1. Mohamed Khalil Abd El Rahman
PROFILE:-
Hoping My Qualification Meet Your Appreciation.
Personal Data:-
Title : Senior Civil Engineer.
Mobile No : 00974-66080450
Address : Doha - Qatar
Email : eng_mohamedkhalil@hotmial.com
Marital Status : Married
Nationality : Egyptian
Education and Qualifications:-
University : El Minia University - Faculty of Engineering – Civil Engineering
University Degree : Bachelor of Civil engineering June- 2006
Grad of Bachelor : V.Good
General Grade : Passed
Graduation Project Grade: Excellent
Language skills
Arabic : Native (Mother Language)
English : Very Good Command of English (Speaking, Reading, Writing)
Computer skills
1 AutoCAD.
2 Microsoft Office
3 Surfer 8 & 9
4 Sokkia Prolink, LEICA Geo Office Tools, Topcon t-com Survey Programs.
5 Microsoft Windows
Certifications
1 UPDA Certified (Urban Planning Development Authority)
2 CPW (UN 5608) (Consolidated Permit Work - RLIC Ras-Lafan).
3 Certified Engineer of Egyptian Engineers Syndicate.
2. Other skills
1 Keen to learn and teach
2 Fast Learning
3 Ability to work under pressure
4 Well-organized
5 Self- motivation
6 Problem solving
7 Expert in survey equipment
8 Hard worker
Experience:-
• From 9/2008 till Now as Senior Civil Engineer in
TADMUR Cont. & Trade. Est., Qatar
Project of Roads and infrastructure in Wakrah west MMUP PH2, PKG14
Project Owner: Public Works Authority (ASHGHAL).
Main Contractor: TADMUR Cont. & Trade. Est.
Supervising Authority: PARSONS INTERNATIONAL LIMITED
Total Budget: 150,000,000 USD.
Project of Three Schools Project Package 7A - Qatar.
Project Owner: ASHGHAL (P.W.A).
Main Contractor: TADMUR Cont. & Trade. Est.
Supervising Authority: ECG(Engineering Consultants Group).
Total Budget: 60,000,000 USD.
Project of EPIC FOR RAW SEWAGE EFFLUENT(RSE) NETWORK PIPE LINE
Project Owner: Ras Laffan Industrial city (RLIC).
Main Contractor: TADMUR Cont. & Trade. Est.
Supervising Authority: Qatar Petroleum Q.P.
Total Budget: 25,000,000 USD.
Project of Barwa Commercial Avenue (Type 5 & Type 2)
Project Owner: Barwa Real Estate Group.
Main Contractor: HOCHTIEF Solution QATAR.
Sub-Contractor: TADMUR Cont. & Trade. Est.
Supervising Authority: Aecom Middle East Limited
Total Budget: 110,000,000 USD.
3. Project of Qatar University (New Research, External Package & C.S.U. )
Project Owner: Qatar University
Main Contractor: TADMUR Cont. & Trade. Est.
Supervising Authority: The Arab architects
Total Budget: 100,000,000 USD.
• Project of Qatar Foundation (Student Center) Total
Project Owner: Qatar Foundation
Main Contractor: TADMUR Cont. & Trade. Est.
Supervising Authority: KEO
Total Budget: 125,000,000 USD.
My DUTIES AND RESPONSIBILITIES:
1) Coordinate and control the progress & quality of works
2) Directly reporting to the Construction Manager of progress and suggest the solutions to the
encountered problems on site.
3) Initiate plan on the delivery of materials
4) Controls and supervise the daily activities and progress of subcontractor.
5) Monitoring all the activities and ensure that the progress is according to the scheduled date of
completion.
6) Review project sub-contractors bills and Monthly bill for client.
7) Check all contract drawing and Coordinate between arch, Civil and electro-mechanical
drawing to make the Shop drawing.
8) Coordinate with Engineers (Planning - Arch – Mech. – Elec.)
9) Over all supervision and control of the activities.
• From 10/2007 till 9/2008 as Civil Engineer in
Alkan networks, Egypt.
Major:
• Line of site surveyor Engineer.
• Excellent Working on path loss program.
• Good Communication and Negotiation Skills.
• Site surveying Engineer.
4. • From 10/2006 till 10/2007 as Civil Engineer in
TAV (Tepe Akfen) Cairo, Egypt.
• Project of Terminal 3 of Cairo International Airport.
Project Owner: Egyptian Government
Main Contractor: TAV (Tepe Akfen)
Supervising Authority: ECG (Engineering Consultants Group)
Total Budget: 350,000,000 USD.
Project stages:
• Main building
• Fingers
• Power plant
• External Tunnel
• Bridge
My DUTIES AND RESPONSIBILITIES:
1) Execution of the main utility tunnel (3*3m R.C rectangular tunnel) including survey works excavation
and R.C works.
2) Execution of power plant of the project as structural works.
3) Execution of two special buildings for giant planes (Airbus 380) for passenger's translation.
4) Execution of small watchtower (13m height) in airport runway.
5) Supervision of electromechanical installation works (Travellators ,escalators and bridges
connecting between planes and pier building)
6) Infrastructures works in the project such as electrical ducts and manholes, water and fire
pipelines and rain drain system.
• Graduation project (June-July 2006) included :
Making information maps for El Minia University Using surveying instruments (GPS - the level
– the theodolite - the total station)
Hydrographic surveying for El-Ibrahimya canal using total station
Treatment with surveying computer programs (Leica GPS and total station) ,surfer and
ACAD2006
• Survey engineer(Training) BG Consulting Group, Egypt, Cairo, July 2005 - Sep 2005
working in B.G. consulting group as office engineer familiar with computer programs (A Cad
& surfer).
• Summer 2004 training in Electric Egypt Company as a Civil Engineer
• Worked in the field of computer hardware maintenance.