Internship report
The report is prepared on request from Maaz and Shahrukh for their 4-week internship program.
The data has been provided by them.
This report includes theoretical, pictorial and mathematical material.
Industrial Training report Civil Engineering.JAPJEETSINGH13
Industrial training report for civil engineering major training final year. All rights to the images, blueprints and content is reserved.
Only available for educational purposes.
CIVIL ENGINEERING INTERNSHIP REPORT, DETAILED INTERNSHIP REPORT ON A CIVIL ENGINEERING SITE , USEFUL REPORT FOR FRESHER CIVIL ENGINEERS WITH EXTRA ORDINARY DETAILS WITH IMAGES AND CHECK LIST, FOR CIVIL ENGINEERING STUDENTS FOR HOW TO MAKE INTERNSHIP REPORT
Report is about the Internship of a Civil Engineer.
This Report is for the students of civil engineering. In this report u can find the format of the Report, Mechanism of the internship report. It is very useful to understand some civil engineering terms.
Industrial Training report Civil Engineering.JAPJEETSINGH13
Industrial training report for civil engineering major training final year. All rights to the images, blueprints and content is reserved.
Only available for educational purposes.
CIVIL ENGINEERING INTERNSHIP REPORT, DETAILED INTERNSHIP REPORT ON A CIVIL ENGINEERING SITE , USEFUL REPORT FOR FRESHER CIVIL ENGINEERS WITH EXTRA ORDINARY DETAILS WITH IMAGES AND CHECK LIST, FOR CIVIL ENGINEERING STUDENTS FOR HOW TO MAKE INTERNSHIP REPORT
Report is about the Internship of a Civil Engineer.
This Report is for the students of civil engineering. In this report u can find the format of the Report, Mechanism of the internship report. It is very useful to understand some civil engineering terms.
Industrial Summer Training Report at Construction Site of CPWD Alok Mishra
Construction of Police Station Khajuri Khas, Near Sonia Vihar, Delhi (SH: C/o Police Station Building, Electric sub Station & External Development Work i.e. Internal Electrical Installations)
building Site report for 1st year students of B.sc Civil Engineering... this will be helpful in case you have just joined Civil Engineering Class and Your Teacher ask you to prepare a report based on Basic Knowledge.
Internship Report Construction Site and Office WorkAkshathaBhandary
Absolutely good the reason behind this performance was I integrate with all workers within a short time and get involved in different site works to gain more knowledge about the working environment in the site and improve myself with more site works
and office work. Since the site work is very repetitive I have been working in different section to get involved and pass through different peace of works. Especially the work tasks I have been performing in the office work were very impressive because I didn‘t have any knowledge about the quantity works, cost and report writing etc. In general in the last four month I perform all my duties nicely and get knowledge of the practical world and relate it with the theory I have learnt in the class in the last three years. Also I transform myself to another level of skill, ethics, knowledge and leadership using this internship class and I perform it well.
this report is helpful for highway work or road construction, its also useful for pavement works or pavement design. this report told about bitumen road work construction, in this report cement used for work in side of road.its helpful for those civil engineers who want to submit there training report or seminar report.
Industrial Summer Training Report at Construction Site of CPWD Alok Mishra
Construction of Police Station Khajuri Khas, Near Sonia Vihar, Delhi (SH: C/o Police Station Building, Electric sub Station & External Development Work i.e. Internal Electrical Installations)
building Site report for 1st year students of B.sc Civil Engineering... this will be helpful in case you have just joined Civil Engineering Class and Your Teacher ask you to prepare a report based on Basic Knowledge.
Internship Report Construction Site and Office WorkAkshathaBhandary
Absolutely good the reason behind this performance was I integrate with all workers within a short time and get involved in different site works to gain more knowledge about the working environment in the site and improve myself with more site works
and office work. Since the site work is very repetitive I have been working in different section to get involved and pass through different peace of works. Especially the work tasks I have been performing in the office work were very impressive because I didn‘t have any knowledge about the quantity works, cost and report writing etc. In general in the last four month I perform all my duties nicely and get knowledge of the practical world and relate it with the theory I have learnt in the class in the last three years. Also I transform myself to another level of skill, ethics, knowledge and leadership using this internship class and I perform it well.
this report is helpful for highway work or road construction, its also useful for pavement works or pavement design. this report told about bitumen road work construction, in this report cement used for work in side of road.its helpful for those civil engineers who want to submit there training report or seminar report.
A brief presentation on Karachi Circular Railway for Mass Transit System of Karachi.
