MIRZA AZMATULLAH BAIG
Mechanical Engineer
Arabian Technocrats Company
1
Mobile: 00966-533178084.
Email : baig0802@gmail.com.
PROFESSIONAL OBJECTIVE:
 To be associated with a progressive organization which can provide me with a dynamic work
sphere to extract my inherent skills as a Professional. Use and develop my aptitude to further
the organization’s objectives and also attain my career targets in the progress.
AACCAADDEEMMIICC QQUUAALLIIFFIICCAATTIIOONN::
Bachelor of Engineering (Mechanical)
Osmania University, 2011.
Board of Intermediate Education
Intermediate Public Examination (M.P.C), 2007.
Board of Secondary Education A.P
Secondary School Certificate, 2005.
TTEECCHHNNIICCAALL QQUUAALLIIFFIICCAATTIIOONN::
CSWIP 3.1 Certified Welding Inspector, CSWIP Cert no: 96510
ASNT Level II (American Society for Non Destructive Testing)
 Liquid Penetrant Testing (LPT)
 Magnetic Particle Testing (MPT)
 Radiograpy Testing (RT)
 Ultrasound Testing (UT)
Post Graduate Diploma in Process Piping Design & Engineering (IPEBS, Hyderabad)
Quality Control and Engineering Inspection (Advance Training Institute, Govt. of India)
AutoCAD (MSME, Govt. of India)
MIRZA AZMATULLAH BAIG
Mechanical Engineer
Arabian Technocrats Company
2
PPRROOJJEECCTT DDEESSCCRRIIPPTTIIOONN::
Company : Arabian Technocrats Company
Project : Replace HVAC Systems at Yanbu NGL , KSA
Client : Saudi Aramco Oil Company
Duration : Feb 2014 to till date
Position : Mechanical QC Inspector (Approved)
Company : Tawfiq Ahmed Al Muqahwi Est.
Project : Replacement of LPPT D2 @ GOSP-4, Uthmania, KSA
Client : Saudi Aramco Oil Company
Duration : June 2013 to Dec 2013
Position : Piping QC Inspector
Company : Nasser S. Al Hajri Corporation (NSH)
Project : SATORP Package-1, Jubail KSA
Client : Saudi Aramco Total Refining & Petrochemical Company
Duration : July 2012 to March 2013
Position : Piping QC Inspector (Approved)
Company : EBENEZER CONSTRUCTION
Duration : June 2011 to April 2012
Position : Piping Supervisor
DDUUTTIIEESS && RREESSPPOONNSSIIBBIILLIITTIIEESS
Company : Arabian Technocrats Company
Project : Replace HVAC Systems at Yanbu NGL , KSA
Client : Saudi Aramco Oil Company
 Prepare Mechanical Work Procedures like Gasket Installation and Bolt Tightning, Hydro testing
of Pipe and Valves etc as per Saudi Aramco Standards and Specifications.
 Prepare Hydro test and Tie-In Packages.
 Inspection of Pipe, Fittings and Piping Components as per MTO, BOM, MTA and related
Documents.
 Verify dimensional accuracy, alignment, plumbness etc of piping connections, fit-up etc.
 Monitoring Fabrication Activities at Fabrication Shop and Site.
 Monitor and inspects Pipe Fittings, O lets, nuts and stud bolts as per BOM (bill of materials) and
correct size and type, and all the pipe and pipe supports installed according to the approved
drawing and specification.
 Visual inspection of flanges, gaskets, and bolts, prior to installation.
 Bolt Torquing done as per Approved Procedure and Proper Torquing Value
 Inspection of valve, type of valves, direction of valve installed, valve handles orientation, valve
tag number, flange rating & size, vales operation and maintenance access.
MIRZA AZMATULLAH BAIG
Mechanical Engineer
Arabian Technocrats Company
3
 Perform Hydro testing of Valves (Body and Seat Test)
 Perform inspection and test activities including supervision monitoring of entire activities a site
and prepare reports.
 Visual inspection of welds, prior to release for hydro testing.
 Line check prior to hydro test, to verify the entire work in the test limits has been completed as
per isometric and project quality control procedures /specifications /standards.
 Prepare punch items during Line Check
 Coordinating with Construction Team for Clearing Punch Items, to release for hydro testing.
 Review hydro test package to ensure that the NDT summary, weld summary, weld map, support
drawing, valve list, approved drawing duly marked the test limits, P &Id marked with test
boundaries, check list, and all the related documents are attached in the test package as per the
project requirements.
