Something to consider, when you want to have information flow from design -> construction -> FM.
This is what we do in Granlund.
Sorry, some slides in Finnish...
What does BIM mean for Civil Engineers?Chun Keung Ng
BIM is a norm for the building industry. How about for infrastructures? Some countries are over confident on the implementation of BIM in both building and civil engineering industries. Is the BIM technology for infrastructures mature and easily available? Are the professionals ready for BIM?
Fiona Moore, Cirrus Consultant Services
What does a client have to do if they want to benefit from BIM, especially if they don’t have internal BIM expertise. Suppliers are invited to attend too, to better understanding BIM from a client’s perspective.
Covering:
Why. What problems might a client be trying to solve? Procurement time and costs, life-cycle costs, quality assured information
What. What should the Client ask for ask for – Information: Models, Documents and/or Data – Organisational Information Requirements (OIR) into Asset Information Requirements (AIR) – PAS1192-3
How. How to ask for what you want and how to make sure you get it. Employers Information Requirements (EIR) and information exchanges – PAS1192-2.
BIM for Operations
Mr. Wood Douglas, BIM Software Architect, IBM Corporation
HKIBIM-CIC BIM Conference 2014
Date: 29-Oct-2014 (Wed)
Time: 9:30 a.m. – 5:00 p.m.
Venue: Room 201 B & C, Asia World Expo, Hong Kong International Airport, Lantau, Hong Kong
Organizers:
The Hong Kong Institute of Building Information Modelling (HKIBIM)
http://www.hkibim.org
Co-organizers:
The Construction Industry Council
http://www.hkcic.org
HKTDC Hong Kong International Building and Hardware Fair
http://www.hktdc.com/fair/hkbdh-en/HKTDC-Hong-Kong-International-Building-and-Decoration-Materials-and-Hardware-Fair.html
The HKIBIM - CIC BIM Conference 2014 is the 5th Annual Conference organized by the Hong Kong Institute of Building Information Modelling (HKIBIM). It is the premier annual event for experienced AEC professionals to demonstrate the practical use of Building Information Modelling (BIM) processes using real cases. The speakers will illustrate lessons learned in practical projects so that others can improve their efficient use of BIM and advance practical knowledge.
What does BIM mean for Civil Engineers?Chun Keung Ng
BIM is a norm for the building industry. How about for infrastructures? Some countries are over confident on the implementation of BIM in both building and civil engineering industries. Is the BIM technology for infrastructures mature and easily available? Are the professionals ready for BIM?
Fiona Moore, Cirrus Consultant Services
What does a client have to do if they want to benefit from BIM, especially if they don’t have internal BIM expertise. Suppliers are invited to attend too, to better understanding BIM from a client’s perspective.
Covering:
Why. What problems might a client be trying to solve? Procurement time and costs, life-cycle costs, quality assured information
What. What should the Client ask for ask for – Information: Models, Documents and/or Data – Organisational Information Requirements (OIR) into Asset Information Requirements (AIR) – PAS1192-3
How. How to ask for what you want and how to make sure you get it. Employers Information Requirements (EIR) and information exchanges – PAS1192-2.
BIM for Operations
Mr. Wood Douglas, BIM Software Architect, IBM Corporation
HKIBIM-CIC BIM Conference 2014
Date: 29-Oct-2014 (Wed)
Time: 9:30 a.m. – 5:00 p.m.
Venue: Room 201 B & C, Asia World Expo, Hong Kong International Airport, Lantau, Hong Kong
Organizers:
The Hong Kong Institute of Building Information Modelling (HKIBIM)
http://www.hkibim.org
Co-organizers:
The Construction Industry Council
http://www.hkcic.org
HKTDC Hong Kong International Building and Hardware Fair
http://www.hktdc.com/fair/hkbdh-en/HKTDC-Hong-Kong-International-Building-and-Decoration-Materials-and-Hardware-Fair.html
The HKIBIM - CIC BIM Conference 2014 is the 5th Annual Conference organized by the Hong Kong Institute of Building Information Modelling (HKIBIM). It is the premier annual event for experienced AEC professionals to demonstrate the practical use of Building Information Modelling (BIM) processes using real cases. The speakers will illustrate lessons learned in practical projects so that others can improve their efficient use of BIM and advance practical knowledge.
Keynote Speech
Mr. Kevin POOLEChairman, Committee on Environment, Innovation and Technology, Construction Industry Council
HKIPM‐HKIBIM Joint Conference: BIM in Project Management
Details of Conference
Date: 2‐Apr‐2014 (Wed)
Time: 2:00 pm – 5:00 pm
Venue: Chiang Chen Studio Theatre – The Hong Kong Polytechnic University
Organizers:
Hong Kong Institute of Project Management (HKIPM)
http://www.hkipm.org.hk/
The Hong Kong Institute of Building Information Modelling (HKIBIM)
http://www.hkibim.org
Sole Sponsor:
建造業議會 - Construction Industry Council
http://www.hkcic.org/
In this session you will learn:
Feed documents overview
PFD and P&ID
Process flow diagram
Piping and instrumentation diagram
For more information, visit: https://www.mindsmapped.com/courses/industrial-automation/complete-training-on-industrial-automation-for-beginners/
Building information modelling (BIM) is a process involving the generation and management of digital representations of physical and functional characteristics of places. Building information models (BIMs) are files (often but not always in proprietary formats and containing proprietary data) which can be extracted, exchanged or networked to support decision-making regarding a building or other built asset.
presentation by Paul Wilkinson to CIMCIG BIM conference, Building Centre, London WC1 on Wednesday 25 April 2012.
Presentation explains what BIM is (and isn't), and outlines why it has become important in 2012, as the UK construction industry looks to meet a UK Government BIM deadline by 2016.
Revit Modeling India is a precursor in the application of the BIM software, methods and processes in the building engineering and construction sectors holding on to current project BIM requirements. Our experience with outsourcing has enabled us to understand the requirements of international customers and constantly provide reliable engineering services for a wide spectrum of industries. Revit Modeling India offers complete solutions for BIM technology from 3D modeling in Revit, 4D-enabling the manipulation of models through time, 5D-incorporating cost data, nD-extrapolating energy utilization and sustainability performance.
HKIBIM BIM Networking Seminar: Guest Speaker Igor Starkov from EcoDomus on 12 March 2016 at Studio 302, 3/F, IVE (Morrison Hill).
, 6 Oi Kwan Road, Wan Chai, Hong Kong.
This HKIBIM networking Seminar provides the opportunity for all attendees to interact with the speaker and the local BIM community
Guest Speaker: Mr. Igor Starkov - Co-founder and President of EcoDomus Inc.
Mr. Igor Starkov President EcoDomus, Inc.
Mr. Starkov is a computer scientist and entrepreneur with over 25 years of experience in software development, including 14 years of experience leveraging technology to improve construction project delivery and management of the built environment.
Mr. Starkov’s experience in the AEC, IT, and Facilities Management arenas and his in-depth knowledge of BIM, COBie, and Lean workflows provide him with the unique capability of creating versatile information-enabled solutions.
Mr. Starkov co-founded EcoDomus in 2008, and made the company the leading provider of Lifecycle BIM solutions. EcoDomus is working with the clients around the world, including Google, Disney, US Government (GSA), Fedearl Aviation Administration (US), University of Southern California, Singapore's Ministry of Health (MOHH), NTT Facilities (Japan), and many others.
