Summer Training Report
Electric Locomotive Shed
Gomoh Dhanbad
Summer Training Report
10th
June to 9th
July 2015
Guided By - Submitted By-
Mr. Vinay Sir SUNIL KUMAR
ACKNOWLEDGEMENT
I am thankful to the organization"ELECTRICAL LOCO SHED
GOMOH DHANBAD" for providing necessary facility to carry
out my training successfully.
It is our duty to record our sincere thanks and gratitude towards
the institute staff, who helped us in bringing
this project to its present form. The valuableguidance and interest
taken by them has been a motivator and source ofinspiration for
me to carry out the necessary proceedings for the project to
becompleted successfully.
Also, we are highly obliged to the head of our training and
placement cell
who provided us such a great opportunity to do our summer
training in a reputed institute like
"ELECTRIC LOCOMOTIVE SHED DHANBAD".
CONTENTS
1- About the company
2- Introduction
3- Operation of Locomotive
4- Different Equipment In Electric
Locomotive
5- Dc Motor Brush Holder
6- Performance Of Carbon Brushes and
Failure of carbon brushes
7- Installation of Carbon Brushes
8- Causes of failure of Commutation
9- Main Cause of Brush Failure
10- Conclusion
About The Company
The Electric loco shed, Gomoh, Dhanbad
was established during the year 1965 for homing 11 locomotives.
This shed was commissioned primarily to meet the requirement of
passenger and goods traffic over Indian railways. At present the
shed has been expended suitably to home 176 loco motives for
hauling, passenger and goods traffic.
The shed is responsible for carrying out monthly inspection
schedule viz. IA, IB, IC, I0& ICO in addition to annual and
intermediate overhauling schedules.
Further the unscheduled repairs to electric locos of CNB shed &
other sheds are being done as per requirements of RDSO organizati
on & HQ’s instructions. All modification&specialmaintenance
instructions, approved by RDSO & N.Rly. Hd. Qtr. are also carried
out as per the guide lines being issued from time to time.
ELECTRIC LOCO MAINTENANCE SHED
Electric Loco Shed maintains locomotive for utilization in freight
and passenger train. All the miner and major inspection are carried
out in the shed on a regular schedule specified by RDSO (Research
Design Standard Organization). Monthly schedule are done at an
interval of 45 days and major schedule are carried out after 18
months.
OPERATION OF LOCOMOTIVE
The electric locomotive basically works at 25 KV, 50Hz supply. The
25KV AC supply is drawn from overhead catenaries wires. The
supply from overhead wires are drawn through a pantograph
inside the loco transformer. This transformer is an
autotransformer from which regulated voltage is taken to a
rectifier block for conversion from AC to DC .It may be worth
mentioning that the final tractive effort is through DC traction
motor hence AC is required to be converted to DC. The DC current
from rectifier block is then filtered to pure DC and then fed to
traction motor.
There are 6 traction motors which works parallel to provide the
attractive effort for hauling the train.
All the operations are controlled through control circuit which
works at 110 volt DC. Various power equipments during operation
gets heated up and hence to cool the same, it is done by various
blowers.
Different Equipments in an Electrical
Locomotive
1) Pantograph
It is pneumatically operated equipment mounted on the roof
for collection of current from overhead wire.
2) Main Transformer
It is an autotransformer which is utilized for drawing various
grades of voltage required for operation of locomotive.
3) Rectifier
This unit consists of rectifier diodes connected in bridge for
conversion of AC current to DC current.
4) Traction Motor
The traction motor is one of the most important equipment
in the locomotive which transmits power to wheels for
moving the trains.
5) Auxiliary Circuit
This Circuit is three phase 415 volts which supplies current to
various three phase induction motors used for driving
blowers for forced air cooling of major equipments like
transformer, rectifier, smoothing reactor and traction motor.
This 3 phase line voltage is supplied by either static converter
or Rotary ARNO Converter.
6) ARNO Converter
Arno converter , is specific-duty machine for conversion of a
single-phase supply into a three-phase supply. While the
electric traction supply is standardized as single-phase A.C.
supply, a three-phase supply is needed on locomotives for
driving certain auxiliary equipments. The function of the Arno
converter is to convert the incoming single-phase supply in to
a three-phase supply for the auxiliaries.
ARNO Converter is of vertical construction and has a flexible
mounting .The machine is of robust mechanical construction
to withstand the several vibrations encountered on
locomotives.
TECHNICAL DATA
Single-phase input Three-phase output
KVA 150 KVA 120
Volts 380 Volts 380
Amps 395 Amps 190
Frame VA-330
Class ’F’
Connection: Star RPM 1490 Cycle 50
OPERATIONAL PRINCIPLE
The single-phase supply of 380 volts AC is fed ‘direct’ to the
‘U’ & ‘V’ phases of the Arno converter. Since the ARNO
Converter is connected to single-phase supply, no starting
torque is developed. For starting the ‘ARNO’ split phase
starting method has been employed. The W phase winding is
connected to the supply phase U through a starting resistor
R-118 and starting contactor C-118 for a short duration to
start the Arno. Thus unbalanced three-phase voltage is
impressed to each phase winding of Arno converter and the
starting torque is developed .the Arno Converter picks up
speed within five seconds. After the Arno has gained
sufficient speed, the phase W is opened from the starting
circuit by starting contactor C-118.
The Arno converts the single phase input into 3 phase output
as 380 volt ± 22.5%. The three-phase output of the Arno
converter is connected to the auxiliary motors.
7) Control Circuit
The control circuit is purely 110 volt DC and the most
important network for handling various operational feature
of the locomotive. All the power equipment and auxiliary
circuit equipment are controlled through various switches in
110 volt circuit provided in the driving cab. All the circuit and
equipment in the high voltage power side & auxiliary circuit
equipment and the control circuit is protected against
overloading, short circuiting and earth fault. For this purpose
various relays have been used as protection device so as to
protect the circuit from any mal functioning.
8) Asynchronous Motor
Modern traction motor type using three phase AC electrical
supply and now the favoured design for modern train
traction systems. Can be used on DC and AC electrified
railways with suitable control electronics and on diesel-
electric locomotives.
9) Axle Brush
The means by which the power supply circuit is completed
with the substation once power has been drawn on the
locomotive. Current collected from the overhead line or third
rail is returned via the axle brush and one of the running rails.
10) Battery
