SlideShare a Scribd company logo
1 of 5
Download to read offline
Curriculum Vitae
Personal Information
 Name : Mohamed Atef abd Elsamei.
 Address : 51 Omar Ibn Alkhattab St.-Ard Algameiea-Imbaba-Giza-Egypt.
 Phone No. : +20233117987 -- +20222524378 --+20226539560
 Mobile No. : +201006018184
 E-Mail :m_atef2001@yahoo.com
 Birth Day : 05/3/1975.
 Birth Location: Giza.
 Marital Status: Married.
 Religion : Muslim.
Objective
My aim in my work is to utilize every second to gain a new experience and knowledge while
maintaining the team spirit to raise the value of the company I belong to.
Education
 Faculty : Faculty of Engineering-Cairo University.
 Department : Civil Department.
 Graduation Year : 1999.
 General Grade : Very Good.
 Project : Reinforced Concrete.
 Project Grade : Distinction.
 Project Description: Project Contents:
Tennis stadium, Official Building, Olympic Swimming Pool, Shed
 Further Studies :
 Master degree in Structural Engineering (Jan. 2009) (M.Sc)
 CPM (Construction Project Manager ) Certificate from ASCE 2010 from AUC
Professional Experience
1) Current Job:
 Company: NOKIA Solutions- KSA.
 Period : from 1/3/2015 until Now.
Responsibilities :
USF9-Civil PM; This include
 CW Handover from Site Acquisition to CW
 Send site information to design office to prepare for Civil drawings which include preparing:
(1) Topographical Site Survey; Soil Test Report; Far End Existing tower survey
(2) Preliminary Civil drawings
(3) Assign CW Subcontractors according to geographical area and capacity with design
package
(4) control CW with partners/Subcon to start access road, Excavation, RC casting,
Backfilling, Tower Erection, Site Completion, Acceptance ;
(5) Partners/Subcon meetings to follow CW progress;
 Customer meetings to follow progress
 Project planning; implementation, acceptance, Documentation
Achievement :
- Material Delivery tracking for all Project process from Hybrid Units, Towers for 460 sites
- Site Design tracking from NOKIA to Approved site designers (data needed as SAF, TCC,
Coordinates, soil test, survey, priority, submit design, .etc for 365 sites
- Site design from NOKIA to Partners/Subcon to start Civil work for 260 sites
- Follow up Civil Work till site is ready for installation for 175 sites in 6 months
2)Previous Jobs:
 Company: HOI MEA for Engineering.
 Period : from 15/7/2008 until 28/2/2015.
Responsibilities :
HOI MEA Sales Manager This include
 Studying the GSM Market for the New Products.
 Coordinate with the customers for new bids and tenders.
 Complete the documentation for tenders and bids
 Cooperate with the other parties to complete the documentation
 Negotiate with the customers for the pricing and requests as technical and financial.
 Follow up the manufacturing and preparation of material and products.
 Tendering and Bidding for Turnkey site base and Supply of Special Products.
 Advertisement arrangement for company products and affairs.
 Exhibitions & Fairs Preparation.
Achievement :
Product Bidding :
 KSA RDU towers orders by about 3.2 Million SAR.
 Zain-KSA bidding for TK sites, RDU and Palm trees.
 Zain-Bahrain for bidding for Backbone towers and Shelters.
 Telecelglobe Bidding for mobile solution and fast track sites……..etc.
 Vodafone Egypt Special Products E-Auctions and Bids.
 Vodafone Egypt L1 Maintenance Project.
 Ericsson MRC Project in Sudan.
 Vodafone Egypt Global Supply Project
 Etisalat Misr Settlement Case Finalisation.
 Etisalat Misr Frame Agreement for Supply
 Etisalat Misr TOWERCO project
 Vodafone Egypt TOWERCO Project.
 Others
Company: HUAWEI TECHNOLOGIES.
Period : from 29/10/2006 until 13/7/2008.
Responsibilities :
Delta Rollout Manager for CiviI Work; This include
 checking STA/STC Reports &
 Coordinate with SA Subcontractors and
 Prepare Acceptance Documentations for Green Field and Rooftop Sites ;
 Checking Leases , Permits and certificates ;
 Preparing Materials With Warehouse ;
 Follow up material Fabrication Progress ;
 Follow Up Site Construction Progress with CW Subcontractors till transfer to Telecom Work
.Achievement :
Cairo Regional Office :
 Establishing The Preparation of preliminary STA/STC Report Templates for 3rd Liscence
Project
 Preparing the Standard Site Layouts (Plan and Elevation ) for Greenfield (GF) and Rooftop
(RT) Sites
 Preparing the Standard Site Earthing System Layouts
 Preparation of Huawei Technologies Co.,Ltd. Technical Specification for 3rd Liscence Project
 Checking and Revising The STA/STC Reports
 Surveying and Supervising the Construction of the BSC Sites
 Checking and Revising the Tower Designs (RT and GF Structures)
Delta Representative Office :
CW Construction :
 Revising and Checking of STA/STC reports
 Preparing the Materials from Warehouse
 Follow up the Fabrication of CW Materials
 Follow up the Site Mobilization and Supporting
 Supervising The CW Construction Progress