 Preparing Red Line/ As Built Drawing.
 Perform Hydro testing of Piping as per Saudi Aramco Approved Procedure.
 Final Inspection of Piping System with the Client to check the Completeness.
 Issuing NCR for Standard Violation at Different Stages of Projects (Material receiving and
Installation)
 Involve in pre commissioning activities and monitor punch list.
Company : Tawfiq Ahmed Al Muqahwi Est.
Project : Replacement of LPPT D2 @ GOSP-4, Uthmania, KSA
Client : Saudi Aramco Oil Company
 Inspection of pipe line, spools as per isometric drawings.
 Verify and inspects the Piping material and Fittings as per specification and bill of materials.
 Verify alignment of piping connections, fit-up etc
 Line check prior to hydro test, to verify the entire work in the test limits has been completed as
per isometric and project quality control procedures /specifications /standards.
 Monitor and ensures that all welding activities are carried out according to the approved
procedures and compliance to welding codes.
 Prepare punch items, prior to release for hydro testing according to the punch list category.
 Review hydro test package to ensure that the NDT summary, weld summary, weld map, support
drawing, valve list, approved drawing duly marked the test limits, P &Id marked with test
boundaries, check list, and all the related documents are attached in the test package as per the
project requirements.
 Perform Hydro testing of Piping as per Saudi Aramco Approved Procedure.
 Final Inspection of the Piping after Installation.
MIRZA AZMATULLAH BAIG
Mechanical Engineer
Arabian Technocrats Company
4
Company : Nasser S. Al Hajri Corporation (NSH)
Project : SATORP Package-1, Jubail KSA
Client : Saudi Aramco Total Refining & Petrochemical Company (SATORP)
 Inspection of Pipe, Fittings and Piping Components as per MTO, BOM, MTA and related
Documents.
 Verify dimensional accuracy, alignment, plumbness etc of piping connections, fit-up etc.
 Monitor and inspects Pipe Fittings, O lets, nuts and stud bolts as per BOM (bill of materials) and
correct size and type, and all the pipe and pipe supports installed according to the approved
drawing and specification.
 Visual inspection of flanges, gaskets, and bolts, prior to installation.
 Bolt Torquing done as per Approved Procedure and Proper Torquing Value
 Inspection of valve, type of valves, direction of valve installed, valve handles orientation, valve
tag number, flange rating & size, vales operation and maintenance access.
 Visual inspection of welds, prior to release for hydro testing.
 Line check prior to hydro test, to verify the entire work in the test limits has been completed as
per isometric and project quality control procedures /specifications /standards.
 Prepare punch items during Line Check
 Coordinating with Construction Team for Clearing Punch Items, to release for hydro testing.
 Review hydro test package to ensure that the NDT summary, weld summary, weld map, support
drawing, valve list, approved drawing duly marked the test limits, P &Id marked with test
boundaries, check list, and all the related documents are attached in the test package as per the
project requirements.
 Perform Hydro testing of Piping as per SATORP Approved Procedure.
Company : EBENEZER CONSTRUCTION
Duration : June 2011 to April 2012
Position : Piping Supervisor
 Verify the Piping material and Fittings as per specification and bill of materials.
 Verify the Dimensions, alignment of piping connections done as per Approved drawings.
 Verify the Fit-up assembly done with proper gaping as per WPS
 Monitor and ensures that all welding activities are carried out according to the approved
procedures and Coordinate with Welding QC Inspector.
 Monitor the preparation for Pressure testing of Piping
 Coordinate with QC Inspector at all stages of Fabrication, Testing and Installation
MIRZA AZMATULLAH BAIG
Mechanical Engineer
Arabian Technocrats Company
5
SSTTRREENNGGTTHHSS::
 Highly motivated and goal-oriented Mechanical professional with experience 4 Years.
 Proven skills of working independently or as a team member to enhance efficiency.
 Comprehensive problem solving abilities.
 Good verbal and written communication skills.
 Ability to deal with people diplomatically.
 Willingness to learn, team facilitator and hard worker.
 Can meet the deadlines affectively and with ease.
 Punctual and Disciplined
PPEERRSSOONNAALL DDEETTAAIILLSS ::
Date of Birth : 16-08-1988
Nationality : Indian
Marital status : Single
Languages : English, Urdu, Hindi and Basic Arabic
Iqama : 2323445649
Driving License : Available (Indian, Saudi)
Passport No : K1824886
I hereby state that the above, given details are true and correct with my best of knowledge.