All trains are provided with a battery to provide start up
current and for supplying essential circuits, such as
emergency lighting, when the line supply fails. The battery is
usually connected across the DC control supply circuit.
12) Camshaft
Most DC electric traction power circuits use a camshaft to
open or close the contactors controlling the resistances of
the traction motor power circuit. The camshaft is driven by
an electric motor or pneumatic cylinder. The cams on the
shaft are arranged to ensure that the contactors open and
close in the correct sequence. It is controlled by commands
from the driver's cab and regulated by the fall of current in
the motor circuit as each section of resistance is cut out in
steps. The sound of this camshaft stepping can be heard
under many older (pre electronics) trains as they accelerates.
14) Chopper Control
A development in electric traction control which eliminates the
need for power resistors by causing the voltage to the traction
motors to be switched on and off (chopped) very rapidly during
acceleration. It is accomplished by the use of thyristors and will
give up to 20% improvement in efficiency over conventional
resistance control.
15) Circuit Breaker
An electric train is almost always provided with some sort of
circuit breaker to isolate the power supply when there is a fault,
or for maintenance. On AC systems they are usually on the roof
near the pantograph. There are of two types - the air blast circuit
breaker and the vacuum circuit breaker or VCB. The air or vacuum
part is used to extinguish the arc which occurs as the two tips of
the circuit breaker are opened. The VCB is popular in the UK and
the air blast circuit breaker is more often seen on the continent of
Europe.
16) Contactor
Similar to a relay in that it is a remotely operated switch used to
control a higher power local circuit. The difference is that
contactors normally latch or lock closed and have to be opened by
a separate action. A lighting contactor will have two, low voltage
operating coils, one to "set" the contactor closed to switch on the
lights; the other to "trip" off the lights.
17) Converter
Generic term for any solid state electronic system for converting
alternating current to direct current or vice versa. Where an AC
supply has to be converted to DC it is called a rectifier and where
DC is converted to AC it is called an inverter. The word originated
in the US but is now common elsewhere.
18) Cooling Fans
To keep the thyristors and other electronic power systems cool,
the interior of a modern locomotive is equipped with an air
management system, electronically controlled to keep all systems
operating at the correct temperature. The fans are powered by an
auxiliary inverter producing 3-phase AC at about 400 volts.
19) Creep Control
A form of electronically monitored acceleration control used very
effectively on some modern drive systems which permits a certain
degree of wheel slip to develop under maximum power
application. The GM Class 59 diesel-electric locomotive built for
the UK has this system. A locomotive can develop maximum slow
speed tractive effort if its wheels are turning between 5% and
15% faster than actually required by the train speed.
21) Dynamic Braking
A train braking system using the traction motors of the power
vehicle(s) to act as generators which provide the braking effort.
The power generated during braking is dissipated either as heat
through on-board resistors (rheostatic braking) or by return to the
traction supply line (regenerative braking). Most regenerative
systems include on board resistors to allow rheostatic braking if
the traction supply system is not receptive.
The choice is automatically selected by the traction control
system. .
22) Grid
Train or locomotive mounted expanded steel resistor used to
absorb excess electrical energy during motor or braking power
control. Often seen on the roofs of diesel electric locomotives
where they are used to dissipate heat during dynamic braking.
23) Ground Relay
An electrical relay provided in diesel and electric traction systems
to protect the equipment against damage from earths and so-
called "grounds".
The result of such a relay operating is usually a shut-down of the
electrical drive. Also sometimes called an Earth Fault Relay.
Electrical Connections
The primary function of the brush involves conducting current. In
many cases the brush holder is also a part of this electrical circuit.
Therefore it is necessary that all electrical connections are of
minimal resistance to provide the best path for current flow from
the main lead connection to the contact surface. Corrosion,
contamination, or electrolytic action over a period of time can
cause dramatic increases in resistance which then requires
cleaning. Careless installation of the brushes or the holders can
lead to loose connections. Any high resistance in the brush circuit
will result in excess heat or an undesirable path of current flow and
unequal loading of the brushes.
On fractional horsepower cartridge style brushholders with captive
coil spring type brushes the current should flow from the clip
connector at the bottom of the holder up the brass insert to the cap
on the end of the brush and then down through the shunt to the
carbon. The brushes fail very quickly if the round or eared cap on
the end of the brush does not make proper contact with the brass
holder insert. When this condition exists current will flow directly
from the brass insert to the spring or to the carbon. In either case
there will be extreme heat, loss of brush contact, commutator wear,
and eventually motor failure.
Another problem with larger frame sizes can occur when the
holder mounting is part of the electric circuit. If the holder
mounting surface becomes dirty, corroded, or even painted over
then current will again need to follow another path and thereby
cause problems.
Return to top of page.
Summary
The general knowledge and experience in the field on rotating
equipment has been slowly declining for many years. In addition
brushholders have seldom ever received proper attention during
trouble shooting or as part of a maintenance program. Therefore it
is hoped that the above information will be helpful in creating
awareness of the potential problems with brushholders as a very
critical component in the satisfactory performance of carbon
brushes on motors, generators, and other types of sliding contacts.
The important factors to check for proper functioning of the holder
and brush are:
1. Inside holder dimensions
2. Holder spacing
3.Holder angle
4.Holder height
5.Spring force
6. Electrical connections
When there is an opportunity to implement new holders, the use of
the principles mentioned above along with the coordination of the
latest constant pressure holder .
Installation Steps
Carbon Brush
1-Disconnect the power to the machine using approvedlock-out
procedures.
2. Remove all old brushesfrom the holders. Make
Noteof any unusualconditions of the brushesincluding roughness orburning
