Omar Alani
Ph. D. Civil Engineer
CURRICULUM VITAE
PERSONAL INFORMATION
Name OMAR ALANI
Nationality Turkish
Birth 1962
Languages Fluent in English, Arabic & Turkish with some French
Address Doha, Qatar
Tel Mobile: +974-50641720
E-mail omar.alani@gmail.com
SKYPE omar-alani
Driving License Valid Jordanian & Qatari
PERSONAL STATEMENT
To gain fulfillment and satisfaction through challenging works assignment while making significant
contribution to the company I am working with, as well as the field I am interested in making most
through the acquiring both growth and professional advancement.
SKILLS
• More than 25 year experience in construction field as Civil Engineer (Project Manager) for
Infrastructure, Water & Waste Water Treatment Plants, Power Plant, Five Star Hotel,
Hospitals, etc.
• Preparing budgets & pre-tender estimate as required during tender process. Involve in the
negotiation process and preparing the letter of award either for the Consultant or
Contractor.
• Sound knowledge of construction, very good record in planning & preparing construction
schedules of all types of work (Civil, Structural, MEP) as per requirement of international
standards and client specifications.
• Well versed with computer applications MS Office, MS Power Point, Auto CAD, MS Project,
Primavera P6, Structural design software (STAAD, SAFE, STRAP).
• Preparing monthly & daily reports (technical & financial).
• Familiar with FIDIC & International Building Codes.
• Directing sub-contractors and give instructions to achieve the work as per standards and
prepare variation works to client.
• Deep ability to analyze construction equipment needs, implement solutions, maintain
accurate records, apply HSE regulations and ensures proper and safe use of tools and
equipment.
1 | P a g e
Omar Alani
Ph. D. Civil Engineer
WORK HISTORY
1. Consultant’s Design Team Leader / Civil Engineer
Company: EGIS International (www.egis-group.com) / Qatar
Duration: 21st
June 2015 till Present
Project:
Sewage Treatment Plant (105,000m3
/day)/ Doha West, Public Works Authority, Cost $220Mn
Contractors Joint Venture (Suez & Marubeni)
2. PROJECT MANAGER
Company: MAACO Group (www.maacogroup.com) / Iraq
Duration: 1st
Apr. 2014 till 19th
June 2015
Project:
Pre-stressed Concrete Girder Production Factory, State Company for Implementation of
Transport Projects, Ministry of Transportation, Iraq, Cost $10Mn
3. PROJECT MANAGER
Company: AL-QABAS Economic Group (www.alqabasgroup.com) / Iraq
Duration: 1st
Apr. 2010 till 31st
Mar. 2014
Projects:
1- AL-SADA & AL-GOBOR Water Treatment Plant (2000m3
/hr) with 10km ductile transmission
lines / Ministry of Municipalities & Public Works / Iraq, Cost $28Mn
2- AL-SALAM & AL-MASOURIYA Water Treatment Plant (4000m3
/hr) with 65km ductile
transmission lines / Ministry of Municipalities & Public Works / Iraq. Cost $60Mn
4. PROJECT MANAGER
Company: AMJAD DAR ESELAM Company for General Contracts (AEDCO) (Amman / Jordan)
Duration: 15th
June 2009 till 31st
Mar. 2010.
Project:
1- Design & Build C4ISR Bunkers Amman, Jordan, (3 underground Command, Control,
Communications, Computers, Intelligence, Surveillance and Reconnaissance bunkers located
on different sites in Jordan) Middle East Division – US Corps of Engineers. Cost: $21Mn.
5. PROJECT MANAGER
Company: AMJAD DAR ESELAM Company for General Contracts (AEDCO) (Baghdad / Iraq)
Duration: 28th
Oct 2005 till 15 June 2009.