It was a part of the class presentation, it has cover topics like Transportation mode of Karachi, mass transit, Karachi Circular Railway history
Its a brief analysis of one world trade center from architectural perspective. It also provides the idea of design concept used to build this building.
(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...Bharat Badre
rajapeth rob is an bridge in amravti if want soft copy of file with report also write me at akashkolamkar@gmail.com ,,,, iam engineer of project ,, so i will try to explain all points wit h reports ,,, now am a student of engineering so i completelly know need of seminars
i am akash kolamkar ,in my city amravati maharashtra india ,, in my city amravati a biggest bridge structure is going to construct so i have an idea to make it useful for others,,, in this report i will explain all concept with detailed drawing presentation ,, because i am engineer of project with college student if want soft copy of that file with report also so, u can mail me at akashkolamkar@gmail.com
Experienced to work with Large Refineries, Petrochemical Plants, Power Plants, and Cement Plant, at different positions in order to excel my carrier apply Engineering tools for the advancement of Process plants.
To work in an organization which provides me a career growth and to utilize my Engineering skills which will enable be to culminate into a rewarding career.
Having all most 16 years extensive professional experience in Saudi Arabia & Pakistan, in the field of civil Engineering execution supervision of Construction, specialized in Buildings, Roads, Highways, Bridges, , infrastructure projects, and other all the site activities storm water pipe lines, Sewerage drains, utility pipe sleeves Box culverts, manholes, open water storm drains and utility lines carried out by the contractor on site accordance with the drawings and standard specifications in Self-motivated initiative and maintains a high level of energy to handle timely and to successfully complete mega highway and Infra structure project.
Effects of Shredded Tyre Chips & Fine Rubber Crumbs on the Stabilization of P...Zakaria Yahya
This presentation is a requirement of my course Engineering Research Method ENGG955 while persuing my MS at UOW.
It is a work on Peat soil stabilization. Collectively the PPT, Research report and this video can help future students taking this ERM course.
Youtube video link
https://www.youtube.com/watch?v=p1Zt-ZS03yU&t=4s
The statement of purpose or entrance essay is written while applying for admission to any university. I wrote this SOP while applying for Masters to several universities. It was my general SOP and every university I apply to just have to edit the final last part of it i.e information and motivation for that specific university.
Hope this will help many students
Importing Survey Data | ACAD Civil 3D | Total Station |Zakaria Yahya
A report prepared and compiled using AutoCAD Civil 3D 2016.
This report contents are Import of survey points or data into the computer, Creating Alignment, Making A Profile of road, and so on.
Road Alignment | Road Profile | Contour | Box Culvert | Add Labels | Pick Coordinates | Center Line Coordinates | Surface | Survey | Incremental Station Report |
Project Management Knowledge Area Applied on Construction Site Civil Eneginee...Zakaria Yahya
Our Final year Project was basically a case study of Bahria Grand Mosque Karachi, where we have worked on its management areas.
This is the recise presentation which has to be presented with in 12 minutes only.
Pavement Failure Summary of Research PapersZakaria Yahya
Summary pf two scholarly published research papers for the topic Pavement Failure.
Related to asphalt pavement and its failure due to moisture presence under the soil.
It also summarizes the causes of pavement failure in Jordan.
A concise presentation on bridge construction. Related to civil engineering courses. can be helpful for undergraduate students.
Its a Part of my class presentation.
The report is being made on the experience of 3 weeks office training.
briefly describes the quality tests of Fine and Coarse aggregates .
Complete calculation of concrete mix design is included with solved numerical equations.
Cement, water and admixtures quality test is not performed because the contractor purchase it from other chemical and cement manufacturer company.
Report on surveying and leveling during my summer Internship period.
The two-week program did not cover too much and it was done in the 4th semester so the report is of beginner level.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Water billing management system project report.pdfKamal Acharya
Our project entitled “Water Billing Management System” aims is to generate Water bill with all the charges and penalty. Manual system that is employed is extremely laborious and quite inadequate. It only makes the process more difficult and hard.
The aim of our project is to develop a system that is meant to partially computerize the work performed in the Water Board like generating monthly Water bill, record of consuming unit of water, store record of the customer and previous unpaid record.
We used HTML/PHP as front end and MYSQL as back end for developing our project. HTML is primarily a visual design environment. We can create a android application by designing the form and that make up the user interface. Adding android application code to the form and the objects such as buttons and text boxes on them and adding any required support code in additional modular.