Seminar title:
EcoDomus recent Use Cases in US and Middle East:
The previous presentation done by Igor Starkov at HKIBIM in 2014 was focused on the handover of COBie and BIM to facility owners. This year’s presentation will demonstrate BIM for FM use cases developed by EcoDomus for the leading facility owners in the world, such as Stanford University, Sydney Opera House, Google, etc. and will address the concepts of Central Facility Repository and Common Data Environment.
The new revolutionary concept of Building Information Modeling (BIM) is a digital representation of physical and functional characteristics of a facility
Building information modeling (BIM) is a process involving the generation and management of digital representations of physical and functional characteristics of places. Building information models (BIMs) are files (often but not always in proprietary formats and containing proprietary data) which can be exchanged or networked to support decision-making about a place. Current BIM software is used by individuals, businesses and government agencies who plan, design, construct, operate and maintain diverse physical infrastructures, such as water, wastewater, electricity, gas, refuse and communication utilities, roads, bridges and ports, houses, apartments, schools and shops, offices, factories, warehouses and prisons.
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...Fabio Roberti
A BIM Execution Plan (BEP) is a valuable and necessary part of any project in the AEC sector. It is essential when the team needs to work in a collaborative process to ensure that everyone on the project is aligned with the project objectives. A correctly implemented BEP will ensure the project goals are clear and agreed by the wide project team. Communication is a key component of all construction projects. To be successful, it requires many different people working together to achieve the client requirements. A well-built BEP requires the project team to work together and communicate from the very beginning to the completion of the project. This class will explain the importance of the BEP and demonstrate how to create an efficient BEP for post-contract-award which will include the Model Production & Delivery Table (MPDT). The post-contract-award BEP sets out how the information required in the Employer's Information Requirements will be provided.
Guest Lecture: "BIM & Sustainability" for the MSc. BIM & Integrated Design Summer School 2016. University of Salford, Manchester, United Kingdom
Covers:
1. Sustainable Design
2. BIM for Sustainable Design Decision Making
3. BIM for Sustainable Design Compliance (BREEAM example)
4. BIM for Sustainable Design Performance (Passivhaus example)
ETDP 2015 D2 Key Note Preparing for a Digital Built Britain - David PhilpComit Projects Ltd
Keynote - Preparing for a Digital Built Britain
David Philp, Director BIM – EMEA at AECOM, Head of BIM, UK BIM Task Group
The Digital Built Britain (DBB) programme will build a digital economy for the construction industry in support of dramatically improving delivery, operations and services provided to citizens building on the standards and savings delivered by the BIM level 2 initiative. This session will explore how the Digital Built Britain strategy will take the next steps in defining advanced standards, creating new commercial models and identifying technologies to transform our approach to social infrastructure development and construction. The session will look at the need for operational data sets and integration of telemetry and IoT within the Built Environment and a shift towards Level 3 BIM. Level 3 will enable the interconnected digital design of different elements in a built environment and will extend BIM into the operation of assets over their lifetimes supporting the accelerated delivery of smart cities, services and grids.
Keynote Speech
Mr. Kevin POOLEChairman, Committee on Environment, Innovation and Technology, Construction Industry Council
HKIPM‐HKIBIM Joint Conference: BIM in Project Management
Details of Conference
Date: 2‐Apr‐2014 (Wed)
Time: 2:00 pm – 5:00 pm
Venue: Chiang Chen Studio Theatre – The Hong Kong Polytechnic University
Organizers:
Hong Kong Institute of Project Management (HKIPM)
http://www.hkipm.org.hk/
The Hong Kong Institute of Building Information Modelling (HKIBIM)
http://www.hkibim.org
Sole Sponsor:
建造業議會 - Construction Industry Council
http://www.hkcic.org/
In this session you will learn:
Feed documents overview
PFD and P&ID
Process flow diagram
Piping and instrumentation diagram
For more information, visit: https://www.mindsmapped.com/courses/industrial-automation/complete-training-on-industrial-automation-for-beginners/
Building information modelling (BIM) is a process involving the generation and management of digital representations of physical and functional characteristics of places. Building information models (BIMs) are files (often but not always in proprietary formats and containing proprietary data) which can be extracted, exchanged or networked to support decision-making regarding a building or other built asset.
presentation by Paul Wilkinson to CIMCIG BIM conference, Building Centre, London WC1 on Wednesday 25 April 2012.
Presentation explains what BIM is (and isn't), and outlines why it has become important in 2012, as the UK construction industry looks to meet a UK Government BIM deadline by 2016.
Revit Modeling India is a precursor in the application of the BIM software, methods and processes in the building engineering and construction sectors holding on to current project BIM requirements. Our experience with outsourcing has enabled us to understand the requirements of international customers and constantly provide reliable engineering services for a wide spectrum of industries. Revit Modeling India offers complete solutions for BIM technology from 3D modeling in Revit, 4D-enabling the manipulation of models through time, 5D-incorporating cost data, nD-extrapolating energy utilization and sustainability performance.
HKIBIM BIM Networking Seminar: Guest Speaker Igor Starkov from EcoDomus on 12 March 2016 at Studio 302, 3/F, IVE (Morrison Hill).
, 6 Oi Kwan Road, Wan Chai, Hong Kong.
This HKIBIM networking Seminar provides the opportunity for all attendees to interact with the speaker and the local BIM community
Guest Speaker: Mr. Igor Starkov - Co-founder and President of EcoDomus Inc.
Mr. Igor Starkov President EcoDomus, Inc.
Mr. Starkov is a computer scientist and entrepreneur with over 25 years of experience in software development, including 14 years of experience leveraging technology to improve construction project delivery and management of the built environment.
Mr. Starkov’s experience in the AEC, IT, and Facilities Management arenas and his in-depth knowledge of BIM, COBie, and Lean workflows provide him with the unique capability of creating versatile information-enabled solutions.
Mr. Starkov co-founded EcoDomus in 2008, and made the company the leading provider of Lifecycle BIM solutions. EcoDomus is working with the clients around the world, including Google, Disney, US Government (GSA), Fedearl Aviation Administration (US), University of Southern California, Singapore's Ministry of Health (MOHH), NTT Facilities (Japan), and many others.
Seminar title:
EcoDomus recent Use Cases in US and Middle East:
The previous presentation done by Igor Starkov at HKIBIM in 2014 was focused on the handover of COBie and BIM to facility owners. This year’s presentation will demonstrate BIM for FM use cases developed by EcoDomus for the leading facility owners in the world, such as Stanford University, Sydney Opera House, Google, etc. and will address the concepts of Central Facility Repository and Common Data Environment.
The new revolutionary concept of Building Information Modeling (BIM) is a digital representation of physical and functional characteristics of a facility
Building information modeling (BIM) is a process involving the generation and management of digital representations of physical and functional characteristics of places. Building information models (BIMs) are files (often but not always in proprietary formats and containing proprietary data) which can be exchanged or networked to support decision-making about a place. Current BIM software is used by individuals, businesses and government agencies who plan, design, construct, operate and maintain diverse physical infrastructures, such as water, wastewater, electricity, gas, refuse and communication utilities, roads, bridges and ports, houses, apartments, schools and shops, offices, factories, warehouses and prisons.
