SUBMITTED BY:-
NAND LAL PRAJAPATI
MECHANICAL ENGG.
ROLL NO:-7ME81
SUBMITTED TO:-
M/S PUSHPA GUPTA
MECHANICAL DEPT.
GUIDED BY:-
NAGESHWAR RAI.
 ACKNOWLEDGEMENT
 INTRODUCTION
 HISTORY OF CHITRANJAN LOCOMOTIVES
 BASIC INFORMATION ABOUT CLW
 SECTION VISITED DURING TRAINING
 BASIC INFORMATION ABOUT LOCOMOTIVE(TYPES OF TRACKS)
 BASIC INFORMATION ABOUT LOCOMOTIVE(NAMING SYMBOLS)
 ACTIONS ADOPTED
 LAYOUT OF CLW
 ROOF
 DRIVER CABIN
 MACHINE ROOM
 UNDERFRAME
 BOGIE
 ASSEMBLY ROOM
 PHOTO GALLERY
 QUALITY POLICY
 ENVIRONMENTAL POLICY
 TYPES OF LOCO(FREIGHT&PASSENGER)
 DEVELOPMENT OF 3-PHASE LOCO
 SHOP FLOOR ACTIVITIES
 THANK YOU
 I feel satisfied in preparing the project on CLW. It
was a great experience at CLW in training duration .I
Nand Lal Prajapati student of JAIPUR NATIONAL
UNIVERSITY, sincerely thanks various department
of CLW for the assistance provided to me in
preparing the report during industrial training. I
thank to my department & college who has given
permission to go for industrial training in CLW.
 Thanking You
 It is the only major Electric Locomotive builder in the country. It is situated
just at the Border of West Bengal and Jharkhand and is at about 32 km from
Asansol and 237 kms from Kolkata.
 The Workshop has an area of 18.34 Sq . km. It have consists Workshops,
Offices , Schools , College , Staff quarters , Cinema halls , hospital and
Auditorium.
 Land area under Workshop-893.373 Sq .m.
 CLW became the first production unit in the developing countries ,Second
in Asia and fifth in the world to manufacture elective locomotive works.
 CLW has in houses facilities for Machining and Assembly of wheels sets
,Fabrication and Machining of bogies etc. The facilities including modern
CNC Machines , plasma -cutting machines ,inert gas welding sets etc.
 CLW is the dream of the nation’s visionaries, coming true.
 The loco works was initially established for production of 120 average
sized steam locomotives with the capacity to manufacture 50 square boilers.
 CLW produces one complete electric loco in each working days.
LOKMANYA 5
 CLW ,located in the land of VISWA BHARTI ,a great educational & cultural
seat in the world is the premier electric loco producer in this country.
 On the 9th january1948,survey of the proposal area was done.
 The production of Electric Locomotives commenced in 1961. In the process,
fifteen versions of electric locomotives were produced by CLW and the latest in
that series is the freight locomotive WAG-7 and
passenger locomotive WAP-4. Pandit Jawaharlal Nehru, the first
Prime Minister of India, commissioned the first 1500 V dc Locomotive
named “LOKMANYA” on the 14th October, 1961.The production of
25 kV ac loco commenced on 16th November, 1963.
 The first Electric Loco turned out from CLW, christened as “BIDHAN” was a
broad gauge 25 kV ac. Freight Locomotive (WAG-1) of 2840 hp with
maximum speed of 80 km/hr. Subsequently CLW gradually upgraded the
horsepower of Electric Loco from 2840 hp to 6000 hp and maximum speed
from 80 Km/h to 160 km/h.
 CLW also built 25 kV ac/1500 V dc, ac/dc Loco, WCAM-1 for hauling Mail /
Express Trains from BRC to BCT on Western Railway.
 The loco works was initially established for production of 120 average sized
steam locomotives with the capacity of manufacture 50 spare boilers.
 ROOF
 DRIVER’S CABIN
 MACHINE ROOM
 BOGIE
 TRANSDUCER
 PANTOGRAPH
 ROOF LINE
 RESISTER HARMONIC FILTER
TRANSDUCER
 Transducer is a device that convert a signal in
one form of energy .
 Energy types includes electrical , mechanical ,
electro (include light) magnetic and thermal
energy.
 The term transducer implies the use of a
sensor/detector , any device which converts
energy can be considered a transducer.
 Transducer are widely used in measuring
instrument.
PENTOGRAPH
Pantograph is an
instrument used to