 Solve Technical Problems In Sites Wile CW Construction
Site Acceptance :
 Planning ,Coordinate and Managing the Site Acceptance Visits With Subcontractor
 Planning ,Coordinate and Managing the Site Acceptance Visits With Customer
 Proceeding Preliminary Site Acceptance (PAC) to Check the Site Snags Report
 Follow up the site snags Progress
 Proceeding Final Site Acceptance (FAC) to revise the checklists and BOQ and As Built
Drawings
 Revising and Checking the Site Acceptance Documentation.
Company: Al Ashoury Factory for Steel Fabrication.
Period : from 16/3/2005 until 1/9/2006.
Responsibilties :
 Structural Design Engineer for Telecommunication GSM Towers. This include design &
Check of New and Existing GSM Towers with Different Heights (from 6m to 123m) by Guy
Mast Program and
 Making Calculation Sheets for Towers as A Design For Approval For Main GSM Service
Operators In Kingdom Of Saudi Arabia ( Mobily GSM Network )
 Making Towers Design by STAAD III & Pro Program
This Include Also A Design Of Raft and Pad & Chimney Foundations For Tower Support.
Achievement :
 Approved Design Of Rooftop Masts And Wall Mounts For Newtel-Nokia Emirates.
 Approved Telecom Tower Designs For Mobily (Second GSM Operator in Saudi Arabia)
Self-Supporting Towers( Heights: 35m,50m,60m and 90m )
Rooftop Structures (Heights: 9m and 12m )
 Preparation of Tower Tenders for rooftop and Greenfield Structures
Company: Hoi/Aste for Technical Engineering.
Period : from 1/1/2002 until 15/3/2005
Responsibilties :
 Structural Design Engineer for Telecommunication Mobile Stations. This include design &
Check of New and Existing GSM Towers with Different Heights (from 6m to 123m) by
Guy Mast Program
 Making Calculation Sheets for Existing Residential Buildings by STAAD III & Pro Program
Design OF Telecom Steel Towers , Monopoles and Rooftop Structures
 Revising and Analysing all steel and concrete structures by using STAAD PRO Program
Professionally,
 GSM SITE Aquistion and Structurally Survey;
 Design Of GSM Stations Civil and Structural ,
 Site Aquistion Co-ordinator,
 Structural Survey,Design of GSM Stations (Civil and Structural),
 Preparing of Structural Calculation Sheet, Tower and Raft Design Calculation(Using
GUYMAST Program and STAAD PRO Program)
Achievements :
 First Trial Sites for Third GSM Network in Egypt
(About 45 Sites for SIEMENS Co. (2002))
 Site Aquistion and Survey (37 Sites in Two Monthes) and Design of 8 Sites for MOTOROLA
and ORASCOM in Iraq .;
 Supervision and Construction of 4 Sites in First GSM Network for MOTOROLA and
ORASCOM in Iraq .
 Design of TELECOM Towers for CDMA Project for HUAWEI Company (Heights 50M,60M
and 70M)
 Design of Towers Families (Heights 20M to 85M )
for ORASCOM Company for Bangladish and Other Countries .
 Survey and Design of GSM Stations for MOTOROLA and ATHEER MTC Companies
(Second Network in Iraq)
 Revising and Analysing all steel and concrete structures by using STAAD PRO Program
Professionally, for STC Network in KSA
Company: ES-SPECTRA CO. for Special Services
Period : from 21/07/2001 until 31/12/2001.
 Tasks : Site Engineer for Nuweiba Water Supply & Waste water Project as Subcontractor for
MORGANTI (International American Company)
Detailed data:
Construction of Pump Stations Composed of
 Generator Room.
 Operating Room
 Pump Station Well
 Fence Surrounding Station
 Construction of Waste Water Pipe lines to Pump stations With Encasement.
Company: Eng. Alaa Office for Construction
 Period : from 1/2/2001 until 16/4/2001.
 Tasks : Site Engineer for Construction of (6) Residential Buildings.
Special Skills:
Language Skills:
 Arabic : Mother Tongue.
 English: Fluent written and spoken.
 French: Fair.
Computer Skills:
1)Operating system programs:
 Professional in DOS and windows2000.
2) Application programs:
 MS office : very good in word and Excel also Outlook.
 AutoCAD2005: Excellent in both 2D and 3D drawing.
 STAAD III and Pro: Excellent (Modeling and analysis for 3D Space Structures and Frames).
 MAST PROG: Excellent (modeling and analysis of telecommunication Towers).
3) Programming programs:
 Visual basic: initial course in programming by visual basic.
GSM Experience:
Site Acquisition :making full site acquisition from nominal receiving to searching options by
GPS and making full survey by taking panoramic photos and making layout for site and
civil(design of GSM station) and structural drawings for steel frame of shelter and tower .
Check of Existing Buildings which supporting GSM station by STAAD PRO Software to make
structural analysis and modeling of shelter and tower frame and Building and check it against
applied loads using STAAD PRO and PCACOL software.
DESIGN all types of telecommunication towers, masts and Monopoles according to TIA/EIA-
222F Code(American)( Aisc & Asce 10-90 Codes) Using GuyMast and Staad Pro Program ;
Design of tower Footings (Both Raft & Pad & Chimney Foundation).