of the contact face,
Polished sides on thecarbon, excess heat on thewires, or frayed shunt
wires. Unusual brush conditionsare indications of the need for and improved
brushdesign or for maintenanceon the machine.
3. Inspect the commutatorfor unusual conditions
for high bars and mica.Make note for required
maintenance.
4. Check the inside holdercavity for dust, dirt, oil,
deposits, carbon buildup,corrosion, or burned areas
and clean as needed.
5. Check the terminal connectionarea and clean, asneeded.
6. Brush holders should besecured to their mount andchecked that none
havebecome loosened or are outof alignment.
7. Measure spring forces to ensure there is consistentcontact force at
therecommended level. Usethe measured force to calculate the spring
pressurefor comparison withrecommended level of 4.0+PSI.
8. Remove the old film fromthe brush tracks, if the newbrushes are made
from a different grade. Dry untreatedcanvas applied witha pressure block or
a rubberabrasive. Seater stone canbe used as an alternative.
However, the remainingdust must be vacuumed or
blown out of the machine.
9. Install new brushes in allholders with attention to theorientation on
angled designs.Ensure that the
brushes can move freely inthe radial direction and thatthere is a relatively
close fitin the tangential and axialdirections.
10. Apply the pressure springto the top of the brush.
11. Pull up on the brush andallow to gently return tocontact with the
commutatoror ring to ensure
there is no binding of thebrush and spring.
12. Connect the terminals. Besure all terminal connections are tight and
secure.
13. Seat the brushes to the contour of the commutatorusing non-metal
bearingsandpaper or garnet paper.Do NOT use emery. Mediumcoarse
grade paper pulledunder the brush face in thedirection of rotation
improvesthe quality of the brush contact surface andspeeds the process.
Thereshould be at least 90% ofthe brush face seated to
the contour of the contactsur face prior to operating
the machine at load. Oncethis level has been
achieved, then the resultingdust in the machine aroundthe brushes, holders,
andcommutator should bevacuumed or blown out.
14. Operate the machine at noload for the final wear-incontour of the
contact surfaces in order to ensurecomplete electrical contactof the
brushes. This procedureallows the brush tomake intimate contact in
itsoperating position in theholder.
15. The machine is ready foruse. The film process onthe contact sur face
can beenhanced with the use of anuntreated hardwood burnishingblock or a
rubber polishingstone. This procedurecan reduce the high frictionand brush
dust developed
during the initial filmforming period.
NOTE: In some cases timeallotment, operating conditions, or performance
issues mayrequire the replacement of lessthan a full set of brusheswithout
normal seating. Then, it is especially important to
adhere to step 11 with extendedoperation at no-load. Shortcuts on
procedures forbrush installation will result inexcess electrical damage to
thebrush face and the contact surface.
Causes of Commutation Failure
1- Streaking
2- Threading
3- Bar Edge Burning
4- Grooving
5- Slot Bar Marking
6- Photographing
7- Copper
Streaking
Causes
• Low or unequal springpressure
• Low current loads
• Contaminated atmosphere
• High humidity
• Copper particle pickup fromcommutator
(streaking)
THREADING
Causes
• Low or unequal springpressure
• Low current loads
• Contaminated atmosphere
• High humidity
• Uneven current distribution
• Conditions have beenmaintained for a long period
of time and causedcommutator damage
BAR EDGE BURNING
Causes
• Low or unequal springpressure
• Incorrect brush alignment /off neutral
• Wrong brush grade
• Sparking caused bycommutation problems
• Incorrect interpole strength
Grooving
Causes
• Low or unequal springpressure
• Contaminated atmosphere
• Low humidity andtemperature
• Abrasive brush grade
SLOT BAR MARKING
Causes
• Low or unequal springpressure
• Excess vibration
• Wrong brush grade
• Commutator becomesoverheated and softened
• High Friction
Copper Drag
Causes
• Uneven current distributionin armature windings
• Unequal number of windingsin adjacent slots
• Inconsistency in armaturewindings related to numberof coils, slots,
andcommutator bars.
Carbon Brush Failure
The most common cause of carbon brush failure is incorrect spring tension.
Oncethe proper force is applied, grade selection can be fine-tuned to ensure
optimumbrush and machine performance. For reference, the chart below
indicates the recommended ranges of spring pressure for various
applications and the methodof calculating spring pressure from the
measured spring force.
Spring Pressure
Industrial D.C Applications 4-6 psi 280-420 g/cm2
WRIM & Sync. Rings 3.5-4.5 psi 240-310 g/cm2
High Speed Turbine Rings
Soft Graphite Grades 2.5-3.5 psi 170-240 g/cm2
Metal Graphite Brushes 4.5-5.5 psi 310-390 g/cm2
FHP Brushes 4-7 psi 280-490 g/cm2
Traction Brushes 5-8 psi 350-560 g/cm2
For brushes with top and bottom angles greater than
25 degrees, add an extra .5-1 psi = 35-70 g/cm2
Spring (P.S.I.) =Measured Force (lbs.)
Pressure Brush Thickness (in.) X BrushWidth (in.)
CONCLUSION
A locomotive is a railwayvehicle that provides the motive power for a train. The
word originates from the Latinloco – "from a place", ablative of locus, "place" +
Medieval Latin motivus, "causing motion", and is a shortened form of the term
locomotive engine,[1]
first used in the early 19th century to distinguish between
mobile and stationary steam engines.
A locomotive has no payload capacity of its own, and its sole purpose is to move
the train along the tracks. In contrast, some trains have self-propelled payload-
carrying vehicles. These are not normally considered locomotives, and may be
referred to as multiple units, motor coaches or railcars. The use of these self-
propelled vehicles is increasingly common for passenger trains, but rare for freight.
Vehicles which provide motive power to haul an unpowered train, but are not
generally considered locomotives because they have payload space or are rarely
detached from their trains, are known as power cars.
Traditionally, locomotives pull trains from the front. Increasingly common is push-
pull operation, where a locomotive pulls the train in one direction and pushes it in
the other, and can be controlled from a control cab at the other end of the train.
Like great books, no project is created entirely by an individual. There are many
people involved in this project too and have helped a lot right from the beginning
till the completion of our project. Any bouquets for the merits in this project
should go to our door. Any brickbats we are ready to catch ourselves.
It is with a great sincerity, we convey our heartfull gratitude to our Mr.Mohammad
Israr, Supervisor, Electric Loco Shed, Kanpur, for his excellent guidance, valuable
advice and ample co-operation throughout the training. It is a proud privilege to
have availed of the opportunity of guidance.