reproduce to an enlarge
or a reduce scale.
A pantograph is mostly
used for the
reproduction of planes
etc , on enlarge or
reduced scales.
A modified form of
pantograph is used to
collect power at the top
of an electric locomotive.
ROOF LINE
A roof line is used to
describe the fascia , saffits ,
bargeboards and cladding
that forms the frontage
immediately below the roof
and the eaves of most
homes.
Fascia is a term used in
architecture to refers to a
frieze or band running
horizontally and situated
vertically under the roof
edge .
RESISTER HORMONIC
FILTER
The harmonic filter
resister are used to
eliminate the
dangerous
distortion(harmonic
s) generated inside
the network due to
connection of more
and more number of
electronic power
convertor
 DRIVER DESK SHEAT
 DRIVER DESK
 ENERGY FLASHER LIGHTER
 PENUMATIC HORN
 HORN LEAVER
 WIPER MOTER
 PARK BRAKE GUAGE
 SPEEDOMETER
 EMERGENCY BRAKE GUAGE
 SWITCH-SANDING,BRAKE RELEASE
PENUMATIC
HORN
Loco horn is an air horn
Loco horns are operated
by compressed air
,typically 8.6 to 9.6 bar and
fed form a locomotive main
air reservoir.
The engineer open the
horn valve , air flow
through a supply line into
the power chamber at the
base of the horn.
It passes through a
narrow opening b/w a
nozzle and circular metal
diaphragm in chamber and
vibrate and to produce
sound.
SPEEDOMETE
R
It is an instrument
that measures the
speed of locomotive.
Some speedometer
are round with
numbers and a
pointer like that of
the hands on a clock
face , through
others are digital
,like mainly wrist
watches.
 RESEVOIR 450Lt. IN WAG-9/9H
 240Lt-4 IN WAP-7/WAG5
 TRACTION COVERTER 1&2
 AUXILARY CONVERTER BOX 1&2
 BLOWERS
 OIL COOLING UNIT
 AUXILARY COMPRESSOR
 WHEEL
 SAND BOX
 BOGIE FRAME
 WHEEL SET
 SPRING—PRIMARY/SECONDERY
 BRAKE SET
 DAMPER—
PRIMARY/SECONDARY/HORIZONTAL/VE
RTICAL
WHEELS OF LOCO
SAND BOX OF LOCO
BOGIE FRAME OF LOCO
BRAKE SET OF LOCO
STEAM ENGINE DIESEL ENGINE
ELECTRIC ENGINE
 FREIGHT LOCO
 PASSENGER LOCO
FREIGHT LOCOMOTIVE
WAG-9
Passenger Locomotive
1.WAP-4
2. WAP-5
3. WAP-7
 CLW is an ISO-9001 unit has a well-established
quality system.
 The loco works of CLW obtained its ISO-9001
certification on 13.07.1996 while the ISO- 9002:1994
certification for steel foundry was obtained on
08.08.1996.
 Up gradation to ISO 9001:2001 for both Loco works
and steel Foundry was complicated on 250.902003.
 First surveillance Audit was conducted during
06.09.2005 to 09.09.2005.
 Renewal audit was conducted from 28th August to
30th August,2006.
 Improved environmental management systems , prevention of
pollution and continuous improvement of environment
performance.
 Conservation of natural resources and implementation of
fundamentals of waste management
 Waste generated in shops have been reduced by 5% from the
previous year by improvement of operational procedures.
 Air pollution control Device has been installed in integrated paint
shop to reduce air pollution.
 Dust collector has been installed in sand plant for reduction of air
pollution
 Consumption of electricity in plant and township has been
reduced by use of energy efficient lights ,installation of capacitor
bank etc.
 50,000 trees have been planted in the CLW townships .Another
50,000 trees will be planted during current year.
 Use of Poly bag has been totally banned inside the township.
 Cumulative production of Traction Motors
during the year 2007-08 has touched an all time
high of 1225 Traction Motors.
 This is the best ever in the 53 years history of
CLW.
 CLW has achieved the rare distinction of being
only production unit in the country which can
cross 10,000 Traction motors production mark
in a year.
indian railways chittranjan locomotive works ppt
indian railways chittranjan locomotive works ppt
indian railways chittranjan locomotive works ppt

