MODULAR CONSTRUCTION
Submitted To :- Mr. Sumit Phugat sir
SUBJECT :- CONSTRUCTION TECHNIQUES
Presented By :- Vaibhav Nautiyal 170305216022
Sohail khan 170305216008
CONTENTS
• WHAT IS MODULAR CONSTRUCTION
• WHY MODULAR CONSTRUCTION
• REASONS TO ADOPT MODULAR CONSTRUCTION
• COMPARISON BETWEEN MODULAR AND CONVENTIONAL
CONSTRUCTION
• INTRODUCTION TO MODULAR COORDINATION
• BASIC AIMS FOR MODULAR CO-ORDINATION
• CLASSIFICATION OF MODULES IN MODULAR COORDINATION
• ADVANTAGES AND LIMITATIONS OF MODULAR CONSTRUCTION
MODULAR CONSTRUCTION
• There are many different ways to define the modular construction but
one basic definition of modular construction can be given as follows:
• “Modular Construction is a pre-engineered process of making any
structures or elements in a factory that is off-site and are delivered to
the sites and assembled as large volumetric components or as
substantial elements of any structures.”
• It can also be defined as “A modular building is a pre-engineered
structure that is flexible enough to satisfy virtually any requirement
tougher than standard drywall construction, expandable, can be
relocated and completely re-usable.”
MODULAR CONSTRUCTION (CONT.)
• With increasing industrialization to the building industry, steadily
larger parts of buildings are made up of prefabricated components,
delivered to the building site from the factories.
• Modular design, or "modularity in design", is a design approach that
subdivides a system into smaller parts called modules or skids, that
can be independently created and then used in different systems.
WHY CHOOSE MODULAR
CONSTRUCTION
• One of the major reason to adopt modular construction is that not only can
one save up to 35% on the initial construction costs like labor and
materials, but there are other benefits as well.
• Another major reason is about the quality as one can attain a suitable
quality in the elements of any structures that are to be pre-fabricated or
pre-cast in the construction factory.
• Modular construction takes most of the construction phase away from the
building site. Quicker and efficient factory processes are replacing the slow,
less productive site activities.
• Sustainability in modular construction can be achieved through the
factory production of the modular units
• For a modular construction project to complete with a good result,
proper planning, coordination and communication must exist
between various relevant parties involved from the early stage of the
project.
• A table is also shown that depicts the factors that are important in
modular construction than in conventional(standard) construction.
COMPARISON BETWEEN MODULAR AND
CONVENTIONAL CONSTRUCTION
INTRODUCTION TO MODULAR
COORDINATION
• “Modular coordination is a concept of coordination of dimension and
space in which buildings and components are dimensioned and
positioned in terms of basic unit or module.”
• The basic module is known as 1M which is equivalent to 100mm.
• It is internationally accepted by the International Standard
Organization and many other countries including Malaysia.
AIMS AND BASICS OF MODULAR
COORDINATION
• To achieve dimensional compatibility between building dimensions,
span, or spaces and the sizes of components or equipment by using
related modular dimensions.
• Making the planning simpler & clearer by distinct indication of
location of the building component in the building, both in respect to
each other & a modular grid.
• Simplification of site work.
• Limiting the member of sizes of building component so that the
linkage is based on modular measurement.
• Facilitating cooperation between designers, manufacturers, suppliers
& builders
CONT.
• Providing practical and logical construction methods for the
coordination of the position & dimension of elements, components &
spaces in a building design, which will contribute to :-
• FIRST - increased design freedom
• SECOND - improve balance between quality and cost of the
manufacturing the component.
CLASSIFICATION OF MODULES IN
MODULAR COORDINATION
• There are three type of MODULE :-
• (I) Basic Module
• (II) Multi Module
• (III) Sub Module
• Basic Module :- It is the fundamental unit of size in modular coordination
and for general application to building & components .The size of basic
Module is taken as 100mm denoted by “M”.
• It is considered to be large enough to effect some variety reduction in
range of component size and is small enough to provide a flexible unit of
measurement for the purpose of design.
• Multi Module :- Certain whole multiples of basic module usually
expressed in as “M” with numeric prefix as 2M , 3M, 4M etc are
referred to as multi module.
• Sub Module:- Certain submultiples of basic module which are whole
simple fractions shall be chosen when absolutely necessary for an
increment smaller than the basic module.
• For practical considerations, this sub modular increment shall be
expressed as “M” with fractional prefix as 1/5M, 1/4M, 1/3M,etc.
• These all three types of modules are practically used in some different
levels in the construction industry mainly in abroad.
ADVANTAGES AND LIMITATIONS OF
MODULAR CONSTRUCTION
ADVANTAGES
1 Reduced Costs
• One key advantage of modular construction is that it's more cost effective
than traditional on-site building.
• Modular builders take advantage of economies of scale by building
multiple similar pieces at once.
• They also get to work on smaller pieces of the building, reducing the need
to use ladders or scaffolding.
• Finally, since the bulk of the construction and finishing work is done
indoors, there's less risk of weather-related delays in construction that can
cause workers to sit around idly waiting for the ability to work.
2 The Need for Speed:- The nature of factory building also makes
modular homes faster to build. They're frequently built on an assembly
line that continuously operate.
when they get built on-site, all that needs to be done is to have them
placed on the site and joined together.
3 New Construction :- A modular home is a new home. This means
that it's built to modern standards and comes with new appliances and
systems.
4 Quality :- The quality of the homes will be much better as the
elements will be constructed with desirable size and volumetric shapes
that will be helpful in reaching the desired quality standards expecting
from a particular client or clients.
DRAWBACKS OF MODULAR CONSTRUCTIONS
1 Limited customization :- Modular buildings can certainly be
customized, but there is often an extent or limit to how much
customization can go into it.
2 Limited service area :- The very nature of modules means they’re
going to be made in a fabrication facility, then they must be shipped to
the building location, which can be extremely far away, depending on
where that location is and where the nearest fabrication facility is.
3 Payment Plans :- Modular homes typically need to be paid for up-
front or financed on an as-you-go basis. In many cases, you won't be
able to get a traditional bank loan until you finish the home.
Modular construction ppt

