SlideShare a Scribd company logo
1 of 9
The Most Trustworthy Inspection Partner in Korea
Inspection
Services
Statics
Equipment
Rotating
Equipment
Material
Handling
Package
Electrical &
Instrument
FPSO, Bulks
Piping,
Valves
Technical
Translation
Services
Drawings
Various
kinds of
Procedure
TR CU
Certificates
Shipping
Document
Technical
Passport
Manual
Expediting
Services
Procurement
Status
Monitoring/
Alarming
Verification
Auditing
Reporting
RUSSIAN,
KAZAKH &
C.I.S.
CERTIFICATION
Type of
Certificate
Voluntary
Certificate
Single
shipment
Certificates
GOST-R
Pattern
approval
certificate
Exemption
Letter
Sourcing
Services
Pressure
Vessel
Heat
Exchange
Valves
Pipes
Fittings
Flange
With our professional Inspectors, our company’s strategic goal and central focus is to establish solid
partnerships and entrusted corporate relationships, the framework of which will be a continuous added
value interaction resulting to benefits in the customer’s outcome.
The cooperation framework and interaction with our customers, is gradually expanding into new areas
and fields, since the unified quality and safety pathways become even more important for both parties.
Our services include Field Inspection, Shop Inspection, Welding Inspection, Steel Structures Inspection,
Goods & Cargo Inspection, Pressure Vessels Equipment Inspection, Stage Inspections, NDT (Non-
destructive Testing), Pre-Shipment Inspection (PSI), Factory Acceptance Tests (FAT), Loading/Unloading,
Securing and Packing Inspection, Quality Assurance, Expediting, Measurement & Testing, Order Control,
Factory Audit, Mill Test, Consulting, Engineering and Procurement.
ISO 9001 : 2008 integrates the various internal processes within an organization to identify, measure,
control and improve the core business processes to improve business performance and exceed
customer expectations.
We are performing inspection services, currently available in the countries shown as follow;
America, Austria, Argentina, Australia, Brazil, Belgium, China, Czech, Canada, France, Germany, Iran,
Italy, India, Indonesia, Jordan, Japan, KSA, Malaysia, Mexico, Netherland, Poland, Russia, Singapore,
Spain, Switzerland, Taiwan, Ukraine, UK, Turkey, etc.
North
America
AUS
Asia
South
America
Europe
JK offers a wide range of services that comprise Engineering Inspection of Static equipment, Rotating
equipment, Material Handling equipment, Skid/or Module Package, Electrical and Instrument, Pipes,
Valves and Bulks purchased by customer for Oil & Gas, Petrochemical, Power generation plant. The main
purpose of these services is providing with integrity of quality for customer’s project and to deliver the
correct customized equipment and materials to project site and to minimize any further potential risk.
JK carries out Third Party Vendor Inspection at manufacturer based on client requirements
We are ready to work closely with you to establish your requirements, preference at your satisfaction.
We carry out inspection using our resource base of field Engineers and our global network of offices. All
field Engineers are inducted in accordance with our Quality Management System and are assessed on
an ongoing basis for capability and competency. This has a direct, positive impact on the quality of the
inspection services we provide.
Our global network of offices enables us to provide local services and deliver complete project solutions
across the oil, gas, power generation and petrochemical industries.
The following services are offered from our inspection group, but not limited to,
Inspection
Rotating
Electric
Stationary
Steel
Structure
Instruments
Piping
Package
• Leading a Pre-Inspection Meeting
• Sourcing Inspection
• Dimensional Inspection
• Welding Inspection
• Performance and Mechanical Running Test
• Coating and Packing Inspection
• Electrical
• Physical Inspection at Vendor / Supplier and
dedicated area such as Yard, Field,
Maintenance plant
• Vendor/ Supplier Inspection, Auditing and
Assessment
• Field Inspection, Auditing and Assessment
• Most equipment and materials such as
