1. 1 of 2
SKILLS
Strategic Consulting
Construction Management
Project Management
Asset Management
Capital Planning
Communications and
Change
Business Case Evaluation
Risk Analysis
Watershed Master-planning
Project Scoping/Budgeting
Technical Writing
GIS Analyses
LOS Determination
Data Collection & Analysis
Data Management
Surveying
AutoCAD Drafting
Hydraulic Modelling
Watershed Modelling
Model Parameterization
Drainage Design
KENNETH A. HOKENNETH A. HOKENNETH A. HOKENNETH A. HORRRRNER, P.ENER, P.ENER, P.ENER, P.E....
KENNETH.HORNER@CH2M.COM
(C) 352.514.8742
EXPERIENCE
CH2MHILL Engineering Inc. May 2011 – Present
Consulting Services – Assistant PM and project engineer providing strategic consulting services across
water, wastewater, and water resources fields.
• DC Water Asset Management Program – Washington, D.C.; $15M 2016
o Key team member developing a strategic asset management program to manage risk and
improve operational efficiency and reliability
o Assistant Project Manager responsible for development of budget, identifying resources
and staffing needs and producing a schedule for $2.7M contract extension.
o Author and assistant project manager of comprehensive Asset Management Plans to
provided recommendations to deliver world-class water and waste water services through
programmatic improvements
o Developed a customized business case evaluation process to facilitate planning efforts by
identifying high value, low cost alternatives for improvement across the authority.
o Developed a Capital Project Prioritization tool and process incorporating client specific
prioritization criteria to compare and prioritize projects across multiple disciplines and
provide recommendations for capital improvement expenditures.
• Watershed Master Planning and Model Development –
Southwest Florida Water Management District; Approx. $2M 2011-2015
o Construction and maintenance of large scale watershed models used for development of a
regional Watershed Master Plan (WMP).
o Development of model parameters, BMP analysis, and Level of Service evaluations
o Determination of future capital expenditures and recommendations for improvements in
maintenance and operations procedures.
o Created innovative processes to meet aggressive schedule and strict budget constraints
• Inventory Development City of Anna Maria Island 2012-2015
o Developed customized data collection and management processes to meet client-specific
needs; Managed field work, geospatial (GPS) data collection and processing and
development of inventory geodatabase
o High client satisfaction provided strategic positioning for acquisition of future work
• Nevis Master Drainage Plan Project Engineer/USAID – Island of Nevis $360K 2013
o Development of a riverine flood model, and flood warning system
o Provided recommendation of infrastructure improvements to reduce loss of life/property
o Developed data collection and management processes
Construction Services – Superintendent/Resident Engineer performing QAQC of sub-contractor
performance, documenting that all contract document stipulations were performed. Safety site
coordinator performing preparation of safety material and regular safety audits.
• Superintendent-UCAP Capital Improvement – Tampa, FL 2014-2015
o Heavy civil construction incorporating multiple subcontractors in an urban area. High
priority given to public awareness and safety due to high profile nature of project.
o 36” and 8” DIP water mains under roadway alongside roadway realignment
o Stormwater infrastructure including RCP sewer, catch-basins/manholes, pre-cast box
culverts ranging in size up to dual 12’x14’ culverts and pour-in-place structural concrete
o Soil cement micro-tunneling launch pit and boring of a 400 Linear foot, 42” Micro tunnel
• Resident Engineer – Boyette Reservoir TRD soil cement wall – Wesley Chapel, FL; $40M 2014
o Sub-surface soil cement TRD wall for reservoir containment below ground surface
• Resident Engineer – Noman C Cole Waste Water Treatment Plant – Lorton, VA 2015-2016
o Contract document management including specification review, as-built coordination, and
RFI/Change order evaluation and processing.
2. 2 of 2
CERTIFICATIONS /
TRAINING
Professional Engineer (P.E.)
OSHA 10HR Certified
CPR-AED Training
Confined Spaces Training
CH2M Site Safety
Coordinator
Excavation Competent
Person Training
KENNETH A. HOKENNETH A. HOKENNETH A. HOKENNETH A. HORRRRNER, P.ENER, P.ENER, P.ENER, P.E....
REFERENCES AVAILABLE
UPON REQUEST
EXPERIENCE (cont.)
CH2MHILL Engineering Inc. May 2011 – Present
Design Services – Assistant PM and project engineer performing all necessary hydraulic
modelling, permitting, and design for various best management practices (BMP) providing
stormwater treatment and attenuation.
• Storm water Infrastructure Retrofit Public Private Partnership Design Execution Plan –
Prince Georges County, MD; $1.7M assigned, $80M ceiling 2015
o Engineering and construction services retrofitting up to 2,000 acres of publically owned
impervious area within the County.
o Developed Best Management Practices (BMPs), and low impact development/Green
Infrastructure Practices (LID) to satisfy NPDES MS4 Permit requirements.
o Designed multiple Submerged Gravel Wetlands and High Flow Media filters and created
standard procedures to increase efficiency of design and provide consistency between
designers
• Pinellas Park storm water Pond PD&E Assistant PM and Project Engineer –
Pinellas County, FL, $130K 2014-2015
o Preliminary Design and Engineering comparing multiple BMP’s to provide flood
attenuation and stormwater treatment for a residential area
o Innovative solutions in design and constructability, directly benefiting the cost/benefit
ratio of the design and increasing client satisfaction.
o High client satisfaction provided strategic positioning for acquisition of future work
resulting in the awarding of 3 contracts with values totaling $5.2M
• Jerry Smith Road Drainage Design Project Engineer – Tampa, FL 2014-2015
o Design engineer for replacement of a storm water culvert to mitigate flooding issues.
• Sir Solomon Hochoy Highway Project Engineer – Trinidad and Tobago 2011
o Design engineer on an international team designing and constructing of an interstate
highway under design build project delivery.
o Due to the work being overseas, priority was given to incorporating in-country means
and methods of constructability and procurement of local materials and goods.
• Design Engineer for industrial port sites in multiple locations:
o Port Development Drainage Design Project Engineer – Island of Montserrat 2011
o Arawac Cay Industrial Port Development Project Engineer –
Arawac Cay, Bahamas 2011
o NCP5 Pier Construction Project Engineer – Cape Canaveral, FL 2011
o Port Redwing Berth Development Tampa Port Authority Project Engineer –
Tampa Bay, FL 2011
EDUCATION
Bachelor of Science Civil Engineering – University of Central Florida 2011
• Researcher at the Stormwater Management And Testing Lab (SMARTLab) 2009-2011
COMMUNITY INVOLVEMENT/AWARDS
• ASCE Young Members Forum – Vice President 2014-2015
• CH2M Reward and Recognition for exceptional work Multiple Years
• Society for International Development – Member 2015-2016
• EWB Philanthropy Trip – Design Manager 2011
• Bible Study – Worship Leader 2008-2011