LIVE CASE STUDY – II | MAHARANA PRATAP ISBT, KASHMIRI GATE, DELHI | ABOUT THE CITY &
SITE AND SURROUNDINGS
MRIDUL BHANDARI (B.ARCH | V – YR. / X – SEM.)
THESIS TOPIC : INTER-STATE BUS TERMINUS FOR UDAIPUR CITY
BUDDHA INSTITUTE OF ARCHITECTURE & TOWN PLANNING UDAIPUR (313001),
RAJASTHAN
SHEET NO. 1
CASE STUDY – II
DATE : 27TH FEBRUARY / 2015
0
50
100
150
200
250
JAN FEB MAR APR MAY JUNE JULY AUG SEP OCT NOV DEC
TEMPERATURE (degree celcius)
rH (%)
PRECIPITATION (inch)
DELHI FACTFILE
UNION TERRITORY : DELHI
AREA : 1484 SQKM
POPULATION : 1,10,07,835 (CENCUS-2013)
POPULATION DENSITY : 11,050 PERSONS / SQKM.
SEISMIC ZONE : II (LEAST ACTIVE)
CLIMATE : TROPICAL CLIMATE
AVG. TEMPERATURE : 32 °C (SUMMERS)
12–13 °C (WINTERS)
PRECIPITATION : 790 MM / YEAR
KASHMIRI GATE, DELHI BUS TERMINUS
AREA : 56,126 SQMT.
SHAPE : ALMOST RECTENGULAR
DESIGNED BY : MR. RAJENDRA KUMAR
FOOTFALL / DAY : MORE THAN 1,00,000 PEOPLE
BUS TRIPS / DAY : 2,000 TRIPS
SURROUNDINGS THE BUS TERMINUS ARE AS FOLLOWS :
NORTH : FLY OVER 20M WIDE
EAST : RING ROAD 30M WIDE
SOUTH : KASHMIRI GATE METRO STATION
WEST : ROAD 20M WIDE
NEAR-BY HOSPITAL : SANT PARMANAND HOSPITAL (4.5 KM)
ACCESS TO THE SITE :
I & II - BUS ENTRY AND EXIT
III & IV - PUBLIC ENTRY AND EXIT
DISTANCES FROM MAJOR LANDMARKS :
INDRA GANDHI INTERNATIONAL AIRPORT : 25 KM
SABZI MANDI RAILWAY STATION : 3.6 KM
LIVE CASE STUDY – II | MAHARANA PRATAP ISBT, KASHMIRI GATE, DELHI | SITE PLAN & GROUND FLOOR PLAN
N
MRIDUL BHANDARI (B.ARCH | V – YR. / X – SEM.)
THESIS TOPIC : INTER-STATE BUS TERMINUS FOR UDAIPUR CITY
BUDDHA INSTITUTE OF ARCHITECTURE & TOWN PLANNING UDAIPUR (313001),
RAJASTHAN
SHEET NO. 2
CASE STUDY – II
DATE : 27TH FEBRUARY / 2015
LEGENDS
1 - 47 BUS BAYS FOR BOARDING
2 - ENTRANCE TO THE LOUNGE
3 - 2 RAMP
4 - TOILETS
5 - FOOD STALLS & TICKET COUNTERS
6 - LIFT
7 - ESCATOR
8 - STAIRCASE
9 - 15 BUS BAYS FOR DEBOARDING
10 - CLOAK ROOM
11 - PARCEL OFFICE
12 - ARRIVAL PATH
13 - FIRST AID ROOM
1
2 2
2 2
3 3
4
5
4
5
