAN CONSTRUCTION COMPANY "ACC" (EGYPT) Web Site: http://www.accsal.com/ FROM MARCH 2013 TILL AUGUST 2015 PROJECTS : Mivida (Construction of Parcel 8 & 17 Finished Villas) (460 million LE). Nile Ritz Carlton Hotel , Cairo. with total contract amount (560 million LE). Cairo Sheraton Public Areas Phase 2 with total contract amount (120 million LE). Cairo Marriot Hotal and Omar Khayyam Casino Renovation – Main Kitchen with total contract amount ( 70 million LE). Mivida (Construction of Parcel 8 & 17 Finished Villas (460 million L.E ). Quantity Surveying Engineer Client: EMAAR Project manager: Turner Architectural consultant: AB Gruop Architectural consultant: Ehaf Architectural consultant: Al Amar Member of the project management team has the following responsibilities: Preparing quantities survey for project items. Preparing and submitting invoices for the consultant. Prepare the monthly statements for the whole executed works Approve and release the interim payments for subcontractors. Identify changes between ‘tender’ and ‘construction’ design information. Assist in any contracts administration duties related to QS. Monitoring and review project budget and actual cost of the project. PROFESSIONAL HISTORY Technical office
  • 3.
    Nile Ritz CarltonHotel , Cairo. (560 million L.E ). Quantity Surveying Engineer Client: Misr Hotels Co. Project manager: Hill international Architectural consultant: Ehaf Member of the project management team has the following responsibilities: Preparing quantities survey for project items. Preparing and submitting invoices for the consultant. Prepare the monthly statements for the whole executed works Approve and release the interim payments for subcontractors. keep track of any variations to the contract that may affect costs. Evaluate variations and handle contractual correspondences. Identify changes between ‘tender’ and ‘construction’ design information. Prepares estimates by calculating complete takeoff of scope of work, accurately quantifies and prices the labor,materials and equipment needed to perform the work and determines cost effectiveness. Researching historical data (Purchase Orders, Subcontracts, productivity analysis reports, etc.) And compiling summary reports to develop guidelines and precedence for future estimates. Assist in any contracts administration duties related to QS. Monitoring and review project budget and actual cost of the project. Cairo Sheraton Public Areas Phase 2 (120 million L.E ). Quantity Surveying Engineer Responsibilities : .Evaluation of proposals for subcontracrors Preparing the contracts for subcontractors. Cairo Marriot Hotal and Omar Khayyam Casino Renovation–Main Kitchen (70 million L.E ). Technical office Engineer Site engineer Client: Ecoth Project manager: amaar Architectural consultant: Dr. Sayed Madboli Office Engineering Consultants Structural consultant: Dr. Ali Abdel -Rahman E.C.O Responsibilities : Quantity Surveying Shop drawing Material transmittals Contracting/Invoices for sub contractors - and owners. Civil Work, Architectural Work Solving the construction problems. responsible for reviewing the material submittals preparing Technical office
  • 4.
    Supervising the constructionof high standard finishing Executing base and columns and beams for project "winter garden" . Executing thermal and moisture protection . Repair for slab,column, beam concrete and interval . Executing concrete floor finishes and miscellaneous . Executing masonry. Executing cement plaster for walls . Metal door installation . Executing ceramic "wall" by cement . Executing ceramic "floor" by duration paste . Watering Epoxy for floor ceramic . Executing false ceiling . Executing gypsum board ceiling. Executing gypsum board partition. Executing work painting. Marble installation . Glass aluminum windows. Executing Vinly wall covering. FROM JULY 2010 TILL MARCH 2013 Technical office Engineer Site engineer Responsibilities : Construction of a building Cabinet of the Ministry of Insurance and Social Affairs – Agouza. Construction of an apartment complex have Cooperative Association for construction and housing Giza Security Directorate and on an area of ​​35 acres with Sheikh Zayed and develop models of villas and buildings and infrastructure works. Development Project and the renovation of the entrance Tower Zmallk and Jazeera Marriott Hotel Cairo Draft development and renovation of the entrance to the palace and the draft winter garden and prepare all the architectural drawings and perspectives and interfaces. project development and renewal of the hotel's service areas such as the casino and nightclub summer concerts kitchen and the main kitchen and the Egyptian night. to participate in the preparation all working details for development Site engineer Dr. Sayed Madboli Office Engineering Consultants