More Related Content

What's hot

Railway loco ppt
Railway loco ppt Railway loco ppt
Railway loco ppt
Anand Dwivedi
 
Indian Railway locomotive ppt
Indian Railway locomotive pptIndian Railway locomotive ppt
Indian Railway locomotive ppt
Shrey Sandiman
 
Electrical loco tripshed,sawai madhopur
Electrical loco tripshed,sawai madhopurElectrical loco tripshed,sawai madhopur
Electrical loco tripshed,sawai madhopur
Akash Karol
 
Brijeh yadav ppt
Brijeh yadav pptBrijeh yadav ppt
Brijeh yadav ppt
bky2756
 
Project report of vocational training at Chittaranjan locomotive workshop
Project report of vocational training at Chittaranjan locomotive workshopProject report of vocational training at Chittaranjan locomotive workshop
Project report of vocational training at Chittaranjan locomotive workshop
Sagardwip das
 
clw , chittaranjan locomotive works vocational training project (without wate...
clw , chittaranjan locomotive works vocational training project (without wate...clw , chittaranjan locomotive works vocational training project (without wate...
clw , chittaranjan locomotive works vocational training project (without wate...
le goplu
 
Training report of Electric Loco Shed
Training report of Electric Loco ShedTraining report of Electric Loco Shed
Training report of Electric Loco Shed
Aarti Ojha
 
Summer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, GhaziabadSummer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, Ghaziabad
Vishal Dubey
 
POH seminar ppt bhusawal
POH seminar ppt bhusawalPOH seminar ppt bhusawal
POH seminar ppt bhusawal
Dhiraj Mahajan
 
Niraj ppt
Niraj pptNiraj ppt
Niraj ppt
Niraj Kumar
 
CHITTARANJANLOCOMOTIVES WORKS
CHITTARANJANLOCOMOTIVES WORKSCHITTARANJANLOCOMOTIVES WORKS
CHITTARANJANLOCOMOTIVES WORKS
Kanhaiya Kumar
 
PPT ON ELECTRIC LOCO SHED
PPT ON ELECTRIC LOCO SHEDPPT ON ELECTRIC LOCO SHED
PPT ON ELECTRIC LOCO SHED
Tarang Mittal
 
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHEDINTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
Pruthvi Raj
 
PRESENTATION ON DIESEL TRACTION CENTRE GONDA
PRESENTATION ON DIESEL TRACTION CENTRE GONDA PRESENTATION ON DIESEL TRACTION CENTRE GONDA
PRESENTATION ON DIESEL TRACTION CENTRE GONDA
ABDUS SAMAD
 
electrical locomotive report for final students
electrical locomotive report for final studentselectrical locomotive report for final students
electrical locomotive report for final students
Piyush Saini
 
Summer training report on electric loco shed
Summer training report on electric loco shedSummer training report on electric loco shed
Summer training report on electric loco shed
Tarang Mittal
 
Training ppt on Chittaranjan Locomotive Works
Training ppt on Chittaranjan Locomotive WorksTraining ppt on Chittaranjan Locomotive Works
Training ppt on Chittaranjan Locomotive Works
Dhruv Upadhaya
 
NikhilYadav ( Training ppt)
NikhilYadav ( Training ppt)NikhilYadav ( Training ppt)
NikhilYadav ( Training ppt)
Nikhil Yadav
 
Abes engineering college ghaziabad
Abes engineering college  ghaziabadAbes engineering college  ghaziabad
Abes engineering college ghaziabad
Palash Awasthi
 