More Related Content

What's hot (20)

Amgad Joseph Labeb ( CV )
Amgad Joseph Labeb ( CV )Amgad Joseph Labeb ( CV )
Amgad Joseph Labeb ( CV )
 
Ahmed CV
Ahmed CVAhmed CV
Ahmed CV
 
HUM-Surveyor-CV
HUM-Surveyor-CVHUM-Surveyor-CV
HUM-Surveyor-CV
 
C-V_Naoras 2016
C-V_Naoras 2016C-V_Naoras 2016
C-V_Naoras 2016
 
Mohab Samoil_Resume
Mohab Samoil_ResumeMohab Samoil_Resume
Mohab Samoil_Resume
 
Cv marc andré gauvin en 2015
Cv marc andré gauvin en 2015Cv marc andré gauvin en 2015
Cv marc andré gauvin en 2015
 
ENG Gamal CV
ENG Gamal CVENG Gamal CV
ENG Gamal CV
 
DavidG_CV 2017
DavidG_CV 2017DavidG_CV 2017
DavidG_CV 2017
 
ayman y7ia
ayman y7iaayman y7ia
ayman y7ia
 
Summery
SummerySummery
Summery
 
NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORS
 
My CV with Exp.26-11-2016
My CV with Exp.26-11-2016My CV with Exp.26-11-2016
My CV with Exp.26-11-2016
 