More Related Content

What's hot

presentation on diesel locomotive works (dlw)
presentation on diesel locomotive works (dlw)presentation on diesel locomotive works (dlw)
presentation on diesel locomotive works (dlw)shubham vishwakarma
 
Permanent magnet motor drives.pptx
Permanent magnet motor drives.pptxPermanent magnet motor drives.pptx
Permanent magnet motor drives.pptxSuvenduMondal12
 
Control methods of PMSM
Control methods of PMSMControl methods of PMSM
Control methods of PMSMkarthi1017
 
Wireless charging of electric vehicles
Wireless charging of electric vehiclesWireless charging of electric vehicles
Wireless charging of electric vehiclesObul Naidu
 
PERMANENT MAGNET BRUSHLESS DC MOTOR
PERMANENT MAGNET BRUSHLESS DC MOTORPERMANENT MAGNET BRUSHLESS DC MOTOR
PERMANENT MAGNET BRUSHLESS DC MOTORArchana Balachandran
 
Railway summer training report electrical engineering
Railway summer training report electrical engineeringRailway summer training report electrical engineering
Railway summer training report electrical engineeringYogesh Jadoun
 
Electric traction system final upload
Electric traction system final uploadElectric traction system final upload
Electric traction system final uploadBishal Rimal
 
Permanent magnet synchronous motor
Permanent magnet synchronous motorPermanent magnet synchronous motor
Permanent magnet synchronous motorZeeshan Akhtar
 
Electric locomotive ppt
Electric locomotive pptElectric locomotive ppt
Electric locomotive pptSubhash kumar
 
Training ppt on Chittaranjan Locomotive Works
Training ppt on Chittaranjan Locomotive WorksTraining ppt on Chittaranjan Locomotive Works
Training ppt on Chittaranjan Locomotive WorksDhruv Upadhaya
 
Reference frame theory
Reference frame theoryReference frame theory
Reference frame theoryRamesh Babu
 
Industrial Star Delta Starter for a 3-Phase Induction Motor
Industrial Star Delta Starter for a 3-Phase Induction MotorIndustrial Star Delta Starter for a 3-Phase Induction Motor
Industrial Star Delta Starter for a 3-Phase Induction Motorelprocus
 
Interior Permanent Magnet (IPM) motor drive
Interior Permanent Magnet (IPM) motor driveInterior Permanent Magnet (IPM) motor drive
Interior Permanent Magnet (IPM) motor driveanusheel nahar
 

What's hot (20)

Main Parts of Electric Locomotive
Main Parts of Electric LocomotiveMain Parts of Electric Locomotive
Main Parts of Electric Locomotive
 
presentation on diesel locomotive works (dlw)
presentation on diesel locomotive works (dlw)presentation on diesel locomotive works (dlw)
presentation on diesel locomotive works (dlw)
 
Permanent magnet motor drives.pptx
Permanent magnet motor drives.pptxPermanent magnet motor drives.pptx
Permanent magnet motor drives.pptx
 
Reluctance motor
Reluctance  motor Reluctance  motor
Reluctance motor
 
Control methods of PMSM
Control methods of PMSMControl methods of PMSM
Control methods of PMSM
 
Wireless charging of electric vehicles
Wireless charging of electric vehiclesWireless charging of electric vehicles
Wireless charging of electric vehicles
 
PERMANENT MAGNET BRUSHLESS DC MOTOR
PERMANENT MAGNET BRUSHLESS DC MOTORPERMANENT MAGNET BRUSHLESS DC MOTOR
PERMANENT MAGNET BRUSHLESS DC MOTOR
 
Railway loco ppt
Railway loco ppt Railway loco ppt
Railway loco ppt
 
Stepper motor
Stepper motorStepper motor
Stepper motor
 
Railway summer training report electrical engineering
Railway summer training report electrical engineeringRailway summer training report electrical engineering
Railway summer training report electrical engineering
 
Electric traction system final upload
Electric traction system final uploadElectric traction system final upload
Electric traction system final upload
 
