• This Software is used to calculate the Life Cycle Cost (LCC) of an equipment based on
Reliability, Maintainability, and Availability using appropriate methods to simulate, which
would otherwise have to be done manually and is difficult to analyze.
• This tool helps to analyze the LCC based on various governing parameters like Acquisition
Cost, Operational Cost, and Maintenance Cost etc.
• Various reports can be generated using this software for good decision-making
• The software is developed using J2EE and MySql
• The software is developed with the applicable mathematical formulas. Costs are derived or
calculated with a given cost estimating methods
2
Description
• The Software is designed to map any given system architecture into corresponding cost
elements based on reliability, availability and maintainability of the components.
• Each part of the system is configurable in its subcomponents and the importance of any
component in estimating the cost of system can be identified.
• To estimate LCC of an equipment, the tool accepts the cost inputs such as acquisition,
operation, maintenance and other costs of the equipment.
• The LCC of equipment is the sum of the Acquisition Cost, Operational Cost, Maintenance Cost
and Other Costs. Any revenues accrued shall be deducted from the LCC. LCC is calculated for
various parameters like operating hour per year etc. Where ever applicable the calculations
are done by considering inflation rate
3
Description contd..
• The system uses database for storing the information related to various cost elements of
various equipments and also provides a data base for equipment details.
• Generally LCC is done by a particular scientist at a given point of time, hence data base is
created with author name (scientist) as the main element to retrieve the details of the
equipment, costs etc.
• The software contains several modules. They can greatly enhance the calculation the LCC of
an equipment or system. Users can choose these modules according to their needs to
calculate the LCC of a system
4
The Main Features
• Equipment Tree Structure (ETS)
• Equipment Data
• Acquisition Cost
• Maintenance Cost
• Operational Cost
• Other Cost
• LCC Calculator
• Sensitivity Analysis
• Distributions
• Formulae
• Charts
• Reports
• Currency Converter
• Database Back up
• Scientific Calculator, Help and FAQ’s
5
The Main Features Description
• Equipment Tree Structure (ETS)
– Equipment Tree Structure (ETS) contains the list of equipments of the system in the left
side of the Main Screen. In particular the user is required to select
Equipment/Organization from ETS
• Equipment Data
– Equipment Data Module deals with the equipment details of the system used in the LCC
Estimation. This module allows the user to input the details of the equipment, such as
name, model etc.,
• Acquisition Cost
– Acquisition Cost Form allows the user to enter acquisition cost parameters to calculate
acquisition cost. In this module the user can enter the inputs for the various acquisition
cost parameters such as Basic Cost, Up gradation Cost, Initial Spare Cost, Packaging &
Forwarding Cost etc.,
6
The Main Features Description contd..
• Maintenance Cost
– Maintenance Cost Form allows the user to select the type of the maintenance cost:
• Annual Maintenance Cost
– Annual Maintenance Cost Form allows the user to enter maintenance cost parameters
to calculate Total Maintenance cost.
• Annual Breakdown Maintenance Cost
– Annual Breakdown Maintenance Cost form allows the user to enter breakdown
maintenance cost parameters to calculate Total Breakdown Maintenance cost
• Annual Schedule/Preventive Maintenance Cost
– Annual Schedule/Preventive Maintenance Cost Form allows the user to enter
schedule/preventive maintenance cost parameters to calculate Total
Schedule/Preventive Maintenance cost.
7
The Main Features Description contd..
– Variable Maintenance Cost
• Variable Maintenance Cost Form allows the user to enter maintenance cost parameters to
calculate Total Maintenance cost.
• Variable Schedule/Preventive Maintenance Cost
– Variable Schedule/Preventive Maintenance Cost form allows the user to enter
schedule/preventive maintenance cost parameters to calculate variable
Schedule/Preventive Maintenance cost.
• Variable Breakdown Maintenance Cost Form
– Variable Breakdown Maintenance Cost form allows the user to enter breakdown
maintenance cost parameters to calculate variable Breakdown Maintenance cost.
8
The Main Features Description contd..
• Operational Cost
– Operational Cost Form allows the user to enter operational cost parameters to calculate
the Annual Operational Cost.
– Also operational cost module permits the user to enter the inputs for the equipment
based on the following questions:
1. How much fuel or power consumed by equipment, if applicable both?
2. How many crew and support crews needed to operate the equipment?
3. How much the cost of the crew as well supports crews?
4. How much the Operational infrastructure, training, admin cost with respect to the
equipment?
5. Any miscellaneous cost?
6. Unit of cost calculation for example: year, week.
9
The Main Features Description contd..
• Other Cost
– Other Cost module is useful when some of the input costs are not covered in the above
cost modules. This module allows the user to provide the details of various cost
elements such as the cost of up gradation, disposal cost etc
• LCC Calculator
– LCC Calculator Form allows the user to view LCC of System (Organization) or Equipment
describing various cost parameters incorporated in various Cost modules.
• Sensitivity Analysis
– This module is used to analyze the LCC variation for selected equipment by varying the
cost percentages associated with that equipment
10
The Main Features Description contd..
• Distributions
– The Distributions used for Simulation are
Exponential
Triangular
Uniform
– User can select a particular distribution to simulate the various cost parameters like
Acquisition Cost, Operational Cost, Maintenance Cost and LCC based on MTBF, MTTR
and Availability values.
• Formulae
– The mathematical formulae used to estimate LCC are presented in this module. The
Formulae are
– Availability Rate
– MTTF/MTBF
– Dormancy
– Missile Reliability
– Net Present Value (NPV)
11
The Main Features Description contd..
• Currency Converter
– The Currency Converter Screen helps to exchange currency rates i.e., how much one
currency is worth in terms of the other. It is the value of a foreign nation’s currency in
terms of the home nation’s currency
• Database Back up
– The Software is developed using MySQL 5.0 as the DBMS of choice.
– The DBMS software will provide a backup capability to ensure protection of the data in
the DBMS. In addition, the DBMS software provides a transaction recording feature that
can be used to keep track of all transactions during normal operation.
• Charts
– This module helps the user to generate various types of charts like Bar, Pie, Combination
Pie and Water Fall and also to generate various reports such as Author based,
Equipment Costs, LCC of equipment and organization and Equipment list.
12
The Main Features Description contd..
• Reports
– User can generate the following reports:
• Author Based
– Acquisition Cost
– Operational Cost
– Maintenance Cost
• Annual
• Variable
• Equipment List
• Equipment Costs
– Acquisition Cost
– Operational Cost
– Maintenance Cost
• Annual
• Variable
– Equipment Data
• LCC
– Equipment
– Organization
13
The Main Modules
• User Module
• Equipment Data Module
• Acquisition Cost Module
• Maintenance Cost Module
• Other Cost Module
• LCC Calculator Module
• Output Module
• Database Management System Module
• Distributions used for Simulation Module
• Formulae Module
• Currency Converter Module
• FAQ’s and Help Modules
14
Sample Screens
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

