Analysis of rates for various types of construction works provides very useful information for effective planning, control, organization and management.
Contracts and Tenders
When two or more persons have common intention communicated to each other to create same obligation between them there is said to be an agreement. An agreement which is enforceable by law is a Contract.
A Tenders is called upon for executing certain specified work, or supplying specified materials; subjected to certain terms and conditions like rates, time limit, etc. It is an offer in written form: Legally speaking, it is an offer to receive an offer for the work, within the specified financial limits.
Check for more presentations at - www.archistudent.net
Contracts and Tenders
When two or more persons have common intention communicated to each other to create same obligation between them there is said to be an agreement. An agreement which is enforceable by law is a Contract.
A Tenders is called upon for executing certain specified work, or supplying specified materials; subjected to certain terms and conditions like rates, time limit, etc. It is an offer in written form: Legally speaking, it is an offer to receive an offer for the work, within the specified financial limits.
Check for more presentations at - www.archistudent.net
Detailed specification of an item of work specifies the quantities of materials, proportion of mortar, workmanship, method of preparation & execution and method of measurement.
Detailed specifications of different items of works are prepared separately and describe what the work should be and these shall be executed and constructed.
This presentation covers introduction to Estimating and costing and its importance. Also, types of estimation, different terms and provisions used in estimating, are explained in it. Format of measurement sheet and abstract sheet and the rate analysis has been covered in this presentation. It can be helpful to study basics of estimating and costing.
Presentation on building bye laws as per GTU (syllabus) building & town planning.
It is my first presentation on slide share so please give suggestion on given topic or any other requirement.
Thank you.
Prefabrication is the practice of assembling components of a structure in a factory or other manufacturing site, and transporting them to the construction site where the structure is to be located.
what is polymer concrete, types, properties, material used in manufacturing process , manufacturing process, applications and their advantages. case study on polymer composite concrete.
Pile foundation is important for construction of foundation where bearing capacity of soil is poor. Pile foundation is use for distribution of uneven load of superstructure.There are so many type of pile are use for construction. Here i present some of pile with suitable condition for construction and methods for construction.
Thank you.
Detailed specification of an item of work specifies the quantities of materials, proportion of mortar, workmanship, method of preparation & execution and method of measurement.
Detailed specifications of different items of works are prepared separately and describe what the work should be and these shall be executed and constructed.
This presentation covers introduction to Estimating and costing and its importance. Also, types of estimation, different terms and provisions used in estimating, are explained in it. Format of measurement sheet and abstract sheet and the rate analysis has been covered in this presentation. It can be helpful to study basics of estimating and costing.
Presentation on building bye laws as per GTU (syllabus) building & town planning.
It is my first presentation on slide share so please give suggestion on given topic or any other requirement.
Thank you.
Prefabrication is the practice of assembling components of a structure in a factory or other manufacturing site, and transporting them to the construction site where the structure is to be located.
what is polymer concrete, types, properties, material used in manufacturing process , manufacturing process, applications and their advantages. case study on polymer composite concrete.
Pile foundation is important for construction of foundation where bearing capacity of soil is poor. Pile foundation is use for distribution of uneven load of superstructure.There are so many type of pile are use for construction. Here i present some of pile with suitable condition for construction and methods for construction.
Thank you.
ESTIMATION AND COSTING
1. Introduction
2. Measurement of materials and works
3. Types of estimates
4. Detailed and abstract estimate of buildings
5. Specification and analysis of rates
6. Earthwork calculations
7. Detailed estimates
Lec.2 binifits of estamations...Types of EstimationMuthanna Abbu
In this unit the student will learn:
• The main types of estimation.
• When each type of estimation is used.
• Making approximate estimate to predict the expected cost of a project.
Lec.5 earthworks for various engineering projectsMuthanna Abbu
Earthworks in construction of roads, canals, railway tracks and hydraulic structures represent substantial part of the whole work. Therefore, it is very important to estimate the quantities of earthworks as accurate as possible, despite of the complicated process of calculation caused by variation in ground level.
Estimating is a complex process involving collection of available and pertinent information relating to the scope of a project, expected resource consumption, and future changes in resource costs. This process is required in all stages of the project life-cycle.
Lec.2 statically determinate structures & statically indeterminate struct...Muthanna Abbu
The student will learn the determination of internal forces in different structures and the
kind of forces distribution due to external & internal effects .He will also learn about the
structures deformation due to these effects .
Lec.1 introduction to the theory of structures. types of structures, loads,Muthanna Abbu
The student will learn the determination of internal forces in different structures and the
kind of forces distribution due to external & internal effects .He will also learn about the
structures deformation due to these effects .