MySQL is free open source database that facilitates the effective management of the databases by connecting them to the software. It is a stable ,reliable and the powerful solution with the advanced features and advantages which are as follows: Data Security.MySQL is free open source database that facilitates the effective management of the databases by connecting them to the software.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
1. Department of Civil Technology
Written By: Maaz A. Naqvi & Shahrukh. Aqiq Hosting Company: 1
Internship report 2016
MAAZ AHMED NAQVI
SHAHRUKH AQIQ
BS CIVIL TECHNOLOGY
2. Department of Civil Technology
Written By: Maaz A. Naqvi & Shahrukh. Aqiq Hosting Company: 2
INTERNSHIP SUPERVISOR: Engr. Osama Zahid
AUTHOR: Maaz A. Naqvi
Shahrukh Aqiq
Hosting Organization: Paragon Constructors (PVT) LTD.
CommencementDate: September28, 2016
Completion Date: November 03, 2016
Approved By:
Name of DGM: Eng. Zahoor Shah
Signature:
Name of mentor: Engr.Osama Zahid
Signature:
Hosting company stamp
3. Department of Civil Technology
Written By: Maaz A. Naqvi & Shahrukh. Aqiq Hosting Company: 3
ACKNOWLEDGEMENT
I would like to thank ParagonConstrucrtors (PVT)LTD for giving me
the opportunity to undertake my five week internship in their
working area. I would like to convey my heartiest thanks to site
engineer Osama and the project manager Engr. Zahoor Shah for
their immense support and cooperation which made this experience
very learning and worthwhile.
Date:November10, 2016
4. Department of Civil Technology
Written By: Maaz A. Naqvi & Shahrukh. Aqiq Hosting Company: 4
Contents
1.Chapter one
Introduction of the company ………………04
2. Chapter two
Over all internship experience …………………...05
3. Chapter three
Materials and methods ………………………….08
4. Batching Plant Inspection.
…………………………...…….10
5. Laboratory work………… 12
5. Department of Civil Technology
Written By: Maaz A. Naqvi & Shahrukh. Aqiq Hosting Company: 5
Chapter one
1. Introduction of the company
Paragon continually strivesto be the premierproviderof
constructionservicesin Pakistan. Our people are experts
in fostering solutions that create value for our clients,
employees and stakeholdersby consistentlyexceeding
expectations. Our management approach and team orientation
enable Paragon to truly be the Owner’s advocate.Our success is
measuredby our client’s trust.
BANKERS
Habib Metropolitan Bank, Karachi
Bank Islami Pakistan Limited
Summit Bank Limited
Askari Bank Limited
UBL
JS Bank
Meezan Bank
AUDITORS
S. Shakeel-ur-Rehman & Co
INSURERS
Adamjee Insurance, Karachi
Eastern Federal Union, Karachi
New Jubilee Insurance, Karachi
New Hampshire Insurance Co, Karachi
Pak Qatar Takaful Limited, Karachi
6. Department of Civil Technology
Written By: Maaz A. Naqvi & Shahrukh. Aqiq Hosting Company: 6
United Insurance Company of Pakistan Limited.
Chapter Two
Over all internship experience
Joiningof the company
I joined Paragon Costructors PVT LTD Karachi Pakistan
on 28th September 2016. The GM Engr.ZahoorShah
assignedme with the siteengineer on their on-going
project BahriaGrand .Mosquein Bahria Town Karachi
Section of the company I have been work
My hosting company is working on several projects in
the country. I was appointedin BahriaTown site
which is almost 35km away from Karachi city center.
Our hosting company was a contractor it has so many
responsibilities.Firstthe accountant compute bidfor
their drawing after they selected by client they supply
a working drawing like structuraldrawing, sanitary
drawing, electrical drawing in one copy based on the
agreement and the total project cost(bill of quantity)
for the client after they officially announced the
contractor. Then constructionbegins starting from
mobilization and office building.
7. Department of Civil Technology
Written By: Maaz A. Naqvi & Shahrukh. Aqiq Hosting Company: 7
Planning, Scheduling:
Create WBS
Managed Activities
Drawings Study
Labor & Machinery Deployment
Site Layout:
Foundation Layout
Form work Layout
Steel Layout
Column Layout
Beam Layout
Centre Line Marking
8. Department of Civil Technology
Written By: Maaz A. Naqvi & Shahrukh. Aqiq Hosting Company: 8
Fig: Footing layout markings
Digging Excavationfor Foundation:
Fig: Excavation in process with excavator
Compactionof Foundation:
9. Department of Civil Technology
Written By: Maaz A. Naqvi & Shahrukh. Aqiq Hosting Company: 9
Chapter three
task execution and Methods.