More Related Content

What's hot

Introduction to flexible manufacturing system (fms)
Introduction to flexible manufacturing system (fms)Introduction to flexible manufacturing system (fms)
Introduction to flexible manufacturing system (fms)
Nilraj Vasandia
 
L 2 basic computer organization
L 2 basic computer organizationL 2 basic computer organization
L 2 basic computer organization
Stubborn sam
 
Quantitative analysis
Quantitative analysisQuantitative analysis
Quantitative analysishokagymichael
 
MICROPROCESSORS AND MICROCONTROLLERS
MICROPROCESSORS AND MICROCONTROLLERSMICROPROCESSORS AND MICROCONTROLLERS
MICROPROCESSORS AND MICROCONTROLLERS
selvakumar948
 
Unit 1 INTRODUCTION (COMPUTER AIDED DESIGN AND MANUFACTURING )
Unit 1 INTRODUCTION (COMPUTER AIDED DESIGN AND MANUFACTURING )Unit 1 INTRODUCTION (COMPUTER AIDED DESIGN AND MANUFACTURING )
Unit 1 INTRODUCTION (COMPUTER AIDED DESIGN AND MANUFACTURING )
ravis205084
 
Information System Part 2
Information System Part 2Information System Part 2
Information System Part 2
Fizaril Amzari Omar
 
Fms
FmsFms
Flexible Manufacturing Systems
Flexible Manufacturing SystemsFlexible Manufacturing Systems
Flexible Manufacturing Systems
VADLAJAGADEESHWARAAC
 
Layout of FMS
Layout of FMSLayout of FMS
Layout of FMSsgrsoni45
 
Computer system
Computer systemComputer system
Computer system
Mandip Bhattarai
 
Chapter 5
Chapter 5Chapter 5
FUNCTIONAL UNIT
FUNCTIONAL UNITFUNCTIONAL UNIT
FUNCTIONAL UNIT
Surkhab Shelly
 
Ch 1 95
Ch 1 95Ch 1 95
Ch 1 95
shivendra
 
Unit 4 cim
Unit 4 cimUnit 4 cim
Unit 4 cim
rknatarajan
 
Operating system 10 real time operating system
Operating system 10 real time operating systemOperating system 10 real time operating system
Operating system 10 real time operating system
Vaibhav Khanna
 
Computer cpu
Computer cpuComputer cpu
Computer cpu
Aftab Ali
 

What's hot (17)