The student will learn the determination of internal forces in different structures and the kind of forces distribution due to external & internal effects .He will also learn about the structures deformation due to these effects .
The student will learn the manner of design & connecting the different parts in the steel structures . He also learn the transition nature of forces and stresses in steel members .
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
We have compiled the most important slides from each speaker's presentation. This year’s compilation, available for free, captures the key insights and contributions shared during the DfMAy 2024 conference.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Lec.3 General rules in quantitative survey. Quantity measuring. Rate analysis
1. Northern Technical University
Engineering Technical College of Mosul
Building & Construction
Technology Engineering Dept.
Estimation, Specifications and
Contracts
SECOND CLASS
Lecturer:
Dr. Muthanna Adil Najm ABBU
2017-2018
2. Estimation, Specifications
& Contracts General rules, units Lecture .3
1
Dr. Muthanna Adil Najm Northern Technical University
General rules in quantitative survey:
The rules for measurement of each item are invaribly described in IS- 1200.
However some of the general rules are listed below.
1. Measurement shall be made for finished item of work and description of each
item shall include materials, transport, labour, fabrication tools and plant and all
types of overheads for finishing the work in required shape, size and specification.
2. In booking, the order shall be in sequence of length, breadth and height or
thickness.
3. All works shall be measured subject to the following tolerances.
i) Linear measurement shall be measured to the nearest 0.01m.
ii) Areas shall be measured to the nearest 0.01 sq.m
iii) Cubic contents shall be worked-out to the nearest 0.01 cum
4. Same type of work under different conditions and nature shall be measured
separately under separate items.
5. The bill of quantities shall fully describe the materials, proportions,
workmanships and accurately represent the work to be executed.
6. In case of masonary (stone or brick) or structural concrete, the categories shall
be measured separately and the heights shall be described:
a) from foundation to plinth level
b) from plinth level to First floor level
c) from Fist floor to Second floor level and so on.
Principles in selecting units of measurement for items:
The units of measurements are mainly categorised for their nature, shape and size
and for making payments to the contractor and also. The principle of units of
measurements normally consists the following:
a) Single units work like doors, windows, trusses etc., are expressed in numbers.
b) Works consists linear measurements involve length like cornice, fencing, hand
rail, bands of specified width etc., are expressed in running metres (RM)
c) Works consists areal surface measurements involve area like plastering, white
washing, partitions of specified thickness etc., are expressed in square meters (m2)
d) Works consists cubical contents which involve volume like earth work, cement
concrete, Masonry etc are expressed in Cubic metres.
3. Estimation, Specifications
& Contracts General rules, units Lecture .3
2
Dr. Muthanna Adil Najm Northern Technical University
various units and modes of measurement for different items of works:
4. Estimation, Specifications
& Contracts General rules, units Lecture .3
3
Dr. Muthanna Adil Najm Northern Technical University
details of quantities measuring:
METHODS OF TAKING OUT QUANTITIES:
The quantities like earth work, foundation concrete, brickwork in plinth and super
structure etc., canbe workout by any of following two methods:
a) Long wall - short wall method
b) Centre line method.
c) Partly centre line and short wall method.
5. Estimation, Specifications
& Contracts General rules, units Lecture .3
4
Dr. Muthanna Adil Najm Northern Technical University
a) Long wall-short wall method:
In this method, the wall along the length of room is considered to be long wall
while the wall perpendicular to long wall is said to be short wall. To get the length
of long wall or short wall, calculate first the centre line lengths of individual walls.
Then the length of long wall, (out to out) may be calculated after adding half
breadth at each end to its centre line length. Thus the length of short wall
measured into in and may be found by deducting half breadth from its centre line
length at each end. The length of long wall usually decreases from earth work to
brick work in super structure while the short wall increases. These lengths are
multiplied by breadth and depth to get quantities.
b) Centre line method:
This method is suitable for walls of similar cross sections. Here the total centre
line length is multiplied by breadth and depth of respective item to get the total
quantity at a time. When cross walls or partitions or verandah walls join with
mainall, the centre line length gets reduced by half of breadth for each junction.
such junction or joints are studied caefully while calculating total centre line
length.The estimates prepared by this method are most accurate and quick.
c) Partly centre line and partly cross wall method:
This method is adopted when external (i.e., alround the building) wall is of one
thickness and the internal walls having different thicknesses. In such cases, centre
line method is applied to external walls and long wall-short wall method is used to
6. Estimation, Specifications
& Contracts General rules, units Lecture .3
5
Dr. Muthanna Adil Najm Northern Technical University
internal walls. This method suits for different thicknesses walls and diffeent level
of foundations. Because of this reason, all Engineering departments are practicing
this method.