Sandeep
SandeepSandeep
Sandeep
Sandeep Kumar
 

What's hot (20)

Railway loco ppt
Railway loco ppt Railway loco ppt
Railway loco ppt
 
Indian Railway locomotive ppt
Indian Railway locomotive pptIndian Railway locomotive ppt
Indian Railway locomotive ppt
 
Electrical loco tripshed,sawai madhopur
Electrical loco tripshed,sawai madhopurElectrical loco tripshed,sawai madhopur
Electrical loco tripshed,sawai madhopur
 
Brijeh yadav ppt
Brijeh yadav pptBrijeh yadav ppt
Brijeh yadav ppt
 
Project report of vocational training at Chittaranjan locomotive workshop
Project report of vocational training at Chittaranjan locomotive workshopProject report of vocational training at Chittaranjan locomotive workshop
Project report of vocational training at Chittaranjan locomotive workshop
 
clw , chittaranjan locomotive works vocational training project (without wate...
clw , chittaranjan locomotive works vocational training project (without wate...clw , chittaranjan locomotive works vocational training project (without wate...
clw , chittaranjan locomotive works vocational training project (without wate...
 
Training report of Electric Loco Shed
Training report of Electric Loco ShedTraining report of Electric Loco Shed
Training report of Electric Loco Shed
 
Summer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, GhaziabadSummer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, Ghaziabad
 
POH seminar ppt bhusawal
POH seminar ppt bhusawalPOH seminar ppt bhusawal
POH seminar ppt bhusawal
 
Niraj ppt
Niraj pptNiraj ppt
Niraj ppt
 
CHITTARANJANLOCOMOTIVES WORKS
CHITTARANJANLOCOMOTIVES WORKSCHITTARANJANLOCOMOTIVES WORKS
CHITTARANJANLOCOMOTIVES WORKS
 
PPT ON ELECTRIC LOCO SHED
PPT ON ELECTRIC LOCO SHEDPPT ON ELECTRIC LOCO SHED
PPT ON ELECTRIC LOCO SHED
 
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHEDINTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
 
PRESENTATION ON DIESEL TRACTION CENTRE GONDA
PRESENTATION ON DIESEL TRACTION CENTRE GONDA PRESENTATION ON DIESEL TRACTION CENTRE GONDA
PRESENTATION ON DIESEL TRACTION CENTRE GONDA
 
electrical locomotive report for final students
electrical locomotive report for final studentselectrical locomotive report for final students
electrical locomotive report for final students
 
Summer training report on electric loco shed
Summer training report on electric loco shedSummer training report on electric loco shed
Summer training report on electric loco shed
 
Training ppt on Chittaranjan Locomotive Works
Training ppt on Chittaranjan Locomotive WorksTraining ppt on Chittaranjan Locomotive Works
Training ppt on Chittaranjan Locomotive Works
 
NikhilYadav ( Training ppt)
NikhilYadav ( Training ppt)NikhilYadav ( Training ppt)
NikhilYadav ( Training ppt)
 
Abes engineering college ghaziabad
Abes engineering college  ghaziabadAbes engineering college  ghaziabad
Abes engineering college ghaziabad
 
Sandeep
SandeepSandeep
Sandeep
 

Viewers also liked

Indian Railways
Indian RailwaysIndian Railways
Indian Railways
Anand Dube
 
Electric traction system final upload
Electric traction system final uploadElectric traction system final upload
Electric traction system final upload
Bishal Rimal
 
Electric Traction System
Electric  Traction  SystemElectric  Traction  System
Electric Traction System
sahotaharman
 
Comparators
ComparatorsComparators
Comparators
Vaibhav Aggarwal
 
Diesel Locomotive Works (DLW)
 Diesel Locomotive Works (DLW) Diesel Locomotive Works (DLW)
Diesel Locomotive Works (DLW)
Neha Gethe
 
comparators
comparatorscomparators
comparators
mayankbaheti
 
Mechanical Comparators
Mechanical ComparatorsMechanical Comparators
Mechanical Comparators
DENNY OTTARACKAL
 