More Related Content

What's hot

PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMSagar Shah
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
Aishwarya Deopujari
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
Construction Tech. and Mgmt., VNIT Nagpur
 
Prefabrication in construction
Prefabrication in constructionPrefabrication in construction
Prefabrication in construction
Shailja km
 
Cost effective construction techniques
Cost effective construction techniquesCost effective construction techniques
Cost effective construction techniquesSayali Darakh
 
Prefabricated Structure and its installation process
Prefabricated Structure and its installation processPrefabricated Structure and its installation process
Prefabricated Structure and its installation process
Udayram Patil
 
Prefabricated components
Prefabricated componentsPrefabricated components
Prefabricated components
Sofia Rajesh
 
Cost effective materials
Cost effective materialsCost effective materials
Cost effective materialsSarthak Kaura
 
Pre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concretePre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concrete
Rajat Nainwal
 
prefabricated Structures
prefabricated Structuresprefabricated Structures
prefabricated Structures
Boopathi Raja
 
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ASHOK KUMAR TIWARY
 
Building by laws
Building  by lawsBuilding  by laws
Building by laws
Sameer Thaiyam
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
Bilal Ansari
 
Precast and Prefabricated components and structures and the connection betwee...
Precast and Prefabricated components and structures and the connection betwee...Precast and Prefabricated components and structures and the connection betwee...
Precast and Prefabricated components and structures and the connection betwee...
nishant patyal
 
Low cost housing
Low cost housingLow cost housing
Low cost housing
SAI KIRAN
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
Akshay Revekar
 
Precast construction
Precast constructionPrecast construction
Precast construction
Divya Vishnoi
 
Classification of Buildings as per National Building Code of India (NBC) 2016
Classification of Buildings as per National Building Code of India (NBC) 2016Classification of Buildings as per National Building Code of India (NBC) 2016
Classification of Buildings as per National Building Code of India (NBC) 2016
Rohan Dasgupta
 
Roof truss
Roof trussRoof truss
Roof truss
Pankajkumar Singh
 

What's hot (20)

PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEM
 
Steel trusses
Steel trussesSteel trusses
Steel trusses
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
 
Prefabrication in construction
Prefabrication in constructionPrefabrication in construction
Prefabrication in construction
 
Cost effective construction techniques
Cost effective construction techniquesCost effective construction techniques
Cost effective construction techniques
 