Jvm1
Jvm1Jvm1
Jvm1
 
kenan Alnamous CV
kenan Alnamous CVkenan Alnamous CV
kenan Alnamous CV
 
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
 
doaa mohamed cv -1
doaa mohamed  cv -1doaa mohamed  cv -1
doaa mohamed cv -1
 
cv بدون
cv بدونcv بدون
cv بدون
 
Freelance Preview
Freelance PreviewFreelance Preview
Freelance Preview
 
RESUME DJT van der Merwe
RESUME DJT van der MerweRESUME DJT van der Merwe
RESUME DJT van der Merwe
 
cv 8-8-2016
cv 8-8-2016cv 8-8-2016
cv 8-8-2016
 

Viewers also liked

Fact Sheet Vexos
Fact Sheet VexosFact Sheet Vexos
Fact Sheet VexosMike Cash
 
Ph d lib15_konference_hilde-daland-nyborg2015
Ph d lib15_konference_hilde-daland-nyborg2015Ph d lib15_konference_hilde-daland-nyborg2015
Ph d lib15_konference_hilde-daland-nyborg2015Jeannette Ekstrøm
 
Managerial Accounting Garrison Noreen Brewer Chapter 01Managerial Accounting ...
Managerial Accounting Garrison Noreen Brewer Chapter 01Managerial Accounting ...Managerial Accounting Garrison Noreen Brewer Chapter 01Managerial Accounting ...
Managerial Accounting Garrison Noreen Brewer Chapter 01Managerial Accounting ...Asif Hasan
 
(워크시트) 실행계획및추정재무_스타트업을하는깐깐한방법
(워크시트) 실행계획및추정재무_스타트업을하는깐깐한방법(워크시트) 실행계획및추정재무_스타트업을하는깐깐한방법
(워크시트) 실행계획및추정재무_스타트업을하는깐깐한방법Kwangdong Min
 
Forging powerful relationships part 3
Forging powerful relationships part 3Forging powerful relationships part 3
Forging powerful relationships part 3Ethan Chazin MBA
 
Diversity_Inclusion_TheChazinGroupLLC
Diversity_Inclusion_TheChazinGroupLLCDiversity_Inclusion_TheChazinGroupLLC
Diversity_Inclusion_TheChazinGroupLLCEthan Chazin MBA
 
Diseno e implementacion de centro de procesamiento de datos en la ips centro ...
Diseno e implementacion de centro de procesamiento de datos en la ips centro ...Diseno e implementacion de centro de procesamiento de datos en la ips centro ...
Diseno e implementacion de centro de procesamiento de datos en la ips centro ...Lino Pinto
 

Viewers also liked (9)

Fact Sheet Vexos
Fact Sheet VexosFact Sheet Vexos
Fact Sheet Vexos
 
Ph d lib15_konference_hilde-daland-nyborg2015
Ph d lib15_konference_hilde-daland-nyborg2015Ph d lib15_konference_hilde-daland-nyborg2015
Ph d lib15_konference_hilde-daland-nyborg2015
 
Yehia_CV_2016.PDF
Yehia_CV_2016.PDFYehia_CV_2016.PDF
Yehia_CV_2016.PDF
 
Managerial Accounting Garrison Noreen Brewer Chapter 01Managerial Accounting ...
Managerial Accounting Garrison Noreen Brewer Chapter 01Managerial Accounting ...Managerial Accounting Garrison Noreen Brewer Chapter 01Managerial Accounting ...
Managerial Accounting Garrison Noreen Brewer Chapter 01Managerial Accounting ...
 
(워크시트) 실행계획및추정재무_스타트업을하는깐깐한방법
(워크시트) 실행계획및추정재무_스타트업을하는깐깐한방법(워크시트) 실행계획및추정재무_스타트업을하는깐깐한방법
(워크시트) 실행계획및추정재무_스타트업을하는깐깐한방법
 
Forging powerful relationships part 3
Forging powerful relationships part 3Forging powerful relationships part 3
Forging powerful relationships part 3
 
Diversity_Inclusion_TheChazinGroupLLC
Diversity_Inclusion_TheChazinGroupLLCDiversity_Inclusion_TheChazinGroupLLC
Diversity_Inclusion_TheChazinGroupLLC
 
Programación 1: fundamentos
Programación 1: fundamentosProgramación 1: fundamentos
Programación 1: fundamentos
 
Diseno e implementacion de centro de procesamiento de datos en la ips centro ...
Diseno e implementacion de centro de procesamiento de datos en la ips centro ...Diseno e implementacion de centro de procesamiento de datos en la ips centro ...
Diseno e implementacion de centro de procesamiento de datos en la ips centro ...
 