Place: Yanbu, KSA
Date : August, 2015

C.V

  • 1.
    MIRZA AZMATULLAH BAIG MechanicalEngineer Arabian Technocrats Company 1 Mobile: 00966-533178084. Email : baig0802@gmail.com. PROFESSIONAL OBJECTIVE:  To be associated with a progressive organization which can provide me with a dynamic work sphere to extract my inherent skills as a Professional. Use and develop my aptitude to further the organization’s objectives and also attain my career targets in the progress. AACCAADDEEMMIICC QQUUAALLIIFFIICCAATTIIOONN:: Bachelor of Engineering (Mechanical) Osmania University, 2011. Board of Intermediate Education Intermediate Public Examination (M.P.C), 2007. Board of Secondary Education A.P Secondary School Certificate, 2005. TTEECCHHNNIICCAALL QQUUAALLIIFFIICCAATTIIOONN:: CSWIP 3.1 Certified Welding Inspector, CSWIP Cert no: 96510 ASNT Level II (American Society for Non Destructive Testing)  Liquid Penetrant Testing (LPT)  Magnetic Particle Testing (MPT)  Radiograpy Testing (RT)  Ultrasound Testing (UT) Post Graduate Diploma in Process Piping Design & Engineering (IPEBS, Hyderabad) Quality Control and Engineering Inspection (Advance Training Institute, Govt. of India) AutoCAD (MSME, Govt. of India)
  • 2.
    MIRZA AZMATULLAH BAIG MechanicalEngineer Arabian Technocrats Company 2 PPRROOJJEECCTT DDEESSCCRRIIPPTTIIOONN:: Company : Arabian Technocrats Company Project : Replace HVAC Systems at Yanbu NGL , KSA Client : Saudi Aramco Oil Company Duration : Feb 2014 to till date Position : Mechanical QC Inspector (Approved) Company : Tawfiq Ahmed Al Muqahwi Est. Project : Replacement of LPPT D2 @ GOSP-4, Uthmania, KSA Client : Saudi Aramco Oil Company Duration : June 2013 to Dec 2013 Position : Piping QC Inspector Company : Nasser S. Al Hajri Corporation (NSH) Project : SATORP Package-1, Jubail KSA Client : Saudi Aramco Total Refining & Petrochemical Company Duration : July 2012 to March 2013 Position : Piping QC Inspector (Approved) Company : EBENEZER CONSTRUCTION Duration : June 2011 to April 2012 Position : Piping Supervisor DDUUTTIIEESS && RREESSPPOONNSSIIBBIILLIITTIIEESS Company : Arabian Technocrats Company Project : Replace HVAC Systems at Yanbu NGL , KSA Client : Saudi Aramco Oil Company  Prepare Mechanical Work Procedures like Gasket Installation and Bolt Tightning, Hydro testing of Pipe and Valves etc as per Saudi Aramco Standards and Specifications.  Prepare Hydro test and Tie-In Packages.  Inspection of Pipe, Fittings and Piping Components as per MTO, BOM, MTA and related Documents.  Verify dimensional accuracy, alignment, plumbness etc of piping connections, fit-up etc.  Monitoring Fabrication Activities at Fabrication Shop and Site.  Monitor and inspects Pipe Fittings, O lets, nuts and stud bolts as per BOM (bill of materials) and correct size and type, and all the pipe and pipe supports installed according to the approved drawing and specification.  Visual inspection of flanges, gaskets, and bolts, prior to installation.  Bolt Torquing done as per Approved Procedure and Proper Torquing Value  Inspection of valve, type of valves, direction of valve installed, valve handles orientation, valve tag number, flange rating & size, vales operation and maintenance access.
  • 3.