Introduction to flexible manufacturing system (fms)
Introduction to flexible manufacturing system (fms)Introduction to flexible manufacturing system (fms)
Introduction to flexible manufacturing system (fms)
 
L 2 basic computer organization
L 2 basic computer organizationL 2 basic computer organization
L 2 basic computer organization
 
Quantitative analysis
Quantitative analysisQuantitative analysis
Quantitative analysis
 
MICROPROCESSORS AND MICROCONTROLLERS
MICROPROCESSORS AND MICROCONTROLLERSMICROPROCESSORS AND MICROCONTROLLERS
MICROPROCESSORS AND MICROCONTROLLERS
 
Unit 1 INTRODUCTION (COMPUTER AIDED DESIGN AND MANUFACTURING )
Unit 1 INTRODUCTION (COMPUTER AIDED DESIGN AND MANUFACTURING )Unit 1 INTRODUCTION (COMPUTER AIDED DESIGN AND MANUFACTURING )
Unit 1 INTRODUCTION (COMPUTER AIDED DESIGN AND MANUFACTURING )
 
Information System Part 2
Information System Part 2Information System Part 2
Information System Part 2
 
Fms
FmsFms
Fms
 
Flexible Manufacturing Systems
Flexible Manufacturing SystemsFlexible Manufacturing Systems
Flexible Manufacturing Systems
 
Layout of FMS
Layout of FMSLayout of FMS
Layout of FMS
 
Computer system
Computer systemComputer system
Computer system
 
Chapter 5
Chapter 5Chapter 5
Chapter 5
 
FUNCTIONAL UNIT
FUNCTIONAL UNITFUNCTIONAL UNIT
FUNCTIONAL UNIT
 
Ch 1 95
Ch 1 95Ch 1 95
Ch 1 95
 
Unit 4 cim
Unit 4 cimUnit 4 cim
Unit 4 cim
 
Operating system 10 real time operating system
Operating system 10 real time operating systemOperating system 10 real time operating system
Operating system 10 real time operating system
 
Lec # 1 chapter 2
Lec # 1 chapter 2Lec # 1 chapter 2
Lec # 1 chapter 2
 
Computer cpu
Computer cpuComputer cpu
Computer cpu
 

Viewers also liked

Social media - chapter 11
Social media  - chapter 11Social media  - chapter 11
Social media - chapter 11
jaygibbs
 
Audience 1 (1)
Audience 1 (1)Audience 1 (1)
Audience 1 (1)
Tasmina Ali
 
Dakotta-Ethics-Commission-Recommendation-2
Dakotta-Ethics-Commission-Recommendation-2Dakotta-Ethics-Commission-Recommendation-2
Dakotta-Ethics-Commission-Recommendation-2Dakotta Alex, M.Div.
 
Questionnaire ingles
Questionnaire inglesQuestionnaire ingles
Questionnaire ingles
Luis Saavedra Adasme
 
Proyecto 1 Marjorie sandí
Proyecto 1   Marjorie sandíProyecto 1   Marjorie sandí
Proyecto 1 Marjorie sandí
mayosandi
 
6918 dilatometro
6918 dilatometro6918 dilatometro
6918 dilatometro
KárenMar DC
 
Momento individual
Momento individualMomento individual
Momento individual
dorangelicam
 
Công ty tổ chức lễ khởi công khánh thành chuyên nghiệp nhất ở tại bình phước
Công ty tổ chức lễ khởi công khánh thành chuyên nghiệp nhất ở tại bình phướcCông ty tổ chức lễ khởi công khánh thành chuyên nghiệp nhất ở tại bình phước
Công ty tổ chức lễ khởi công khánh thành chuyên nghiệp nhất ở tại bình phước
CÔNG TY TNHH TỔ CHỨC SỰ KIỆN VIETSKY
 

Viewers also liked (10)

Social media - chapter 11
Social media  - chapter 11Social media  - chapter 11
Social media - chapter 11
 
page_77
page_77page_77
page_77
 
Audience 1 (1)
Audience 1 (1)Audience 1 (1)
Audience 1 (1)
 
Dakotta-Ethics-Commission-Recommendation-2
Dakotta-Ethics-Commission-Recommendation-2Dakotta-Ethics-Commission-Recommendation-2
Dakotta-Ethics-Commission-Recommendation-2
 
Questionnaire ingles
Questionnaire inglesQuestionnaire ingles
Questionnaire ingles
 
Proyecto 1 Marjorie sandí
Proyecto 1   Marjorie sandíProyecto 1   Marjorie sandí
Proyecto 1 Marjorie sandí
 