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...Fabio Roberti
A BIM Execution Plan (BEP) is a valuable and necessary part of any project in the AEC sector. It is essential when the team needs to work in a collaborative process to ensure that everyone on the project is aligned with the project objectives. A correctly implemented BEP will ensure the project goals are clear and agreed by the wide project team. Communication is a key component of all construction projects. To be successful, it requires many different people working together to achieve the client requirements. A well-built BEP requires the project team to work together and communicate from the very beginning to the completion of the project. This class will explain the importance of the BEP and demonstrate how to create an efficient BEP for post-contract-award which will include the Model Production & Delivery Table (MPDT). The post-contract-award BEP sets out how the information required in the Employer's Information Requirements will be provided.
Guest Lecture: "BIM & Sustainability" for the MSc. BIM & Integrated Design Summer School 2016. University of Salford, Manchester, United Kingdom
Covers:
1. Sustainable Design
2. BIM for Sustainable Design Decision Making
3. BIM for Sustainable Design Compliance (BREEAM example)
4. BIM for Sustainable Design Performance (Passivhaus example)
ETDP 2015 D2 Key Note Preparing for a Digital Built Britain - David PhilpComit Projects Ltd
Keynote - Preparing for a Digital Built Britain
David Philp, Director BIM – EMEA at AECOM, Head of BIM, UK BIM Task Group
The Digital Built Britain (DBB) programme will build a digital economy for the construction industry in support of dramatically improving delivery, operations and services provided to citizens building on the standards and savings delivered by the BIM level 2 initiative. This session will explore how the Digital Built Britain strategy will take the next steps in defining advanced standards, creating new commercial models and identifying technologies to transform our approach to social infrastructure development and construction. The session will look at the need for operational data sets and integration of telemetry and IoT within the Built Environment and a shift towards Level 3 BIM. Level 3 will enable the interconnected digital design of different elements in a built environment and will extend BIM into the operation of assets over their lifetimes supporting the accelerated delivery of smart cities, services and grids.
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015Aconex
In this webinar, we heard Sean VonFeldt of Triunity and Matt Abeles of BuiltWorlds discuss how their organizations use BIM project-wide to accelerate and improve decisions from concept through handover. We also saw a live demo of Aconex Connected BIM showing how sharing models can streamline processes like design coordination, approval cycles, and handover to benefit your entire project team.
An APM webinar held on 24 March 2022.
Speaker: Geoff Roberts, Director, Global Industry Strategy for Energy and Resources at Oracle Construction and Engineering
Oracle is building the Industries Innovation Lab in the UK to provide a simulated environment to test technologies and solve problems. Find out why it's a great thing and what it means for you.
Digital transformation is shaping the construction worksite of tomorrow as solutions such as internet of things (IoT), 5G, drones, artificial intelligence, modelling and autonomous vehicles, enable better and smarter ways of working via the cloud.
Given that digital technology is driving rapid change across the project and asset lifecycle, Oracle Construction and Engineering has responded by launching a simulated worksite where customers and partners can explore and test the transformative power of technologies to bolster their digitalisation efforts and stay on the leading edge. It can also help customers with their sustainability journeys by demonstrating carbon reduction strategies, a must, as the world becomes increasingly cognisant about environmental impact.
Now the first European lab is due to open in the UK this year, get all the exclusive insights and previews directly from Oracle when you attend this webinar.
https://youtu.be/SbRHE6Hf-Qw
https://www.apm.org.uk/news/reimagine-project-delivery-with-oracle-industries-innovation-lab-uk-webinar/
Introduction – OPEN DEI Webinar "The role of the Reference Architectures in D...OPEN DEI
Introduction – OPEN DEI Webinar "The role of the Reference Architectures in Data-oriented Digital Platforms"
28 May 2020
Angelo Marguglio (Head of Smart Industry & Agri-food, Engineering)
https://graphisoft.sharefile.com/share?cmd=d&id=sc918c9aa871477b8#/view/sc918c9aa871477b8?_k=mac511
Seminar: Documentation from BIM - Tips for GBP Submission to BD
Co-organized by: Graphisoft / HKIBIM / IVE BIM Centre
Speaker: Peter Koncz - M. Arch, MHKIBIM, MbSHK, GRAPHISOFT Registered Consultant, Business Development Manager, GRAPHISOFT Asia Ltd.
Biography:
Mr Peter Koncz is an architect and Registered Consultant based in Hong Kong. His main responsibilities are marketing GRAPHISOFT products and helping the prospect and existing clientele with the introduction and implementation of BIM technology. As a member of HKIBIM and BuildingSmart HK, he is committed to the idea of an open BIM environment in Hong Kong. Before his career at GRAPHISOFT, he has worked in architecture in Brasil and Hungary, where the use of BIM is widely established, so he has totally 8 years of relevant experience.
Outline:
With ARCHICAD, you create a 3D Building Information Model — all the necessary documentation and images are created automatically. New, priority based junctions, intelligent building materials ensure correct graphical representation of elements and materials in sections, surfaces in 3D views, and thermal properties throughout the building energy evaluations. ARCHICAD’s powerful view setting possibilities, its unique drawing handling, together with the integrated publishing capabilities ensure that printing or saving the various drawing sets of a project won‘t require extra time and will be derived from the same Building Information Model.
Date & Time: 4-May 4:00 pm – 5:30 pm
Venue: Lecture Theather LT-01, IVE(Morrison Hill)
Note: The seminar will be conducted in English.
For more information about GRAPHISOFT in Hong Kong: http://www.graphisoft.com.hk
For any enquiry, please contact Mr. Peter Koncz at pkoncz@graphisoft.com
The Cloud has become an everyday resource that helps enable our daily routines. Consider how things such
as electricity, water, natural gas, telephone service, and television are provided by companies that specialize
in delivering those services, and you can begin to wrap your mind around the parallels with cloud computing.
Delivering operational efficiency in the new dawn of complex BIM data through...p6academy
Referenced: www.p6academy.com
Source: http://coll15.mapyourshow.com
There is a part of the engineering & construction lifecycle where huge amounts of inefficiency exists. Project documents are numerous and with the changes in the industry towards 3D BIM, stakeholders involved in the review process need more sophisticated tools and applications to work with this complex information. Documents that define buildings, infrastructure and assets are not only growing in complexity but also in physical size. In order to deal with the processing of the variety and complexity of data, organizations need to rethink what tools and applications will be needed to enable the efficient and integrated processes demanded by projects. Oracle AutoVue brings a unique set of capabilities that supports the variety of application formats, helping companies involved in the engineering construction lifecycle to deliver operational efficiencies that are integrated to the Primavera solutions. We explore the use of deep integration to Unifier BP’s, working in conjunction with drawings and Building Information Models enabling all stakeholders to view and digitally collaborate on project documents in the appropriate business context.
EBEC2015 Helsinki. Concept of Big Room, Granlund OyTero Järvinen
Assignment to EBEC Helsinki 2015, Aalto University.
"A Collaborative Workspace for Multiparty Construction Design Team, eq. ”Big Room” concept.
Main sponsor: Granlund Oy
Discover Yeni Eyup Evleri 2, nestled among the rising values of Eyupsultan, offering the epitome of modern living in Istanbul.