5 5
6
7
8
8
8
9
8 8 4 10 11
12
134
6
66
ARRIVAL PATH 6M WIDE VIEW OF THE BUILDING FROM
THE PARKING
POTABLE WATER FACILITY LINK BLOCK
FIRST AID ROOM
BUS BAYS
FRONT VIEW FROM WEST
SIDE ROAD
VIEW FROM NORTH SIDE
BUS ENTRY CORRIDORE
GROUND FLOOR PLAN
SITE PLAN
AUTO-
STAND
BELOW
PARKING FOR 60 FOUR WHEELERS 20 TWO WHEELERS
GREEN
BELT
AREA
10M
WIDE
ROAD
10M WIDE
PUBIL ENTRANCE
N
MRIDUL BHANDARI (B.ARCH | V – YR. / X – SEM.)
THESIS TOPIC : INTER-STATE BUS TERMINUS FOR UDAIPUR CITY
BUDDHA INSTITUTE OF ARCHITECTURE & TOWN PLANNING UDAIPUR (313001),
RAJASTHAN
SHEET NO. 3
CASE STUDY – II
DATE : 27TH FEBRUARY / 2015
LIVE CASE STUDY – II | MAHARANA PRATAP ISBT, KASHMIRI GATE, DELHI | FIRST FLOOR PLAN & PARKING LAYOUT &
CONCLUSION
DOWNSTAIRS TO ACCESS AUTO
STAND
CAR PARKING
ROAD AND FOOTPATH
JUNCTION
LEGENDS
1 - STAIRCASE / RAMP / ESCALATOR
2 - FOOD COURT (PROPOSED)
3 - POLICE CABIN
4 - TOILETS
5 - WAITING LOUNGE
6 - 16 TICKET COUNTERS & INQUIRY OFFICE
7 - RECEPTION
8 - DIMTS OFFICE
9 - DTIDC OFFICE
10 - SBI BANK BRANCH OFFICE
11 - CHECK POST
12 - PORTICO
FIRST FLOOR PLAN
POSITIVE ASPECTS
THE CONNECTIVITY FOR ISBT, KASHMIRI GATE IS WELL DEFINED
BY MEANS OF METROS, CITY BUSES, RRTS.
IT IS LOCATED AT THE INTERSECTION OF NH-24 & NH-28,
WHICH MAKES THE TERMINUS EASIER TO APPROACH BY ROAD.
THERE ARE SAPERATE BLOCKS OF BOARDING AND DEBOARDING
TO CATER THE CROWD.
DIFFERENT CIRCULATION SPACES FOR DIFFRENT TYPE OF
VEHICLES.
THE BUILDING IS DISABLE FRIENDLY AS THERE ARE RAMPS AND
ELEVATORS PROVIDED TO ACCESS THE UPPER FLOORS.
NEGETIVE ASPECTS
THERE IS A MARKED ABSENCE OF GOOD SIGNAGES ,THOUGH
IT IS MENTIONED THAT THIS IS THE ENTRANCE FOR BUSES
ONLY, TWO WHEELERS & PEDESTRIANS ALSO ENTER THE
PREMISES AT TIMES DUE TO CONFUSION.
THERE IS A ECO-PROBLEM UNDER THE LINK BLOCK BAYS.
FOUR WHEELER AND TWO WHEELER PARKING IS VERY LESS
IN Nos. WITH RESPECT TO FOOTFALL.
RAMPS, ELEVATORS,
ESCALATORS
TICKET COUNTERS
1
1
11
1
1
2
3
4
4
5
6
7
8
9
10
11
12
1
1
4
41
1