Prefabricated Structure and its installation process
Prefabricated Structure and its installation processPrefabricated Structure and its installation process
Prefabricated Structure and its installation process
 
Prefabricated components
Prefabricated componentsPrefabricated components
Prefabricated components
 
Cost effective materials
Cost effective materialsCost effective materials
Cost effective materials
 
Pre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concretePre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concrete
 
prefabricated Structures
prefabricated Structuresprefabricated Structures
prefabricated Structures
 
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
 
Building by laws
Building  by lawsBuilding  by laws
Building by laws
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Precast and Prefabricated components and structures and the connection betwee...
Precast and Prefabricated components and structures and the connection betwee...Precast and Prefabricated components and structures and the connection betwee...
Precast and Prefabricated components and structures and the connection betwee...
 
Low cost housing
Low cost housingLow cost housing
Low cost housing
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 
Precast construction
Precast constructionPrecast construction
Precast construction
 
Classification of Buildings as per National Building Code of India (NBC) 2016
Classification of Buildings as per National Building Code of India (NBC) 2016Classification of Buildings as per National Building Code of India (NBC) 2016
Classification of Buildings as per National Building Code of India (NBC) 2016
 
Roof truss
Roof trussRoof truss
Roof truss
 

Similar to Modular construction ppt

PEB 2-5.pptx
PEB 2-5.pptxPEB 2-5.pptx
PEB 2-5.pptx
sonu515144
 
Modular Construction
Modular ConstructionModular Construction
Modular Construction
Jeelkumar Patel
 
Modular construction
Modular constructionModular construction
Modular construction
Kiran Gill
 
5 modular const.pptx
5 modular const.pptx5 modular const.pptx
5 modular const.pptx
sonu515144
 
Design Principles
Design PrinciplesDesign Principles
Design Principles
Nishma2
 
Modular High Rise Construction.pptx
Modular High Rise Construction.pptxModular High Rise Construction.pptx
Modular High Rise Construction.pptx
GeethikaSV
 
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
Construction Tech. and Mgmt., VNIT Nagpur
 
Modular cordination
Modular cordinationModular cordination
Modular cordination
Shivangi Saini
 
MODULAR FURNITURE OF OFFICE
MODULAR FURNITURE OF OFFICE MODULAR FURNITURE OF OFFICE
MODULAR FURNITURE OF OFFICE
Abhishek Mewada
 
Modular Construction In India : Opportunities and challenges pdf notes
Modular Construction  In India : Opportunities and challenges pdf notesModular Construction  In India : Opportunities and challenges pdf notes
Modular Construction In India : Opportunities and challenges pdf notes
Fluidconstructions
 
Modular coordination
Modular coordinationModular coordination
Modular coordination
Atul Verma
 
#6a modular construction (1)
#6a    modular construction (1)#6a    modular construction (1)
#6a modular construction (1)Eveana Crystle
 
PREFABRICATION AND MODULAR COORDINATION
PREFABRICATION AND MODULAR COORDINATIONPREFABRICATION AND MODULAR COORDINATION
PREFABRICATION AND MODULAR COORDINATION
sreestr18
 
Modular Buildings
Modular BuildingsModular Buildings
Modular Buildings
Rohan Dasgupta
 
Modular coordination
Modular coordinationModular coordination
Modular coordination
Shubham Jain
 
Capitalizing on modular construction as the next frontier for innovation
Capitalizing on modular construction as the  next frontier for innovationCapitalizing on modular construction as the  next frontier for innovation
Capitalizing on modular construction as the next frontier for innovation
SJVijay
 
Modular Construction.pptx
Modular Construction.pptxModular Construction.pptx
Modular Construction.pptx
MOHAMMEDMUSTAFAD
 
PREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdfPREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdf
GourhariBiswas1
 
Modular Construction Advancements
Modular Construction AdvancementsModular Construction Advancements
Modular Construction Advancements
Akhil Saxena
 
Mmcrevisionnotes 100523035236-phpapp02
Mmcrevisionnotes 100523035236-phpapp02Mmcrevisionnotes 100523035236-phpapp02
Mmcrevisionnotes 100523035236-phpapp02
Gopinan
 

Similar to Modular construction ppt (20)