Mechanical, Rotating, Electrical &
Instrumentation,
• Pipes, Bulks in Shop/ Supplier/ Site based
on the Purchaser’s
• Inspection Guide Plan or Approved
Vendor Inspection Test Plan.
• Monitoring all Inspection steps
• Consulting Welding, Special Materials
fabrication, Process of Complexity of
Commodity
• Supporting Technical matters in Trouble
shootings
• Reporting by Flash, Daily and Weekly in detail.
• Issuing and closing Punch Lists
• Issuing an Inspection Release Note
• Reviewing of Manufacture’s Data
Report/Dossier
• Pre-Shipment Inspection
When technical translation is needed, speed, accuracy and delivery on time are essential and has
a reputation for combining these fundamental requirements with a standard of personal service
that is second to none.
JK has a full service Russian Technical Translation Department staffed by bilingual, Russian-
educated engineers. Our technical translation personnel use the latest versions of word processing
and AutoCAD software to ensure professional results.
JK provides the complete range of federal approval documents required to legally impart and use
material and equipment in Russia, Kazakhstan and C.I.S and we will first consult and do support
translation work for the projects with customers, of various documentations as below.
Translation document types:
• Technical Passport
• Drawing
• Inspection/Dimensional Report, Material Test Report
• Procedure
(Burner Firing Test, Fabrication, Inspection Test, Heat Treatment, Hydro Test, NDE, Packing,
Painting, PMI, Pressure Test, Pre-Dry Out, Repair Welding, Rust Prevention, Refractory
Installation)
• Certificate ( Inspection & Test , Mill Test, Calibration )
• Cause and Effect Chart
• Data Sheet
• Damper Actuator Vendor Print
• Operating & Maintenance Manual
• PWHT, Inspection Test Plan
• Packing List, Welder List
• Shipping Document
• Spare parts List
• Pressure Part Calculation, Strength Calculation,
• Acid Dew Point Calculation
• Sub-vendor List
• WPS, PQR, IRN
The Certificate of the Customs Union (CU certification) is necessarily required for entry into the
market of the Customs Union by the customs of each Member State. The aim was to appeal technical
obstacles, such as the compulsory certification trade between three countries and to reduce the number
of mandatory technical procedures for the importation of goods into and export of goods from the
territory of the Customs Union.
TR CU Certificate and Declaration (Technical Regulation conformity Certificate)
Since 25 September 2010 new regulations came into force on certification equipment, production lines
of various kinds, plants of various kinds. From 25 September for these types of product should not be
issued more GOST-R, but a new certificate called “Certificate TR CU(Technical Regulation Conformity
Certificate TRCU”) certificate of approval from the technical requirements.
Type of Certificate
• Voluntary Certificate
For products not subjected mandatory certification according to the Russian law, voluntary
certification scheme may be applied. Exporters or importers initiate voluntary certification with
the aim to formally prove the conformity of their products to the applicable Russian standards,
technical norms or recipes. In other words, GOST Certificate of Conformity is a powerful
marketing too to capture Russian customer.
• Single shipment Certificates GOST-R
That kind of certificate is a good solution for companies which export their products only
occasionally. The single shipment certificate is valid for one delivery but there is also possibility
to use that document for few deliveries. In a content of certificate is inscribed the quantity of
exporting products which can be divided into few deliveries.
• Pattern approval certificate
This is an official document certifying that the measurement device( the formula) satisfies the
requirements of standards and is approved for use in the Russian Federation. The certificate
should contain the registration number of the instrument. The certificate is issued with the
Annex, which should indicate the area of application, technical and metrological significant