Projects:
1- Construction of Five Star Hotel in Baghdad (B+G+9) / Iraq, total buildup area 35,000m2
, /
Summit Hotels Ltd. / BVI. Cost: $110Mn
2- Base Security Upgrade – LSA TALLIL, Southern Iraq / United States Corps of Engineers. Cost
$19Mn
3- BUCCA Waste Water Treatment Plant / Basra, Iraq / US Department of the Army. Cost
$32Mn
4- Construction of New Water Treatment Plant (150m3
/hr), Construction of New Water Pipe
Network (6km) and Rehabilitation of existing Water Treatment Plant in MUSSAIB Technical
Institute (North BABIL, Iraq), Cost $1.25Mn
2 | P a g e
Omar Alani
Ph. D. Civil Engineer
6. TEAM LEADER / CIVIL ENGINEER PROJECT MANAGER
Company: United Nations Development Program (UNDP), Iraqi Reconstruction & Employment
Program (IREP), Baghdad, Iraq
Duration: 1st
May 2003 till 15th
Oct. 2005
Projects:
1- Rehabilitation of 47 sewage pumping stations, water treatment plant, buildings & Hospitals.
7. PROJECT MANAGER
Company: "Sinan Al-Ani Bureau" for General Contracting and Trading (Baghdad / Iraq)
Duration: 1st
March 2001 till 30 Apr. 2003
Projects:
1- Nahrawan pumping station: supply and install pumping station with concrete ground
storage tank 500m3 with 6km PVC transmission line
2- Al-Umma Garage: Stone Facade for the garage
3- Different small size supply projects mostly mechanical equipment.
8. TECHNICAL MANAGER
Company: AL-MAWAZEEN Lab for Soil and Material Testing, SHARJAH & DUBAI, UAE.
Duration: 1st
Oct. 1999 till 28 Feb. 2001
Responsibilities:
• Managing & supervising the lab.
• Market actively for new clients (consultant & contracting offices).
• Arrange site visit for projects.
• Supervise samples analysis.
• Preparing site investigation reports.
• Maintain time, training, calibration, QC and testing records.
• Train lab technicians and assistants on the correct use of lab equipment
• Assure quality system in the lab.
• Make sure their employees follow industry standards and safety regulations for handling and
disposing of test samples.
• Comply and analyzes test information to determine operating efficiency of processes and
equipment and to diagnose problems and malfunctions.
• Ensure laboratory practices meet or exceed company policy and industry standards.
9. ASSISTANT PROFESSOR
Company: Civil & Architecture Engineering Departments, College of Engineering, Western Mountain
University, Libya.
Duration: 1st
March 1997 till 1st
Sep. 1999
Subjects taught:
 Project Management & Engineering Economy
 Fluid Mechanics
 Sanitary Engineering
 Ground Water Hydraulics
 Programming
 Auto CAD
 Numerical Analysis
 Supervising M. Sc. Thesis “Different Types of Water Conveyance System” (AL-FATIH
University - Tripoli)
3 | P a g e
Omar Alani
Ph. D. Civil Engineer
 Supervising graduation projects in Civil Engineering Department “Pipe Network
Analysis”, “Fire Fighting Network Analysis”, “Rain Water Networks”, and “Water
Conveyance System (110 km)”.
• Designer and Supervisor
 Design 2 pipes in (RUJBAN and JADO) with pumping stations, for the benefit for the
local municipality.
10. EXTERNAL LECTURER
Company: Irrigation and Drainage Engineering Department, College of Engineering, Baghdad
University – Iraq.
Duration: Sep. 1995 till Sep. 1996
Subjects taught for M. Sc. courses:
 Ground Water Hydraulics.
 Digital Solution of Engineering Problems.
11. CONSULTANT ENGINEER
Company: ASHOUR Contracting Company, Ministry of Construction & Housing, Baghdad, Iraq
Duration: Dec. 1988 Aug. 1995
Responsibilities:
• Analyzing and developing computer software program for project management. The
program handles all company’s projects, easy to use input interface, many output reports
including progress rate of each project, summary reports, cash payment and resource
allocation (human, vehicle and material).