LINEAR and ANGULAR Measurement
LINEAR and ANGULAR MeasurementLINEAR and ANGULAR Measurement
LINEAR and ANGULAR Measurement
Dhruv Parekh
 
Angular measurements
Angular measurementsAngular measurements
Angular measurements
Naman Dave
 
Electric traction
Electric tractionElectric traction
Electric traction
Piyush Kumar
 

Viewers also liked (10)

Indian Railways
Indian RailwaysIndian Railways
Indian Railways
 
Electric traction system final upload
Electric traction system final uploadElectric traction system final upload
Electric traction system final upload
 
Electric Traction System
Electric  Traction  SystemElectric  Traction  System
Electric Traction System
 
Comparators
ComparatorsComparators
Comparators
 
Diesel Locomotive Works (DLW)
 Diesel Locomotive Works (DLW) Diesel Locomotive Works (DLW)
Diesel Locomotive Works (DLW)
 
comparators
comparatorscomparators
comparators
 
Mechanical Comparators
Mechanical ComparatorsMechanical Comparators
Mechanical Comparators
 
LINEAR and ANGULAR Measurement
LINEAR and ANGULAR MeasurementLINEAR and ANGULAR Measurement
LINEAR and ANGULAR Measurement
 
Angular measurements
Angular measurementsAngular measurements
Angular measurements
 
Electric traction
Electric tractionElectric traction
Electric traction
 

Similar to indian railways chittranjan locomotive works ppt

Project report on failure of fuse & mcb
Project report on failure of fuse & mcbProject report on failure of fuse & mcb
Project report on failure of fuse & mcb
sachin singh
 
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
Devendra Kumar
 
456.pdf
456.pdf456.pdf
456.pdf
HerryHerry33
 
power generation through speed breaker
power generation through speed breaker power generation through speed breaker
power generation through speed breaker
Ranjan Kumar Thakur
 
Diesel locomotive work
Diesel locomotive workDiesel locomotive work
Diesel locomotive work
vipin rai
 
diesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedidiesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedi
somesh dwivedi
 
Kanchrapara Railway workshop Project(Short)
Kanchrapara Railway workshop Project(Short)Kanchrapara Railway workshop Project(Short)
Kanchrapara Railway workshop Project(Short)
babai das
 
POH seminar bhusawal
POH seminar bhusawal POH seminar bhusawal
POH seminar bhusawal
Dhiraj Mahajan
 
DLW Summer Training for ECE
DLW Summer Training for ECEDLW Summer Training for ECE
DLW Summer Training for ECE
Sujeet Nirmal
 
Uttar Pradesh Power Corparation Ltd. Training Report
Uttar Pradesh Power Corparation Ltd. Training ReportUttar Pradesh Power Corparation Ltd. Training Report
Uttar Pradesh Power Corparation Ltd. Training Report
AmitKumar6931
 
Neeraj nuclear power car
Neeraj nuclear power carNeeraj nuclear power car
Neeraj nuclear power car
Neeraj Vincent
 
Dlw summer trainning project electrical branch by shubhang pandey
Dlw summer trainning project electrical branch by shubhang pandeyDlw summer trainning project electrical branch by shubhang pandey
Dlw summer trainning project electrical branch by shubhang pandey
shubhangpandey5
 
Km169 (rpg) road power generation
Km169 (rpg) road power generationKm169 (rpg) road power generation
Km169 (rpg) road power generation
1000kv technologies
 
DESIGN OF MINE SHAFT ELEVATOR design guide
DESIGN OF MINE SHAFT ELEVATOR   design  guideDESIGN OF MINE SHAFT ELEVATOR   design  guide
DESIGN OF MINE SHAFT ELEVATOR design guide
Suresh Ramarao
 
A044010114
A044010114A044010114
A044010114
IJMER
 
Study on Bogie and Suspension System of an Electric Locomotive (Wap-4)
Study on Bogie and Suspension System of an Electric Locomotive  (Wap-4) Study on Bogie and Suspension System of an Electric Locomotive  (Wap-4)
Study on Bogie and Suspension System of an Electric Locomotive (Wap-4)
IJMER
 
