KIM MILLER
CURRICULUM VITAE
PERSONAL DETAILS
NAME : KIM GAIL MILLER
RESIDENCE : MORNINGSIDE, JOHANNESBURG
CELL NO : 082 3755303
EMAIL ADDRESS : kim@gptraining.co.za
WEBSITE : www.globalpeopletraining.co.za
NATIONALITY : SOUTH AFRICAN
FIRST LANGUAGE : ENGLISH
WORK HISTORY
SELF EMPLOYED (1 FEBRUARY 2006 to date)
For the past 10 years, I have run an accredited training consultancy, called Global
People Training. I have conducted various training and development
interventions and consulted to a variety of corporate and government
organisations across South Africa and into Africa.
The organizations I have provided learning and development services for are
as follows:
 Scania
 Stanlib
 Alexander Forbes Financial
Services
 Arcelormittal
 Murray and Roberts
 Ericsson
 Film & Publications Board
 BHP Billiton
 Wings Corporate Travel
 Angor Financial Services
 F G La Pasta
 Ampath
 SABC
 IIR
 Randwater
 Bokomo
 Daimler Chrysler
 Joshua Doore Group
 SITA
 Rentokil
 Xerox
 SAFAIR
 Customer Centric Solutions
 Nimico
 Department of Education
 Department of Labour
 South African Gambling
Board
 SITA
 Eastern Cape Municipality
 De Beers
 Rio Tinto
 CDC Agency
 Vodacom
 MTN
 Centre for the study of
Violence & Reconciliation
 US Agency Centres for
Diseases Control and
Prevention
 KZN Treasury
 Ethiopian Airlines
 CIPRO
 Kyocera Mita
 AsgiSA (Eastern Cape)
 Eastern Cape Development
Corp
 Mafikeng Department of
Justice
 Monash University
 National Prosecuting
Authority
 South African Police Services
 KZN Mongusuthu University
 Imperial
 Cargomovement
 Fraser Alexander
 African Barrick Gold
 Redefine Properties
 National Prosecuting Agency
 SABS
 SAPS
 Johannesburg Water
 Robert Bosch
 SAPS
 ABSA Capital
 Namibia Water
 Lonmin Mines
 FIETA
 Joy Mining Machinery
 SA Bank Note
 SBV Cash Intransit
 Albaraka Bank
 Stats SA
The programmes I have developed and facilitated are as follows:
1. Management and
Leadership Skills
2. Company Specific
Programmes
3. Emotional Intelligence
4. Business Communication
Skills
5. Business Report Writing
6. Project Management
Principles, Tools &
Techniques
7. Assertiveness Skills
8. Presentation skills
9. Negotiation & Conflict
Resolution
10. Team Building using
Personality Profiling
11. Minutes & Meetings
12. Business Etiquette
13. Time Management
14. People Management
15. Performance Management
16. Interviewing & selection
skills
17. Succession Planning &
Workforce planning
18. Career Management
19. Organisational
Development
20. Stress Management
21. Customer Service &
Telephone Etiquette
22. Advanced skills for
secretaries
23. Office Administration
24. MS Excel Basic to
Advanced
25. MS PowerPoint Basic to
Advanced
26. MS Word Basic to
Advanced
27. MS Project Basic to
Advanced
28. Facilitate Learning/Train
the Trainer
29. Skills Development
Facilitator
30. Assessor Training
31. Residential Advisors’
Programme
32. Process Development,
Training & assessing for
Financial Sector
33. Component & Product
Knowledge for Scania
Truck sales & services
The Learning & Development projects I have been involved in, while owning
Global People Training are as follows:
1. SCANIA (Truck/Bus/Engine Manufacturer) – Commercial Learning
Manager Consultant (August 2015 – to date)
Co-developing the learning strategy and priorities based on the Global &
Regional business strategy, aligned to the Global and Regional Learning
minimum standards and deliverables
Conducting Training Needs Analysis for all Sales, Services, Support Staff &
Management
Developing Curriculae for 2016/2017 for all staff across the organization
Developing blended learning materials for various programmes across the
organisation
Planning, directing and co-ordinating Automotive/Industry specific and
general learning activities
Facilitating, directing and supporting the integrated Learning and
Development process within the organisation
Providing Learning analytics to allow meaningful interactions and
decisions
Evaluating Learning Practitioner performance, in collaboration with Line
Management as well as effectiveness of Learning interventions providing
recommendations for improvement, in conjunction with Management, up
to EXCO level.