margins of uncertainty, the calibration interval and the mane of the normative document on
which the research was conducted.
When operating in Russia, you need to ensure that your measuring instruments comply with the
required regulations.
Our pattern approval certificate services can help you to achieve the pattern approval certificate
for measuring instruments.
• Exemption Letter
There are two kinds of Exemption Letters:
(1) Refusal Explanation Letters- the main aim of that document it to prove customs that
product doesn’t need obligatory certificate
(2) Information Letters( References)- it proves receivers intermediary companies that your
product do not need the GOST certificate. The procedure of issuing an Exemption Letter
usually takes about 5-7working days.
JK Inspection Engineering Co., Ltd. provides a
proactive and cost effective expediting, service
through the company’s network of experienced
field expeditors.
To save unnecessary cost and minimize
potential risks, the supplier and customer may
agree on the use of a third party expediter.
Our expediters are trained and skilled in typical
production planning and manufacturing
processes. They work with the manufacturer to
ensure adequate planning to meet the delivery
dates. With our professional and a rich
experienced in process of commodities of
expediting services the client is assured of an
independent, knowledgeable view of the
expected impact on project schedules.
• The following services are provided from
our expediting team:
- Supplier/Vendor Procurement Status
- Assessment of Production Schedules
- Monitoring Supplier/Vendor Schedules
for Submittal of Documentation
- Verification of Delivery/Completion
• Schedules
1. Manpower Loading and Assessment
2. Verification of Production Schedule
3. Verification of Equipment Capabilities
4. Auditing Supplier/Vendor
Manufacturing
• Process
I. Engineering Information Verification
II. Reporting Daily/Weekly/Monthly
basis
III. Forecasting/Alarming behind
schedule
We provide sourcing service for the
customer in its purchasing of equipment and
materials such as pressure vessels, heat
exchangers, valves, pipes, fittings, flanges and
so on.
In addition, we offer the service of delivery
control engineering work, material control,
fabrication control, vendor/supplier control
and reporting periodically.
We can develop vendor, sub-vendor,
supplier for the customer, moreover we
provide shop auditing, and surveillance such
vendor, potential vendor/supplier on behalf of
customer before purchase order.
We can help companies worldwide achieve
significant cost savings when purchasing a
variety of goods and services at the same
time maintaining or increasing the quality of
the parts provided.
We have the ability and experience to fast-
track and ensure your company starts off with
a reliable supply chain.
• JK can guarantee you:
- Notable and consistent cost
improvement
- Consistently high quality
- Supplier partnering/certification
- Reliability- Just in Time delivery
intervals
Our goal is to provide the most effective
and efficient procurement of quality goods
and service to enable the customer to achieve
its successful project.
Project & Vendor Information.
Spec. & Procedure of Inspection.
Relevant Drawings, Production Schedule.
Required scope and schedule of work.
Inspector & Expeditor
(JK or Affiliated
Inspection Company)
Report by Email
P.O. Sheet, General Job
Instruction, Spec, & Procedure
of Inspection
REMARKS
( Documents
handed over)
North
America
AUS
Asia
South
America
Europe
Since 2011, JK Inspection Engineering Co., Ltd. headquarter has been located in
Sindorim Prugio 1cha, #102-1805, Gyungin-Ro 661, Guro-Gu, Seoul, South Korea
1 Seoul, South Korea
T : +82 (0)2-6120-7414
2 Yeosu, South Korea
T : +82 061 906 3994
3 Ulsan, South Korea
T : +82 052 267 5967
4 Moscow, Russia
T : +7 495 332 33 80
5 Suzhou, China
T :+86 512 6920 9598
6 Jakarta, Indonesia
T : +6221 4893 456
7 Selangor D. E, Malaysia
T : +6019 355 6099
8 Los Angeles, U.S.A
T : +1 213 948 7531