More Related Content

What's hot

Mattuthavani bus terminal case study
Mattuthavani bus terminal  case studyMattuthavani bus terminal  case study
Mattuthavani bus terminal case study
Abinaya Ramakrishnan
 
Bus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt showBus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt showkiranightly
 
Ved tranzcube plaza, Vadodara
Ved tranzcube plaza, VadodaraVed tranzcube plaza, Vadodara
Ved tranzcube plaza, Vadodara
Palak Khandelwal
 
BUS TERMINAL LIBRARY STUDY
BUS TERMINAL LIBRARY STUDYBUS TERMINAL LIBRARY STUDY
BUS TERMINAL LIBRARY STUDY
Sumit Ranjan
 
Transit hub
Transit hub Transit hub
Transit hub
Athira Suresh
 
Inter state bus terminal - Library Study & Case Study
Inter state bus terminal - Library Study & Case StudyInter state bus terminal - Library Study & Case Study
Inter state bus terminal - Library Study & Case Study
Ar. Prerna Chouhan
 
Bus Terminal-Bachelor thesis project 2006
Bus Terminal-Bachelor thesis project 2006 Bus Terminal-Bachelor thesis project 2006
Bus Terminal-Bachelor thesis project 2006 Hassan Raza
 
Ad bus terminal chennai
Ad bus terminal chennaiAd bus terminal chennai
Ad bus terminal chennai
Bhagyashree G Zadmukhe
 
casestudy.pptx
casestudy.pptxcasestudy.pptx
casestudy.pptx
priyanka438227
 
Literature study- koyembedu chennai
Literature study- koyembedu chennaiLiterature study- koyembedu chennai
Literature study- koyembedu chennai
Abinaya Ramakrishnan
 
Transbay Transit Center
Transbay Transit CenterTransbay Transit Center
Transbay Transit CenterCordoba Corp
 
Data Collection-Standards- Bus Terminal- Multi-Modal Hub
Data Collection-Standards- Bus Terminal- Multi-Modal HubData Collection-Standards- Bus Terminal- Multi-Modal Hub
Data Collection-Standards- Bus Terminal- Multi-Modal Hub
hrudai11
 
Site analysis - Transit hub
Site analysis - Transit hubSite analysis - Transit hub
Site analysis - Transit hub
nainadesh
 
ISBT site analysis for redesigning at udaipur
ISBT site analysis for redesigning at udaipurISBT site analysis for redesigning at udaipur
ISBT site analysis for redesigning at udaipur
Mridul Bhandari
 
DLF Cyber city (integrated business district)
DLF Cyber city (integrated business district)  DLF Cyber city (integrated business district)
DLF Cyber city (integrated business district)
Kapil Kaushik
 
karunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.Archkarunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.Arch
Tuhina Chatterjee
 
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...Gargee Ghosh
 
Case study KSRTC terminal calicut
Case study KSRTC terminal calicutCase study KSRTC terminal calicut
Case study KSRTC terminal calicut
Hmd
 
Chennai Mofussil Bus Terminal
Chennai Mofussil Bus TerminalChennai Mofussil Bus Terminal
Chennai Mofussil Bus Terminal
SwarnaSajith
 
District center (college projects)
District center (college projects)District center (college projects)
District center (college projects)
sonali parashar
 

What's hot (20)

Mattuthavani bus terminal case study
Mattuthavani bus terminal  case studyMattuthavani bus terminal  case study
Mattuthavani bus terminal case study
 
Bus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt showBus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt show
 
Ved tranzcube plaza, Vadodara
Ved tranzcube plaza, VadodaraVed tranzcube plaza, Vadodara
Ved tranzcube plaza, Vadodara
 
BUS TERMINAL LIBRARY STUDY
BUS TERMINAL LIBRARY STUDYBUS TERMINAL LIBRARY STUDY
BUS TERMINAL LIBRARY STUDY
 
Transit hub
Transit hub Transit hub
Transit hub
 
Inter state bus terminal - Library Study & Case Study
Inter state bus terminal - Library Study & Case StudyInter state bus terminal - Library Study & Case Study
Inter state bus terminal - Library Study & Case Study
 
Bus Terminal-Bachelor thesis project 2006
Bus Terminal-Bachelor thesis project 2006 Bus Terminal-Bachelor thesis project 2006
Bus Terminal-Bachelor thesis project 2006
 
Ad bus terminal chennai
Ad bus terminal chennaiAd bus terminal chennai
Ad bus terminal chennai
 
casestudy.pptx
casestudy.pptxcasestudy.pptx
casestudy.pptx
 
Literature study- koyembedu chennai
Literature study- koyembedu chennaiLiterature study- koyembedu chennai
Literature study- koyembedu chennai
 
Transbay Transit Center
Transbay Transit CenterTransbay Transit Center
Transbay Transit Center
 
Data Collection-Standards- Bus Terminal- Multi-Modal Hub
Data Collection-Standards- Bus Terminal- Multi-Modal HubData Collection-Standards- Bus Terminal- Multi-Modal Hub
Data Collection-Standards- Bus Terminal- Multi-Modal Hub
 
Site analysis - Transit hub
Site analysis - Transit hubSite analysis - Transit hub
Site analysis - Transit hub
 
ISBT site analysis for redesigning at udaipur
ISBT site analysis for redesigning at udaipurISBT site analysis for redesigning at udaipur
ISBT site analysis for redesigning at udaipur
 
DLF Cyber city (integrated business district)
DLF Cyber city (integrated business district)  DLF Cyber city (integrated business district)
DLF Cyber city (integrated business district)
 
karunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.Archkarunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.Arch
 
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
Planning for a Multimodal Transport Hub: Case Study - Sealdah Interchange, Ko...
 