(2014) Upskilling of all sales and service staff on Emotional Intelligence,
Communication & Stress Management
2. ERICSSON – We are the preferred soft skills, Communications, Microsoft
and Management & Leadership skills provider for all staff across Africa
3. MURRAY & ROBERTS coaching & training of frontline staff, call centre
and support staff. Developed & delivered business communication skills
for Graduate Development Programme
4. ARCELORMITTAL (2013 – 2014) Upskilling their general staff and
management on MS Excel Basic – Advanced and Report Writing and MS
Word
5. IIR : Consultant to IIR for 6 years : Obtaining and maintaining
accreditation with the Services SETA, aligning 32 of their programmes,
developing and updating their Quality Management System, Assessing
Portfolios of Evidence for their learners, facilitating site visits from SETA,
obtaining accreditation with the ETDP SETA and obtaining programme
approval for 13 programmes, setting up systems to track and monitor
learner achievements and uploading onto the National Learner Records
Database
6. STANLIB: A 6 month project, which involved the development and
documentation of processes for Stanlib operations division. This project
involved the development of documented procedure guides, training and
assessment of 200 people on operational processes, from New Business,
Withdrawals to Switches etc. As part of this programme, I trained Stanlib
staff on their IT systems, such as Compass, Mindkey and Online.
Conducted Financial Industry training and assessment for 45 Stanlib
operational staff members and 60 Stanlib Call Centre Agents
7. WINGS CORPROATE TRAVEL : One year contract with Wings Corporate
Travel, training their staff on Microsoft products, presentation skills and
customer service.
8. ALEXANDER FORBES : Developed Foundational Financial learning
materials for Alexander Forbes Financial Services Provider and trained and
assessed approximately 50 of their call centre agents. This programme
included topics such as, the economy, financial markets, Linked Investment
Service Providers, Unit Trusts, legislation and retirement fund products.
9. CO-AUTHORED text books for the South African Further Education and
Training Colleges, published by Pearson Publishers. The subject was New
Venture Creation, NQF Levels 3 & 4.
10. FG LA PASTA : Served as a Skills Development Facilitator for FG La Pasta
and Customer Centric Solutions for 2 years. Role was to ensure that the
organisations complied with Skills Development legislation, that their
training programmes were unit standard aligned, their assessment tools
were developed and they obtained their skills development grants.
11. Trained various learnerships at NQF Level 4
12. Coached from administration to executive level
INSITE TRAINING (September 2004 – 31 January 2006)
Training Manager/ Trainer / Skills Development Facilitator
Trainer
Trained various soft skills & IT programmes.
Course Developer
Developed the following courses and aligned them to unit standards:
Key Accounts (Sales)
Business Writing
Minutes & Meetings
Teamwork & conflict resolution for elementary staff
Supervisory skills
Insurance Industry training
Skills Development Facilitator/ Registered Assessor
SETA liaison, Institutional & learning programme alignment & accreditation,
Quality Management System – policies & procedures, ensured organization
complied with all Skills Development legislation
Training Manager
Upskilling/Training of Trainers, contracts, invoices & payments, problem
solving and recruiting of new trainers.
INVESTMENT SOLUTIONS (Subsidiary of Holding Company: Alexander
Forbes) (April 1999 – August 2004)
Training & Development Practitioner / Skills Development Facilitator
 Conducted system training (Compass Administration System), Financial
industry related training (Retirement Funds and Products & Portfolios),
company specific training (Company Overview, Quality Awareness &
Outcomes Based Education) and soft skills training (Social Styles and
Planning & Organising)
 Developed in-house curricula
 Developed in-house outcomes based & unit standard aligned learning
material
 Developed outcomes based learning material for the Collective
Investment Scheme, NQF Level 4 national qualification – part of the
INSETA material writing project.
 Guided and gave advice regarding the design of other departmental
training materials.
 Training provider accreditation – managed the application &
implementation process
 Designed and implemented a Quality Management System, which keeps
records of proposed and actual training and assessment of every staff
member.
 Training needs analyst – helped with identifying learning and develop
needs of the organization
 Strategist – formulated plans for training and development and policies
and practices to accommodate vision and mission of the organization
 Standardised costs of training
 Advised company on NQF requirements, outcomes based training &
assessments.
 Evaluated the learning systems of the organization to ensure all internal &
external training was aligned with NQF requirements
 Registered Assessor - assessed competency status of staff against agreed
outcomes for all in-house training
 Guided, counseled and coached learners
 Kept HR development records up to date
 Attended Regional Forums to keep abreast of Sectoral developments
 Developed & submitted Workplace Skills Plans and compiled &
submitted Annual Training Reports
 Ensured company complied with Skills Development legislation
 Ensured planned training was conducted & grants were received
 Ensured staff were FAIS compliant by ensuring necessary exams were
written & necessary training was given.