Similar to MOHAMED ATEF C.V. (updated Sept. 2015)

Similar to MOHAMED ATEF C.V. (updated Sept. 2015) (20)

Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816
 
Sobeih CV - ( latest -2015)
Sobeih CV - ( latest -2015)Sobeih CV - ( latest -2015)
Sobeih CV - ( latest -2015)
 
Alaa Mahmoud' CV
Alaa Mahmoud' CVAlaa Mahmoud' CV
Alaa Mahmoud' CV
 
Mahmoud CV 11-2015
Mahmoud CV 11-2015Mahmoud CV 11-2015
Mahmoud CV 11-2015
 
Mohamed Magdy
Mohamed MagdyMohamed Magdy
Mohamed Magdy
 
C.V.constr. (1)
C.V.constr. (1)C.V.constr. (1)
C.V.constr. (1)
 
Telecommunication infrastructure services
Telecommunication infrastructure servicesTelecommunication infrastructure services
Telecommunication infrastructure services
 
Mohamed osama cv piping
Mohamed osama cv pipingMohamed osama cv piping
Mohamed osama cv piping
 
Aftab_14-06-15
Aftab_14-06-15Aftab_14-06-15
Aftab_14-06-15
 
Motaz al saady cv
Motaz al saady cvMotaz al saady cv
Motaz al saady cv
 
CV - 2017
CV - 2017CV - 2017
CV - 2017
 
CV - 2017
CV - 2017CV - 2017
CV - 2017
 
M Kamal
M Kamal M Kamal
M Kamal
 
C.V.UP DATE
C.V.UP DATEC.V.UP DATE
C.V.UP DATE
 
Alaa_Attiya resume
Alaa_Attiya resumeAlaa_Attiya resume
Alaa_Attiya resume
 
Borapureddi Ashok_present
Borapureddi Ashok_presentBorapureddi Ashok_present
Borapureddi Ashok_present
 
CURRICLUM VITAE-Kashif
CURRICLUM VITAE-KashifCURRICLUM VITAE-Kashif
CURRICLUM VITAE-Kashif
 
CURRICLUM VITAE-Kashif
CURRICLUM VITAE-KashifCURRICLUM VITAE-Kashif
CURRICLUM VITAE-Kashif
 
CV-Osama Amin ..........
CV-Osama Amin  ..........CV-Osama Amin  ..........
CV-Osama Amin ..........
 

MOHAMED ATEF C.V. (updated Sept. 2015)