• Analyzing and developing computer software program for company’s vehicles including
coding, plate No., chases No. engine No. etc. trace and check for replacement of tires and
batteries.
• Consulting of other engineering software, human resource software, account software, store
software, salaries software.
12. CIVIL DESIGN ENGINEER
Entity: Design Office Directorate of Military Works, Ministry of Defense, Baghdad, Iraq
Duration: Apr. 1986 till Dec. 1988
Obligatory Army Service
Responsibilities:
Prepare design drawings & follow up for:
• Water pipe networks.
• Sewerage networks.
• Steel and concrete water tanks.
• Building plumbing.
13. CIVIL ENGINEER
Company: MAJEED AL-ANI Bureau for General Contracting and Trading (Baghdad / Iraq).
Duration: July 1983 till March 1986
Projects:
Concrete Buildings, Steel Buildings, Villas, Pipe line, Pumping Stations, etc.
Responsibilities:
• Follow up projects implementation regarding all activities (construction, material supply,
mechanical & electrical installations, etc.).
• Site Supervision.
4 | P a g e
Omar Alani
Ph. D. Civil Engineer
EDUCATION
• Ph. D. Civil Engineering (Water Resources with minor in Environmental Engineering), Apr.
1995, Irrigation and Drainage Department, College of Engineering, Baghdad University,
Baghdad, Iraq.
• M. Sc. Civil Engineering (Water Resources with minor in Sanitary Engineering), Apr. 1986,
Building and Construction Department, University of Technology, Baghdad, Iraq.
• B. Sc. Civil Engineer (General Civil Engineer) June 1983, Building and Construction
Department, University of Technology, Baghdad, Iraq, with 1st
rank.
INTERESTS AND HOBBIES
In my spare time I enjoy jogging, swimming, tennis & basketball playing. I am also a good reader for
general articles and crime novels. I love to solve mathematical puzzles using computer.
PROFESSIONAL AFFILIATION
• Member of Iraqi Engineering Union, ID 35331 dated 31/7/1983
• Member of Federation of Arab Engineers ID 9/4212 dated 16/4/2015
• Member of Jordanian Engineers Association 2015
COMPUTER SKILLS
1- Professional in MS-Office (Word, Excel, Power Point, Access, Visio, etc.)
2- Professional in MS Project & Primavera.
3- Professional in Auto CAD (2D & 3D)
4- Professional in structural design program STAAD III, SAFE and other structural software.
5- Database programming languages: (FoxPro, Dbase)
6- Computer languages: BASIC, FORTRAN, Dbase
5 | P a g e
Omar Alani
Ph. D. Civil Engineer
EDUCATION
• Ph. D. Civil Engineering (Water Resources with minor in Environmental Engineering), Apr.
1995, Irrigation and Drainage Department, College of Engineering, Baghdad University,
Baghdad, Iraq.
• M. Sc. Civil Engineering (Water Resources with minor in Sanitary Engineering), Apr. 1986,
Building and Construction Department, University of Technology, Baghdad, Iraq.
• B. Sc. Civil Engineer (General Civil Engineer) June 1983, Building and Construction
Department, University of Technology, Baghdad, Iraq, with 1st
rank.
INTERESTS AND HOBBIES
In my spare time I enjoy jogging, swimming, tennis & basketball playing. I am also a good reader for
general articles and crime novels. I love to solve mathematical puzzles using computer.
PROFESSIONAL AFFILIATION
• Member of Iraqi Engineering Union, ID 35331 dated 31/7/1983
• Member of Federation of Arab Engineers ID 9/4212 dated 16/4/2015
• Member of Jordanian Engineers Association 2015
COMPUTER SKILLS
1- Professional in MS-Office (Word, Excel, Power Point, Access, Visio, etc.)
2- Professional in MS Project & Primavera.
3- Professional in Auto CAD (2D & 3D)
4- Professional in structural design program STAAD III, SAFE and other structural software.
