SlideShare a Scribd company logo
1 of 4
Download to read offline
Mohamed Khalil Abd El Rahman
PROFILE:-
Hoping My Qualification Meet Your Appreciation.
Personal Data:-
Title : Senior Civil Engineer.
Mobile No : 00974-66080450
Address : Doha - Qatar
Email : eng_mohamedkhalil@hotmial.com
Marital Status : Married
Nationality : Egyptian
Education and Qualifications:-
University : El Minia University - Faculty of Engineering – Civil Engineering
University Degree : Bachelor of Civil engineering June- 2006
Grad of Bachelor : V.Good
General Grade : Passed
Graduation Project Grade: Excellent
Language skills
Arabic : Native (Mother Language)
English : Very Good Command of English (Speaking, Reading, Writing)
Computer skills
1 AutoCAD.
2 Microsoft Office
3 Surfer 8 & 9
4 Sokkia Prolink, LEICA Geo Office Tools, Topcon t-com Survey Programs.
5 Microsoft Windows
Certifications
1 UPDA Certified (Urban Planning Development Authority)
2 CPW (UN 5608) (Consolidated Permit Work - RLIC Ras-Lafan).
3 Certified Engineer of Egyptian Engineers Syndicate.
Other skills
1 Keen to learn and teach
2 Fast Learning
3 Ability to work under pressure
4 Well-organized
5 Self- motivation
6 Problem solving
7 Expert in survey equipment
8 Hard worker
Experience:-
• From 9/2008 till Now as Senior Civil Engineer in
TADMUR Cont. & Trade. Est., Qatar
 Project of Roads and infrastructure in Wakrah west MMUP PH2, PKG14
Project Owner: Public Works Authority (ASHGHAL).
Main Contractor: TADMUR Cont. & Trade. Est.
Supervising Authority: PARSONS INTERNATIONAL LIMITED
Total Budget: 150,000,000 USD.
 Project of Three Schools Project Package 7A - Qatar.
Project Owner: ASHGHAL (P.W.A).
Main Contractor: TADMUR Cont. & Trade. Est.
Supervising Authority: ECG(Engineering Consultants Group).
Total Budget: 60,000,000 USD.
 Project of EPIC FOR RAW SEWAGE EFFLUENT(RSE) NETWORK PIPE LINE
Project Owner: Ras Laffan Industrial city (RLIC).
Main Contractor: TADMUR Cont. & Trade. Est.
Supervising Authority: Qatar Petroleum Q.P.
Total Budget: 25,000,000 USD.
 Project of Barwa Commercial Avenue (Type 5 & Type 2)
Project Owner: Barwa Real Estate Group.
Main Contractor: HOCHTIEF Solution QATAR.
Sub-Contractor: TADMUR Cont. & Trade. Est.
Supervising Authority: Aecom Middle East Limited
Total Budget: 110,000,000 USD.
 Project of Qatar University (New Research, External Package & C.S.U. )