  • 1. Curriculum Vitae Personal Information  Name : Mohamed Atef abd Elsamei.  Address : 51 Omar Ibn Alkhattab St.-Ard Algameiea-Imbaba-Giza-Egypt.  Phone No. : +20233117987 -- +20222524378 --+20226539560  Mobile No. : +201006018184  E-Mail :m_atef2001@yahoo.com  Birth Day : 05/3/1975.  Birth Location: Giza.  Marital Status: Married.  Religion : Muslim. Objective My aim in my work is to utilize every second to gain a new experience and knowledge while maintaining the team spirit to raise the value of the company I belong to. Education  Faculty : Faculty of Engineering-Cairo University.  Department : Civil Department.  Graduation Year : 1999.  General Grade : Very Good.  Project : Reinforced Concrete.  Project Grade : Distinction.  Project Description: Project Contents: Tennis stadium, Official Building, Olympic Swimming Pool, Shed  Further Studies :  Master degree in Structural Engineering (Jan. 2009) (M.Sc)  CPM (Construction Project Manager ) Certificate from ASCE 2010 from AUC Professional Experience 1) Current Job:  Company: NOKIA Solutions- KSA.  Period : from 1/3/2015 until Now. Responsibilities : USF9-Civil PM; This include  CW Handover from Site Acquisition to CW  Send site information to design office to prepare for Civil drawings which include preparing: (1) Topographical Site Survey; Soil Test Report; Far End Existing tower survey (2) Preliminary Civil drawings (3) Assign CW Subcontractors according to geographical area and capacity with design package (4) control CW with partners/Subcon to start access road, Excavation, RC casting, Backfilling, Tower Erection, Site Completion, Acceptance ; (5) Partners/Subcon meetings to follow CW progress;
  • 2.  Customer meetings to follow progress  Project planning; implementation, acceptance, Documentation Achievement : - Material Delivery tracking for all Project process from Hybrid Units, Towers for 460 sites - Site Design tracking from NOKIA to Approved site designers (data needed as SAF, TCC, Coordinates, soil test, survey, priority, submit design, .etc for 365 sites - Site design from NOKIA to Partners/Subcon to start Civil work for 260 sites - Follow up Civil Work till site is ready for installation for 175 sites in 6 months 2)Previous Jobs:  Company: HOI MEA for Engineering.  Period : from 15/7/2008 until 28/2/2015. Responsibilities : HOI MEA Sales Manager This include  Studying the GSM Market for the New Products.  Coordinate with the customers for new bids and tenders.  Complete the documentation for tenders and bids  Cooperate with the other parties to complete the documentation  Negotiate with the customers for the pricing and requests as technical and financial.  Follow up the manufacturing and preparation of material and products.  Tendering and Bidding for Turnkey site base and Supply of Special Products.  Advertisement arrangement for company products and affairs.  Exhibitions & Fairs Preparation. Achievement : Product Bidding :  KSA RDU towers orders by about 3.2 Million SAR.  Zain-KSA bidding for TK sites, RDU and Palm trees.  Zain-Bahrain for bidding for Backbone towers and Shelters.  Telecelglobe Bidding for mobile solution and fast track sites……..etc.  Vodafone Egypt Special Products E-Auctions and Bids.  Vodafone Egypt L1 Maintenance Project.  Ericsson MRC Project in Sudan.  Vodafone Egypt Global Supply Project  Etisalat Misr Settlement Case Finalisation.  Etisalat Misr Frame Agreement for Supply  Etisalat Misr TOWERCO project  Vodafone Egypt TOWERCO Project.  Others Company: HUAWEI TECHNOLOGIES. Period : from 29/10/2006 until 13/7/2008. Responsibilities : Delta Rollout Manager for CiviI Work; This include  checking STA/STC Reports &  Coordinate with SA Subcontractors and  Prepare Acceptance Documentations for Green Field and Rooftop Sites ;  Checking Leases , Permits and certificates ;  Preparing Materials With Warehouse ;
  • 3.  Follow up material Fabrication Progress ;  Follow Up Site Construction Progress with CW Subcontractors till transfer to Telecom Work .Achievement : Cairo Regional Office :  Establishing The Preparation of preliminary STA/STC Report Templates for 3rd Liscence Project  Preparing the Standard Site Layouts (Plan and Elevation ) for Greenfield (GF) and Rooftop (RT) Sites  Preparing the Standard Site Earthing System Layouts  Preparation of Huawei Technologies Co.,Ltd. Technical Specification for 3rd Liscence Project  Checking and Revising The STA/STC Reports  Surveying and Supervising the Construction of the BSC Sites  Checking and Revising the Tower Designs (RT and GF Structures) Delta Representative Office : CW Construction :  Revising and Checking of STA/STC reports  Preparing the Materials from Warehouse  Follow up the Fabrication of CW Materials  Follow up the Site Mobilization and Supporting  Supervising The CW Construction Progress  Solve Technical Problems In Sites Wile CW