With its spacious living areas, contemporary architecture, and meticulous details, Yeni Eyup Evleri 2 is poised to be the star of your happiest moments. Situated in the new favorite district of Eyupsultan, claim your spot and unlock the doors to a peaceful life alongside your loved ones. Nestled next to the historical and natural beauties of Eyupsultan, embrace the comfort of modern living and rediscover life.
Social Amenities:
Yeni Eyup 2 offers a life filled with joy with its green landscaping areas, gym, sauna, children’s play areas, café, outdoor pool, and basketball court. Reserve your place for unforgettable moments!
Reliable Structure:
With 1+1, 2+1, and 3+1 apartment options, Yeni Eyup Evleri 2 is designed with first-class materials and craftsmanship. The doors to a safe and comfortable life are here! Choose the option that suits you best and step into your dream home.
Project:
Yeni Eyup 2 is conveniently located, with Istanbul Airport just 26 minutes away, the Mecidiyeköy Metro Line 4 minutes away, and the Tram Stop 5 minutes away, making your life easier with its central location.
Location:
Your home is positioned in a privileged location, providing easy access to the city center, shopping malls, restaurants, schools, and other important places.
Yeni Eyup 2 offers 1+1, 2+1, and 3+1 apartment options designed to meet different needs. Find an option suitable for every lifestyle and open the doors to a comfortable life in your dream home.
https://listingturkey.com/property/yeni-eyup-evleri-2/
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus o...Joseph Lewis Aguirre
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus on Public Safety as Job #1, Engagement, Wealth of HOA, Branding, Communication, Culture, Civic Responsibility
Simpolo Tiles & Bathware
Tile ho,
toh Simpolo.
Since the first steps were taken in 1977, Simpolo Ceramics has carved its niche as a consistently growing organisation with unparalleled innovation and passion rooted in simplicity.
We endure gratification for every experience we offer, created to share something meaningful. It may not resonate with the majority, but that makes us a class apart. If only a handful were to understand the purpose of our existence, we would be proud to have found our believers. Rather, people with whom we can share our beliefs.
VISUALIZER
Design your space in your style with our very own Visualizer. Now, you can choose the tiles of your liking from our wide selection and see how they would look in a space. Select the tile from the multiple options and the visualiser will replace the surfaces in the image with the selected tiles. This way, instead of just your imagination, you can choose the tiles for your place by getting an actual picture of how they would look in a space. So, design your space the way you desire digitally and implement it in real life to get the best results!
You can also share this visualiser with others to help them design their space.
Committed to delighting customers with world-class ceramic products and services. Make Simpolo synonymous with the best quality and set new benchmarks of excellence for all stakeholders. Pursue best business practices with utmost integrity to make Simpolo an exciting organisation to work with, for vendors, channel partners, investors and employees alike.
Gain worldwide recognition in the field of ceramic building products through Research and Innovation and bring an enhanced lifestyle within reach for every household.
The SVN® organization shares a portion of their new weekly listings via their SVN Live® Weekly Property Broadcast. Visit https://svn.com/svn-live/ if you would like to attend our weekly call, which we open up to the brokerage community.
Keep Your Home Naturally Cool and Warm Out Change in Seasons
Vinra Construction is a private limited company registered under the ROC. The management has an experience of over 15 years of understanding the needs and delivering apt solutions to the end users We are providing turnkey solutions in construction fields. like Construction, Interior Designing Facility Management, Plantation Management, etc..
Vinra Construction Tech Enabled Company for Eco-Friendly Home Construction
Contact With Vinra for a Greener Future >>> Call us @ 888 4898 765
Rixos Tersane Istanbul Residences Brochure_May2024_ENG.pdfListing Turkey
Tersane Suites Residences is a luxurious real estate project located in the heart of Istanbul, next to the beautiful Golden Horn. This unique development offers hotel concept residences with Rixos management, making it the perfect choice for both homeowners and investors.
The Tersane Suites Residences offers a wide range of options, from studio apartments to spacious four-bedroom units, all designed to the highest standard. The suites are finished with high-quality materials and feature modern, open-plan living spaces, fully-equipped kitchens, and large balconies with stunning views of the city and sea.
One of the standout features of Tersane Suites Residences is the Rixos management, which provides a truly exclusive and upscale living experience. Residents will have access to a range of luxury amenities, including a fitness center, spa, and indoor and outdoor swimming pools. Plus, the on-site restaurants and cafes provide a taste of the local and international cuisine.
The Tersane Suites Residences also offers a great opportunity for investors, as it provides a rental guarantee program. This means that investors can enjoy a steady income stream, with the peace of mind that their property is being managed by a reputable and experienced team.
The location of Tersane Suites Residences is also unbeatable, with easy access to the city’s main transportation links and within close proximity to the historic center, making it the perfect base for exploring all that Istanbul has to offer.
Serviced Apartment Ho Chi Minh For RentalGVRenting
GVRenting is the leading rental real estate company in Vietnam. We help you to find a serviced apartment for rent in Ho Chi Minh & Saigon. Discover our broad range of rental properties in Vietnam.
For more details https://gvrenting.com/
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...JagadishKR1
Embark on a journey where lush landscapes and contemporary living converge at Total Environment's Tangled Up In The Green Residential Plots in Devanahalli, Bangalore. Surrounded by verdant expanses, these plots offer an idyllic setting for your dream home. Immerse yourself in the serenity of nature while enjoying the finest amenities and design, where every moment is a harmonious blend of luxury and tranquility.
Sense Levent Kagithane Catalog - Listing TurkeyListing Turkey
Sense Levent offers a luxurious living experience in the heart of Istanbul’s vibrant Levent district.
This cutting-edge development seamlessly integrates modern design with natural elements, featuring live evergreen plants maintained by an advanced irrigation system, ensuring lush greenery year-round.
The building’s elegant ceramic balconies are both stylish and durable, enhancing the overall aesthetic and functionality. Residents can enjoy the 700m Sky Lounge, which provides breathtaking views of Istanbul and a perfect space to relax and unwind.
Sense Levent promotes a healthy and active lifestyle with a full gym, swimming pool, sauna, and steam room, all available in the building. The interiors are crafted with high-quality materials, ensuring a luxurious and inviting living space.
Designed with young professionals in mind, Sense Levent features 1+1 and 2+1 units with smart floor plans and balconies. The project promises high investment returns, with an expected annual return of 6.5-7%, significantly above Istanbul’s average ROI.
Located in the rapidly growing and highly desirable Levent area, the development benefits from ongoing urban regeneration projects. Its prime location offers proximity to shopping malls, municipal buildings, universities, and public transportation, adding immense value to your investment.
Early investors can take advantage of discounted units during the construction phase, with an expected capital appreciation of +45% USD upon completion. Property Turkey provides comprehensive rental management services, ensuring a seamless and profitable investment experience.
Additionally, robust legal support and significant tax advantages are available through Property Turkey’s licensed Real Estate Investment Fund. Levent is a dynamic urban hub, ideal for young professionals with its numerous corporate headquarters and shopping malls.
Sense Levent is more than just a residence; it’s a place where dreams and opportunities come to life. Contact us today to secure your place in this exclusive development and experience the best of Istanbul living. Sense Levent: Sense the Opportunity. Live the Dream.
https://listingturkey.com/property/sense-levent/
The SVN® organization shares a portion of their new weekly listings via their SVN Live® Weekly Property Broadcast. Visit https://svn.com/svn-live/ if you would like to attend our weekly call, which we open up to the brokerage community.