Case study KSRTC terminal calicut
Case study KSRTC terminal calicutCase study KSRTC terminal calicut
Case study KSRTC terminal calicut
 
Chennai Mofussil Bus Terminal
Chennai Mofussil Bus TerminalChennai Mofussil Bus Terminal
Chennai Mofussil Bus Terminal
 
District center (college projects)
District center (college projects)District center (college projects)
District center (college projects)
 

Similar to Isbt, kashmiri gate, delhi_a case study

383759330.pdf
383759330.pdf383759330.pdf
383759330.pdf
AbhishekSharma352837
 
Heera Mohan PORTFOLIO
Heera Mohan PORTFOLIOHeera Mohan PORTFOLIO
Heera Mohan PORTFOLIO
Heera Mohan
 
Co working office spaces
Co working office spacesCo working office spaces
Co working office spaces
Siddiq Salim
 
Theoritical framework
Theoritical frameworkTheoritical framework
Theoritical framework
Isha Kirti
 
Architecture and Town Planning _Unit 4_SPPU_Survey and Transportation Managem...
Architecture and Town Planning _Unit 4_SPPU_Survey and Transportation Managem...Architecture and Town Planning _Unit 4_SPPU_Survey and Transportation Managem...
Architecture and Town Planning _Unit 4_SPPU_Survey and Transportation Managem...
Shrikant Kate
 
K Rail Silver line DPR - James Joseph Adhikarathil 9447464502
K Rail Silver line DPR  - James Joseph Adhikarathil 9447464502K Rail Silver line DPR  - James Joseph Adhikarathil 9447464502
K Rail Silver line DPR - James Joseph Adhikarathil 9447464502
Jamesadhikaram land matter consultancy 9447464502
 
Redevelopment of an uban lost space( A case of Safdarjung Airport)
Redevelopment of an uban lost space( A case of Safdarjung Airport)Redevelopment of an uban lost space( A case of Safdarjung Airport)
Redevelopment of an uban lost space( A case of Safdarjung Airport)
Akshat Chouhan
 
Xun Lei port folio
Xun Lei port folioXun Lei port folio
Xun Lei port folioXun Lei
 
Chandigarh
ChandigarhChandigarh
Pandit Nehru Bus Terminal
Pandit Nehru Bus Terminal Pandit Nehru Bus Terminal
Pandit Nehru Bus Terminal
KeerthireddyNussi
 
ASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKET
ASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKETASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKET
ASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKET
IRJET Journal
 
Transportation Planning as Effective Mean to Rejuvenate a Pilgrimage Town
Transportation  Planning as Effective Mean to Rejuvenate a Pilgrimage TownTransportation  Planning as Effective Mean to Rejuvenate a Pilgrimage Town
Transportation Planning as Effective Mean to Rejuvenate a Pilgrimage Town
IRJET Journal
 
Architecture Portfolio (Undergradute)
Architecture Portfolio (Undergradute)Architecture Portfolio (Undergradute)
Architecture Portfolio (Undergradute)
Madhura Udapure
 
Narendra nagar flexible road pavement training report
Narendra nagar  flexible road pavement training reportNarendra nagar  flexible road pavement training report
Narendra nagar flexible road pavement training report
Narendra Nagar
 
Chandigarh - planning and its transformation
Chandigarh - planning and its transformation Chandigarh - planning and its transformation
Chandigarh - planning and its transformation
Gagan Tanwar
 
Construction of joka majherhat phase-i metro corridor considering the requir...
Construction of joka  majherhat phase-i metro corridor considering the requir...Construction of joka  majherhat phase-i metro corridor considering the requir...
Construction of joka majherhat phase-i metro corridor considering the requir...Rajesh Prasad
 