Project Owner: Qatar University
Main Contractor: TADMUR Cont. & Trade. Est.
Supervising Authority: The Arab architects
Total Budget: 100,000,000 USD.
• Project of Qatar Foundation (Student Center) Total
Project Owner: Qatar Foundation
Main Contractor: TADMUR Cont. & Trade. Est.
Supervising Authority: KEO
Total Budget: 125,000,000 USD.
My DUTIES AND RESPONSIBILITIES:
1) Coordinate and control the progress & quality of works
2) Directly reporting to the Construction Manager of progress and suggest the solutions to the
encountered problems on site.
3) Initiate plan on the delivery of materials
4) Controls and supervise the daily activities and progress of subcontractor.
5) Monitoring all the activities and ensure that the progress is according to the scheduled date of
completion.
6) Review project sub-contractors bills and Monthly bill for client.
7) Check all contract drawing and Coordinate between arch, Civil and electro-mechanical
drawing to make the Shop drawing.
8) Coordinate with Engineers (Planning - Arch – Mech. – Elec.)
9) Over all supervision and control of the activities.
• From 10/2007 till 9/2008 as Civil Engineer in
Alkan networks, Egypt.
Major:
• Line of site surveyor Engineer.
• Excellent Working on path loss program.
• Good Communication and Negotiation Skills.
• Site surveying Engineer.
• From 10/2006 till 10/2007 as Civil Engineer in
TAV (Tepe Akfen) Cairo, Egypt.
• Project of Terminal 3 of Cairo International Airport.
Project Owner: Egyptian Government
Main Contractor: TAV (Tepe Akfen)
Supervising Authority: ECG (Engineering Consultants Group)
Total Budget: 350,000,000 USD.
Project stages:
• Main building
• Fingers
• Power plant
• External Tunnel
• Bridge
My DUTIES AND RESPONSIBILITIES:
1) Execution of the main utility tunnel (3*3m R.C rectangular tunnel) including survey works excavation
and R.C works.
2) Execution of power plant of the project as structural works.
3) Execution of two special buildings for giant planes (Airbus 380) for passenger's translation.
4) Execution of small watchtower (13m height) in airport runway.
5) Supervision of electromechanical installation works (Travellators ,escalators and bridges
connecting between planes and pier building)
6) Infrastructures works in the project such as electrical ducts and manholes, water and fire
pipelines and rain drain system.
• Graduation project (June-July 2006) included :
 Making information maps for El Minia University Using surveying instruments (GPS - the level
– the theodolite - the total station)
 Hydrographic surveying for El-Ibrahimya canal using total station
 Treatment with surveying computer programs (Leica GPS and total station) ,surfer and
ACAD2006
• Survey engineer(Training) BG Consulting Group, Egypt, Cairo, July 2005 - Sep 2005
 working in B.G. consulting group as office engineer familiar with computer programs (A Cad
& surfer).
• Summer 2004 training in Electric Egypt Company as a Civil Engineer
• Worked in the field of computer hardware maintenance.

More Related Content

What's hot (20)

M Kamal
M Kamal M Kamal
M Kamal
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 
CV Mahmoud Farid PM
CV Mahmoud Farid PMCV Mahmoud Farid PM
CV Mahmoud Farid PM
 
Eng. Ahmed Yhia
Eng.  Ahmed YhiaEng.  Ahmed Yhia
Eng. Ahmed Yhia
 
MCV
MCVMCV
MCV
 
Cv m.safdar.2016
Cv m.safdar.2016Cv m.safdar.2016
Cv m.safdar.2016
 
ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)
 
AHMED GEMEIY CV-26-04
AHMED GEMEIY CV-26-04AHMED GEMEIY CV-26-04
AHMED GEMEIY CV-26-04
 
CV
CVCV
CV
 
NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORS
 
C.V. small size
C.V. small sizeC.V. small size
C.V. small size
 
Cv Presentation
Cv PresentationCv Presentation
Cv Presentation
 
Milroy CVs
Milroy CVsMilroy CVs
Milroy CVs
 
elsayed cv last
elsayed cv lastelsayed cv last
elsayed cv last
 
ashraf frieg CV
ashraf frieg CVashraf frieg CV
ashraf frieg CV
 
CV update
CV updateCV update
CV update
 
MOHAMMAD HAMID MUSTAFA (Project Manager)
MOHAMMAD HAMID MUSTAFA  (Project Manager)MOHAMMAD HAMID MUSTAFA  (Project Manager)
MOHAMMAD HAMID MUSTAFA (Project Manager)
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
 
Malik@ cv
Malik@  cvMalik@  cv
Malik@ cv
 
Maged Fawzy CV (pm) rev 01
Maged Fawzy CV (pm) rev 01Maged Fawzy CV (pm) rev 01
Maged Fawzy CV (pm) rev 01
 

Viewers also liked

MY Update CIVI only
MY Update CIVI onlyMY Update CIVI only
MY Update CIVI onlyelias shahi
 
Top 8 civil engineer resume samples
Top 8 civil engineer resume samplesTop 8 civil engineer resume samples
Top 8 civil engineer resume samplesRottenTomatoes345
 
Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007sajid hasan
 

Viewers also liked (6)

MY Update CIVI only
MY Update CIVI onlyMY Update CIVI only
MY Update CIVI only
 
Ali CV
Ali  CVAli  CV
Ali CV
 
Top 8 civil engineer resume samples
Top 8 civil engineer resume samplesTop 8 civil engineer resume samples
Top 8 civil engineer resume samples
 
Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007
 
Civil engineer
Civil engineerCivil engineer
Civil engineer
 
CV Site Engineer Civil
CV Site Engineer CivilCV Site Engineer Civil
CV Site Engineer Civil
 

Similar to Sr Civil Engineer (20)

A.Hussein - C.V
A.Hussein - C.VA.Hussein - C.V
A.Hussein - C.V
 
ENG Gamal CV
ENG Gamal CVENG Gamal CV
ENG Gamal CV
 
My Resume Full
My Resume FullMy Resume Full
My Resume Full
 
Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)
 
cv
cvcv
cv
 
CV
CVCV
CV
 
cv amr
cv amrcv amr
cv amr
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
Oct. -2015-CV
Oct. -2015-CVOct. -2015-CV
Oct. -2015-CV
 
Omar Alani CV 20160410
Omar Alani CV 20160410Omar Alani CV 20160410
Omar Alani CV 20160410
 
c.v mohab A.hamza (References)
c.v mohab A.hamza (References) c.v mohab A.hamza (References)
c.v mohab A.hamza (References)
 
mustafa raafat c.v
mustafa raafat c.v mustafa raafat c.v
mustafa raafat c.v
 
HUM-Surveyor-CV
HUM-Surveyor-CVHUM-Surveyor-CV
HUM-Surveyor-CV
 
ayman y7ia
ayman y7iaayman y7ia
ayman y7ia
 
mohamed salem cv final
mohamed salem cv finalmohamed salem cv final
mohamed salem cv final
 
Mina Mourad CV
Mina Mourad CVMina Mourad CV
Mina Mourad CV
 
Mostafa CV
Mostafa CVMostafa CV
Mostafa CV
 
Ibrahim C.V
Ibrahim C.VIbrahim C.V
Ibrahim C.V
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
 