    MIRZA AZMATULLAH BAIG MechanicalEngineer Arabian Technocrats Company 3  Perform Hydro testing of Valves (Body and Seat Test)  Perform inspection and test activities including supervision monitoring of entire activities a site and prepare reports.  Visual inspection of welds, prior to release for hydro testing.  Line check prior to hydro test, to verify the entire work in the test limits has been completed as per isometric and project quality control procedures /specifications /standards.  Prepare punch items during Line Check  Coordinating with Construction Team for Clearing Punch Items, to release for hydro testing.  Review hydro test package to ensure that the NDT summary, weld summary, weld map, support drawing, valve list, approved drawing duly marked the test limits, P &Id marked with test boundaries, check list, and all the related documents are attached in the test package as per the project requirements.  Preparing Red Line/ As Built Drawing.  Perform Hydro testing of Piping as per Saudi Aramco Approved Procedure.  Final Inspection of Piping System with the Client to check the Completeness.  Issuing NCR for Standard Violation at Different Stages of Projects (Material receiving and Installation)  Involve in pre commissioning activities and monitor punch list. Company : Tawfiq Ahmed Al Muqahwi Est. Project : Replacement of LPPT D2 @ GOSP-4, Uthmania, KSA Client : Saudi Aramco Oil Company  Inspection of pipe line, spools as per isometric drawings.  Verify and inspects the Piping material and Fittings as per specification and bill of materials.  Verify alignment of piping connections, fit-up etc  Line check prior to hydro test, to verify the entire work in the test limits has been completed as per isometric and project quality control procedures /specifications /standards.  Monitor and ensures that all welding activities are carried out according to the approved procedures and compliance to welding codes.  Prepare punch items, prior to release for hydro testing according to the punch list category.  Review hydro test package to ensure that the NDT summary, weld summary, weld map, support drawing, valve list, approved drawing duly marked the test limits, P &Id marked with test boundaries, check list, and all the related documents are attached in the test package as per the project requirements.  Perform Hydro testing of Piping as per Saudi Aramco Approved Procedure.  Final Inspection of the Piping after Installation.
  • 4.
    MIRZA AZMATULLAH BAIG MechanicalEngineer Arabian Technocrats Company 4 Company : Nasser S. Al Hajri Corporation (NSH) Project : SATORP Package-1, Jubail KSA Client : Saudi Aramco Total Refining & Petrochemical Company (SATORP)  Inspection of Pipe, Fittings and Piping Components as per MTO, BOM, MTA and related Documents.  Verify dimensional accuracy, alignment, plumbness etc of piping connections, fit-up etc.  Monitor and inspects Pipe Fittings, O lets, nuts and stud bolts as per BOM (bill of materials) and correct size and type, and all the pipe and pipe supports installed according to the approved drawing and specification.  Visual inspection of flanges, gaskets, and bolts, prior to installation.  Bolt Torquing done as per Approved Procedure and Proper Torquing Value  Inspection of valve, type of valves, direction of valve installed, valve handles orientation, valve tag number, flange rating & size, vales operation and maintenance access.  Visual inspection of welds, prior to release for hydro testing.  Line check prior to hydro test, to verify the entire work in the test limits has been completed as per isometric and project quality control procedures /specifications /standards.  Prepare punch items during Line Check  Coordinating with Construction Team for Clearing Punch Items, to release for hydro testing.  Review hydro test package to ensure that the NDT summary, weld summary, weld map, support drawing, valve list, approved drawing duly marked the test limits, P &Id marked with test boundaries, check list, and all the related documents are attached in the test package as per the project requirements.  Perform Hydro testing of Piping as per SATORP Approved Procedure. Company : EBENEZER CONSTRUCTION Duration : June 2011 to April 2012 Position : Piping Supervisor  Verify the Piping material and Fittings as per specification and bill of materials.  Verify the Dimensions, alignment of piping connections done as per Approved drawings.  Verify the Fit-up assembly done with proper gaping as per WPS  Monitor and ensures that all welding activities are carried out according to the approved procedures and Coordinate with Welding QC Inspector.  Monitor the preparation for Pressure testing of Piping  Coordinate with QC Inspector at all stages of Fabrication, Testing and Installation
  • 5.
    MIRZA AZMATULLAH BAIG MechanicalEngineer Arabian Technocrats Company 5 SSTTRREENNGGTTHHSS::  Highly motivated and goal-oriented Mechanical professional with experience 4 Years.  Proven skills of working independently or as a team member to enhance efficiency.  Comprehensive problem solving abilities.  Good verbal and written communication skills.  Ability to deal with people diplomatically.  Willingness to learn, team facilitator and hard worker.  Can meet the deadlines affectively and with ease.  Punctual and Disciplined PPEERRSSOONNAALL DDEETTAAIILLSS :: Date of Birth : 16-08-1988 Nationality : Indian Marital status : Single Languages : English, Urdu, Hindi and Basic Arabic Iqama : 2323445649 Driving License : Available (Indian, Saudi) Passport No : K1824886 I hereby state that the above, given details are true and correct with my best of knowledge. Place: Yanbu, KSA Date : August, 2015