More Related Content

What's hot

Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
Saif Ali
 
jaynt singh (CV) (5)
jaynt singh (CV) (5)jaynt singh (CV) (5)
jaynt singh (CV) (5)
Jayant Singh
 
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCUpdated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
khursheed aiam
 
MD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_originalMD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_original
M.Nafis Haque
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDF
Chandra Battu
 
RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTOR
Mohsin Iqubal
 
Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)
MUHAMMAD ASIF
 

What's hot (20)

Kazi nazmul cv with all attachments
Kazi nazmul cv with all attachments Kazi nazmul cv with all attachments
Kazi nazmul cv with all attachments
 
Qc
QcQc
Qc
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
 
SUMER_MECH_Er
SUMER_MECH_ErSUMER_MECH_Er
SUMER_MECH_Er
 
Tamil_Updated_Resume
Tamil_Updated_ResumeTamil_Updated_Resume
Tamil_Updated_Resume
 
Linsin CV
Linsin CVLinsin CV
Linsin CV
 
jaynt singh (CV) (5)
jaynt singh (CV) (5)jaynt singh (CV) (5)
jaynt singh (CV) (5)
 
Babbu jakir resume
Babbu jakir resumeBabbu jakir resume
Babbu jakir resume
 
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCUpdated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
 
MD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_originalMD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_original
 
Cv senior qc manager mk-bencharif - english
Cv senior qc manager  mk-bencharif - englishCv senior qc manager  mk-bencharif - english
Cv senior qc manager mk-bencharif - english
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDF
 
Welding Inspector - QC Inspector
Welding Inspector - QC InspectorWelding Inspector - QC Inspector
Welding Inspector - QC Inspector
 
Ganesan Plant Inspector_CV
Ganesan Plant Inspector_CVGanesan Plant Inspector_CV
Ganesan Plant Inspector_CV
 
RESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTORRESUME FOR QC INSPECTOR
RESUME FOR QC INSPECTOR
 
ars resume
ars resumears resume
ars resume
 
Phairat-CV(2015)
Phairat-CV(2015)Phairat-CV(2015)
Phairat-CV(2015)
 
Quality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipelineQuality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipeline
 
C.V
C.VC.V
C.V
 
Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)Muhammad Asif - Procurement Quality Supervisor CV (2)
Muhammad Asif - Procurement Quality Supervisor CV (2)
 

Viewers also liked (8)

tIC_ SESION 3 JOHAN JARAMILLO
tIC_ SESION 3 JOHAN JARAMILLOtIC_ SESION 3 JOHAN JARAMILLO
tIC_ SESION 3 JOHAN JARAMILLO
 
Las tecnologías de la información y comunicacion
Las tecnologías de la información y comunicacionLas tecnologías de la información y comunicacion
Las tecnologías de la información y comunicacion
 
tic sesion 5
tic sesion 5tic sesion 5
tic sesion 5
 
RESUME AZAD
RESUME AZADRESUME AZAD
RESUME AZAD
 
HAN 470 PowerPoint Presentation
HAN 470 PowerPoint PresentationHAN 470 PowerPoint Presentation
HAN 470 PowerPoint Presentation
 
Slit lampbiomicroscopy-jinal & dhara
Slit lampbiomicroscopy-jinal & dharaSlit lampbiomicroscopy-jinal & dhara
Slit lampbiomicroscopy-jinal & dhara
 
Accommodation
AccommodationAccommodation
Accommodation
 
Marketing project on Gloria jean's coffee
Marketing project on Gloria jean's coffeeMarketing project on Gloria jean's coffee
Marketing project on Gloria jean's coffee
 

Similar to JK Inspection PQ2015 (20)

QA-QC Welding,Corrosion,Plant inspector
QA-QC Welding,Corrosion,Plant inspectorQA-QC Welding,Corrosion,Plant inspector
QA-QC Welding,Corrosion,Plant inspector
 
Resume Khurshid
Resume KhurshidResume Khurshid
Resume Khurshid
 
QA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceQA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrence
 
QC WELDING INSPECTOR
QC WELDING INSPECTORQC WELDING INSPECTOR
QC WELDING INSPECTOR
 
YOGARAJ CV
YOGARAJ CVYOGARAJ CV
YOGARAJ CV
 
PRAGASH-QC INSPECTION ENGG Feb'2016
PRAGASH-QC INSPECTION ENGG Feb'2016PRAGASH-QC INSPECTION ENGG Feb'2016
PRAGASH-QC INSPECTION ENGG Feb'2016
 
Mohamad Elyaas CV & Certf
Mohamad Elyaas CV & CertfMohamad Elyaas CV & Certf
Mohamad Elyaas CV & Certf
 
ANAND CV
ANAND CVANAND CV
ANAND CV
 
sonu jaiswal resume 17.02.2017
sonu jaiswal resume  17.02.2017sonu jaiswal resume  17.02.2017
sonu jaiswal resume 17.02.2017
 