6918 dilatometro
6918 dilatometro6918 dilatometro
6918 dilatometro
 
Expo calidad
Expo calidadExpo calidad
Expo calidad
 
Momento individual
Momento individualMomento individual
Momento individual
 
Công ty tổ chức lễ khởi công khánh thành chuyên nghiệp nhất ở tại bình phước
Công ty tổ chức lễ khởi công khánh thành chuyên nghiệp nhất ở tại bình phướcCông ty tổ chức lễ khởi công khánh thành chuyên nghiệp nhất ở tại bình phước
Công ty tổ chức lễ khởi công khánh thành chuyên nghiệp nhất ở tại bình phước
 

Similar to Life Cycle Cost

Life Cycle Cost Analysis
Life Cycle Cost AnalysisLife Cycle Cost Analysis
Life Cycle Cost Analysis
imagstech
 
Stock analyzer.ppt review
Stock analyzer.ppt reviewStock analyzer.ppt review
Stock analyzer.ppt review
Sree Chinni
 
SAP Product costing Calculation With Components - Skillstek
SAP Product costing Calculation With Components  - SkillstekSAP Product costing Calculation With Components  - Skillstek
SAP Product costing Calculation With Components - Skillstek
Skillstek
 
6. System and its Life Cycle.pptx
6. System and its Life Cycle.pptx6. System and its Life Cycle.pptx
6. System and its Life Cycle.pptx
AminaButt14
 
Analysis modeling & scenario based modeling
Analysis modeling &  scenario based modeling Analysis modeling &  scenario based modeling
Analysis modeling & scenario based modeling
Benazir Fathima
 
AVReporter v2.5 energy management
AVReporter v2.5 energy managementAVReporter v2.5 energy management
AVReporter v2.5 energy management
Avreporter KONsys
 
MineExcellence Drilling Platform
MineExcellence Drilling Platform MineExcellence Drilling Platform
MineExcellence Drilling Platform
MineExcellence
 
Saa s based inventory management system
Saa s based inventory management systemSaa s based inventory management system
Saa s based inventory management system
SAP Silver Touch
 
Software maintenance real world maintenance cost
Software maintenance real world maintenance costSoftware maintenance real world maintenance cost
Software maintenance real world maintenance cost
malathieswaran29
 
eFACiLiTY Presentation
eFACiLiTY PresentationeFACiLiTY Presentation
eFACiLiTY Presentation
SIERRA ODC Private Limited
 
Ps training mannual ( configuration )
Ps training mannual ( configuration )Ps training mannual ( configuration )
Ps training mannual ( configuration )
Soumya De
 
Railway Reservation System - Software Engineering
Railway Reservation System - Software EngineeringRailway Reservation System - Software Engineering
Railway Reservation System - Software Engineering
Lalit Pal
 
1 Software Requirements Descriptions and specification.docx
1 Software Requirements Descriptions and specification.docx1 Software Requirements Descriptions and specification.docx
1 Software Requirements Descriptions and specification.docx
jeremylockett77
 
Hybrid Cloud example for SlideShare
Hybrid Cloud example for SlideShareHybrid Cloud example for SlideShare
Hybrid Cloud example for SlideShareHewlett-Packard
 
22-REQUIREMENT.ppt
22-REQUIREMENT.ppt22-REQUIREMENT.ppt
22-REQUIREMENT.ppt
ssuser5e271f1
 
SFDC Other Platform Features
SFDC Other Platform FeaturesSFDC Other Platform Features
SFDC Other Platform Features
Sujit Kumar
 
Embedded Systems (18EC62) – Embedded System Design Concepts (Module 4)
Embedded Systems (18EC62) – Embedded System Design Concepts (Module 4)Embedded Systems (18EC62) – Embedded System Design Concepts (Module 4)
Embedded Systems (18EC62) – Embedded System Design Concepts (Module 4)
Shrishail Bhat
 

Similar to Life Cycle Cost (20)

Life Cycle Cost Analysis
Life Cycle Cost AnalysisLife Cycle Cost Analysis
Life Cycle Cost Analysis
 
Stock analyzer.ppt review
Stock analyzer.ppt reviewStock analyzer.ppt review
Stock analyzer.ppt review
 
SAP Product costing Calculation With Components - Skillstek
SAP Product costing Calculation With Components  - SkillstekSAP Product costing Calculation With Components  - Skillstek
SAP Product costing Calculation With Components - Skillstek
 
6. System and its Life Cycle.pptx
6. System and its Life Cycle.pptx6. System and its Life Cycle.pptx
6. System and its Life Cycle.pptx
 
Analysis modeling & scenario based modeling
Analysis modeling &  scenario based modeling Analysis modeling &  scenario based modeling
Analysis modeling & scenario based modeling
 
