SlideShare a Scribd company logo
1 of 5
Download to read offline
SSN PRASAD AKSHINTALA
Qualification
M.Tech. STRUCTURAL ENGINEERING
Total years of experience – 4.2
Email Address:
Sujit_ssn_prasad@yahoo.co.in
prasadakshintalassn@gmail.com
Mobile: +968 - 96634659
Communication Address:
14-2-25, PB road,
Vizianagaram,
Andhra Pradesh,India-535002.
Passport No : G1950914
Valid Upto : 11.04.2017
ACADEMIC PROFILE
M-Tech Structural Engineering ,
Andhra University college of Engineering ,
Visakhapatnam, Andhra Pradesh, India.
2009 - 2011
BE Civil Engineering ,
Andhra University college of Engineering ,
Visakhapatnam, Andhra Pradesh, India.
2005 - 2009
TECHNICAL SKILLS
Analysis Software : STAAD Pro, ETABS,
SAFE Foundations
Modeling Software : AUTOCAD
Office package : Excel, Ms Word, power point.
Codes Exposed : IS codes, BS codes, Euro codes
CAREER SUMMARY
Civil structural design engineer with 4 years of experience in Structural Analysis, Design
and Detailing of both RCC & steel structures, Layout planning, project co-ordination & civil
material quantity estimations. Worked on various projects in Thermal power plants, HVDC
Converter stations in India 2 Years and Electrical Substations ranging from 11KV to 400KV in
Oman for 2 Years.
KEY EXPERIENCE
Experience in Structural analysis, design & detailing
Steel RCC
Pipe Rack Structures & Pipe supports
Valve hall
DG Shed
Crane girders
Intermediate steel platform
Truss Analysis
Switch yard structures
Transformer sheds
Capacitor bank shed
Service building, control building
GIS building
Fire water pump house
Equipment/ Machine/ pump foundations
Raft foundation, Pile group foundation for
Power plant structures
Finite element analysis
Switch yard structures and foundation
Cable and pipe trench
Underground Pit structures
Firewall and Blast wall
Plot layout planning, Road layout preparation, Drainage layout planning
Management & Interdepartment
coordination
Automation & Development
Managing Engineering & drawing Team
Assist Head of the department in planning and
scheduling
Effective monitoring to achieve project schedules.
Coordination with Project team, Site Engineers and
other engineering disciplines
Developed automated design tools in Excel
Implemented innovative approaches in design
and detailing procedure to reduce Project
schedule in quality manner
PERSONALITY TRAITS
Excellent communication and interpersonal skills.
Excellent Leadership quality.
Strong in reconciling problems and resolving conflicts.
Ability to work independently as well as in a team environment.
Ability to work even under high pressure.
CORE COMPETENCIES
Expertise in STAAD PRO and FEM analysis.
Developed automated design tools in Excel.
Implemented innovative approaches in design and detailing procedure to reduce Project
schedule in quality manner.
Good at steel structural design, detailing and 3D visualisation.
Facing time bound challenges & proven every time that task is finished within stipulated
time.
Efficient management and organizational abilities
Ability to work in complex environments.
Excellent Ability to handle variety of tasks and shift priorities simultaneously.
PROFESSIONAL EXPERIENCE
July 2013 - present: HAMED ENGINEERING SERVICES LLC, OMAN
(Currently acquired by VEC Oil & Gas Consultants, Oman)
Position : Civil Design Engineer
ROLES EXECUTED
• Working as lead engineer for the projects assigned by the head of the department with a
team of one junior engineer and three designers. Responsible for the total civil aspects
associated with the electrical substation from conceptualization to completion of the
designs.
• Analysis, Design & Detailing of structures (steel & concrete).
• Review of contractor documents and drawings of all kinds (steel & concrete)
• Inter departmental co-ordination. Vendor drawing review.
• Involved in the design and detailing of main structures viz. GIS building, control room building,
transformer foundation structural steel shed, transformer fire wall, switchyard equipment
supporting structures & its foundations, cable trenches, Capacitor bank foundation & its shed,
etc.
• Preparation of CTR(man hour estimation),DCS(Document Control Schedule), Man hours
allocation for designers & Jr. Engineers .
• Review of tower & Gantry superstructure designs & preparation of foundations of towers.
• Planning of project deliverable schedules in line with site requirements.
• Co-ordination with contractors & vendors for inputs required for the project.
• Attending project review meetings and meetings with review consultants for document
approval if required.
• Supporting & maintaining records of quality documents for auditing & reviews.
• As a Civil / Structural Engineer responsible for the detailed engineering including
Inter-discipline coordination and coordination with client and site engineers.
• The works carried out are described under main heads project-wise in detail :
PROJECTS
Detailed design for upgrading of IZKI GS to 220/132kv of OETC
• Design of 500MVA transformer foundation and fire wall.
• Design of NER & EAT foundations.
• Design and layout of Internal and External cable trenches as per electrical layout.
• Design of 6m wide bitumen top internal Road layout with orientation & slope co-ordination
inline with drainage requirements as roads acts as drains in sub stations.
Detailed Design Of Madinat Barka _&_Al Khadra Grid Stations of OETC
• Design of 132KV GIS & Control building with basement for GIS hall in Al Khadra GS .
• Design of compound wall & its foundation for both stations.
• Design of external cable trenches in M Barka grid station.
Consultancy services for Amerat and Mabella 132-33KV grid stations of OETC
• Owners engineer for this project and third party made specifications for the project.
• Review of Civil design documents & drawings submitted by contractors consultant.
• Organized project review meetings for the work progress assessment and comments
clarification for the contractor consultant along with contractor.