HR Practitioner
 Handled staff queries, including medical aid issues
 Developed a leave system on excel and administered leave
 Administered all staff study assistance
 Coordinated job profiles for all staff members
 Interviewed and selected new staff members
 Implemented a Share Incentive Scheme Management System
 Administered shares on the share system and compiled & issued all
necessary documentation
 Developed reports on Crystal Report Writer for Share Incentive
Management Scheme
P&O Nedlloyd (1997 - 1999)
PA to Director / Computer Trainer / Software Support
 Shorthand & typing of general correspondence & emails
 Compiled spreadsheets on Excel & presentations on Powerpoint
 Diary control
 Local & international travel arrangements
 Organised functions & conferences
 Took minutes for disciplinary hearings & management meetings
 Conducted computer training for all staff members in MS Office &
Windows 95
 Provided software support to staff members
MOORES ROWLAND (1991 – 1997)
PA to Staff Partner
 Dictaphone, shorthand, typing of general correspondence, leases, wills,
tax schedules, balance sheets etc.
 Handled all personnel matters, ie. leave records, registration of training
contracts, employment contracts & resignations
 Diary control
 Travel arrangements
 Handled daily mail
 Customer Services
 Controlled curatorship account
 Controlled Debtors accounts
COMPUTER MANAGEMENT (1990 – 1991)
Mainframe Programmer
 RPG II programmer on System 38 Mainframe
 Handled end-users’ computer problems
 Compiled reports for managers
EDUCATIONAL QUALIFICATIONS
DEGREES
UNISA (2008)
Btech Degree in Human Resource Development (Passed with Distinction)
Subjects included:
Human Resource Management II
Management of Training II
Organisational Development
Advanced Management of Training IV
Research Methodology
Financial Management
Training and Development Strategies
University of South Africa (1996 – 1999)
Bachelor of Arts Degree (Passed with Distinction)
Majors : English & Psychology
University of South Africa (1990)
Programming course in RPG II & System 38
University of Cape Town (1986 – 1987)
Bachelor of Arts Degree (First Year)
Durban Girls’ High School (1981 – 1985)
Matric Exemption
Leadership roles: Class Captain / School Prefect
OTHER COURSES
Challenger Coaching for Sales (2016)
CEB
Microsoft (2013)
Microsoft Office Specialist Certificate
Corporate College International (2001)
Assessor Award
University of South Africa (2001)
Skills Development Facilitator Programme
INSETA (2002)
Outcomes Based Training course
Network of Training (2002)
Social Styles (Leader Trainer course)
Qualified Instructor

Kim Miller CV

  • 1.
  • 2.
    PERSONAL DETAILS NAME :KIM GAIL MILLER RESIDENCE : MORNINGSIDE, JOHANNESBURG CELL NO : 082 3755303 EMAIL ADDRESS : kim@gptraining.co.za WEBSITE : www.globalpeopletraining.co.za NATIONALITY : SOUTH AFRICAN FIRST LANGUAGE : ENGLISH
  • 3.
    WORK HISTORY SELF EMPLOYED(1 FEBRUARY 2006 to date) For the past 10 years, I have run an accredited training consultancy, called Global People Training. I have conducted various training and development interventions and consulted to a variety of corporate and government organisations across South Africa and into Africa. The organizations I have provided learning and development services for are as follows:  Scania  Stanlib  Alexander Forbes Financial Services  Arcelormittal  Murray and Roberts  Ericsson  Film & Publications Board  BHP Billiton  Wings Corporate Travel  Angor Financial Services  F G La Pasta  Ampath  SABC  IIR  Randwater  Bokomo  Daimler Chrysler  Joshua Doore Group  SITA  Rentokil  Xerox  SAFAIR  Customer Centric Solutions  Nimico  Department of Education  Department of Labour  South African Gambling Board  SITA  Eastern Cape Municipality  De Beers  Rio Tinto  CDC Agency  Vodacom  MTN  Centre for the study of Violence & Reconciliation  US Agency Centres for Diseases Control and Prevention  KZN Treasury  Ethiopian Airlines  CIPRO  Kyocera Mita  AsgiSA (Eastern Cape)  Eastern Cape Development Corp  Mafikeng Department of Justice  Monash University  National Prosecuting Authority  South African Police Services  KZN Mongusuthu University  Imperial  Cargomovement  Fraser Alexander  African Barrick Gold  Redefine Properties  National Prosecuting Agency  SABS  SAPS  Johannesburg Water
  • 4.