IAM-EAM PPT.ppt
IAM-EAM PPT.pptIAM-EAM PPT.ppt
IAM-EAM PPT.ppt
 
AVReporter v2.5 energy management
AVReporter v2.5 energy managementAVReporter v2.5 energy management
AVReporter v2.5 energy management
 
sdlc.pptx
sdlc.pptxsdlc.pptx
sdlc.pptx
 
MineExcellence Drilling Platform
MineExcellence Drilling Platform MineExcellence Drilling Platform
MineExcellence Drilling Platform
 
Saa s based inventory management system
Saa s based inventory management systemSaa s based inventory management system
Saa s based inventory management system
 
Software maintenance real world maintenance cost
Software maintenance real world maintenance costSoftware maintenance real world maintenance cost
Software maintenance real world maintenance cost
 
eFACiLiTY Presentation
eFACiLiTY PresentationeFACiLiTY Presentation
eFACiLiTY Presentation
 
Ps training mannual ( configuration )
Ps training mannual ( configuration )Ps training mannual ( configuration )
Ps training mannual ( configuration )
 
Railway Reservation System - Software Engineering
Railway Reservation System - Software EngineeringRailway Reservation System - Software Engineering
Railway Reservation System - Software Engineering
 
1 Software Requirements Descriptions and specification.docx
1 Software Requirements Descriptions and specification.docx1 Software Requirements Descriptions and specification.docx
1 Software Requirements Descriptions and specification.docx
 
OCSP.pptx
OCSP.pptxOCSP.pptx
OCSP.pptx
 
Hybrid Cloud example for SlideShare
Hybrid Cloud example for SlideShareHybrid Cloud example for SlideShare
Hybrid Cloud example for SlideShare
 
22-REQUIREMENT.ppt
22-REQUIREMENT.ppt22-REQUIREMENT.ppt
22-REQUIREMENT.ppt
 
SFDC Other Platform Features
SFDC Other Platform FeaturesSFDC Other Platform Features
SFDC Other Platform Features
 
Embedded Systems (18EC62) – Embedded System Design Concepts (Module 4)
Embedded Systems (18EC62) – Embedded System Design Concepts (Module 4)Embedded Systems (18EC62) – Embedded System Design Concepts (Module 4)
Embedded Systems (18EC62) – Embedded System Design Concepts (Module 4)
 

Recently uploaded

The+Prospects+of+E-Commerce+in+China.pptx
The+Prospects+of+E-Commerce+in+China.pptxThe+Prospects+of+E-Commerce+in+China.pptx
The+Prospects+of+E-Commerce+in+China.pptx
laozhuseo02
 
History+of+E-commerce+Development+in+China-www.cfye-commerce.shop
History+of+E-commerce+Development+in+China-www.cfye-commerce.shopHistory+of+E-commerce+Development+in+China-www.cfye-commerce.shop
History+of+E-commerce+Development+in+China-www.cfye-commerce.shop
laozhuseo02
 
test test test test testtest test testtest test testtest test testtest test ...
test test  test test testtest test testtest test testtest test testtest test ...test test  test test testtest test testtest test testtest test testtest test ...
test test test test testtest test testtest test testtest test testtest test ...
Arif0071
 
Output determination SAP S4 HANA SAP SD CC
Output determination SAP S4 HANA SAP SD CCOutput determination SAP S4 HANA SAP SD CC
Output determination SAP S4 HANA SAP SD CC
ShahulHameed54211
 
This 7-second Brain Wave Ritual Attracts Money To You.!
This 7-second Brain Wave Ritual Attracts Money To You.!This 7-second Brain Wave Ritual Attracts Money To You.!
This 7-second Brain Wave Ritual Attracts Money To You.!
nirahealhty
 
1.Wireless Communication System_Wireless communication is a broad term that i...
1.Wireless Communication System_Wireless communication is a broad term that i...1.Wireless Communication System_Wireless communication is a broad term that i...
1.Wireless Communication System_Wireless communication is a broad term that i...
JeyaPerumal1
 
1比1复刻(bath毕业证书)英国巴斯大学毕业证学位证原版一模一样
1比1复刻(bath毕业证书)英国巴斯大学毕业证学位证原版一模一样1比1复刻(bath毕业证书)英国巴斯大学毕业证学位证原版一模一样
1比1复刻(bath毕业证书)英国巴斯大学毕业证学位证原版一模一样
3ipehhoa
 
Multi-cluster Kubernetes Networking- Patterns, Projects and Guidelines
Multi-cluster Kubernetes Networking- Patterns, Projects and GuidelinesMulti-cluster Kubernetes Networking- Patterns, Projects and Guidelines
Multi-cluster Kubernetes Networking- Patterns, Projects and Guidelines
Sanjeev Rampal
 