Rams Garden Bahcelievler - Istanbul - ListingTurkeyListing Turkey
Implemented by Rams Global in Bahcelievler, the Rams Garden Bahcelievler Apartments includes 796 residences of different types from 2+1 to 5+1.
Next to the project, which will have 33 thousand square meters of green area, there will be 42 thousand 300 square meters of woodland. There will also be a 210-meter-long pond in the landscape of the project. There are 94.5 square meters of green space per flat.
Rams Garden Bahcelievler Apartments, which has 8 times more green space than the average of Istanbul with its 33 thousand square meters of green area located within a total of 75 thousand square meters, offers various housing options from 2+1 to 5+1.RAMS Garden has brought a lifeline to the construction industry.
Rams Global, which has signed projects in many places from Dubai to Phuket and delivered more than 20 thousand residences, is now starting new projects in Istanbul.
Rams Garden Bahcelievler is located 9 minutes from Metroport AVM, 5 minutes from Marmara Forum AVM, 12 minutes from Kazlıçeşme beach, 9 minutes from Yıldız Technical University, 7 minutes from Istinye University, 9 minutes from Ramada Hotel and Medicana Hospital.
https://listingturkey.com/property/rams-garden-bahcelievler-apartments/
The KA Housing - Catalogue - Listing TurkeyListing Turkey
Welcome to KA Housing, a distinguished real estate development nestled in the heart of Eyüpsultan, one of Istanbul’s most promising districts.
Just 10 minutes from the bustling city center, Eyüpsultan offers a serene escape with the convenience of urban living. The direct metro line ensures seamless connectivity to all parts of Istanbul, making it an ideal location for residents who seek both tranquility and vibrancy.
KA Housing boasts unparalleled accessibility, with proximity to Istanbul Airport only 30 minutes away, facilitating easy international travel. Effortless city access is guaranteed by direct metro and transportation links to Istanbul’s cultural and commercial hubs. Quick access to key metro lines connects you to every corner of the city within minutes, making commuting and exploring the city hassle-free.
The development offers luxurious living spaces with a range of unit layouts from 1+1 to 4+1, designed with meticulous attention to detail. Each unit features balconies or terraces, providing stunning vistas of Istanbul and enhancing the living experience. High-quality materials and superior craftsmanship ensure durability and elegance, while sound-proof insulation and high ceilings (2.95 m) offer comfort and sophistication.
Residents of KA Housing enjoy exclusive on-site amenities, including a state-of-the-art gym, outdoor swimming pool, yoga area, and walking paths. Entertainment options abound with a private cinema, children’s playground, and a variety of dining options including a café and restaurant. Security and convenience are paramount with 24/7 security, a dedicated carpark garage, and an IP intercom system.
KA Housing represents a prime investment opportunity with limited availability in a high-demand area, ensuring enduring value and potential for lucrative returns. Homes in this development provide exceptional value without compromising on quality, offering affordable luxury for discerning buyers. The construction is of the highest quality, built to the latest seismic and disaster resistance standards, ensuring safety and resilience.
The community and surroundings of KA Housing are enriched by close proximity to prestigious universities such as Haliç University, Bilgi University, and Istanbul Ticaret University, making it an ideal location for students and academics. The development is adjacent to the Alibeyköy stream leading into the Halic waters, offering serene natural escapes amidst lush greenery. Residents can enjoy the cultural richness of the area, surrounded by historical and cultural landmarks that blend leisure, nature, and culture seamlessly.
https://listingturkey.com/property/the-ka-housing/
Recent Trends Fueling The Surge in Farmhouse Demand in IndiaFarmland Bazaar
Embarking on the journey to acquire a farmhouse for sale is just the beginning; the real investment lies in crafting an environment that contributes to our mental and physical well-being while satisfying the soul. At Farmlandbazaar.com, India’s leading online marketplace dedicated to farm land, farmhouses, and agricultural lands, we understand the importance of transforming a humble farmland into a warm and inviting sanctuary. Let's explore the fundamental aspects that can elevate your farmhouse into a tranquil haven.
2. 1960
GRANLUND WAS
ESTABLISHED IN
NET SALES OPERATING PROFIT
FINNISH,
100%
EMPLOYEE-OWNED
BUSINESS
NET SALES
PERSONNEL AT THE END OF THE YEAR
2019 2020 2021
981 1,095 1,222
EVERY YEAR
6%
OF NET SALES
ON INNOVATION
Operating profit out of net sales
3. 99%
85%
82%
SATISFIED WITH GRANLUND
FULLY SATISFIED OR SATISFIED WITH
GRANLUND'S EXPERTISE
FULLY SATISFIED OR SATISFIED WITH GRANLUND'S
SUSTAINABILITY
Our customers
NPS
47
Housing companies 5.2%
Property owners and
investors 10.6%
Building and construction 9.6%
Industry 4.6%
Wholesale and retail 8.0%
Social and healthcare
services 16.0%
State 9.2%
Other 12.6%
Municipalities
14.1%
Energy companies 0.4%
Services 5.7%
Information and communications 4.0%
4. Building on Innovation
History of BIM in Granlund
Multi-objective building
performance optimization
(Using algorithms)
2020
6. Building on Innovation
Information flow from the Project to Facilities Management
Construction Commissioning Guarantee period Facilities Management
Performance
optimization
Digital
delivery
Updating of
digital assets
Facility
management
requirements
Determination of
data interfaces
Preventitive
maintanance
Linked Data
Data warehouses
and analysis
Standardized information content and services
End user feedback,
analysis and actions
Graphical
Digital Twin
environments
Services
Solutions
teroj / 2020
7. Building on Innovation
Raportointi
Digital lifecycle management
Data alusta
Digitaalinen kaksonen
Sovellus
Visualisointi
APIt
Sovellus
Sovellus AI/ML
Datasources
Kimmo / 2020
8. Building on Innovation
From several suggestions to one concept design layout. From concept to Detail Design
Suggestions Concept Design Detail Design
System comparisations,
Energy simulations /
optimization, mock-up rooms.
Comparisations of different
possibilities
Selected systems in one
Concept Design.
Main routes, shafts, technical
spaces, diagrams, device
specifications
Detail Desing BIM model
according to COBIM2012
requirements
Contractor is using designers
models for MEP assemblies
From Suggestions to Detail Design
9. Building on Innovation
Benchmark data as design input
Concept design
Constuction
Benchmark-data
(Quantities, Cost, Carbon
footprint)
Real project data
(Quantities, Cost, Carbon footprint, 4D-schedule)
Collecting benchmark
data
Development Design
Digitaalinen
delivery
Procurement
The starting point for the initial
design is volume-based data
from previous buildings
In the middle of the general design, the
data becomes the data of the actual object.