Steel Fixing In Picked-UpWall:
Picked-Upwalls are vertical load distributionwall. It is
a RCC structure.
Fig: Steel formation can be seen in picked up wall
10. Department of Civil Technology
Written By: Maaz A. Naqvi & Shahrukh. Aqiq Hosting Company: 10
Steel Form work on Dome:
Steel Structure Fixing:
Fixing of steel structureinsideminar.
Steel Structure has used insidethe minar.
Steel ramp are constructed for future maintenance
work.
Centre space will be used for lift.
11. Department of Civil Technology
Written By: Maaz A. Naqvi & Shahrukh. Aqiq Hosting Company: 11
Batching Plant Inspection:
Batching Plant produces Ready mix concrete.
It is operated by a technician in control room located near
plant.
Crush stone, sand and cement added in plant with proper
weight through conveyor belt.
Water is then added.
Fig: Control room inside view
o Fig: Conveyor belt at Batching Plant and silo mixer with, 108Ton capacity each
o Shovel in process of foiling belt
12. Department of Civil Technology
Written By: Maaz A. Naqvi & Shahrukh. Aqiq Hosting Company: 12
Fig: Ready-mix concrete is transferring into Transit Mixer to sent to Site.
13. Department of Civil Technology
Written By: Maaz A. Naqvi & Shahrukh. Aqiq Hosting Company: 13
Laboratory work.
I. Concrete Mix Design
II. Compression Test
III. Field Density Test
Concrete Mix Design
No of Cement Bags for Concrete:
Total Quantity = 100 Cft/sft
Dry Volume = 100x1.54
Dry = 154
No. of Cement Bags
Vol of cement Bag =
154
1+2+4
∗ 1
Volume of Cement = 22Cft
No of Cement Bag =
𝑣𝑜𝑙 𝑜𝑓 𝑐𝑒𝑚𝑒𝑛𝑡 𝑞𝑢𝑎𝑛𝑡𝑖𝑡𝑦
𝑉𝑜𝑙 𝑜𝑓 1 𝑏𝑎𝑔
No of Cement bag =
22
1.25
No of cement bag = 17.6 qty.
Volume of Fine Aggregate:
=
154
1+2+4
x2
44 Cft.
Volume of Coarse Aggregate:
154
1 + 2 + 4
∗ 4
88 Cft.
14. Department of Civil Technology
Written By: Maaz A. Naqvi & Shahrukh. Aqiq Hosting Company: 14
Plaster quantity for 100 Sqft
Wet Volume = 100 x1/2 x ½
= 25
Dry Volume = 25 x 1.2 = 30Sq/ft
Cement Ratio: =
𝐷𝑟𝑦 𝑉𝑜𝑙𝑢𝑚𝑒
𝑆𝑢𝑚 𝑜𝑓 𝑟𝑎𝑡𝑖𝑜
∗ 𝑅𝑎𝑡𝑖𝑜 𝑜𝑓 𝑐𝑒𝑚𝑒𝑛𝑡
=
30
1+4
∗ 1
Cement Bag for Plaster = 6 bags
Compression Test:
Compression Test is done to find out the bearing capacity of
concrete mix design
Cylinders or Cubical design of concrete are use in testing.
It is performed before concrete start on site.
Several tests are conducted after 7, 14 and 28 days
respectively.
Compression Test after 7 days @ 4000 PSI:
420 KN/M x 7.95
3340 PSI
3340
4000
∗ 100 = 83.5%
15. Department of Civil Technology
Written By: Maaz A. Naqvi & Shahrukh. Aqiq Hosting Company: 15
Field Density Test
Sand = 16# sieve Pass , 30# sieve Retain
Sand Weight = Cone + Sand
=7728gms
Executed Soil Weight = 4915gm
Residual Sand = 2674 gm
Moisture Content = Oven Baked
Weight of Waste/ Dry Soil = %
Conclusion:
We were appointed on Bahria grand mosque. We were asked to
perform different task. The staff of Paragon Constructors were so
friendly and helpful and do listen to new generation ideas.
We did enjoy our work with learning experience, and we thanked all
engineers’ staff and workers who helped me.
This report is helpful for students of Civil Engineering upto 3rd year.
Refernce:
http://paragon.com.pk/new/
http://www.slideshare.net/zakkisbest/surveying-internship-
report
This report is compiled and edited by Ahmed
Zakaria on client request.