Soft starters
Soft startersSoft starters
Soft starters
 
Permanent magnet synchronous motor
Permanent magnet synchronous motorPermanent magnet synchronous motor
Permanent magnet synchronous motor
 
Electric locomotive ppt
Electric locomotive pptElectric locomotive ppt
Electric locomotive ppt
 
Training ppt on Chittaranjan Locomotive Works
Training ppt on Chittaranjan Locomotive WorksTraining ppt on Chittaranjan Locomotive Works
Training ppt on Chittaranjan Locomotive Works
 
Reference frame theory
Reference frame theoryReference frame theory
Reference frame theory
 
Industrial Star Delta Starter for a 3-Phase Induction Motor
Industrial Star Delta Starter for a 3-Phase Induction MotorIndustrial Star Delta Starter for a 3-Phase Induction Motor
Industrial Star Delta Starter for a 3-Phase Induction Motor
 
Electric locomotive
Electric locomotiveElectric locomotive
Electric locomotive
 
Interior Permanent Magnet (IPM) motor drive
Interior Permanent Magnet (IPM) motor driveInterior Permanent Magnet (IPM) motor drive
Interior Permanent Magnet (IPM) motor drive
 
types of motors ppt
types of motors ppttypes of motors ppt
types of motors ppt
 

Viewers also liked

Chittaranjan locomotive works (Summer Training Report)
Chittaranjan locomotive works (Summer Training Report)Chittaranjan locomotive works (Summer Training Report)
Chittaranjan locomotive works (Summer Training Report)Deo Nath Jha
 
Project report of vocational training at Chittaranjan locomotive workshop
Project report of vocational training at Chittaranjan locomotive workshopProject report of vocational training at Chittaranjan locomotive workshop
Project report of vocational training at Chittaranjan locomotive workshopSagardwip das
 
electrical locomotive report for final students
electrical locomotive report for final studentselectrical locomotive report for final students
electrical locomotive report for final studentsPiyush Saini
 
Indian Railway locomotive ppt
Indian Railway locomotive pptIndian Railway locomotive ppt
Indian Railway locomotive pptShrey Sandiman
 
Summer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSummer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSHAILESH SHUKLA
 
POH,BTC BHUSAWAL AND INTRO TO SIGNALLING
POH,BTC BHUSAWAL  AND INTRO TO SIGNALLINGPOH,BTC BHUSAWAL  AND INTRO TO SIGNALLING
POH,BTC BHUSAWAL AND INTRO TO SIGNALLINGParmeet singh
 
CHITTARANJANLOCOMOTIVES WORKS
CHITTARANJANLOCOMOTIVES WORKSCHITTARANJANLOCOMOTIVES WORKS
CHITTARANJANLOCOMOTIVES WORKSKanhaiya Kumar
 
CLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptxCLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptxAnkan Dey
 
Dlw varanasi training ppt
Dlw varanasi training pptDlw varanasi training ppt
Dlw varanasi training pptPraveen Tiwari
 
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...SUBHAMOY SINGHA ROY
 
Railway coaches
Railway coachesRailway coaches
Railway coachesnoor patel
 
Diesel loco modernization
Diesel loco modernizationDiesel loco modernization
Diesel loco modernizationAmitoj Kaur
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiPrabjeet Singh
 
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
 NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATIONINDUSTRIAL ENGINEERING
 
Project Report -Trainee Engineer At Diesel Locomotive Shed, Indian Railways
Project Report -Trainee Engineer At Diesel Locomotive Shed, Indian RailwaysProject Report -Trainee Engineer At Diesel Locomotive Shed, Indian Railways
Project Report -Trainee Engineer At Diesel Locomotive Shed, Indian RailwaysAditya Bhattacharjee
 
Railway locomotive
Railway locomotiveRailway locomotive
Railway locomotiveRinku Sharma
 

Viewers also liked (20)

Chittaranjan locomotive works (Summer Training Report)
Chittaranjan locomotive works (Summer Training Report)Chittaranjan locomotive works (Summer Training Report)
Chittaranjan locomotive works (Summer Training Report)
 
Project report of vocational training at Chittaranjan locomotive workshop
Project report of vocational training at Chittaranjan locomotive workshopProject report of vocational training at Chittaranjan locomotive workshop
Project report of vocational training at Chittaranjan locomotive workshop
 
electrical locomotive report for final students
electrical locomotive report for final studentselectrical locomotive report for final students
electrical locomotive report for final students
 
Indian Railway locomotive ppt
Indian Railway locomotive pptIndian Railway locomotive ppt
Indian Railway locomotive ppt
 
Summer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSummer Training Report, DLW Varanasi
Summer Training Report, DLW Varanasi
 
POH,BTC BHUSAWAL AND INTRO TO SIGNALLING
POH,BTC BHUSAWAL  AND INTRO TO SIGNALLINGPOH,BTC BHUSAWAL  AND INTRO TO SIGNALLING
POH,BTC BHUSAWAL AND INTRO TO SIGNALLING
 
CHITTARANJANLOCOMOTIVES WORKS
CHITTARANJANLOCOMOTIVES WORKSCHITTARANJANLOCOMOTIVES WORKS
CHITTARANJANLOCOMOTIVES WORKS
 
Sandeep mishra
Sandeep mishraSandeep mishra
Sandeep mishra
 
CLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptxCLW ANKAN PRESENTATION - Copy.pptx
CLW ANKAN PRESENTATION - Copy.pptx
 
Dlw varanasi training ppt
Dlw varanasi training pptDlw varanasi training ppt
Dlw varanasi training ppt
 