     Robert Bosch SAPS  ABSA Capital  Namibia Water  Lonmin Mines  FIETA  Joy Mining Machinery  SA Bank Note  SBV Cash Intransit  Albaraka Bank  Stats SA The programmes I have developed and facilitated are as follows: 1. Management and Leadership Skills 2. Company Specific Programmes 3. Emotional Intelligence 4. Business Communication Skills 5. Business Report Writing 6. Project Management Principles, Tools & Techniques 7. Assertiveness Skills 8. Presentation skills 9. Negotiation & Conflict Resolution 10. Team Building using Personality Profiling 11. Minutes & Meetings 12. Business Etiquette 13. Time Management 14. People Management 15. Performance Management 16. Interviewing & selection skills 17. Succession Planning & Workforce planning 18. Career Management 19. Organisational Development 20. Stress Management 21. Customer Service & Telephone Etiquette 22. Advanced skills for secretaries 23. Office Administration 24. MS Excel Basic to Advanced 25. MS PowerPoint Basic to Advanced 26. MS Word Basic to Advanced 27. MS Project Basic to Advanced 28. Facilitate Learning/Train the Trainer 29. Skills Development Facilitator 30. Assessor Training 31. Residential Advisors’ Programme 32. Process Development, Training & assessing for Financial Sector 33. Component & Product Knowledge for Scania Truck sales & services
  • 5.
    The Learning &Development projects I have been involved in, while owning Global People Training are as follows: 1. SCANIA (Truck/Bus/Engine Manufacturer) – Commercial Learning Manager Consultant (August 2015 – to date) Co-developing the learning strategy and priorities based on the Global & Regional business strategy, aligned to the Global and Regional Learning minimum standards and deliverables Conducting Training Needs Analysis for all Sales, Services, Support Staff & Management Developing Curriculae for 2016/2017 for all staff across the organization Developing blended learning materials for various programmes across the organisation Planning, directing and co-ordinating Automotive/Industry specific and general learning activities Facilitating, directing and supporting the integrated Learning and Development process within the organisation Providing Learning analytics to allow meaningful interactions and decisions Evaluating Learning Practitioner performance, in collaboration with Line Management as well as effectiveness of Learning interventions providing recommendations for improvement, in conjunction with Management, up to EXCO level. (2014) Upskilling of all sales and service staff on Emotional Intelligence, Communication & Stress Management 2. ERICSSON – We are the preferred soft skills, Communications, Microsoft and Management & Leadership skills provider for all staff across Africa 3. MURRAY & ROBERTS coaching & training of frontline staff, call centre and support staff. Developed & delivered business communication skills for Graduate Development Programme 4. ARCELORMITTAL (2013 – 2014) Upskilling their general staff and management on MS Excel Basic – Advanced and Report Writing and MS Word 5. IIR : Consultant to IIR for 6 years : Obtaining and maintaining accreditation with the Services SETA, aligning 32 of their programmes,
  • 6.
    developing and updatingtheir Quality Management System, Assessing Portfolios of Evidence for their learners, facilitating site visits from SETA, obtaining accreditation with the ETDP SETA and obtaining programme approval for 13 programmes, setting up systems to track and monitor learner achievements and uploading onto the National Learner Records Database 6. STANLIB: A 6 month project, which involved the development and documentation of processes for Stanlib operations division. This project involved the development of documented procedure guides, training and assessment of 200 people on operational processes, from New Business, Withdrawals to Switches etc. As part of this programme, I trained Stanlib staff on their IT systems, such as Compass, Mindkey and Online. Conducted Financial Industry training and assessment for 45 Stanlib operational staff members and 60 Stanlib Call Centre Agents 7. WINGS CORPROATE TRAVEL : One year contract with Wings Corporate Travel, training their staff on Microsoft products, presentation skills and customer service. 8. ALEXANDER FORBES : Developed Foundational Financial learning materials for Alexander Forbes Financial Services Provider and trained and assessed approximately 50 of their call centre agents. This programme included topics such as, the economy, financial markets, Linked Investment Service Providers, Unit Trusts, legislation and retirement fund products. 9. CO-AUTHORED text books for the South African Further Education and Training Colleges, published by Pearson Publishers. The subject was New Venture Creation, NQF Levels 3 & 4. 10. FG LA PASTA : Served as a Skills Development Facilitator for FG La Pasta and Customer Centric Solutions for 2 years. Role was to ensure that the organisations complied with Skills Development legislation, that their training programmes were unit standard aligned, their assessment tools were developed and they obtained their skills development grants. 11. Trained various learnerships at NQF Level 4 12. Coached from administration to executive level
  • 7.