Construction Site Acceptance :  Planning ,Coordinate and Managing the Site Acceptance Visits With Subcontractor  Planning ,Coordinate and Managing the Site Acceptance Visits With Customer  Proceeding Preliminary Site Acceptance (PAC) to Check the Site Snags Report  Follow up the site snags Progress  Proceeding Final Site Acceptance (FAC) to revise the checklists and BOQ and As Built Drawings  Revising and Checking the Site Acceptance Documentation. Company: Al Ashoury Factory for Steel Fabrication. Period : from 16/3/2005 until 1/9/2006. Responsibilties :  Structural Design Engineer for Telecommunication GSM Towers. This include design & Check of New and Existing GSM Towers with Different Heights (from 6m to 123m) by Guy Mast Program and  Making Calculation Sheets for Towers as A Design For Approval For Main GSM Service Operators In Kingdom Of Saudi Arabia ( Mobily GSM Network )  Making Towers Design by STAAD III & Pro Program This Include Also A Design Of Raft and Pad & Chimney Foundations For Tower Support. Achievement :  Approved Design Of Rooftop Masts And Wall Mounts For Newtel-Nokia Emirates.  Approved Telecom Tower Designs For Mobily (Second GSM Operator in Saudi Arabia) Self-Supporting Towers( Heights: 35m,50m,60m and 90m ) Rooftop Structures (Heights: 9m and 12m )  Preparation of Tower Tenders for rooftop and Greenfield Structures
  • 4. Company: Hoi/Aste for Technical Engineering. Period : from 1/1/2002 until 15/3/2005 Responsibilties :  Structural Design Engineer for Telecommunication Mobile Stations. This include design & Check of New and Existing GSM Towers with Different Heights (from 6m to 123m) by Guy Mast Program  Making Calculation Sheets for Existing Residential Buildings by STAAD III & Pro Program Design OF Telecom Steel Towers , Monopoles and Rooftop Structures  Revising and Analysing all steel and concrete structures by using STAAD PRO Program Professionally,  GSM SITE Aquistion and Structurally Survey;  Design Of GSM Stations Civil and Structural ,  Site Aquistion Co-ordinator,  Structural Survey,Design of GSM Stations (Civil and Structural),  Preparing of Structural Calculation Sheet, Tower and Raft Design Calculation(Using GUYMAST Program and STAAD PRO Program) Achievements :  First Trial Sites for Third GSM Network in Egypt (About 45 Sites for SIEMENS Co. (2002))  Site Aquistion and Survey (37 Sites in Two Monthes) and Design of 8 Sites for MOTOROLA and ORASCOM in Iraq .;  Supervision and Construction of 4 Sites in First GSM Network for MOTOROLA and ORASCOM in Iraq .  Design of TELECOM Towers for CDMA Project for HUAWEI Company (Heights 50M,60M and 70M)  Design of Towers Families (Heights 20M to 85M ) for ORASCOM Company for Bangladish and Other Countries .  Survey and Design of GSM Stations for MOTOROLA and ATHEER MTC Companies (Second Network in Iraq)  Revising and Analysing all steel and concrete structures by using STAAD PRO Program Professionally, for STC Network in KSA Company: ES-SPECTRA CO. for Special Services Period : from 21/07/2001 until 31/12/2001.  Tasks : Site Engineer for Nuweiba Water Supply & Waste water Project as Subcontractor for MORGANTI (International American Company) Detailed data: Construction of Pump Stations Composed of  Generator Room.  Operating Room  Pump Station Well  Fence Surrounding Station  Construction of Waste Water Pipe lines to Pump stations With Encasement. Company: Eng. Alaa Office for Construction  Period : from 1/2/2001 until 16/4/2001.  Tasks : Site Engineer for Construction of (6) Residential Buildings. Special Skills: Language Skills:  Arabic : Mother Tongue.
  • 5.  English: Fluent written and spoken.  French: Fair. Computer Skills: 1)Operating system programs:  Professional in DOS and windows2000. 2) Application programs:  MS office : very good in word and Excel also Outlook.  AutoCAD2005: Excellent in both 2D and 3D drawing.  STAAD III and Pro: Excellent (Modeling and analysis for 3D Space Structures and Frames).  MAST PROG: Excellent (modeling and analysis of telecommunication Towers). 3) Programming programs:  Visual basic: initial course in programming by visual basic. GSM Experience: Site Acquisition :making full site acquisition from nominal receiving to searching options by GPS and making full survey by taking panoramic photos and making layout for site and civil(design of GSM station) and structural drawings for steel frame of shelter and tower . Check of Existing Buildings which supporting GSM station by STAAD PRO Software to make structural analysis and modeling of shelter and tower frame and Building and check it against applied loads using STAAD PRO and PCACOL software. DESIGN all types of telecommunication towers, masts and Monopoles according to TIA/EIA- 222F Code(American)( Aisc & Asce 10-90 Codes) Using GuyMast and Staad Pro Program ; Design of tower Footings (Both Raft & Pad & Chimney Foundation).