5- Database programming languages: (FoxPro, Dbase)
6- Computer languages: BASIC, FORTRAN, Dbase
5 | P a g e

Omar Alani CV 20160410

  • 1.
    Omar Alani Ph. D.Civil Engineer CURRICULUM VITAE PERSONAL INFORMATION Name OMAR ALANI Nationality Turkish Birth 1962 Languages Fluent in English, Arabic & Turkish with some French Address Doha, Qatar Tel Mobile: +974-50641720 E-mail omar.alani@gmail.com SKYPE omar-alani Driving License Valid Jordanian & Qatari PERSONAL STATEMENT To gain fulfillment and satisfaction through challenging works assignment while making significant contribution to the company I am working with, as well as the field I am interested in making most through the acquiring both growth and professional advancement. SKILLS • More than 25 year experience in construction field as Civil Engineer (Project Manager) for Infrastructure, Water & Waste Water Treatment Plants, Power Plant, Five Star Hotel, Hospitals, etc. • Preparing budgets & pre-tender estimate as required during tender process. Involve in the negotiation process and preparing the letter of award either for the Consultant or Contractor. • Sound knowledge of construction, very good record in planning & preparing construction schedules of all types of work (Civil, Structural, MEP) as per requirement of international standards and client specifications. • Well versed with computer applications MS Office, MS Power Point, Auto CAD, MS Project, Primavera P6, Structural design software (STAAD, SAFE, STRAP). • Preparing monthly & daily reports (technical & financial). • Familiar with FIDIC & International Building Codes. • Directing sub-contractors and give instructions to achieve the work as per standards and prepare variation works to client. • Deep ability to analyze construction equipment needs, implement solutions, maintain accurate records, apply HSE regulations and ensures proper and safe use of tools and equipment. 1 | P a g e
  • 2.
    Omar Alani Ph. D.Civil Engineer WORK HISTORY 1. Consultant’s Design Team Leader / Civil Engineer Company: EGIS International (www.egis-group.com) / Qatar Duration: 21st June 2015 till Present Project: Sewage Treatment Plant (105,000m3 /day)/ Doha West, Public Works Authority, Cost $220Mn Contractors Joint Venture (Suez & Marubeni) 2. PROJECT MANAGER Company: MAACO Group (www.maacogroup.com) / Iraq Duration: 1st Apr. 2014 till 19th June 2015 Project: Pre-stressed Concrete Girder Production Factory, State Company for Implementation of Transport Projects, Ministry of Transportation, Iraq, Cost $10Mn 3. PROJECT MANAGER Company: AL-QABAS Economic Group (www.alqabasgroup.com) / Iraq Duration: 1st Apr. 2010 till 31st Mar. 2014 Projects: 1- AL-SADA & AL-GOBOR Water Treatment Plant (2000m3 /hr) with 10km ductile transmission lines / Ministry of Municipalities & Public Works / Iraq, Cost $28Mn 2- AL-SALAM & AL-MASOURIYA Water Treatment Plant (4000m3 /hr) with 65km ductile transmission lines / Ministry of Municipalities & Public Works / Iraq. Cost $60Mn 4. PROJECT MANAGER Company: AMJAD DAR ESELAM Company for General Contracts (AEDCO) (Amman / Jordan) Duration: 15th June 2009 till 31st Mar. 2010. Project: 1- Design & Build C4ISR Bunkers Amman, Jordan, (3 underground Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance bunkers located on different sites in Jordan) Middle East Division – US Corps of Engineers. Cost: $21Mn. 5. PROJECT MANAGER Company: AMJAD DAR ESELAM Company for General Contracts (AEDCO) (Baghdad / Iraq) Duration: 28th Oct 2005 till 15 June 2009. Projects: 1- Construction of Five Star Hotel in Baghdad (B+G+9) / Iraq, total buildup area 35,000m2 , / Summit Hotels Ltd. / BVI. Cost: $110Mn 2- Base Security Upgrade – LSA TALLIL, Southern Iraq / United States Corps of Engineers. Cost $19Mn 3- BUCCA Waste Water Treatment Plant / Basra, Iraq / US Department of the Army. Cost $32Mn 4- Construction of New Water Treatment Plant (150m3 /hr), Construction of New Water Pipe Network (6km) and Rehabilitation of existing Water Treatment Plant in MUSSAIB Technical Institute (North BABIL, Iraq), Cost $1.25Mn 2 | P a g e
  • 3.