    INSITE TRAINING (September2004 – 31 January 2006) Training Manager/ Trainer / Skills Development Facilitator Trainer Trained various soft skills & IT programmes. Course Developer Developed the following courses and aligned them to unit standards: Key Accounts (Sales) Business Writing Minutes & Meetings Teamwork & conflict resolution for elementary staff Supervisory skills Insurance Industry training Skills Development Facilitator/ Registered Assessor SETA liaison, Institutional & learning programme alignment & accreditation, Quality Management System – policies & procedures, ensured organization complied with all Skills Development legislation Training Manager Upskilling/Training of Trainers, contracts, invoices & payments, problem solving and recruiting of new trainers. INVESTMENT SOLUTIONS (Subsidiary of Holding Company: Alexander Forbes) (April 1999 – August 2004) Training & Development Practitioner / Skills Development Facilitator  Conducted system training (Compass Administration System), Financial industry related training (Retirement Funds and Products & Portfolios), company specific training (Company Overview, Quality Awareness & Outcomes Based Education) and soft skills training (Social Styles and Planning & Organising)  Developed in-house curricula  Developed in-house outcomes based & unit standard aligned learning material  Developed outcomes based learning material for the Collective Investment Scheme, NQF Level 4 national qualification – part of the INSETA material writing project.  Guided and gave advice regarding the design of other departmental training materials.
  • 8.
     Training provideraccreditation – managed the application & implementation process  Designed and implemented a Quality Management System, which keeps records of proposed and actual training and assessment of every staff member.  Training needs analyst – helped with identifying learning and develop needs of the organization  Strategist – formulated plans for training and development and policies and practices to accommodate vision and mission of the organization  Standardised costs of training  Advised company on NQF requirements, outcomes based training & assessments.  Evaluated the learning systems of the organization to ensure all internal & external training was aligned with NQF requirements  Registered Assessor - assessed competency status of staff against agreed outcomes for all in-house training  Guided, counseled and coached learners  Kept HR development records up to date  Attended Regional Forums to keep abreast of Sectoral developments  Developed & submitted Workplace Skills Plans and compiled & submitted Annual Training Reports  Ensured company complied with Skills Development legislation  Ensured planned training was conducted & grants were received  Ensured staff were FAIS compliant by ensuring necessary exams were written & necessary training was given. HR Practitioner  Handled staff queries, including medical aid issues  Developed a leave system on excel and administered leave  Administered all staff study assistance  Coordinated job profiles for all staff members  Interviewed and selected new staff members  Implemented a Share Incentive Scheme Management System  Administered shares on the share system and compiled & issued all necessary documentation  Developed reports on Crystal Report Writer for Share Incentive Management Scheme P&O Nedlloyd (1997 - 1999)
  • 9.
    PA to Director/ Computer Trainer / Software Support  Shorthand & typing of general correspondence & emails  Compiled spreadsheets on Excel & presentations on Powerpoint  Diary control  Local & international travel arrangements  Organised functions & conferences  Took minutes for disciplinary hearings & management meetings  Conducted computer training for all staff members in MS Office & Windows 95  Provided software support to staff members MOORES ROWLAND (1991 – 1997) PA to Staff Partner  Dictaphone, shorthand, typing of general correspondence, leases, wills, tax schedules, balance sheets etc.  Handled all personnel matters, ie. leave records, registration of training contracts, employment contracts & resignations  Diary control  Travel arrangements  Handled daily mail  Customer Services  Controlled curatorship account  Controlled Debtors accounts COMPUTER MANAGEMENT (1990 – 1991) Mainframe Programmer  RPG II programmer on System 38 Mainframe  Handled end-users’ computer problems  Compiled reports for managers
  • 10.
    EDUCATIONAL QUALIFICATIONS DEGREES UNISA (2008) BtechDegree in Human Resource Development (Passed with Distinction) Subjects included: Human Resource Management II Management of Training II Organisational Development Advanced Management of Training IV Research Methodology Financial Management Training and Development Strategies University of South Africa (1996 – 1999) Bachelor of Arts Degree (Passed with Distinction) Majors : English & Psychology University of South Africa (1990) Programming course in RPG II & System 38 University of Cape Town (1986 – 1987) Bachelor of Arts Degree (First Year) Durban Girls’ High School (1981 – 1985) Matric Exemption Leadership roles: Class Captain / School Prefect OTHER COURSES Challenger Coaching for Sales (2016) CEB Microsoft (2013) Microsoft Office Specialist Certificate Corporate College International (2001) Assessor Award
  • 11.
    University of SouthAfrica (2001) Skills Development Facilitator Programme INSETA (2002) Outcomes Based Training course Network of Training (2002) Social Styles (Leader Trainer course) Qualified Instructor