A044010114
A044010114A044010114
A044010114
IJMER
 
Final Report
Final ReportFinal Report
Final Report
Asad Munir
 
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
Meerut Institute of Engineering and Technology
 
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
SUBHAMOY SINGHA ROY
 

Similar to indian railways chittranjan locomotive works ppt (20)

Project report on failure of fuse & mcb
Project report on failure of fuse & mcbProject report on failure of fuse & mcb
Project report on failure of fuse & mcb
 
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
 
456.pdf
456.pdf456.pdf
456.pdf
 
power generation through speed breaker
power generation through speed breaker power generation through speed breaker
power generation through speed breaker
 
Diesel locomotive work
Diesel locomotive workDiesel locomotive work
Diesel locomotive work
 
diesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedidiesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedi
 
Kanchrapara Railway workshop Project(Short)
Kanchrapara Railway workshop Project(Short)Kanchrapara Railway workshop Project(Short)
Kanchrapara Railway workshop Project(Short)
 
POH seminar bhusawal
POH seminar bhusawal POH seminar bhusawal
POH seminar bhusawal
 
DLW Summer Training for ECE
DLW Summer Training for ECEDLW Summer Training for ECE
DLW Summer Training for ECE
 
Uttar Pradesh Power Corparation Ltd. Training Report
Uttar Pradesh Power Corparation Ltd. Training ReportUttar Pradesh Power Corparation Ltd. Training Report
Uttar Pradesh Power Corparation Ltd. Training Report
 
Neeraj nuclear power car
Neeraj nuclear power carNeeraj nuclear power car
Neeraj nuclear power car
 
Dlw summer trainning project electrical branch by shubhang pandey
Dlw summer trainning project electrical branch by shubhang pandeyDlw summer trainning project electrical branch by shubhang pandey
Dlw summer trainning project electrical branch by shubhang pandey
 
Km169 (rpg) road power generation
Km169 (rpg) road power generationKm169 (rpg) road power generation
Km169 (rpg) road power generation
 
DESIGN OF MINE SHAFT ELEVATOR design guide
DESIGN OF MINE SHAFT ELEVATOR   design  guideDESIGN OF MINE SHAFT ELEVATOR   design  guide
DESIGN OF MINE SHAFT ELEVATOR design guide
 
A044010114
A044010114A044010114
A044010114
 
Study on Bogie and Suspension System of an Electric Locomotive (Wap-4)
Study on Bogie and Suspension System of an Electric Locomotive  (Wap-4) Study on Bogie and Suspension System of an Electric Locomotive  (Wap-4)
Study on Bogie and Suspension System of an Electric Locomotive (Wap-4)
 
A044010114
A044010114A044010114
A044010114
 
Final Report
Final ReportFinal Report
Final Report
 
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
 
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
 

Recently uploaded

5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf
AlvianRamadhani5
 
Power Electronics- AC -AC Converters.pptx
Power Electronics- AC -AC Converters.pptxPower Electronics- AC -AC Converters.pptx
Power Electronics- AC -AC Converters.pptx
Poornima D
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
b0754201
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
uqyfuc
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
Assistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdfAssistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdf
Seetal Daas
 
Zener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and ApplicationsZener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and Applications
Shiny Christobel
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
Paris Salesforce Developer Group
 
Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
mahaffeycheryld
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
ijseajournal
 
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
OKORIE1
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
ijaia
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
PreethaV16
 
Ericsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.pptEricsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.ppt
wafawafa52
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
Kamal Acharya
 

Recently uploaded (20)

5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf
 
Power Electronics- AC -AC Converters.pptx
Power Electronics- AC -AC Converters.pptxPower Electronics- AC -AC Converters.pptx
Power Electronics- AC -AC Converters.pptx
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
Assistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdfAssistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdf
 
Zener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and ApplicationsZener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and Applications
 
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
AI + Data Community Tour - Build the Next Generation of Apps with the Einstei...
 
Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
 
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
 
Ericsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.pptEricsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.ppt
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
 

indian railways chittranjan locomotive works ppt

  • 1. SUBMITTED BY:- NAND LAL PRAJAPATI MECHANICAL ENGG. ROLL NO:-7ME81 SUBMITTED TO:- M/S PUSHPA GUPTA MECHANICAL DEPT.
  • 3.  ACKNOWLEDGEMENT  INTRODUCTION  HISTORY OF CHITRANJAN LOCOMOTIVES  BASIC INFORMATION ABOUT CLW  SECTION VISITED DURING TRAINING  BASIC INFORMATION ABOUT LOCOMOTIVE(TYPES OF TRACKS)  BASIC INFORMATION ABOUT LOCOMOTIVE(NAMING SYMBOLS)  ACTIONS ADOPTED  LAYOUT OF CLW  ROOF  DRIVER CABIN  MACHINE ROOM  UNDERFRAME  BOGIE  ASSEMBLY ROOM  PHOTO GALLERY  QUALITY POLICY  ENVIRONMENTAL POLICY  TYPES OF LOCO(FREIGHT&PASSENGER)  DEVELOPMENT OF 3-PHASE LOCO  SHOP FLOOR ACTIVITIES  THANK YOU
  • 4.  I feel satisfied in preparing the project on CLW. It was a great experience at CLW in training duration .I Nand Lal Prajapati student of JAIPUR NATIONAL UNIVERSITY, sincerely thanks various department of CLW for the assistance provided to me in preparing the report during industrial training. I thank to my department & college who has given permission to go for industrial training in CLW.  Thanking You
  • 5.  It is the only major Electric Locomotive builder in the country. It is situated just at the Border of West Bengal and Jharkhand and is at about 32 km from Asansol and 237 kms from Kolkata.  The Workshop has an area of 18.34 Sq . km. It have consists Workshops, Offices , Schools , College , Staff quarters , Cinema halls , hospital and Auditorium.  Land area under Workshop-893.373 Sq .m.  CLW became the first production unit in the developing countries ,Second in Asia and fifth in the world to manufacture elective locomotive works.  CLW has in houses facilities for Machining and Assembly of wheels sets ,Fabrication and Machining of bogies etc. The facilities including modern CNC Machines , plasma -cutting machines ,inert gas welding sets etc.  CLW is the dream of the nation’s visionaries, coming true.  The loco works was initially established for production of 120 average sized steam locomotives with the capacity to manufacture 50 square boilers.  CLW produces one complete electric loco in each working days.
  • 6.
  • 8.  CLW ,located in the land of VISWA BHARTI ,a great educational & cultural seat in the world is the premier electric loco producer in this country.  On the 9th january1948,survey of the proposal area was done.  The production of Electric Locomotives commenced in 1961. In the process, fifteen versions of electric locomotives were produced by CLW and the latest in that series is the freight locomotive WAG-7 and passenger locomotive WAP-4. Pandit Jawaharlal Nehru, the first Prime Minister of India, commissioned the first 1500 V dc Locomotive named “LOKMANYA” on the 14th October, 1961.The production of 25 kV ac loco commenced on 16th November, 1963.  The first Electric Loco turned out from CLW, christened as “BIDHAN” was a broad gauge 25 kV ac. Freight Locomotive (WAG-1) of 2840 hp with maximum speed of 80 km/hr. Subsequently CLW gradually upgraded the horsepower of Electric Loco from 2840 hp to 6000 hp and maximum speed from 80 Km/h to 160 km/h.  CLW also built 25 kV ac/1500 V dc, ac/dc Loco, WCAM-1 for hauling Mail / Express Trains from BRC to BCT on Western Railway.  The loco works was initially established for production of 120 average sized steam locomotives with the capacity of manufacture 50 spare boilers.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.  ROOF  DRIVER’S CABIN  MACHINE ROOM  BOGIE
  • 14.  TRANSDUCER  PANTOGRAPH  ROOF LINE  RESISTER HARMONIC FILTER