• Timely site visits to ensure the construction progress and to support site team at times of
technical conflicts such as fouling’s, mismatches within drawings & alternatives used .
• Review of Material Approval Sheets (MAS) against specifications and recommending suitable
materials for the project.
Construction of Two New Grid Stations 400/220KV at Sur IPP & Jhaloot of OETC
• First 400KV substation in Oman
• Design of 400KV GIS building with battery & LVAC rooms of SUR GS
• Design of 750MVA, 400/220KV transformer foundation and fire wall for SUR GS
• Design of 400KV bus duct support foundations for both stations.
• Design of fire water pump house.
Detailed design of 400_220kV grid station at IZKI & MISFAH of OETC
• Design of 400KV GIS building of IZKI GS
• Revision of 400KV GIS & Control building of MISFAH GS
• Design of 5ton capacity EOT crane girder & steel maintenance platform.
• Design of 400KV bus duct support foundations for both stations.
• Review of 400KV gantry design and design of gantry tower foundations.
Detailed design of 132/33kV grid station at IZKI of OETC
• Design of 132KV GIS & Control building with full basement.
• Design of 125MVA transformer shed & Capacitor bank shed using EURO code for wind load
calculations.
• Design of surge arrester and cable sealing end supporting structures along with foundations.
• Review of 132KV DT+9 terminal tower & design of tower foundation.
Pre bid engineering & Detailed design of 220/132/33kV grid station at Sohar Free Zone of OETC
• Estimation of civil material quantities for the whole project based on tender drawings and
preparation of BOQ in contractor desired format for the tendering purpose.
• After award of contract design of 220KV GIS building with basement.
• Preparation of wadi diversion scheme and design of retaining wall & sloped stone pitching to
protect site from wadi.
• Design of HVAC package unit foundations and duct supporting structure with foundation.
• Review of fire water pump house mechanical layout & preparation of architectural drawings &
design of FWPH.
• Design of fire water tank foundation using FEM analysis.
Owners Engineering Services for implementation of 33kV capacity expansion works
• Review of Civil design documents & drawings submitted by contractors consultant.
• 4 primary substations at North awqad, Hakbeet, Al- Saan, Teetam are reviewed under
this scope of work.
• Review of soil reports, survey details is done.
• Prepared schematic drawings for 9m high retaining walls & tender layouts for all stations.
Detailed Design of 33-11kV, 2x20MVA Mubayila south-7 primary Substation of MEDC
• Design capacitor bank foundation and its structural steel shed with foundations.
• Review of site grading drawing & plot drainage layout.
• Design of holding tank for buildings & oil collection sump for transformers.
July 2011 to June 2013: FICHTNER CONSULTING ENGINEERS LIMITED, CHENNAI.
Position : Design Engineer
ROLES EXECUTED
• Worked as assistant engineer to lead engineer along with two other engineers and six designers.
Responsible for the modeling, analysis, design & detailing of the civil structures and getting
approvals from the owners for construction on the designs and drawings prepared by me & team.
• Ensuring the works meeting with the project specifications and codal requirements.
• Interaction between Owners and clients
• Preparing project schedules meeting the construction requirements at site.
• Assigning works to team members and helping them to resolve difficulties faced in presentation
of the deliverables.
• Attending project review meetings for the progress review and action planning.
• Improvisations of standard excel sheets to suit the design requirements.
• Inter departmental co-ordination and Vendor drawing reviews.
• Analysis, Design & Detailing of structures (steel & concrete).
PROJECTS
6000 MW North East to Agra, HVDC Converter terminals, ABB SWEDEN
Design Engineer (civil)
• World’s biggest HVDC station
• Design of project associated civil and structural works
• Review of vendor drawings and coordination with vendors and contractors.
• Main structures designed are valve hall (steel structure of 80mx38mx 27m height,
Converter transformer foundations with fire wall, service building of 50mx30mx17m
height, LVAC buildings, switchyard structures and its foundations etc.
2x800MW thermal power plant for M/s TATA PROJECTS LTD
Design Engineer (civil)
• Analysis and design of 250m long pipe racks structure.
• Design of pile group foundations using FEM for pipe rack supports.
• Design of 2 story steel ESP Control building.
• Design of RCC fire water pump house.
• Inter departmental coordination and vendor drawing review for the associated structures.
ACADEMIC PROJECTS
M.Tech : Behavioural Study of Geopolymer concrete with addition of Ground granulated
Blastfurnace Slag (GGBS) in percentage to flyash to attain higher strength
concretes at lower costs and fast setting properies.Samples casted are tested for
compressive strength, tensile strength, workability index, thermal resistance and
concluded with positive results on higher strengths and better performance than
cement concretes.
B.Tech : Application of Vertical Drains on Soft Soils for the improvement of the bearing
capacity of the soft soils like clay. Studied different varieties of drains available in
the market at that time and advatntages of the drains. Concluded with a report
with advantages and disadvantages of different types of drains.
PERSONAL INFORMATION
Date of birth : 30 January,1988
Sex : Male
Marital status : Married
Nationality : Indian
Languages known : English, Tamil, Telugu,
Hindi
DECLARATION
My CV is enclosed to provide you with details of my skills and accomplishments, but I am sure/
confident that a personal interview would reveal my desire and ability to contribute to your
distinguished organization.
Place : Muscat
Date : (SSN Prasad Akshintala)