Swarup cv 3 (1)
Swarup cv 3 (1)Swarup cv 3 (1)
Swarup cv 3 (1)
 
Swarup cv 3 (1)
Swarup cv 3 (1)Swarup cv 3 (1)
Swarup cv 3 (1)
 
Nivin Joseph- resume
Nivin Joseph- resumeNivin Joseph- resume
Nivin Joseph- resume
 
Resume_Chintan_Gohil_
Resume_Chintan_Gohil_Resume_Chintan_Gohil_
Resume_Chintan_Gohil_
 
Quality management system system
Quality management system systemQuality management system system
Quality management system system
 
CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016
 
shan resume 2015.1.1
shan resume 2015.1.1shan resume 2015.1.1
shan resume 2015.1.1
 
JIMJITH QC INSPECTOR
JIMJITH QC INSPECTORJIMJITH QC INSPECTOR
JIMJITH QC INSPECTOR
 
CV-Vuong Tatthang
CV-Vuong TatthangCV-Vuong Tatthang
CV-Vuong Tatthang
 
Jaynt singh (cv) (1)
Jaynt singh (cv) (1)Jaynt singh (cv) (1)
Jaynt singh (cv) (1)
 
Jaynt singh (cv) (1)
Jaynt singh (cv) (1)Jaynt singh (cv) (1)
Jaynt singh (cv) (1)
 