Sonepat Global City | Property in Sonepat
Sonepat Global City | Property in SonepatSonepat Global City | Property in Sonepat
Sonepat Global City | Property in Sonepat
Jindal Realty
 
Sonepat global city | Plots in Sonepat | Floors in Sonepat
Sonepat global city | Plots in Sonepat | Floors in SonepatSonepat global city | Plots in Sonepat | Floors in Sonepat
Sonepat global city | Plots in Sonepat | Floors in Sonepat
Kavita Sharma
 
Sonepat Global City | Property in Sonepat | Jindal Realty
Sonepat Global City | Property in Sonepat | Jindal RealtySonepat Global City | Property in Sonepat | Jindal Realty
Sonepat Global City | Property in Sonepat | Jindal Realty
Kavita Sharma
 

Similar to Isbt, kashmiri gate, delhi_a case study (20)

383759330.pdf
383759330.pdf383759330.pdf
383759330.pdf
 
Heera Mohan PORTFOLIO
Heera Mohan PORTFOLIOHeera Mohan PORTFOLIO
Heera Mohan PORTFOLIO
 
Co working office spaces
Co working office spacesCo working office spaces
Co working office spaces
 
sudarshan mukhopadhyay C.V.
sudarshan mukhopadhyay C.V.sudarshan mukhopadhyay C.V.
sudarshan mukhopadhyay C.V.
 
Theoritical framework
Theoritical frameworkTheoritical framework
Theoritical framework
 
Architecture and Town Planning _Unit 4_SPPU_Survey and Transportation Managem...
Architecture and Town Planning _Unit 4_SPPU_Survey and Transportation Managem...Architecture and Town Planning _Unit 4_SPPU_Survey and Transportation Managem...
Architecture and Town Planning _Unit 4_SPPU_Survey and Transportation Managem...
 
K Rail Silver line DPR - James Joseph Adhikarathil 9447464502
K Rail Silver line DPR  - James Joseph Adhikarathil 9447464502K Rail Silver line DPR  - James Joseph Adhikarathil 9447464502
K Rail Silver line DPR - James Joseph Adhikarathil 9447464502
 
Redevelopment of an uban lost space( A case of Safdarjung Airport)
Redevelopment of an uban lost space( A case of Safdarjung Airport)Redevelopment of an uban lost space( A case of Safdarjung Airport)
Redevelopment of an uban lost space( A case of Safdarjung Airport)
 
Xun Lei port folio
Xun Lei port folioXun Lei port folio
Xun Lei port folio
 
Chandigarh
ChandigarhChandigarh
Chandigarh
 
Pandit Nehru Bus Terminal
Pandit Nehru Bus Terminal Pandit Nehru Bus Terminal
Pandit Nehru Bus Terminal
 
ASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKET
ASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKETASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKET
ASSESSING THE IMPACT OF PUNE METRO ON REAL ESTATE MARKET
 
Transportation Planning as Effective Mean to Rejuvenate a Pilgrimage Town
Transportation  Planning as Effective Mean to Rejuvenate a Pilgrimage TownTransportation  Planning as Effective Mean to Rejuvenate a Pilgrimage Town
Transportation Planning as Effective Mean to Rejuvenate a Pilgrimage Town
 
Architecture Portfolio (Undergradute)
Architecture Portfolio (Undergradute)Architecture Portfolio (Undergradute)
Architecture Portfolio (Undergradute)
 
Narendra nagar flexible road pavement training report
Narendra nagar  flexible road pavement training reportNarendra nagar  flexible road pavement training report
Narendra nagar flexible road pavement training report
 
Chandigarh - planning and its transformation
Chandigarh - planning and its transformation Chandigarh - planning and its transformation
Chandigarh - planning and its transformation
 
Construction of joka majherhat phase-i metro corridor considering the requir...
Construction of joka  majherhat phase-i metro corridor considering the requir...Construction of joka  majherhat phase-i metro corridor considering the requir...
Construction of joka majherhat phase-i metro corridor considering the requir...
 