More Related Content

What's hot

Resume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerResume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerWan Sazali
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpSURENDRA BABU
 
Raymond Guo 2016
Raymond Guo 2016Raymond Guo 2016
Raymond Guo 2016Raymond Guo
 
Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.Pintu Darji
 
EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDING
EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDINGEDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDING
EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDINGEduardo H. Pare
 
CV of Karan Vinayak - piping design engineer
CV of  Karan Vinayak - piping design engineerCV of  Karan Vinayak - piping design engineer
CV of Karan Vinayak - piping design engineerKaran Vinayak
 
B Levitt Resume 03_16_2
B Levitt Resume 03_16_2B Levitt Resume 03_16_2
B Levitt Resume 03_16_2Brian Levitt
 
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTIONEDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTIONEduardo H. Pare
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designerbharath kumar
 
CV_S.Athan_2017_01
CV_S.Athan_2017_01CV_S.Athan_2017_01
CV_S.Athan_2017_01Steve Athan
 
CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15Dave Beveridge
 
Madian CV_Sr Civil Structural Tech Eng
Madian CV_Sr Civil Structural  Tech EngMadian CV_Sr Civil Structural  Tech Eng
Madian CV_Sr Civil Structural Tech EngMohamad Madian
 

What's hot (20)

Resume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerResume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping Designer
 
RCPRESUMEOCT2016
RCPRESUMEOCT2016RCPRESUMEOCT2016
RCPRESUMEOCT2016
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
 
Resume
ResumeResume
Resume
 
Raymond Guo 2016
Raymond Guo 2016Raymond Guo 2016
Raymond Guo 2016
 
PMC 1.1- 22jul16
PMC 1.1- 22jul16PMC 1.1- 22jul16
PMC 1.1- 22jul16
 
Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.
 
EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDING
EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDINGEDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDING
EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDING
 
CV of Karan Vinayak - piping design engineer
CV of  Karan Vinayak - piping design engineerCV of  Karan Vinayak - piping design engineer
CV of Karan Vinayak - piping design engineer
 
B Levitt Resume 03_16_2
B Levitt Resume 03_16_2B Levitt Resume 03_16_2
B Levitt Resume 03_16_2
 
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTIONEDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designer
 
CV_S.Athan_2017_01
CV_S.Athan_2017_01CV_S.Athan_2017_01
CV_S.Athan_2017_01
 
CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15
 
rod wimberly
rod wimberlyrod wimberly
rod wimberly
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Scbj 0706187-cv
Scbj 0706187-cvScbj 0706187-cv
Scbj 0706187-cv
 
Madian CV_Sr Civil Structural Tech Eng
Madian CV_Sr Civil Structural  Tech EngMadian CV_Sr Civil Structural  Tech Eng
Madian CV_Sr Civil Structural Tech Eng
 
Perumal_CV_PD_Jan 2017
Perumal_CV_PD_Jan 2017Perumal_CV_PD_Jan 2017
Perumal_CV_PD_Jan 2017
 

Similar to S S N PRASAD AKSHINTALA - CIVIL ME +4 YEARS EXP

Similar to S S N PRASAD AKSHINTALA - CIVIL ME +4 YEARS EXP (20)

Ehsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEhsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical Engineer
 
Behnam_Moeinian_CV
Behnam_Moeinian_CVBehnam_Moeinian_CV
Behnam_Moeinian_CV
 
Naresh Resume
Naresh Resume Naresh Resume
Naresh Resume
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
Omorogiuwa bateson(et)
Omorogiuwa bateson(et)Omorogiuwa bateson(et)
Omorogiuwa bateson(et)
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
jay-resume
jay-resumejay-resume
jay-resume
 
Resume
ResumeResume
Resume
 
updated cv 2015
updated cv 2015updated cv 2015
updated cv 2015
 
Senthilraj_Civil & Structural Engineer
Senthilraj_Civil & Structural EngineerSenthilraj_Civil & Structural Engineer
Senthilraj_Civil & Structural Engineer
 
reeshu_updated resume
reeshu_updated resumereeshu_updated resume
reeshu_updated resume
 
Abhinandan_Sen_3D_CV_latest
Abhinandan_Sen_3D_CV_latestAbhinandan_Sen_3D_CV_latest
Abhinandan_Sen_3D_CV_latest
 
Imaran CV
Imaran CVImaran CV
Imaran CV
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
Resume - Raveendra S
Resume - Raveendra SResume - Raveendra S
Resume - Raveendra S
 
Resume
ResumeResume
Resume
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)
 
Structural Designer-Vijayanand
Structural Designer-VijayanandStructural Designer-Vijayanand
Structural Designer-Vijayanand
 