JK Inspection PQ2015

  • 1. The Most Trustworthy Inspection Partner in Korea
  • 2. Inspection Services Statics Equipment Rotating Equipment Material Handling Package Electrical & Instrument FPSO, Bulks Piping, Valves Technical Translation Services Drawings Various kinds of Procedure TR CU Certificates Shipping Document Technical Passport Manual Expediting Services Procurement Status Monitoring/ Alarming Verification Auditing Reporting RUSSIAN, KAZAKH & C.I.S. CERTIFICATION Type of Certificate Voluntary Certificate Single shipment Certificates GOST-R Pattern approval certificate Exemption Letter Sourcing Services Pressure Vessel Heat Exchange Valves Pipes Fittings Flange
  • 3. With our professional Inspectors, our company’s strategic goal and central focus is to establish solid partnerships and entrusted corporate relationships, the framework of which will be a continuous added value interaction resulting to benefits in the customer’s outcome. The cooperation framework and interaction with our customers, is gradually expanding into new areas and fields, since the unified quality and safety pathways become even more important for both parties. Our services include Field Inspection, Shop Inspection, Welding Inspection, Steel Structures Inspection, Goods & Cargo Inspection, Pressure Vessels Equipment Inspection, Stage Inspections, NDT (Non- destructive Testing), Pre-Shipment Inspection (PSI), Factory Acceptance Tests (FAT), Loading/Unloading, Securing and Packing Inspection, Quality Assurance, Expediting, Measurement & Testing, Order Control, Factory Audit, Mill Test, Consulting, Engineering and Procurement. ISO 9001 : 2008 integrates the various internal processes within an organization to identify, measure, control and improve the core business processes to improve business performance and exceed customer expectations. We are performing inspection services, currently available in the countries shown as follow; America, Austria, Argentina, Australia, Brazil, Belgium, China, Czech, Canada, France, Germany, Iran, Italy, India, Indonesia, Jordan, Japan, KSA, Malaysia, Mexico, Netherland, Poland, Russia, Singapore, Spain, Switzerland, Taiwan, Ukraine, UK, Turkey, etc. North America AUS Asia South America Europe
  • 4. JK offers a wide range of services that comprise Engineering Inspection of Static equipment, Rotating equipment, Material Handling equipment, Skid/or Module Package, Electrical and Instrument, Pipes, Valves and Bulks purchased by customer for Oil & Gas, Petrochemical, Power generation plant. The main purpose of these services is providing with integrity of quality for customer’s project and to deliver the correct customized equipment and materials to project site and to minimize any further potential risk. JK carries out Third Party Vendor Inspection at manufacturer based on client requirements We are ready to work closely with you to establish your requirements, preference at your satisfaction. We carry out inspection using our resource base of field Engineers and our global network of offices. All field Engineers are inducted in accordance with our Quality Management System and are assessed on an ongoing basis for capability and competency. This has a direct, positive impact on the quality of the inspection services we provide. Our global network of offices enables us to provide local services and deliver complete project solutions across the oil, gas, power generation and petrochemical industries. The following services are offered from our inspection group, but not limited to, Inspection Rotating Electric Stationary Steel Structure Instruments Piping Package • Leading a Pre-Inspection Meeting • Sourcing Inspection • Dimensional Inspection • Welding Inspection • Performance and Mechanical Running Test • Coating and Packing Inspection • Electrical • Physical Inspection at Vendor / Supplier and dedicated area such as Yard, Field, Maintenance plant • Vendor/ Supplier Inspection, Auditing and Assessment • Field Inspection, Auditing and Assessment • Most equipment and materials such as Mechanical, Rotating, Electrical & Instrumentation, • Pipes, Bulks in Shop/ Supplier/ Site based on the Purchaser’s • Inspection Guide Plan or Approved Vendor Inspection Test Plan. • Monitoring all Inspection steps • Consulting Welding, Special Materials fabrication, Process of Complexity of Commodity • Supporting Technical matters in Trouble shootings • Reporting by Flash, Daily and Weekly in detail. • Issuing and closing Punch Lists • Issuing an Inspection Release Note • Reviewing of Manufacture’s Data Report/Dossier • Pre-Shipment Inspection
  • 5. When technical translation is needed, speed, accuracy and delivery on time are essential and has a reputation for combining these fundamental requirements with a standard of personal service that is second to none. JK has a full service Russian Technical Translation Department staffed by bilingual, Russian- educated engineers. Our technical translation personnel use the latest versions of word processing and AutoCAD software to ensure professional results. JK provides the complete range of federal approval documents required to legally impart and use material and equipment in Russia, Kazakhstan and C.I.S and we will first consult and do support translation work for the projects with customers, of various documentations as below. Translation document types: • Technical Passport • Drawing • Inspection/Dimensional Report, Material Test Report • Procedure (Burner Firing Test, Fabrication, Inspection Test, Heat Treatment, Hydro Test, NDE, Packing, Painting, PMI, Pressure Test, Pre-Dry Out, Repair Welding, Rust Prevention, Refractory Installation) • Certificate ( Inspection & Test , Mill Test, Calibration ) • Cause and Effect Chart • Data Sheet • Damper Actuator Vendor Print • Operating & Maintenance Manual • PWHT, Inspection Test Plan • Packing List, Welder List • Shipping Document • Spare parts List • Pressure Part Calculation, Strength Calculation, • Acid Dew Point Calculation • Sub-vendor List • WPS, PQR, IRN
