1. Amgad Jozeph Labeeb Halim is seeking a challenging career in civil engineering where he can utilize his experience and academic background in structural design.
2. He has a Master's degree in structural engineering from Ain Shams University and over 10 years of experience in structural design projects for buildings, villas, and infrastructure.
3. His experience includes working as a site engineer, technical office engineer, and senior technical office engineer for large construction projects where he prepared structural drawings, supervised construction, and resolved technical issues.