S S N PRASAD AKSHINTALA - CIVIL ME +4 YEARS EXP

  • 1. SSN PRASAD AKSHINTALA Qualification M.Tech. STRUCTURAL ENGINEERING Total years of experience – 4.2 Email Address: Sujit_ssn_prasad@yahoo.co.in prasadakshintalassn@gmail.com Mobile: +968 - 96634659 Communication Address: 14-2-25, PB road, Vizianagaram, Andhra Pradesh,India-535002. Passport No : G1950914 Valid Upto : 11.04.2017 ACADEMIC PROFILE M-Tech Structural Engineering , Andhra University college of Engineering , Visakhapatnam, Andhra Pradesh, India. 2009 - 2011 BE Civil Engineering , Andhra University college of Engineering , Visakhapatnam, Andhra Pradesh, India. 2005 - 2009 TECHNICAL SKILLS Analysis Software : STAAD Pro, ETABS, SAFE Foundations Modeling Software : AUTOCAD Office package : Excel, Ms Word, power point. Codes Exposed : IS codes, BS codes, Euro codes CAREER SUMMARY Civil structural design engineer with 4 years of experience in Structural Analysis, Design and Detailing of both RCC & steel structures, Layout planning, project co-ordination & civil material quantity estimations. Worked on various projects in Thermal power plants, HVDC Converter stations in India 2 Years and Electrical Substations ranging from 11KV to 400KV in Oman for 2 Years. KEY EXPERIENCE Experience in Structural analysis, design & detailing Steel RCC Pipe Rack Structures & Pipe supports Valve hall DG Shed Crane girders Intermediate steel platform Truss Analysis Switch yard structures Transformer sheds Capacitor bank shed Service building, control building GIS building Fire water pump house Equipment/ Machine/ pump foundations Raft foundation, Pile group foundation for Power plant structures Finite element analysis Switch yard structures and foundation Cable and pipe trench Underground Pit structures Firewall and Blast wall Plot layout planning, Road layout preparation, Drainage layout planning Management & Interdepartment coordination Automation & Development Managing Engineering & drawing Team Assist Head of the department in planning and scheduling Effective monitoring to achieve project schedules. Coordination with Project team, Site Engineers and other engineering disciplines Developed automated design tools in Excel Implemented innovative approaches in design and detailing procedure to reduce Project schedule in quality manner
  • 2. PERSONALITY TRAITS Excellent communication and interpersonal skills. Excellent Leadership quality. Strong in reconciling problems and resolving conflicts. Ability to work independently as well as in a team environment. Ability to work even under high pressure. CORE COMPETENCIES Expertise in STAAD PRO and FEM analysis. Developed automated design tools in Excel. Implemented innovative approaches in design and detailing procedure to reduce Project schedule in quality manner. Good at steel structural design, detailing and 3D visualisation. Facing time bound challenges & proven every time that task is finished within stipulated time. Efficient management and organizational abilities Ability to work in complex environments. Excellent Ability to handle variety of tasks and shift priorities simultaneously. PROFESSIONAL EXPERIENCE July 2013 - present: HAMED ENGINEERING SERVICES LLC, OMAN (Currently acquired by VEC Oil & Gas Consultants, Oman) Position : Civil Design Engineer ROLES EXECUTED • Working as lead engineer for the projects assigned by the head of the department with a team of one junior engineer and three designers. Responsible for the total civil aspects associated with the electrical substation from conceptualization to completion of the designs. • Analysis, Design & Detailing of structures (steel & concrete). • Review of contractor documents and drawings of all kinds (steel & concrete) • Inter departmental co-ordination. Vendor drawing review. • Involved in the design and detailing of main structures viz. GIS building, control room building, transformer foundation structural steel shed, transformer fire wall, switchyard equipment supporting structures & its foundations, cable trenches, Capacitor bank foundation & its shed, etc. • Preparation of CTR(man hour estimation),DCS(Document Control Schedule), Man hours allocation for designers & Jr. Engineers . • Review of tower & Gantry superstructure designs & preparation of foundations of towers. • Planning of project deliverable schedules in line with site requirements. • Co-ordination with contractors & vendors for inputs required for the project. • Attending project review meetings and meetings with review consultants for document approval if required. • Supporting & maintaining records of quality documents for auditing & reviews. • As a Civil / Structural Engineer responsible for the detailed engineering including Inter-discipline coordination and coordination with client and site engineers. • The works carried out are described under main heads project-wise in detail :
  • 3. PROJECTS Detailed design for upgrading of IZKI GS to 220/132kv of OETC • Design of 500MVA transformer foundation and fire wall. • Design of NER & EAT foundations. • Design and layout of Internal and External cable trenches as per electrical layout. • Design of 6m wide bitumen top internal Road layout with orientation & slope co-ordination inline with drainage requirements as roads acts as drains in sub stations. Detailed Design Of Madinat Barka _&_Al Khadra Grid Stations of OETC • Design of 132KV GIS & Control building with basement for GIS hall in Al Khadra GS . • Design of compound wall & its foundation for both stations. • Design of external cable trenches in M Barka grid station. Consultancy services for Amerat and Mabella 132-33KV grid stations of OETC • Owners engineer for this project and third party made specifications for the project. • Review of Civil design documents & drawings submitted by contractors consultant. • Organized project review meetings for the work progress assessment and comments clarification for the contractor consultant