TATE purchases are made before the BIM
model is completed
In connection with the digital
handover, the collection of benchmark
data for the following sites will be
ensured
Data platform under construction
teroj / 2022
11. Building on Innovation
Construction project situation room and dynamic reports
Data-platform
4D timeschedule
Cost estimation Quantity take-off Energy Environment /
carbon footprint
Main schedule
Customer
requirements
IFC model
Benchmark data
Broker
IFC Model
Solibri
Granlund Designer
Benchmark data
Granlund Manager
MOBO
CO2 databases
IFC model
Benchmark data
Reporting
Services
Example of
Information
source
Digital Project Development
Collaboration,
coordination
Memo’s
Excel
Smartsheet
teroj / 2021
13. Building on Innovation
Building on innovation
4D timescedule
Scheduling is one of the most important functions guiding a
construction project
• There are major shortcomings nationally, especially in the
scheduling of MEP design / assemblies
• The 4D schedule combines visual control (BIM models)
and the actual installation schedule
• When 4D is introduced, scheduling errors are very easily
noticed
• 4D forces you to think about getting your schedule in
order
• Possibility to connect also cost and CO2 data to the
schedule
• Usable, e.g. in “Tact-Time”
teroj / 2021
Hypemeter
Lots of talk Daily routine
4D in use There are no
obstacles for using 4D
14. Building on Innovation
Standardization of IFC content
The foundation of a scalable business.
An absolute requirement for cost-effective business
• Almost all construction projects are carried out
with different data contents of BIM models
• The use of information content, e.g. as benchmark
data, is impossible without standardized content
• Finnish “RAVA3Pro” –project is standardizing IFC
content and creating use cases for building control
authorities
• https://kirahub.org/ytv2020-talotekniikan-ja-rakennesuunnittelun-nimistojen-koekayttoa-jatketaan-kevaalle-2022/
teroj / 2021
Hypemeter
Lots of talk Daily routine
Specification is made
15. Building on Innovation
Building on innovation
teroj / 2021
Digital Delivery to
minimize data transfer
between systems
The end product of
construction project is a
digital system environment
Information content and
links between the systems
are made during the
construction period
16. Dataflow
Strategic project to develop data platform for Granlund business
units
This presentation sub-project:
“IFC to database”
17. Building on Innovation
Data -platforms
A concrete need for all companies that swear by
digitization
• Data consistency is achieved through the data
platform
• A demanding operation in a construction
project, as the companies have their own data
platforms
• Ontology platforms are being developed as a
solution, e.g.:
• PoT (Platform of Trust)
• REC (Real Estate Core)
• …
• An enabler of scalable business
teroj / 2021
Hype meter
Lots of talk Daily routine
Data platform in use
18. Building on Innovation
Software A
Main tool of
business unit
”Z”
Azure
Data
crushing
(including
analytics
services)
Software N
Main tool of
business unit
”Y”
Power BI
Combied
reporting
Target
• from software to a dynamic report via Azure
• includes analytics within Azure
• raw data and analyzed data can be shared elsewhere
Situation
awardness
Internal use in own
business,
”quick and dirty”
Outwardly distri-
buted applications /
data streams
When purchasing
software, they
must have API
interfaces for
Azure connection
(even if it is a little worse
than the other software)
Data transfer to
other platforms
Platform of Trust,
Real Estate Core…
BIM data
(IFC)
API-
connectivity
External sources Fast lane
17.11.2021
19. Building on Innovation
Datan omistajuus ja ylläpito
Tietomallintaminen pilvipalveluissa yleistyy
• Nykyisin tietomallit ovat suunnittelijoiden servereillä
• Yhteistoiminnallisuuden mahdollistavat pilvipalvelut
yleistyvät – tiedon jakaminen helpottuu
• Ajantasainen tieto on aidosti tilaajan hallinnassa, jos
tilaaja pystyttää oman pilvipalvelun ja kutsuu
suunnittelijat työskentelemään siellä sekä urakoitsijat
hyödyntämään 2D-piirustuksia ja 3D-malleja ilman
tiedostojen lataamistarvetta omille koneille
• Pilvipalvelu mahdollistaa tietomallien
kustannustehokkaan ylläpidon kiinteistön elinkaaren
aikana
teroj / 2021
Designers Reviewers Decision makers
“Projektipankki steroideilla”
Hypemittari
Paljon puhetta Arkipäivää
Pilviympäristö pilotoinnissa
Pilviympäristön käyttöönotolle ei ole esteitä
20. Building on Innovation
Tietomallinnus
Tietomallinnus vakioituu normaaliksi toimintatavaksi,
ohjeet/määräykset laahaavat edelleen jäljessä
• Maanrakennuslaki uudistumassa -> Rakennuslaki.
Vaatimuksia tietomallien käytölle
• Kansainvälinen ISO19650 standardi
“tietomallinnusprosessin vakiointi” herättää
mielenkiintoa Suomessakin
• SKOL julkaissut uuden yleissuunnitteluvaiheen
prosessikuvauksen tietomallipohjaiselle
suunnittelulle
teroj / 2021
Linkki
Linkki
Linkki
Hypemittari
Paljon puhetta Arkipäivää
Tietomallinnus hankkeissa
21. Building on Innovation
Alternative solutions
Diagrams and device
databases
Spatial provisions and
service area zones
Life Cycle
CFD-simulations
3D-mockups Technical Visualizations
Lighting Simulations
Sustainability
Spacetype Requirements
and Targets
Energy Simulation Model Combied Models
Model Auditing
Modelling of
MEP-networks
BIM based
Provision of Voids
Device Schedule
database
Network Route Design
Common BIM
Requirements
Information export from
models
Revisionhandling of
Models, Documents
and Equipment data
Model based assembly
inspection
Device Validation As-Built Model
Target values of energy
consumption for
Facility Management
SQL
IFC
Assembly Inspections
Concept Design – Detail Design – Construction Site – Facility Management
Energy Optimization
Drawings
Models with simulation
CMMS Software with
Digital Twin
Cost Estimations
AR / VR solution
22. Building on Innovation
Building on Innovation
Scope of work for energy consulting
DEVELOPMENT
PHASE
DETAILED
DESIGN AND
CONSTRUCTION
USE PHASE
Geothermal analysis
Thermal comfort and
cooling simulations
Target energy simulation
CONSTRUCTION
PERMIT
Energy certificate
E-value calculation
Geothermal permit materials
Detailed design for heat pump
system
Contractor negotiations
Updates for target energy and
energy certificates Granlund Manager
Digital services
Quality control
Energy
Consulting
Life Cycle
Consulting
Premilinary environmental certificate
analysis (RTS, LEED, BREEAM)
Carbon-neutral target analysis
Life Cycle Consulting
Environmental certificate
coordination: design
phase material
Realized CO2-calculations
Environmental certificate
coordination: construction
phase material
Energy / 2022
23. Building on Innovation
Building on Innovation
Working methods for energy consulting
Energy
simulations
•The basis for all energy
consulting is simulations
for calculating the target
energy consumption of the
building
•The actual building is
modeled in dynamic
energy calculation
software, and hourly
heating and cooling energy
needs may be used in
energy system evaluation
Geothermal
analysis
•The borehole locations and
amount are determined
according to site plan
•Borehole depth is
optimized with ground
loop simulation software,
using thermal conductivity
data for bedrock when
available
•With simulations, optimal
sizing and total costs for
the system will be
determined
Reporting
•Using visual reports and
graphs, decision making
between different options
will be straightforward in
the early phase of the
project
•Typically, sensitivity
analysis for main variables
(energy price, heat pump
power) may be included to
determine the best system
in different scenarios
Energy / 2022
24. Building on Innovation
MOBO-
monitavoiteptimointi
• Tehokas vertailu jopa miljoonilla
vaihtoehdoilla
• Mahdollistaa esimerkiksi
energiainvestointien optimoinnin
kokonaisuutena perustuen
luotettavaan kustannustietoon ja
laajaan käytännön kokemukseen
19.11.2022
Optimaaliset tulokset eri energiantuotanto-
ratkaisuille kerrostalokohteessa
25. Building on Innovation
Rakennusten energia-
ja olosuhdesimulointi
• Rakennusten energiankulutus sekä
jakautuminen eri tuotantomuotojen
ja kuluttajien välillä tuntikohtaisesti
• Yksittäisten huonetilojen olosuhteet
tuntikohtaisesti
19.11.2022
26. The Concept of Digital Twin
Using information from BIM / cloud -models
teroj / 2018
28. Building on Innovation
Business needs
and strategic decissions
CMMS software for daily
technical operations
IFC models, PDF documents
accessible through cloud
Multiple enduser applications
and platforms
teroj / 2019
Different roles, different users
29. Building on Innovation
BIM2FM key sentences
▪ Information content has to be standardised
❑ Information needs to be machine understandable
▪ Information has to be prioritised
❑ There is too much information in the models
❑ There is a need for information prioritisation and understanding of the use cases
❑ ”Everything is not possible”
▪ Information has to be available 24/7
❑ Cloud services
❑ Roles for users, authentification, documented API’s, security
▪ Information is not transferred
❑ Information is linked between cloud systems
❑ End user decides, which information source is ”home” for them
❑ One cloudservice does not solve problems, for multiple use cases you need multiple cloud services
▪ Information has to be updated
❑ Need for ”Digital Twin”. You need to update the virtual building before or after renovations / minor changes.