Sonepat Global City | Property in Sonepat
Sonepat Global City | Property in SonepatSonepat Global City | Property in Sonepat
Sonepat Global City | Property in Sonepat
 
Sonepat global city | Plots in Sonepat | Floors in Sonepat
Sonepat global city | Plots in Sonepat | Floors in SonepatSonepat global city | Plots in Sonepat | Floors in Sonepat
Sonepat global city | Plots in Sonepat | Floors in Sonepat
 
Sonepat Global City | Property in Sonepat | Jindal Realty
Sonepat Global City | Property in Sonepat | Jindal RealtySonepat Global City | Property in Sonepat | Jindal Realty
Sonepat Global City | Property in Sonepat | Jindal Realty
 

Recently uploaded

GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
Nguyen Thanh Tu Collection
 
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdfESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
Fundacja Rozwoju Społeczeństwa Przedsiębiorczego
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
EduSkills OECD
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
PedroFerreira53928
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
bennyroshan06
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
TechSoup
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
Celine George
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
AzmatAli747758
 
Template Jadual Bertugas Kelas (Boleh Edit)
Template Jadual Bertugas Kelas (Boleh Edit)Template Jadual Bertugas Kelas (Boleh Edit)
Template Jadual Bertugas Kelas (Boleh Edit)
rosedainty
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 

Recently uploaded (20)

GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
 
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdfESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
 
Template Jadual Bertugas Kelas (Boleh Edit)
Template Jadual Bertugas Kelas (Boleh Edit)Template Jadual Bertugas Kelas (Boleh Edit)
Template Jadual Bertugas Kelas (Boleh Edit)
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 