    Omar Alani Ph. D.Civil Engineer 6. TEAM LEADER / CIVIL ENGINEER PROJECT MANAGER Company: United Nations Development Program (UNDP), Iraqi Reconstruction & Employment Program (IREP), Baghdad, Iraq Duration: 1st May 2003 till 15th Oct. 2005 Projects: 1- Rehabilitation of 47 sewage pumping stations, water treatment plant, buildings & Hospitals. 7. PROJECT MANAGER Company: "Sinan Al-Ani Bureau" for General Contracting and Trading (Baghdad / Iraq) Duration: 1st March 2001 till 30 Apr. 2003 Projects: 1- Nahrawan pumping station: supply and install pumping station with concrete ground storage tank 500m3 with 6km PVC transmission line 2- Al-Umma Garage: Stone Facade for the garage 3- Different small size supply projects mostly mechanical equipment. 8. TECHNICAL MANAGER Company: AL-MAWAZEEN Lab for Soil and Material Testing, SHARJAH & DUBAI, UAE. Duration: 1st Oct. 1999 till 28 Feb. 2001 Responsibilities: • Managing & supervising the lab. • Market actively for new clients (consultant & contracting offices). • Arrange site visit for projects. • Supervise samples analysis. • Preparing site investigation reports. • Maintain time, training, calibration, QC and testing records. • Train lab technicians and assistants on the correct use of lab equipment • Assure quality system in the lab. • Make sure their employees follow industry standards and safety regulations for handling and disposing of test samples. • Comply and analyzes test information to determine operating efficiency of processes and equipment and to diagnose problems and malfunctions. • Ensure laboratory practices meet or exceed company policy and industry standards. 9. ASSISTANT PROFESSOR Company: Civil & Architecture Engineering Departments, College of Engineering, Western Mountain University, Libya. Duration: 1st March 1997 till 1st Sep. 1999 Subjects taught:  Project Management & Engineering Economy  Fluid Mechanics  Sanitary Engineering  Ground Water Hydraulics  Programming  Auto CAD  Numerical Analysis  Supervising M. Sc. Thesis “Different Types of Water Conveyance System” (AL-FATIH University - Tripoli) 3 | P a g e
  • 4.
    Omar Alani Ph. D.Civil Engineer  Supervising graduation projects in Civil Engineering Department “Pipe Network Analysis”, “Fire Fighting Network Analysis”, “Rain Water Networks”, and “Water Conveyance System (110 km)”. • Designer and Supervisor  Design 2 pipes in (RUJBAN and JADO) with pumping stations, for the benefit for the local municipality. 10. EXTERNAL LECTURER Company: Irrigation and Drainage Engineering Department, College of Engineering, Baghdad University – Iraq. Duration: Sep. 1995 till Sep. 1996 Subjects taught for M. Sc. courses:  Ground Water Hydraulics.  Digital Solution of Engineering Problems. 11. CONSULTANT ENGINEER Company: ASHOUR Contracting Company, Ministry of Construction & Housing, Baghdad, Iraq Duration: Dec. 1988 Aug. 1995 Responsibilities: • Analyzing and developing computer software program for project management. The program handles all company’s projects, easy to use input interface, many output reports including progress rate of each project, summary reports, cash payment and resource allocation (human, vehicle and material). • Analyzing and developing computer software program for company’s vehicles including coding, plate No., chases No. engine No. etc. trace and check for replacement of tires and batteries. • Consulting of other engineering software, human resource software, account software, store software, salaries software. 12. CIVIL DESIGN ENGINEER Entity: Design Office Directorate of Military Works, Ministry of Defense, Baghdad, Iraq Duration: Apr. 1986 till Dec. 1988 Obligatory Army Service Responsibilities: Prepare design drawings & follow up for: • Water pipe networks. • Sewerage networks. • Steel and concrete water tanks. • Building plumbing. 13. CIVIL ENGINEER Company: MAJEED AL-ANI Bureau for General Contracting and Trading (Baghdad / Iraq). Duration: July 1983 till March 1986 Projects: Concrete Buildings, Steel Buildings, Villas, Pipe line, Pumping Stations, etc. Responsibilities: • Follow up projects implementation regarding all activities (construction, material supply, mechanical & electrical installations, etc.). • Site Supervision. 4 | P a g e
  • 5.