It has to be ”a process” in FM workflow
❑ If information content differs in Digital Twin, virtual model will be useless after couple of years. Information
in virtual model has to be reliable (depending of the use cases)
▪ Normal FM operations will be different
❑ ”BIM2FM” usability cannot be compared to existing use cases. Methods to fullfil the needs of existing use
cases will change
❑ Facility management and property owner organisations need to be ready for change and be willing to
change their workmethods
teroj / 2018
30. Building on Innovation
Granlund Designer
• Designer is for making Device Schedules
• Standardise your company workflow
• History and revision control
• Free coding according to your company standards
• Company device libraries
• Device approval process with contractor input
-> as-built information
• Role based workflow
• Documented API interface
New Generation cloud-based software for device schedules
31. Building on Innovation
Graphical Bim models
Product Types
Materials
For example: S1 =Swegon Colibri-125-600, 40 dm3/s, 28Pa, 32dB(A)
S1 = Swegon Colibri, FD3 = Halton FDI
Heating system; pipe material: Fe
Device Approval
Process
Updates for Product
information and BIM
Device Approval
Process
Updates for Material
Schedule and BIM
MagiCAD, Revit… -> IFC
Granlund Designer
Granlund Designer
Specifications for central units
AHU01, 4 m3/s, 850Pa, Heating Coil…
Device Approval
Process
Updates for Device
Schedule
Granlund Designer
Concept Design Detail Design
As-built –
information in
use for other
applications
Granlund Designer
has documented
API’s
Device and product information should be linked to a graphical BIM model.
teroj / 2021
32. Building on Innovation
Tilannehuoneet
Hankkeen etäjohtamisen työkalu, jolla raportoidaan
reaaliaikaisesti hankkeen etenemistä
• Kun tieto on käytettävissä vakioidusti data-alustalla,
voidaan tuottaa skaalautuvasti ja kustannustehokkaasti
näkymiä hankkeen etenemiseen seurantaan
• Käyttötapauksia mm:
• Uudet avoimet asiat ja esteet
• Sovitut tehtävät
• Päätösesitykset
• Tehdyt päätökset
• Talousseuranta
• Tavoitteet ja niiden täyttyminen
• Tilannehuone voidaan tehdä vakioimattomallakin datalla
teroj / 2021
Hypemittari
Paljon puhetta Arkipäivää
Tilannehuone käytössä
Tilannehuoneen käyttöönotolle ei ole esteitä
33. Building on Innovation
Muita kehitysalueita
Näistä puhutaan välillä isoonkin ääneen
• Lisätty todellisuus (AR, Augmented Reality)
• Paljon videoita / somepostauksia
• Suurin osa PoC tasolla (Proof of Concept)
• AR maailman valmistelu vaatii backofficetyötä
• Tekoäly / koneoppiminen
• Yksittäisiä onnistumisia fokusoituun käyttöön
• Koneoppiminen reaalimaailmaa, tekoäly hieman
kauempana siitä
• Suunnitteluautomaatio
• Tietomallinnus: Rakennepuoli edelläkävijä
• Tietomallinnus: TATE-puolella suuria haasteita
• Energia / elinkaarisimuloinnit: suuria edistysaskeleita
teroj / 2021
34. Building on Innovation
Building on innovation
Digital Twin
Staattisen ja dynaamisen datan yhdistäjä
• Digital Twin yhdistää staattiset BIM tietomallit
sekä esim. kiinteistön mittaustiedot
(IoT, rakennusautomaatio jne.)
• Kaikki toteutukset ovat riippuvaisia Digital Twin –
ohjelmistoon valituista käyttötapauksista
• Digital Twin’n ydin on data – ei grafiikka.
• Visualisointi voidaan toteuttaa myös esim. Power
BI –tyyppisilä ohjelmistoilla
teroj / 2021
Hypemittari
Paljon puhetta Arkipäivää
Digital Twin käytössä
Digitwinin käyttöönotolle ei ole esteitä
36. Building on Innovation
Building on innovation
Kiinteistödatan ylläpito
Digitaalisella omaisuudella on arvoa
• Jos rakennushankkeessa syntyvää tietoa
halutaan myös kiinteistön ylläpidon käyttöön,
tulee sen ajantasaistamiseen varautua
kiinteistön ylläpitobudjetissa
• Digitaalisuus kiinteistössä tarkoittaa sitä, että
sekä fyysistä että digitaalista kiinteistöä tulee
ylläpitää.