  • 6. The Certificate of the Customs Union (CU certification) is necessarily required for entry into the market of the Customs Union by the customs of each Member State. The aim was to appeal technical obstacles, such as the compulsory certification trade between three countries and to reduce the number of mandatory technical procedures for the importation of goods into and export of goods from the territory of the Customs Union. TR CU Certificate and Declaration (Technical Regulation conformity Certificate) Since 25 September 2010 new regulations came into force on certification equipment, production lines of various kinds, plants of various kinds. From 25 September for these types of product should not be issued more GOST-R, but a new certificate called “Certificate TR CU(Technical Regulation Conformity Certificate TRCU”) certificate of approval from the technical requirements. Type of Certificate • Voluntary Certificate For products not subjected mandatory certification according to the Russian law, voluntary certification scheme may be applied. Exporters or importers initiate voluntary certification with the aim to formally prove the conformity of their products to the applicable Russian standards, technical norms or recipes. In other words, GOST Certificate of Conformity is a powerful marketing too to capture Russian customer. • Single shipment Certificates GOST-R That kind of certificate is a good solution for companies which export their products only occasionally. The single shipment certificate is valid for one delivery but there is also possibility to use that document for few deliveries. In a content of certificate is inscribed the quantity of exporting products which can be divided into few deliveries. • Pattern approval certificate This is an official document certifying that the measurement device( the formula) satisfies the requirements of standards and is approved for use in the Russian Federation. The certificate should contain the registration number of the instrument. The certificate is issued with the Annex, which should indicate the area of application, technical and metrological significant margins of uncertainty, the calibration interval and the mane of the normative document on which the research was conducted. When operating in Russia, you need to ensure that your measuring instruments comply with the required regulations. Our pattern approval certificate services can help you to achieve the pattern approval certificate for measuring instruments. • Exemption Letter There are two kinds of Exemption Letters: (1) Refusal Explanation Letters- the main aim of that document it to prove customs that product doesn’t need obligatory certificate (2) Information Letters( References)- it proves receivers intermediary companies that your product do not need the GOST certificate. The procedure of issuing an Exemption Letter usually takes about 5-7working days.
  • 7. JK Inspection Engineering Co., Ltd. provides a proactive and cost effective expediting, service through the company’s network of experienced field expeditors. To save unnecessary cost and minimize potential risks, the supplier and customer may agree on the use of a third party expediter. Our expediters are trained and skilled in typical production planning and manufacturing processes. They work with the manufacturer to ensure adequate planning to meet the delivery dates. With our professional and a rich experienced in process of commodities of expediting services the client is assured of an independent, knowledgeable view of the expected impact on project schedules. • The following services are provided from our expediting team: - Supplier/Vendor Procurement Status - Assessment of Production Schedules - Monitoring Supplier/Vendor Schedules for Submittal of Documentation - Verification of Delivery/Completion • Schedules 1. Manpower Loading and Assessment 2. Verification of Production Schedule 3. Verification of Equipment Capabilities 4. Auditing Supplier/Vendor Manufacturing • Process I. Engineering Information Verification II. Reporting Daily/Weekly/Monthly basis III. Forecasting/Alarming behind schedule We provide sourcing service for the customer in its purchasing of equipment and materials such as pressure vessels, heat exchangers, valves, pipes, fittings, flanges and so on. In addition, we offer the service of delivery control engineering work, material control, fabrication control, vendor/supplier control and reporting periodically. We can develop vendor, sub-vendor, supplier for the customer, moreover we provide shop auditing, and surveillance such vendor, potential vendor/supplier on behalf of customer before purchase order. We can help companies worldwide achieve significant cost savings when purchasing a variety of goods and services at the same time maintaining or increasing the quality of the parts provided. We have the ability and experience to fast- track and ensure your company starts off with a reliable supply chain. • JK can guarantee you: - Notable and consistent cost improvement - Consistently high quality - Supplier partnering/certification - Reliability- Just in Time delivery intervals Our goal is to provide the most effective and efficient procurement of quality goods and service to enable the customer to achieve its successful project.
  • 8. Project & Vendor Information. Spec. & Procedure of Inspection. Relevant Drawings, Production Schedule. Required scope and schedule of work. Inspector & Expeditor (JK or Affiliated Inspection Company) Report by Email P.O. Sheet, General Job Instruction, Spec, & Procedure of Inspection REMARKS ( Documents handed over)
  • 9. North America AUS Asia South America Europe Since 2011, JK Inspection Engineering Co., Ltd. headquarter has been located in Sindorim Prugio 1cha, #102-1805, Gyungin-Ro 661, Guro-Gu, Seoul, South Korea 1 Seoul, South Korea T : +82 (0)2-6120-7414 2 Yeosu, South Korea T : +82 061 906 3994 3 Ulsan, South Korea T : +82 052 267 5967 4 Moscow, Russia T : +7 495 332 33 80 5 Suzhou, China T :+86 512 6920 9598 6 Jakarta, Indonesia T : +6221 4893 456 7 Selangor D. E, Malaysia T : +6019 355 6099 8 Los Angeles, U.S.A T : +1 213 948 7531