PEB 2-5.pptx
PEB 2-5.pptxPEB 2-5.pptx
PEB 2-5.pptx
 
Modular Construction
Modular ConstructionModular Construction
Modular Construction
 
Modular construction
Modular constructionModular construction
Modular construction
 
5 modular const.pptx
5 modular const.pptx5 modular const.pptx
5 modular const.pptx
 
Design Principles
Design PrinciplesDesign Principles
Design Principles
 
Modular High Rise Construction.pptx
Modular High Rise Construction.pptxModular High Rise Construction.pptx
Modular High Rise Construction.pptx
 
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
 
Modular cordination
Modular cordinationModular cordination
Modular cordination
 
MODULAR FURNITURE OF OFFICE
MODULAR FURNITURE OF OFFICE MODULAR FURNITURE OF OFFICE
MODULAR FURNITURE OF OFFICE
 
Modular Construction In India : Opportunities and challenges pdf notes
Modular Construction  In India : Opportunities and challenges pdf notesModular Construction  In India : Opportunities and challenges pdf notes
Modular Construction In India : Opportunities and challenges pdf notes
 
Modular coordination
Modular coordinationModular coordination
Modular coordination
 
#6a modular construction (1)
#6a    modular construction (1)#6a    modular construction (1)
#6a modular construction (1)
 
PREFABRICATION AND MODULAR COORDINATION
PREFABRICATION AND MODULAR COORDINATIONPREFABRICATION AND MODULAR COORDINATION
PREFABRICATION AND MODULAR COORDINATION
 
Modular Buildings
Modular BuildingsModular Buildings
Modular Buildings
 
Modular coordination
Modular coordinationModular coordination
Modular coordination
 
Capitalizing on modular construction as the next frontier for innovation
Capitalizing on modular construction as the  next frontier for innovationCapitalizing on modular construction as the  next frontier for innovation
Capitalizing on modular construction as the next frontier for innovation
 
Modular Construction.pptx
Modular Construction.pptxModular Construction.pptx
Modular Construction.pptx
 
PREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdfPREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdf
 
Modular Construction Advancements
Modular Construction AdvancementsModular Construction Advancements
Modular Construction Advancements
 
Mmcrevisionnotes 100523035236-phpapp02
Mmcrevisionnotes 100523035236-phpapp02Mmcrevisionnotes 100523035236-phpapp02
Mmcrevisionnotes 100523035236-phpapp02
 

Recently uploaded

Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 

Recently uploaded (20)

Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 

Modular construction ppt

  • 1. MODULAR CONSTRUCTION Submitted To :- Mr. Sumit Phugat sir SUBJECT :- CONSTRUCTION TECHNIQUES Presented By :- Vaibhav Nautiyal 170305216022 Sohail khan 170305216008
  • 2. CONTENTS • WHAT IS MODULAR CONSTRUCTION • WHY MODULAR CONSTRUCTION • REASONS TO ADOPT MODULAR CONSTRUCTION • COMPARISON BETWEEN MODULAR AND CONVENTIONAL CONSTRUCTION • INTRODUCTION TO MODULAR COORDINATION • BASIC AIMS FOR MODULAR CO-ORDINATION • CLASSIFICATION OF MODULES IN MODULAR COORDINATION • ADVANTAGES AND LIMITATIONS OF MODULAR CONSTRUCTION
  • 3. MODULAR CONSTRUCTION • There are many different ways to define the modular construction but one basic definition of modular construction can be given as follows: • “Modular Construction is a pre-engineered process of making any structures or elements in a factory that is off-site and are delivered to the sites and assembled as large volumetric components or as substantial elements of any structures.” • It can also be defined as “A modular building is a pre-engineered structure that is flexible enough to satisfy virtually any requirement tougher than standard drywall construction, expandable, can be relocated and completely re-usable.”
  • 4. MODULAR CONSTRUCTION (CONT.) • With increasing industrialization to the building industry, steadily larger parts of buildings are made up of prefabricated components, delivered to the building site from the factories. • Modular design, or "modularity in design", is a design approach that subdivides a system into smaller parts called modules or skids, that can be independently created and then used in different systems.
  • 5. WHY CHOOSE MODULAR CONSTRUCTION • One of the major reason to adopt modular construction is that not only can one save up to 35% on the initial construction costs like labor and materials, but there are other benefits as well. • Another major reason is about the quality as one can attain a suitable quality in the elements of any structures that are to be pre-fabricated or pre-cast in the construction factory. • Modular construction takes most of the construction phase away from the building site. Quicker and efficient factory processes are replacing the slow, less productive site activities.
  • 6. • Sustainability in modular construction can be achieved through the factory production of the modular units • For a modular construction project to complete with a good result, proper planning, coordination and communication must exist between various relevant parties involved from the early stage of the project. • A table is also shown that depicts the factors that are important in modular construction than in conventional(standard) construction.
  • 7.
  • 8. COMPARISON BETWEEN MODULAR AND CONVENTIONAL CONSTRUCTION
  • 9. INTRODUCTION TO MODULAR COORDINATION • “Modular coordination is a concept of coordination of dimension and space in which buildings and components are dimensioned and positioned in terms of basic unit or module.” • The basic module is known as 1M which is equivalent to 100mm. • It is internationally accepted by the International Standard Organization and many other countries including Malaysia.
  • 10.
  • 11. AIMS AND BASICS OF MODULAR COORDINATION • To achieve dimensional compatibility between building dimensions, span, or spaces and the sizes of components or equipment by using related modular dimensions. • Making the planning simpler & clearer by distinct indication of location of the building component in the building, both in respect to each other & a modular grid. • Simplification of site work. • Limiting the member of sizes of building component so that the linkage is based on modular measurement. • Facilitating cooperation between designers, manufacturers, suppliers & builders
  • 12. CONT. • Providing practical and logical construction methods for the coordination of the position & dimension of elements, components & spaces in a building design, which will contribute to :- • FIRST - increased design freedom • SECOND - improve balance between quality and cost of the manufacturing the component.
  • 13. CLASSIFICATION OF MODULES IN MODULAR COORDINATION • There are three type of MODULE :- • (I) Basic Module • (II) Multi Module • (III) Sub Module • Basic Module :- It is the fundamental unit of size in modular coordination and for general application to building & components .The size of basic Module is taken as 100mm denoted by “M”. • It is considered to be large enough to effect some variety reduction in range of component size and is small enough to provide a flexible unit of measurement for the purpose of design.
  • 14. • Multi Module :- Certain whole multiples of basic module usually expressed in as “M” with numeric prefix as 2M , 3M, 4M etc are referred to as multi module. • Sub Module:- Certain submultiples of basic module which are whole simple fractions shall be chosen when absolutely necessary for an increment smaller than the basic module. • For practical considerations, this sub modular increment shall be expressed as “M” with fractional prefix as 1/5M, 1/4M, 1/3M,etc. • These all three types of modules are practically used in some different levels in the construction industry mainly in abroad.
  • 15. ADVANTAGES AND LIMITATIONS OF MODULAR CONSTRUCTION ADVANTAGES 1 Reduced Costs • One key advantage of modular construction is that it's more cost effective than traditional on-site building. • Modular builders take advantage of economies of scale by building multiple similar pieces at once. • They also get to work on smaller pieces of the building, reducing the need to use ladders or scaffolding. • Finally, since the bulk of the construction and finishing work is done indoors, there's less risk of weather-related delays in construction that can cause workers to sit around idly waiting for the ability to work.
  • 16. 2 The Need for Speed:- The nature of factory building also makes modular homes faster to build. They're frequently built on an assembly line that continuously operate. when they get built on-site, all that needs to be done is to have them placed on the site and joined together. 3 New Construction :- A modular home is a new home. This means that it's built to modern standards and comes with new appliances and systems. 4 Quality :- The quality of the homes will be much better as the elements will be constructed with desirable size and volumetric shapes that will be helpful in reaching the desired quality standards expecting from a particular client or clients.
  • 17. DRAWBACKS OF MODULAR CONSTRUCTIONS 1 Limited customization :- Modular buildings can certainly be customized, but there is often an extent or limit to how much customization can go into it. 2 Limited service area :- The very nature of modules means they’re going to be made in a fabrication facility, then they must be shipped to the building location, which can be extremely far away, depending on where that location is and where the nearest fabrication facility is. 3 Payment Plans :- Modular homes typically need to be paid for up- front or financed on an as-you-go basis. In many cases, you won't be able to get a traditional bank loan until you finish the home.