• Kustannukset maksavat itsensä takaisin mm:
• Tyytyväisenä loppukäyttäjänä
• Kiinteistön arvon säilymisenä
• Peruskorjausten yhteydessä
teroj / 2021
Hypemittari
Paljon puhetta Arkipäivää
Digiomaisuuden ylläpitoprosessi olemassa
Prosessin käyttöönotolle ei ole esteitä
37. Building on Innovation
BIM to use in FM
Preliminary design Detail Design Construction FM
Spaces / Zones
Designers BIM
models
FM requirements for
BIM model
BIM in FM
FM coordinator sets requirements and monitors fulfilment
Validation of as-
built content in
the models
Construction organisation FM -organisation
FM BIM execution
plan for the building
Monitoring
FM BIM
handover plan
Mobilisation of
transfer and education
FM Coorninator
teroj / 2018
38. Building on Innovation
Update to native models
Little retrofits:
2D-drawings, hand-made drafts…
Copy from native model if needed
Project drawings / models
Update to native models
Renovation:
Modelling to native
model or copy from it
Project drawings / models
Designers
Service for
building owner
IFC / PDF publish
FM information systems
API interfaces
Daily use of FM software
Designers
Service for
building owner
IFC / PDF publish
FM information systems
API interfaces
Daily use of FM software
IFC / PDF publish
FM information systems
API interfaces
Daily use of FM software
Facility owner’s native BIM models and databases
BIM NATIVE MODEL UPDATING DURING LIFECYCLE
Facility Management Renovation
Newbuilding Facility Management
teroj / 2018
39. Building on Innovation
Päivitys natiivimalleihin
Pienet muutokset:
”Issue” toiminto käytössä,
muutokset www-selaimen kautta
natiivimallin päivittäjälle
As-built tiedon varmistus
Peruskorjaus:
Mallintaminen suoraan
natiivimalliin
Suunnittelijat
Palveluna kiinteistön
omistajalle, esim. 4krt/a
2D ja 3D pilvipalvelussa käytössä
Ylläpidon tietojärjestlemät
API rajapinnat
Päivittäinen ylläpidon toiminta
Suunnittelijat
Palveluna kiinteistön
omistajalle
2D ja 3D pilvipalvelussa käytössä
Ylläpidon tietojärjestlemät
API rajapinnat
Päivittäinen ylläpidon toiminta
2D ja 3D pilvipalvelussa käytössä
Ylläpidon tietojärjestlemät
API rajapinnat
Päivittäinen ylläpidon toiminta
Natiivit Revit mallit pilvipalvelussa (Autodesk Construction Cloud)
Tietomallien päivitys kiinteistön elinkaarella (Revit pilvipalvelu)
Kiinteistön ylläpito Peruskorjaus
Uudisrakennus Kiinteistön ylläpito
teroj / 2018
40. Building on Innovation
Device information
Combining graphical model and seperate
databases we can get all information relevant
to understand assets of the building
Device Schedules, Diagrams…
Air Handling Units, Chillers,
Pumps, Central Units
Concept Design
Network BIM models
Systems
Detail Design
teroj / 2016
41. Building on Innovation
BIM in Facility Management
"Graphical BIM models" vs. "Facility Management environment"
CMMS (Computerized Maintanance
Management System)
Preventative maintenance, Work Orders, Long
Term Planning, Service Request, Energy...
Native models, IFC-files,
2D-pdf drawings...
teroj / 2018
42. Building on Innovation
Data
Environment
Graphical
Environment
Updated BIM and Digital Twin during the lifecycle
teroj / 2021
RVT
Granlund Designer
Device schedules and as-built
information
Granlund Manager
Digital Twin
ACC cloud
Issue Management in use
3D and 2D data models for
construction available and
updatable in a browser-based
manner
PDF
IFC
Designer / Construction / Owner / Facilities Management
• Design and construction software is also
deployed during maintenance
• There is no data transfer between the software
• Changes during maintenance can be
communicated to modelers in a browser-based
manner, made by property maintenance
• For renovations, the latest information is
immediately available, without the need for
updates
• The property maintenance system uses the
site's IFC model as the basis for the Digital
Twin environment
• Links to dynamic data via APIs
BMS / IoT
systems
For example: Autodesk Construction Cloud
BIM Digital Twin
43. Building on Innovation
Example of 3D model / 2D drawing use case
Suggestion for process
ARCH
STRC
HVAC
ELEC
BMS
Native models
in client servers
ifc, pdf
3D IFC publish
2D-pdf publish
ifc, pdf
ifc, pdf
ifc, pdf
ifc, pdf
3D IFC-in cloud
2D pdf cloud
ARCH
STRC
HVAC
ELEC
BMS
Native models in
designers servers
Cloud based
2D-drawing
And/or
3D-BIM model
Viewer for mobile
or desktop use
Same source of information
to every participant
Comments, RFI’s
Updates
teroj / 2018
44. Building on Innovation
Granlund Manager
Kiinteistön digitaalinen kaksonen
Granlund Manager Digital Twin visualisoi yhteen
näkymään staattisista ja dynaamisista lähteistä
kootut tiedot:
• Rakennuksen tietomalli (BIM)
• Laitetiedot sekä TATE-järjestelmät
• Palvelualueet
• Antureilta mitattu data
• Olosuhteiden pysyvyys
• Huoltohistoria
• Käyttöpäiviäkirjamerkinnät
• Palvelupyynnöt, jättö esim. QR koodeilla
• Palvelupyyntöjen analysointi
19.11.2022
45. Building on Innovation
Detail Desing modelling software
• MagiCAD for Revit (Autodesk Collaboration Cloud)
• MagiCAD for AutoCAD
• CADMATIC
• Vectorworks
• ArchiCAD
Other tools
• Navisworks
• Solibri Model Checker
• SimpleBIM
• Enscape
• Unity
• Autodesk Forge (Granlund Manager / Digital Twin)
Simulation software
• Riuska (Energy&Comfort)
• IDA-ICE (Energy&Comfort)
• IES (Energy, Comfort, Environmental)
• MOBO (Energy Optimization)
• One Click LCA (LCA calculations)
• Broker (Cost estimation)
• Dialux (Lighting Design)
• Bentley Synchro (4D timeschedule)
• Comsol, Mathlab…
Other
• Granlund Designer (Device schedule)
• Granlund Manager (CMMS)
• M-Files (Document Management)
• Microsoft Teams
• Power BI etc.
• Project Management, ERP, CRM etc.
Software
50. Building on Innovation
3D-Model
IFC Information Enrichment
Information
update
Asset Information Model, AIM
AIM-system
(Granlund
Designer)
Applications
Utilisation of Information
FM application
(Granlund
Manager)
UseCase UseCase UseCase
Documented API
Sharing Information New Information
User-, Building- and Phase Management
Dynamic Information
IoT, Building Automation System, User Feedback
Performance
Optimisation
IoT
Communication
and
authentications
Other
Applications
Virtual
Property
Business needs
Digital
Twin
Tools
for
updating
Digital
Twin
Property Management
FLM
Facility
Life
cycle
Management
Propery Portfolio
The
Concept
of
Virtual
Property
ROAD MAP TO FACILITY LIFE CYCLE MANAGEMENT
Operative level
Tactical level
Strategic level
teroj / 2018
51. Building on Innovation
Manager
FM Services
REST API
Designer
Device
Database
Metrix
Conditions,
Performance
BAS, IoT
External
Sensors
Pulse
User Feedback
Granlund 3D
User Interface
IFC Properties + Enriched Info from other sources
Linked to Graphics
Linking
Mapping with GUID's, pre-
selected and standardized
IfcObjectClasses / Properties
API Environment
IFC -Files
IFC Graphics (Adesk Forge)
API Environment (Forge)
Granlund
PoC
REST API REST API REST API REST API
Other
Softwares
REST API
Granlund
PoC
Granlund
PoC
Proof Of Concept for linking IFC object information with Information from external sources
teroj / 2018
52. Building on Innovation
MEP Smart Building process and resources
From design to lifecycle operations:
Design System Supliers Construction Comissioning
Smart Building operative system / platform
MEP design and Implementation guide -> role for OT-expert
Requirements for Construction
Palvelut
Requirements for Services
Experience &
Building
Business
Services
Operations
and
maintenance
OT = Operational Technology
Karhu / 2021
53. Building on Innovation
Miten tiedosta tulee käyttöliittymä?
Ontologia
Esim. REC tai PoT
- Real Estate Core
- Platform of Trust
Toteutus
Esim. Azure Digital Twin
Loppukäyttäjän ohjelmistot
Esim. Granlund Manager, Designer,
jne.
Rakennushankkeessa syntyvää tietoa
Todellisuudessa myös
suoria point-to-point
API linkkejä
teroj / 2021