How to Use Contact Form 7 Like a Pro.pptx
How to Use Contact Form 7 Like a Pro.pptxHow to Use Contact Form 7 Like a Pro.pptx
How to Use Contact Form 7 Like a Pro.pptx
Gal Baras
 
原版仿制(uob毕业证书)英国伯明翰大学毕业证本科学历证书原版一模一样
原版仿制(uob毕业证书)英国伯明翰大学毕业证本科学历证书原版一模一样原版仿制(uob毕业证书)英国伯明翰大学毕业证本科学历证书原版一模一样
原版仿制(uob毕业证书)英国伯明翰大学毕业证本科学历证书原版一模一样
3ipehhoa
 
急速办(bedfordhire毕业证书)英国贝德福特大学毕业证成绩单原版一模一样
急速办(bedfordhire毕业证书)英国贝德福特大学毕业证成绩单原版一模一样急速办(bedfordhire毕业证书)英国贝德福特大学毕业证成绩单原版一模一样
急速办(bedfordhire毕业证书)英国贝德福特大学毕业证成绩单原版一模一样
3ipehhoa
 
Living-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptx
Living-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptxLiving-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptx
Living-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptx
TristanJasperRamos
 
Latest trends in computer networking.pptx
Latest trends in computer networking.pptxLatest trends in computer networking.pptx
Latest trends in computer networking.pptx
JungkooksNonexistent
 
BASIC C++ lecture NOTE C++ lecture 3.pptx
BASIC C++ lecture NOTE C++ lecture 3.pptxBASIC C++ lecture NOTE C++ lecture 3.pptx
BASIC C++ lecture NOTE C++ lecture 3.pptx
natyesu
 
ER(Entity Relationship) Diagram for online shopping - TAE
ER(Entity Relationship) Diagram for online shopping - TAEER(Entity Relationship) Diagram for online shopping - TAE
ER(Entity Relationship) Diagram for online shopping - TAE
Himani415946
 
guildmasters guide to ravnica Dungeons & Dragons 5...
guildmasters guide to ravnica Dungeons & Dragons 5...guildmasters guide to ravnica Dungeons & Dragons 5...
guildmasters guide to ravnica Dungeons & Dragons 5...
Rogerio Filho
 

Recently uploaded (16)

The+Prospects+of+E-Commerce+in+China.pptx
The+Prospects+of+E-Commerce+in+China.pptxThe+Prospects+of+E-Commerce+in+China.pptx
The+Prospects+of+E-Commerce+in+China.pptx
 
History+of+E-commerce+Development+in+China-www.cfye-commerce.shop
History+of+E-commerce+Development+in+China-www.cfye-commerce.shopHistory+of+E-commerce+Development+in+China-www.cfye-commerce.shop
History+of+E-commerce+Development+in+China-www.cfye-commerce.shop
 
test test test test testtest test testtest test testtest test testtest test ...
test test  test test testtest test testtest test testtest test testtest test ...test test  test test testtest test testtest test testtest test testtest test ...
test test test test testtest test testtest test testtest test testtest test ...
 
Output determination SAP S4 HANA SAP SD CC
Output determination SAP S4 HANA SAP SD CCOutput determination SAP S4 HANA SAP SD CC
Output determination SAP S4 HANA SAP SD CC
 
This 7-second Brain Wave Ritual Attracts Money To You.!
This 7-second Brain Wave Ritual Attracts Money To You.!This 7-second Brain Wave Ritual Attracts Money To You.!
This 7-second Brain Wave Ritual Attracts Money To You.!
 
1.Wireless Communication System_Wireless communication is a broad term that i...
1.Wireless Communication System_Wireless communication is a broad term that i...1.Wireless Communication System_Wireless communication is a broad term that i...
1.Wireless Communication System_Wireless communication is a broad term that i...
 
1比1复刻(bath毕业证书)英国巴斯大学毕业证学位证原版一模一样
1比1复刻(bath毕业证书)英国巴斯大学毕业证学位证原版一模一样1比1复刻(bath毕业证书)英国巴斯大学毕业证学位证原版一模一样
1比1复刻(bath毕业证书)英国巴斯大学毕业证学位证原版一模一样
 
Multi-cluster Kubernetes Networking- Patterns, Projects and Guidelines
Multi-cluster Kubernetes Networking- Patterns, Projects and GuidelinesMulti-cluster Kubernetes Networking- Patterns, Projects and Guidelines
Multi-cluster Kubernetes Networking- Patterns, Projects and Guidelines
 
How to Use Contact Form 7 Like a Pro.pptx
How to Use Contact Form 7 Like a Pro.pptxHow to Use Contact Form 7 Like a Pro.pptx
How to Use Contact Form 7 Like a Pro.pptx
 