Dc motor
Dc  motorDc  motor
Dc motor
 
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
 
Railway coaches
Railway coachesRailway coaches
Railway coaches
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
Diesel locomotives
Diesel locomotivesDiesel locomotives
Diesel locomotives
 
Diesel loco modernization
Diesel loco modernizationDiesel loco modernization
Diesel loco modernization
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New Delhi
 
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
 NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
 
Project Report -Trainee Engineer At Diesel Locomotive Shed, Indian Railways
Project Report -Trainee Engineer At Diesel Locomotive Shed, Indian RailwaysProject Report -Trainee Engineer At Diesel Locomotive Shed, Indian Railways
Project Report -Trainee Engineer At Diesel Locomotive Shed, Indian Railways
 
Railway locomotive
Railway locomotiveRailway locomotive
Railway locomotive
 

Similar to Summer Training Report on Electric Locomotive Maintenance

SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPUR
SUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPURSUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPUR
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPURShivesh Ranjan
 
33016052 electric-traction-system
33016052 electric-traction-system33016052 electric-traction-system
33016052 electric-traction-systemMasterhead Jack
 
33016052 electric-traction-system
33016052 electric-traction-system33016052 electric-traction-system
33016052 electric-traction-systembabu yadav
 
Electric traction
Electric tractionElectric traction
Electric tractionDipak Meher
 
Electric traction
Electric tractionElectric traction
Electric tractionManish Sahu
 
1550091 634842733511023750
1550091 6348427335110237501550091 634842733511023750
1550091 634842733511023750Mdtarique Anwar
 
Training report on NWR,jaipur
Training report on NWR,jaipurTraining report on NWR,jaipur
Training report on NWR,jaipurLokesh Judani
 
On load tap changer in a.c. locomotive transformer & air blast circuit b...
On load tap changer in a.c. locomotive transformer  & air blast circuit b...On load tap changer in a.c. locomotive transformer  & air blast circuit b...
On load tap changer in a.c. locomotive transformer & air blast circuit b...vishalgohel12195
 
Basics of Electrical Traction drives
Basics of Electrical Traction drivesBasics of Electrical Traction drives
Basics of Electrical Traction drivesVivek Thakkar
 
Major project
Major projectMajor project
Major projectMusi Raju
 
Ccccccccccccccccccc
CccccccccccccccccccCcccccccccccccccccc
CccccccccccccccccccMusi Raju
 
Design of Electric Drive for Vehicular Application Using Vector Control
Design of Electric Drive for Vehicular Application Using Vector ControlDesign of Electric Drive for Vehicular Application Using Vector Control
Design of Electric Drive for Vehicular Application Using Vector ControlIOSR Journals
 
TRACTION-INVETERS-LOCOMOTIVES-10.doc
TRACTION-INVETERS-LOCOMOTIVES-10.docTRACTION-INVETERS-LOCOMOTIVES-10.doc
TRACTION-INVETERS-LOCOMOTIVES-10.docHarishYadav582451
 
Vocational training Report (Train Lighting)
Vocational training Report (Train Lighting)Vocational training Report (Train Lighting)
Vocational training Report (Train Lighting)shovandey07
 
Electric traction system
Electric traction systemElectric traction system
Electric traction systemAmitKumar6931
 
Electric Traction System benefits and different types of electric traction sy...
Electric Traction System benefits and different types of electric traction sy...Electric Traction System benefits and different types of electric traction sy...
Electric Traction System benefits and different types of electric traction sy...ravi9898000178
 

Similar to Summer Training Report on Electric Locomotive Maintenance (20)

SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPUR
SUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPURSUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPUR
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPUR
 
33016052 electric-traction-system
33016052 electric-traction-system33016052 electric-traction-system
33016052 electric-traction-system
 
33016052 electric-traction-system
33016052 electric-traction-system33016052 electric-traction-system
33016052 electric-traction-system
 
Electric traction
Electric tractionElectric traction
Electric traction
 
Electric traction
Electric tractionElectric traction
Electric traction
 
1550091 634842733511023750
1550091 6348427335110237501550091 634842733511023750
1550091 634842733511023750
 
Training report on NWR,jaipur
Training report on NWR,jaipurTraining report on NWR,jaipur
Training report on NWR,jaipur
 
On load tap changer in a.c. locomotive transformer & air blast circuit b...
On load tap changer in a.c. locomotive transformer  & air blast circuit b...On load tap changer in a.c. locomotive transformer  & air blast circuit b...
On load tap changer in a.c. locomotive transformer & air blast circuit b...
 
Ijetr012032
Ijetr012032Ijetr012032
Ijetr012032
 
Basics of Electrical Traction drives
Basics of Electrical Traction drivesBasics of Electrical Traction drives
Basics of Electrical Traction drives
 
Major project
Major projectMajor project
Major project
 
Ccccccccccccccccccc
CccccccccccccccccccCcccccccccccccccccc
Ccccccccccccccccccc
 
Northern western raiways ppt
Northern western raiways pptNorthern western raiways ppt
Northern western raiways ppt
 
Engine control
Engine controlEngine control
Engine control
 
Design of Electric Drive for Vehicular Application Using Vector Control
Design of Electric Drive for Vehicular Application Using Vector ControlDesign of Electric Drive for Vehicular Application Using Vector Control
Design of Electric Drive for Vehicular Application Using Vector Control
 
TRACTION-INVETERS-LOCOMOTIVES-10.doc
TRACTION-INVETERS-LOCOMOTIVES-10.docTRACTION-INVETERS-LOCOMOTIVES-10.doc
TRACTION-INVETERS-LOCOMOTIVES-10.doc
 
Vocational training Report (Train Lighting)
Vocational training Report (Train Lighting)Vocational training Report (Train Lighting)
Vocational training Report (Train Lighting)
 
ELEKTRA_new
ELEKTRA_newELEKTRA_new
ELEKTRA_new
 
Electric traction system
Electric traction systemElectric traction system
Electric traction system
 
Electric Traction System benefits and different types of electric traction sy...
Electric Traction System benefits and different types of electric traction sy...Electric Traction System benefits and different types of electric traction sy...
Electric Traction System benefits and different types of electric traction sy...
 