  • 16.  Transducer is a device that convert a signal in one form of energy .  Energy types includes electrical , mechanical , electro (include light) magnetic and thermal energy.  The term transducer implies the use of a sensor/detector , any device which converts energy can be considered a transducer.  Transducer are widely used in measuring instrument.
  • 17. PENTOGRAPH Pantograph is an instrument used to reproduce to an enlarge or a reduce scale. A pantograph is mostly used for the reproduction of planes etc , on enlarge or reduced scales. A modified form of pantograph is used to collect power at the top of an electric locomotive.
  • 18. ROOF LINE A roof line is used to describe the fascia , saffits , bargeboards and cladding that forms the frontage immediately below the roof and the eaves of most homes. Fascia is a term used in architecture to refers to a frieze or band running horizontally and situated vertically under the roof edge .
  • 19. RESISTER HORMONIC FILTER The harmonic filter resister are used to eliminate the dangerous distortion(harmonic s) generated inside the network due to connection of more and more number of electronic power convertor
  • 20.  DRIVER DESK SHEAT  DRIVER DESK  ENERGY FLASHER LIGHTER  PENUMATIC HORN  HORN LEAVER  WIPER MOTER  PARK BRAKE GUAGE  SPEEDOMETER  EMERGENCY BRAKE GUAGE  SWITCH-SANDING,BRAKE RELEASE
  • 21. PENUMATIC HORN Loco horn is an air horn Loco horns are operated by compressed air ,typically 8.6 to 9.6 bar and fed form a locomotive main air reservoir. The engineer open the horn valve , air flow through a supply line into the power chamber at the base of the horn. It passes through a narrow opening b/w a nozzle and circular metal diaphragm in chamber and vibrate and to produce sound.
  • 22. SPEEDOMETE R It is an instrument that measures the speed of locomotive. Some speedometer are round with numbers and a pointer like that of the hands on a clock face , through others are digital ,like mainly wrist watches.
  • 23.  RESEVOIR 450Lt. IN WAG-9/9H  240Lt-4 IN WAP-7/WAG5  TRACTION COVERTER 1&2  AUXILARY CONVERTER BOX 1&2  BLOWERS  OIL COOLING UNIT  AUXILARY COMPRESSOR
  • 24.  WHEEL  SAND BOX  BOGIE FRAME  WHEEL SET  SPRING—PRIMARY/SECONDERY  BRAKE SET  DAMPER— PRIMARY/SECONDARY/HORIZONTAL/VE RTICAL
  • 26. SAND BOX OF LOCO
  • 28. BRAKE SET OF LOCO
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34. STEAM ENGINE DIESEL ENGINE ELECTRIC ENGINE
  • 35.  FREIGHT LOCO  PASSENGER LOCO
  • 40.  CLW is an ISO-9001 unit has a well-established quality system.  The loco works of CLW obtained its ISO-9001 certification on 13.07.1996 while the ISO- 9002:1994 certification for steel foundry was obtained on 08.08.1996.  Up gradation to ISO 9001:2001 for both Loco works and steel Foundry was complicated on 250.902003.  First surveillance Audit was conducted during 06.09.2005 to 09.09.2005.  Renewal audit was conducted from 28th August to 30th August,2006.
  • 41.  Improved environmental management systems , prevention of pollution and continuous improvement of environment performance.  Conservation of natural resources and implementation of fundamentals of waste management  Waste generated in shops have been reduced by 5% from the previous year by improvement of operational procedures.  Air pollution control Device has been installed in integrated paint shop to reduce air pollution.  Dust collector has been installed in sand plant for reduction of air pollution  Consumption of electricity in plant and township has been reduced by use of energy efficient lights ,installation of capacitor bank etc.  50,000 trees have been planted in the CLW townships .Another 50,000 trees will be planted during current year.  Use of Poly bag has been totally banned inside the township.
  • 42.  Cumulative production of Traction Motors during the year 2007-08 has touched an all time high of 1225 Traction Motors.  This is the best ever in the 53 years history of CLW.  CLW has achieved the rare distinction of being only production unit in the country which can cross 10,000 Traction motors production mark in a year.