原版仿制(uob毕业证书)英国伯明翰大学毕业证本科学历证书原版一模一样
原版仿制(uob毕业证书)英国伯明翰大学毕业证本科学历证书原版一模一样原版仿制(uob毕业证书)英国伯明翰大学毕业证本科学历证书原版一模一样
原版仿制(uob毕业证书)英国伯明翰大学毕业证本科学历证书原版一模一样
 
急速办(bedfordhire毕业证书)英国贝德福特大学毕业证成绩单原版一模一样
急速办(bedfordhire毕业证书)英国贝德福特大学毕业证成绩单原版一模一样急速办(bedfordhire毕业证书)英国贝德福特大学毕业证成绩单原版一模一样
急速办(bedfordhire毕业证书)英国贝德福特大学毕业证成绩单原版一模一样
 
Living-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptx
Living-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptxLiving-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptx
Living-in-IT-era-Module-7-Imaging-and-Design-for-Social-Impact.pptx
 
Latest trends in computer networking.pptx
Latest trends in computer networking.pptxLatest trends in computer networking.pptx
Latest trends in computer networking.pptx
 
BASIC C++ lecture NOTE C++ lecture 3.pptx
BASIC C++ lecture NOTE C++ lecture 3.pptxBASIC C++ lecture NOTE C++ lecture 3.pptx
BASIC C++ lecture NOTE C++ lecture 3.pptx
 
ER(Entity Relationship) Diagram for online shopping - TAE
ER(Entity Relationship) Diagram for online shopping - TAEER(Entity Relationship) Diagram for online shopping - TAE
ER(Entity Relationship) Diagram for online shopping - TAE
 
guildmasters guide to ravnica Dungeons & Dragons 5...
guildmasters guide to ravnica Dungeons & Dragons 5...guildmasters guide to ravnica Dungeons & Dragons 5...
guildmasters guide to ravnica Dungeons & Dragons 5...
 