    Omar Alani Ph. D.Civil Engineer EDUCATION • Ph. D. Civil Engineering (Water Resources with minor in Environmental Engineering), Apr. 1995, Irrigation and Drainage Department, College of Engineering, Baghdad University, Baghdad, Iraq. • M. Sc. Civil Engineering (Water Resources with minor in Sanitary Engineering), Apr. 1986, Building and Construction Department, University of Technology, Baghdad, Iraq. • B. Sc. Civil Engineer (General Civil Engineer) June 1983, Building and Construction Department, University of Technology, Baghdad, Iraq, with 1st rank. INTERESTS AND HOBBIES In my spare time I enjoy jogging, swimming, tennis & basketball playing. I am also a good reader for general articles and crime novels. I love to solve mathematical puzzles using computer. PROFESSIONAL AFFILIATION • Member of Iraqi Engineering Union, ID 35331 dated 31/7/1983 • Member of Federation of Arab Engineers ID 9/4212 dated 16/4/2015 • Member of Jordanian Engineers Association 2015 COMPUTER SKILLS 1- Professional in MS-Office (Word, Excel, Power Point, Access, Visio, etc.) 2- Professional in MS Project & Primavera. 3- Professional in Auto CAD (2D & 3D) 4- Professional in structural design program STAAD III, SAFE and other structural software. 5- Database programming languages: (FoxPro, Dbase) 6- Computer languages: BASIC, FORTRAN, Dbase 5 | P a g e
  • 6.
    Omar Alani Ph. D.Civil Engineer EDUCATION • Ph. D. Civil Engineering (Water Resources with minor in Environmental Engineering), Apr. 1995, Irrigation and Drainage Department, College of Engineering, Baghdad University, Baghdad, Iraq. • M. Sc. Civil Engineering (Water Resources with minor in Sanitary Engineering), Apr. 1986, Building and Construction Department, University of Technology, Baghdad, Iraq. • B. Sc. Civil Engineer (General Civil Engineer) June 1983, Building and Construction Department, University of Technology, Baghdad, Iraq, with 1st rank. INTERESTS AND HOBBIES In my spare time I enjoy jogging, swimming, tennis & basketball playing. I am also a good reader for general articles and crime novels. I love to solve mathematical puzzles using computer. PROFESSIONAL AFFILIATION • Member of Iraqi Engineering Union, ID 35331 dated 31/7/1983 • Member of Federation of Arab Engineers ID 9/4212 dated 16/4/2015 • Member of Jordanian Engineers Association 2015 COMPUTER SKILLS 1- Professional in MS-Office (Word, Excel, Power Point, Access, Visio, etc.) 2- Professional in MS Project & Primavera. 3- Professional in Auto CAD (2D & 3D) 4- Professional in structural design program STAAD III, SAFE and other structural software. 5- Database programming languages: (FoxPro, Dbase) 6- Computer languages: BASIC, FORTRAN, Dbase 5 | P a g e