along with contractor. • Timely site visits to ensure the construction progress and to support site team at times of technical conflicts such as fouling’s, mismatches within drawings & alternatives used . • Review of Material Approval Sheets (MAS) against specifications and recommending suitable materials for the project. Construction of Two New Grid Stations 400/220KV at Sur IPP & Jhaloot of OETC • First 400KV substation in Oman • Design of 400KV GIS building with battery & LVAC rooms of SUR GS • Design of 750MVA, 400/220KV transformer foundation and fire wall for SUR GS • Design of 400KV bus duct support foundations for both stations. • Design of fire water pump house. Detailed design of 400_220kV grid station at IZKI & MISFAH of OETC • Design of 400KV GIS building of IZKI GS • Revision of 400KV GIS & Control building of MISFAH GS • Design of 5ton capacity EOT crane girder & steel maintenance platform. • Design of 400KV bus duct support foundations for both stations. • Review of 400KV gantry design and design of gantry tower foundations. Detailed design of 132/33kV grid station at IZKI of OETC • Design of 132KV GIS & Control building with full basement. • Design of 125MVA transformer shed & Capacitor bank shed using EURO code for wind load calculations. • Design of surge arrester and cable sealing end supporting structures along with foundations. • Review of 132KV DT+9 terminal tower & design of tower foundation. Pre bid engineering & Detailed design of 220/132/33kV grid station at Sohar Free Zone of OETC • Estimation of civil material quantities for the whole project based on tender drawings and preparation of BOQ in contractor desired format for the tendering purpose.
  • 4. • After award of contract design of 220KV GIS building with basement. • Preparation of wadi diversion scheme and design of retaining wall & sloped stone pitching to protect site from wadi. • Design of HVAC package unit foundations and duct supporting structure with foundation. • Review of fire water pump house mechanical layout & preparation of architectural drawings & design of FWPH. • Design of fire water tank foundation using FEM analysis. Owners Engineering Services for implementation of 33kV capacity expansion works • Review of Civil design documents & drawings submitted by contractors consultant. • 4 primary substations at North awqad, Hakbeet, Al- Saan, Teetam are reviewed under this scope of work. • Review of soil reports, survey details is done. • Prepared schematic drawings for 9m high retaining walls & tender layouts for all stations. Detailed Design of 33-11kV, 2x20MVA Mubayila south-7 primary Substation of MEDC • Design capacitor bank foundation and its structural steel shed with foundations. • Review of site grading drawing & plot drainage layout. • Design of holding tank for buildings & oil collection sump for transformers. July 2011 to June 2013: FICHTNER CONSULTING ENGINEERS LIMITED, CHENNAI. Position : Design Engineer ROLES EXECUTED • Worked as assistant engineer to lead engineer along with two other engineers and six designers. Responsible for the modeling, analysis, design & detailing of the civil structures and getting approvals from the owners for construction on the designs and drawings prepared by me & team. • Ensuring the works meeting with the project specifications and codal requirements. • Interaction between Owners and clients • Preparing project schedules meeting the construction requirements at site. • Assigning works to team members and helping them to resolve difficulties faced in presentation of the deliverables. • Attending project review meetings for the progress review and action planning. • Improvisations of standard excel sheets to suit the design requirements. • Inter departmental co-ordination and Vendor drawing reviews. • Analysis, Design & Detailing of structures (steel & concrete). PROJECTS 6000 MW North East to Agra, HVDC Converter terminals, ABB SWEDEN Design Engineer (civil) • World’s biggest HVDC station • Design of project associated civil and structural works • Review of vendor drawings and coordination with vendors and contractors. • Main structures designed are valve hall (steel structure of 80mx38mx 27m height, Converter transformer foundations with fire wall, service building of 50mx30mx17m height, LVAC buildings, switchyard structures and its foundations etc.
  • 5. 2x800MW thermal power plant for M/s TATA PROJECTS LTD Design Engineer (civil) • Analysis and design of 250m long pipe racks structure. • Design of pile group foundations using FEM for pipe rack supports. • Design of 2 story steel ESP Control building. • Design of RCC fire water pump house. • Inter departmental coordination and vendor drawing review for the associated structures. ACADEMIC PROJECTS M.Tech : Behavioural Study of Geopolymer concrete with addition of Ground granulated Blastfurnace Slag (GGBS) in percentage to flyash to attain higher strength concretes at lower costs and fast setting properies.Samples casted are tested for compressive strength, tensile strength, workability index, thermal resistance and concluded with positive results on higher strengths and better performance than cement concretes. B.Tech : Application of Vertical Drains on Soft Soils for the improvement of the bearing capacity of the soft soils like clay. Studied different varieties of drains available in the market at that time and advatntages of the drains. Concluded with a report with advantages and disadvantages of different types of drains. PERSONAL INFORMATION Date of birth : 30 January,1988 Sex : Male Marital status : Married Nationality : Indian Languages known : English, Tamil, Telugu, Hindi DECLARATION My CV is enclosed to provide you with details of my skills and accomplishments, but I am sure/ confident that a personal interview would reveal my desire and ability to contribute to your distinguished organization. Place : Muscat Date : (SSN Prasad Akshintala)