Recently uploaded

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 

Recently uploaded (20)

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 

Summer Training Report on Electric Locomotive Maintenance

  • 2. Electric Locomotive Shed Gomoh Dhanbad Summer Training Report 10th June to 9th July 2015 Guided By - Submitted By- Mr. Vinay Sir SUNIL KUMAR
  • 3. ACKNOWLEDGEMENT I am thankful to the organization"ELECTRICAL LOCO SHED GOMOH DHANBAD" for providing necessary facility to carry out my training successfully. It is our duty to record our sincere thanks and gratitude towards the institute staff, who helped us in bringing this project to its present form. The valuableguidance and interest taken by them has been a motivator and source ofinspiration for me to carry out the necessary proceedings for the project to becompleted successfully. Also, we are highly obliged to the head of our training and placement cell who provided us such a great opportunity to do our summer training in a reputed institute like "ELECTRIC LOCOMOTIVE SHED DHANBAD".
  • 4. CONTENTS 1- About the company 2- Introduction 3- Operation of Locomotive 4- Different Equipment In Electric Locomotive 5- Dc Motor Brush Holder 6- Performance Of Carbon Brushes and Failure of carbon brushes 7- Installation of Carbon Brushes 8- Causes of failure of Commutation 9- Main Cause of Brush Failure 10- Conclusion
  • 5. About The Company The Electric loco shed, Gomoh, Dhanbad was established during the year 1965 for homing 11 locomotives. This shed was commissioned primarily to meet the requirement of passenger and goods traffic over Indian railways. At present the shed has been expended suitably to home 176 loco motives for hauling, passenger and goods traffic. The shed is responsible for carrying out monthly inspection schedule viz. IA, IB, IC, I0& ICO in addition to annual and intermediate overhauling schedules. Further the unscheduled repairs to electric locos of CNB shed & other sheds are being done as per requirements of RDSO organizati on & HQ’s instructions. All modification&specialmaintenance instructions, approved by RDSO & N.Rly. Hd. Qtr. are also carried out as per the guide lines being issued from time to time.
  • 6. ELECTRIC LOCO MAINTENANCE SHED Electric Loco Shed maintains locomotive for utilization in freight and passenger train. All the miner and major inspection are carried out in the shed on a regular schedule specified by RDSO (Research Design Standard Organization). Monthly schedule are done at an interval of 45 days and major schedule are carried out after 18 months.
  • 7. OPERATION OF LOCOMOTIVE The electric locomotive basically works at 25 KV, 50Hz supply. The 25KV AC supply is drawn from overhead catenaries wires. The supply from overhead wires are drawn through a pantograph inside the loco transformer. This transformer is an autotransformer from which regulated voltage is taken to a rectifier block for conversion from AC to DC .It may be worth mentioning that the final tractive effort is through DC traction motor hence AC is required to be converted to DC. The DC current from rectifier block is then filtered to pure DC and then fed to traction motor. There are 6 traction motors which works parallel to provide the attractive effort for hauling the train. All the operations are controlled through control circuit which works at 110 volt DC. Various power equipments during operation gets heated up and hence to cool the same, it is done by various blowers. Different Equipments in an Electrical Locomotive
  • 8. 1) Pantograph It is pneumatically operated equipment mounted on the roof for collection of current from overhead wire. 2) Main Transformer It is an autotransformer which is utilized for drawing various grades of voltage required for operation of locomotive. 3) Rectifier This unit consists of rectifier diodes connected in bridge for conversion of AC current to DC current. 4) Traction Motor The traction motor is one of the most important equipment in the locomotive which transmits power to wheels for moving the trains. 5) Auxiliary Circuit This Circuit is three phase 415 volts which supplies current to various three phase induction motors used for driving blowers for forced air cooling of major equipments like transformer, rectifier, smoothing reactor and traction motor. This 3 phase line voltage is supplied by either static converter or Rotary ARNO Converter.
  • 9. 6) ARNO Converter Arno converter , is specific-duty machine for conversion of a single-phase supply into a three-phase supply. While the electric traction supply is standardized as single-phase A.C. supply, a three-phase supply is needed on locomotives for driving certain auxiliary equipments. The function of the Arno converter is to convert the incoming single-phase supply in to a three-phase supply for the auxiliaries. ARNO Converter is of vertical construction and has a flexible mounting .The machine is of robust mechanical construction to withstand the several vibrations encountered on locomotives. TECHNICAL DATA Single-phase input Three-phase output KVA 150 KVA 120 Volts 380 Volts 380 Amps 395 Amps 190 Frame VA-330 Class ’F’ Connection: Star RPM 1490 Cycle 50
  • 10. OPERATIONAL PRINCIPLE The single-phase supply of 380 volts AC is fed ‘direct’ to the ‘U’ & ‘V’ phases of the Arno converter. Since the ARNO Converter is connected to single-phase supply, no starting torque is developed. For starting the ‘ARNO’ split phase starting method has been employed. The W phase winding is connected to the supply phase U through a starting resistor R-118 and starting contactor C-118 for a short duration to start the Arno. Thus unbalanced three-phase voltage is impressed to each phase winding of Arno converter and the starting torque is developed .the Arno Converter picks up speed within five seconds. After the Arno has gained sufficient speed, the phase W is opened from the starting circuit by starting contactor C-118. The Arno converts the single phase input into 3 phase output as 380 volt ± 22.5%. The three-phase output of the Arno converter is connected to the auxiliary motors.