Isbt, kashmiri gate, delhi_a case study

  • 1. LIVE CASE STUDY – II | MAHARANA PRATAP ISBT, KASHMIRI GATE, DELHI | ABOUT THE CITY & SITE AND SURROUNDINGS MRIDUL BHANDARI (B.ARCH | V – YR. / X – SEM.) THESIS TOPIC : INTER-STATE BUS TERMINUS FOR UDAIPUR CITY BUDDHA INSTITUTE OF ARCHITECTURE & TOWN PLANNING UDAIPUR (313001), RAJASTHAN SHEET NO. 1 CASE STUDY – II DATE : 27TH FEBRUARY / 2015 0 50 100 150 200 250 JAN FEB MAR APR MAY JUNE JULY AUG SEP OCT NOV DEC TEMPERATURE (degree celcius) rH (%) PRECIPITATION (inch) DELHI FACTFILE UNION TERRITORY : DELHI AREA : 1484 SQKM POPULATION : 1,10,07,835 (CENCUS-2013) POPULATION DENSITY : 11,050 PERSONS / SQKM. SEISMIC ZONE : II (LEAST ACTIVE) CLIMATE : TROPICAL CLIMATE AVG. TEMPERATURE : 32 °C (SUMMERS) 12–13 °C (WINTERS) PRECIPITATION : 790 MM / YEAR KASHMIRI GATE, DELHI BUS TERMINUS AREA : 56,126 SQMT. SHAPE : ALMOST RECTENGULAR DESIGNED BY : MR. RAJENDRA KUMAR FOOTFALL / DAY : MORE THAN 1,00,000 PEOPLE BUS TRIPS / DAY : 2,000 TRIPS SURROUNDINGS THE BUS TERMINUS ARE AS FOLLOWS : NORTH : FLY OVER 20M WIDE EAST : RING ROAD 30M WIDE SOUTH : KASHMIRI GATE METRO STATION WEST : ROAD 20M WIDE NEAR-BY HOSPITAL : SANT PARMANAND HOSPITAL (4.5 KM) ACCESS TO THE SITE : I & II - BUS ENTRY AND EXIT III & IV - PUBLIC ENTRY AND EXIT DISTANCES FROM MAJOR LANDMARKS : INDRA GANDHI INTERNATIONAL AIRPORT : 25 KM SABZI MANDI RAILWAY STATION : 3.6 KM
  • 2. LIVE CASE STUDY – II | MAHARANA PRATAP ISBT, KASHMIRI GATE, DELHI | SITE PLAN & GROUND FLOOR PLAN N MRIDUL BHANDARI (B.ARCH | V – YR. / X – SEM.) THESIS TOPIC : INTER-STATE BUS TERMINUS FOR UDAIPUR CITY BUDDHA INSTITUTE OF ARCHITECTURE & TOWN PLANNING UDAIPUR (313001), RAJASTHAN SHEET NO. 2 CASE STUDY – II DATE : 27TH FEBRUARY / 2015 LEGENDS 1 - 47 BUS BAYS FOR BOARDING 2 - ENTRANCE TO THE LOUNGE 3 - 2 RAMP 4 - TOILETS 5 - FOOD STALLS & TICKET COUNTERS 6 - LIFT 7 - ESCATOR 8 - STAIRCASE 9 - 15 BUS BAYS FOR DEBOARDING 10 - CLOAK ROOM 11 - PARCEL OFFICE 12 - ARRIVAL PATH 13 - FIRST AID ROOM 1 2 2 2 2 3 3 4 5 4 5 5 5 6 7 8 8 8 9 8 8 4 10 11 12 134 6 66 ARRIVAL PATH 6M WIDE VIEW OF THE BUILDING FROM THE PARKING POTABLE WATER FACILITY LINK BLOCK FIRST AID ROOM BUS BAYS FRONT VIEW FROM WEST SIDE ROAD VIEW FROM NORTH SIDE BUS ENTRY CORRIDORE GROUND FLOOR PLAN SITE PLAN
  • 3. AUTO- STAND BELOW PARKING FOR 60 FOUR WHEELERS 20 TWO WHEELERS GREEN BELT AREA 10M WIDE ROAD 10M WIDE PUBIL ENTRANCE N MRIDUL BHANDARI (B.ARCH | V – YR. / X – SEM.) THESIS TOPIC : INTER-STATE BUS TERMINUS FOR UDAIPUR CITY BUDDHA INSTITUTE OF ARCHITECTURE & TOWN PLANNING UDAIPUR (313001), RAJASTHAN SHEET NO. 3 CASE STUDY – II DATE : 27TH FEBRUARY / 2015 LIVE CASE STUDY – II | MAHARANA PRATAP ISBT, KASHMIRI GATE, DELHI | FIRST FLOOR PLAN & PARKING LAYOUT & CONCLUSION DOWNSTAIRS TO ACCESS AUTO STAND CAR PARKING ROAD AND FOOTPATH JUNCTION LEGENDS 1 - STAIRCASE / RAMP / ESCALATOR 2 - FOOD COURT (PROPOSED) 3 - POLICE CABIN 4 - TOILETS 5 - WAITING LOUNGE 6 - 16 TICKET COUNTERS & INQUIRY OFFICE 7 - RECEPTION 8 - DIMTS OFFICE 9 - DTIDC OFFICE 10 - SBI BANK BRANCH OFFICE 11 - CHECK POST 12 - PORTICO FIRST FLOOR PLAN POSITIVE ASPECTS THE CONNECTIVITY FOR ISBT, KASHMIRI GATE IS WELL DEFINED BY MEANS OF METROS, CITY BUSES, RRTS. IT IS LOCATED AT THE INTERSECTION OF NH-24 & NH-28, WHICH MAKES THE TERMINUS EASIER TO APPROACH BY ROAD. THERE ARE SAPERATE BLOCKS OF BOARDING AND DEBOARDING TO CATER THE CROWD. DIFFERENT CIRCULATION SPACES FOR DIFFRENT TYPE OF VEHICLES. THE BUILDING IS DISABLE FRIENDLY AS THERE ARE RAMPS AND ELEVATORS PROVIDED TO ACCESS THE UPPER FLOORS. NEGETIVE ASPECTS THERE IS A MARKED ABSENCE OF GOOD SIGNAGES ,THOUGH IT IS MENTIONED THAT THIS IS THE ENTRANCE FOR BUSES ONLY, TWO WHEELERS & PEDESTRIANS ALSO ENTER THE PREMISES AT TIMES DUE TO CONFUSION. THERE IS A ECO-PROBLEM UNDER THE LINK BLOCK BAYS. FOUR WHEELER AND TWO WHEELER PARKING IS VERY LESS IN Nos. WITH RESPECT TO FOOTFALL. RAMPS, ELEVATORS, ESCALATORS TICKET COUNTERS 1 1 11 1 1 2 3 4 4 5 6 7 8 9 10 11 12 1 1 4 41 1