Life Cycle Cost

  • 1. Predicting the Life Cycle Cost using Mathematical and Software Models
  • 2. Introduction • This Software is used to calculate the Life Cycle Cost (LCC) of an equipment based on Reliability, Maintainability, and Availability using appropriate methods to simulate, which would otherwise have to be done manually and is difficult to analyze. • This tool helps to analyze the LCC based on various governing parameters like Acquisition Cost, Operational Cost, and Maintenance Cost etc. • Various reports can be generated using this software for good decision-making • The software is developed using J2EE and MySql • The software is developed with the applicable mathematical formulas. Costs are derived or calculated with a given cost estimating methods 2
  • 3. Description • The Software is designed to map any given system architecture into corresponding cost elements based on reliability, availability and maintainability of the components. • Each part of the system is configurable in its subcomponents and the importance of any component in estimating the cost of system can be identified. • To estimate LCC of an equipment, the tool accepts the cost inputs such as acquisition, operation, maintenance and other costs of the equipment. • The LCC of equipment is the sum of the Acquisition Cost, Operational Cost, Maintenance Cost and Other Costs. Any revenues accrued shall be deducted from the LCC. LCC is calculated for various parameters like operating hour per year etc. Where ever applicable the calculations are done by considering inflation rate 3
  • 4. Description contd.. • The system uses database for storing the information related to various cost elements of various equipments and also provides a data base for equipment details. • Generally LCC is done by a particular scientist at a given point of time, hence data base is created with author name (scientist) as the main element to retrieve the details of the equipment, costs etc. • The software contains several modules. They can greatly enhance the calculation the LCC of an equipment or system. Users can choose these modules according to their needs to calculate the LCC of a system 4
  • 5. The Main Features • Equipment Tree Structure (ETS) • Equipment Data • Acquisition Cost • Maintenance Cost • Operational Cost • Other Cost • LCC Calculator • Sensitivity Analysis • Distributions • Formulae • Charts • Reports • Currency Converter • Database Back up • Scientific Calculator, Help and FAQ’s 5
  • 6. The Main Features Description • Equipment Tree Structure (ETS) – Equipment Tree Structure (ETS) contains the list of equipments of the system in the left side of the Main Screen. In particular the user is required to select Equipment/Organization from ETS • Equipment Data – Equipment Data Module deals with the equipment details of the system used in the LCC Estimation. This module allows the user to input the details of the equipment, such as name, model etc., • Acquisition Cost – Acquisition Cost Form allows the user to enter acquisition cost parameters to calculate acquisition cost. In this module the user can enter the inputs for the various acquisition cost parameters such as Basic Cost, Up gradation Cost, Initial Spare Cost, Packaging & Forwarding Cost etc., 6
  • 7. The Main Features Description contd.. • Maintenance Cost – Maintenance Cost Form allows the user to select the type of the maintenance cost: • Annual Maintenance Cost – Annual Maintenance Cost Form allows the user to enter maintenance cost parameters to calculate Total Maintenance cost. • Annual Breakdown Maintenance Cost – Annual Breakdown Maintenance Cost form allows the user to enter breakdown maintenance cost parameters to calculate Total Breakdown Maintenance cost • Annual Schedule/Preventive Maintenance Cost – Annual Schedule/Preventive Maintenance Cost Form allows the user to enter schedule/preventive maintenance cost parameters to calculate Total Schedule/Preventive Maintenance cost. 7
  • 8. The Main Features Description contd.. – Variable Maintenance Cost • Variable Maintenance Cost Form allows the user to enter maintenance cost parameters to calculate Total Maintenance cost. • Variable Schedule/Preventive Maintenance Cost – Variable Schedule/Preventive Maintenance Cost form allows the user to enter schedule/preventive maintenance cost parameters to calculate variable Schedule/Preventive Maintenance cost. • Variable Breakdown Maintenance Cost Form – Variable Breakdown Maintenance Cost form allows the user to enter breakdown maintenance cost parameters to calculate variable Breakdown Maintenance cost. 8
  • 9. The Main Features Description contd.. • Operational Cost – Operational Cost Form allows the user to enter operational cost parameters to calculate the Annual Operational Cost. – Also operational cost module permits the user to enter the inputs for the equipment based on the following questions: 1. How much fuel or power consumed by equipment, if applicable both? 2. How many crew and support crews needed to operate the equipment? 3. How much the cost of the crew as well supports crews? 4. How much the Operational infrastructure, training, admin cost with respect to the equipment? 5. Any miscellaneous cost? 6. Unit of cost calculation for example: year, week. 9
  • 10. The Main Features Description contd.. • Other Cost – Other Cost module is useful when some of the input costs are not covered in the above cost modules. This module allows the user to provide the details of various cost elements such as the cost of up gradation, disposal cost etc • LCC Calculator – LCC Calculator Form allows the user to view LCC of System (Organization) or Equipment describing various cost parameters incorporated in various Cost modules. • Sensitivity Analysis – This module is used to analyze the LCC variation for selected equipment by varying the cost percentages associated with that equipment 10
  • 11. The Main Features Description contd.. • Distributions – The Distributions used for Simulation are Exponential Triangular Uniform – User can select a particular distribution to simulate the various cost parameters like Acquisition Cost, Operational Cost, Maintenance Cost and LCC based on MTBF, MTTR and Availability values. • Formulae – The mathematical formulae used to estimate LCC are presented in this module. The Formulae are – Availability Rate – MTTF/MTBF – Dormancy – Missile Reliability – Net Present Value (NPV) 11
  • 12. The Main Features Description contd.. • Currency Converter – The Currency Converter Screen helps to exchange currency rates i.e., how much one currency is worth in terms of the other. It is the value of a foreign nation’s currency in terms of the home nation’s currency • Database Back up – The Software is developed using MySQL 5.0 as the DBMS of choice. – The DBMS software will provide a backup capability to ensure protection of the data in the DBMS. In addition, the DBMS software provides a transaction recording feature that can be used to keep track of all transactions during normal operation. • Charts – This module helps the user to generate various types of charts like Bar, Pie, Combination Pie and Water Fall and also to generate various reports such as Author based, Equipment Costs, LCC of equipment and organization and Equipment list. 12
  • 13. The Main Features Description contd.. • Reports – User can generate the following reports: • Author Based – Acquisition Cost – Operational Cost – Maintenance Cost • Annual • Variable • Equipment List • Equipment Costs – Acquisition Cost – Operational Cost – Maintenance Cost • Annual • Variable – Equipment Data • LCC – Equipment – Organization 13
  • 14. The Main Modules • User Module • Equipment Data Module • Acquisition Cost Module • Maintenance Cost Module • Other Cost Module • LCC Calculator Module • Output Module • Database Management System Module • Distributions used for Simulation Module • Formulae Module • Currency Converter Module • FAQ’s and Help Modules 14
  • 16. 16
  • 17. 17
  • 18. 18
  • 19. 19
  • 20. 20
  • 21. 21
  • 22. 22
  • 23. 23
  • 24. 24
  • 25. 25
  • 26. 26
  • 27. 27
  • 28. 28
  • 29. 29
  • 30. 30
  • 31. 31
  • 32. 32
  • 33. 33
  • 34. 34
  • 35. 35
  • 36. 36
  • 37. 37
  • 38. 38
  • 39. 39