Eng. amr taha c.v
Eng. amr taha   c.vEng. amr taha   c.v
Eng. amr taha c.v
 

Sr Civil Engineer

  • 1. Mohamed Khalil Abd El Rahman PROFILE:- Hoping My Qualification Meet Your Appreciation. Personal Data:- Title : Senior Civil Engineer. Mobile No : 00974-66080450 Address : Doha - Qatar Email : eng_mohamedkhalil@hotmial.com Marital Status : Married Nationality : Egyptian Education and Qualifications:- University : El Minia University - Faculty of Engineering – Civil Engineering University Degree : Bachelor of Civil engineering June- 2006 Grad of Bachelor : V.Good General Grade : Passed Graduation Project Grade: Excellent Language skills Arabic : Native (Mother Language) English : Very Good Command of English (Speaking, Reading, Writing) Computer skills 1 AutoCAD. 2 Microsoft Office 3 Surfer 8 & 9 4 Sokkia Prolink, LEICA Geo Office Tools, Topcon t-com Survey Programs. 5 Microsoft Windows Certifications 1 UPDA Certified (Urban Planning Development Authority) 2 CPW (UN 5608) (Consolidated Permit Work - RLIC Ras-Lafan). 3 Certified Engineer of Egyptian Engineers Syndicate.
  • 2. Other skills 1 Keen to learn and teach 2 Fast Learning 3 Ability to work under pressure 4 Well-organized 5 Self- motivation 6 Problem solving 7 Expert in survey equipment 8 Hard worker Experience:- • From 9/2008 till Now as Senior Civil Engineer in TADMUR Cont. & Trade. Est., Qatar  Project of Roads and infrastructure in Wakrah west MMUP PH2, PKG14 Project Owner: Public Works Authority (ASHGHAL). Main Contractor: TADMUR Cont. & Trade. Est. Supervising Authority: PARSONS INTERNATIONAL LIMITED Total Budget: 150,000,000 USD.  Project of Three Schools Project Package 7A - Qatar. Project Owner: ASHGHAL (P.W.A). Main Contractor: TADMUR Cont. & Trade. Est. Supervising Authority: ECG(Engineering Consultants Group). Total Budget: 60,000,000 USD.  Project of EPIC FOR RAW SEWAGE EFFLUENT(RSE) NETWORK PIPE LINE Project Owner: Ras Laffan Industrial city (RLIC). Main Contractor: TADMUR Cont. & Trade. Est. Supervising Authority: Qatar Petroleum Q.P. Total Budget: 25,000,000 USD.  Project of Barwa Commercial Avenue (Type 5 & Type 2) Project Owner: Barwa Real Estate Group. Main Contractor: HOCHTIEF Solution QATAR. Sub-Contractor: TADMUR Cont. & Trade. Est. Supervising Authority: Aecom Middle East Limited Total Budget: 110,000,000 USD.
  • 3.  Project of Qatar University (New Research, External Package & C.S.U. )  Project Owner: Qatar University Main Contractor: TADMUR Cont. & Trade. Est. Supervising Authority: The Arab architects Total Budget: 100,000,000 USD. • Project of Qatar Foundation (Student Center) Total Project Owner: Qatar Foundation Main Contractor: TADMUR Cont. & Trade. Est. Supervising Authority: KEO Total Budget: 125,000,000 USD. My DUTIES AND RESPONSIBILITIES: 1) Coordinate and control the progress & quality of works 2) Directly reporting to the Construction Manager of progress and suggest the solutions to the encountered problems on site. 3) Initiate plan on the delivery of materials 4) Controls and supervise the daily activities and progress of subcontractor. 5) Monitoring all the activities and ensure that the progress is according to the scheduled date of completion. 6) Review project sub-contractors bills and Monthly bill for client. 7) Check all contract drawing and Coordinate between arch, Civil and electro-mechanical drawing to make the Shop drawing. 8) Coordinate with Engineers (Planning - Arch – Mech. – Elec.) 9) Over all supervision and control of the activities. • From 10/2007 till 9/2008 as Civil Engineer in Alkan networks, Egypt. Major: • Line of site surveyor Engineer. • Excellent Working on path loss program. • Good Communication and Negotiation Skills. • Site surveying Engineer.
  • 4. • From 10/2006 till 10/2007 as Civil Engineer in TAV (Tepe Akfen) Cairo, Egypt. • Project of Terminal 3 of Cairo International Airport. Project Owner: Egyptian Government Main Contractor: TAV (Tepe Akfen) Supervising Authority: ECG (Engineering Consultants Group) Total Budget: 350,000,000 USD. Project stages: • Main building • Fingers • Power plant • External Tunnel • Bridge My DUTIES AND RESPONSIBILITIES: 1) Execution of the main utility tunnel (3*3m R.C rectangular tunnel) including survey works excavation and R.C works. 2) Execution of power plant of the project as structural works. 3) Execution of two special buildings for giant planes (Airbus 380) for passenger's translation. 4) Execution of small watchtower (13m height) in airport runway. 5) Supervision of electromechanical installation works (Travellators ,escalators and bridges connecting between planes and pier building) 6) Infrastructures works in the project such as electrical ducts and manholes, water and fire pipelines and rain drain system. • Graduation project (June-July 2006) included :  Making information maps for El Minia University Using surveying instruments (GPS - the level – the theodolite - the total station)  Hydrographic surveying for El-Ibrahimya canal using total station  Treatment with surveying computer programs (Leica GPS and total station) ,surfer and ACAD2006 • Survey engineer(Training) BG Consulting Group, Egypt, Cairo, July 2005 - Sep 2005  working in B.G. consulting group as office engineer familiar with computer programs (A Cad & surfer). • Summer 2004 training in Electric Egypt Company as a Civil Engineer • Worked in the field of computer hardware maintenance.