  • 11. 7) Control Circuit The control circuit is purely 110 volt DC and the most important network for handling various operational feature of the locomotive. All the power equipment and auxiliary circuit equipment are controlled through various switches in 110 volt circuit provided in the driving cab. All the circuit and equipment in the high voltage power side & auxiliary circuit equipment and the control circuit is protected against overloading, short circuiting and earth fault. For this purpose various relays have been used as protection device so as to protect the circuit from any mal functioning. 8) Asynchronous Motor Modern traction motor type using three phase AC electrical supply and now the favoured design for modern train traction systems. Can be used on DC and AC electrified railways with suitable control electronics and on diesel- electric locomotives. 9) Axle Brush The means by which the power supply circuit is completed with the substation once power has been drawn on the locomotive. Current collected from the overhead line or third rail is returned via the axle brush and one of the running rails.
  • 12. 10) Battery All trains are provided with a battery to provide start up current and for supplying essential circuits, such as emergency lighting, when the line supply fails. The battery is usually connected across the DC control supply circuit. 12) Camshaft Most DC electric traction power circuits use a camshaft to open or close the contactors controlling the resistances of the traction motor power circuit. The camshaft is driven by an electric motor or pneumatic cylinder. The cams on the shaft are arranged to ensure that the contactors open and close in the correct sequence. It is controlled by commands from the driver's cab and regulated by the fall of current in the motor circuit as each section of resistance is cut out in steps. The sound of this camshaft stepping can be heard under many older (pre electronics) trains as they accelerates. 14) Chopper Control A development in electric traction control which eliminates the need for power resistors by causing the voltage to the traction motors to be switched on and off (chopped) very rapidly during acceleration. It is accomplished by the use of thyristors and will give up to 20% improvement in efficiency over conventional resistance control.
  • 13. 15) Circuit Breaker An electric train is almost always provided with some sort of circuit breaker to isolate the power supply when there is a fault, or for maintenance. On AC systems they are usually on the roof near the pantograph. There are of two types - the air blast circuit breaker and the vacuum circuit breaker or VCB. The air or vacuum part is used to extinguish the arc which occurs as the two tips of the circuit breaker are opened. The VCB is popular in the UK and the air blast circuit breaker is more often seen on the continent of Europe. 16) Contactor Similar to a relay in that it is a remotely operated switch used to control a higher power local circuit. The difference is that contactors normally latch or lock closed and have to be opened by a separate action. A lighting contactor will have two, low voltage operating coils, one to "set" the contactor closed to switch on the lights; the other to "trip" off the lights. 17) Converter Generic term for any solid state electronic system for converting alternating current to direct current or vice versa. Where an AC supply has to be converted to DC it is called a rectifier and where DC is converted to AC it is called an inverter. The word originated in the US but is now common elsewhere.
  • 14. 18) Cooling Fans To keep the thyristors and other electronic power systems cool, the interior of a modern locomotive is equipped with an air management system, electronically controlled to keep all systems operating at the correct temperature. The fans are powered by an auxiliary inverter producing 3-phase AC at about 400 volts. 19) Creep Control A form of electronically monitored acceleration control used very effectively on some modern drive systems which permits a certain degree of wheel slip to develop under maximum power application. The GM Class 59 diesel-electric locomotive built for the UK has this system. A locomotive can develop maximum slow speed tractive effort if its wheels are turning between 5% and 15% faster than actually required by the train speed. 21) Dynamic Braking A train braking system using the traction motors of the power vehicle(s) to act as generators which provide the braking effort. The power generated during braking is dissipated either as heat through on-board resistors (rheostatic braking) or by return to the traction supply line (regenerative braking). Most regenerative systems include on board resistors to allow rheostatic braking if the traction supply system is not receptive.
  • 15. The choice is automatically selected by the traction control system. . 22) Grid Train or locomotive mounted expanded steel resistor used to absorb excess electrical energy during motor or braking power control. Often seen on the roofs of diesel electric locomotives where they are used to dissipate heat during dynamic braking. 23) Ground Relay An electrical relay provided in diesel and electric traction systems to protect the equipment against damage from earths and so- called "grounds". The result of such a relay operating is usually a shut-down of the electrical drive. Also sometimes called an Earth Fault Relay. Electrical Connections The primary function of the brush involves conducting current. In many cases the brush holder is also a part of this electrical circuit. Therefore it is necessary that all electrical connections are of minimal resistance to provide the best path for current flow from the main lead connection to the contact surface. Corrosion, contamination, or electrolytic action over a period of time can cause dramatic increases in resistance which then requires cleaning. Careless installation of the brushes or the holders can lead to loose connections. Any high resistance in the brush circuit
  • 16. will result in excess heat or an undesirable path of current flow and unequal loading of the brushes. On fractional horsepower cartridge style brushholders with captive coil spring type brushes the current should flow from the clip connector at the bottom of the holder up the brass insert to the cap on the end of the brush and then down through the shunt to the carbon. The brushes fail very quickly if the round or eared cap on the end of the brush does not make proper contact with the brass holder insert. When this condition exists current will flow directly from the brass insert to the spring or to the carbon. In either case there will be extreme heat, loss of brush contact, commutator wear, and eventually motor failure. Another problem with larger frame sizes can occur when the holder mounting is part of the electric circuit. If the holder mounting surface becomes dirty, corroded, or even painted over then current will again need to follow another path and thereby cause problems. Return to top of page.
  • 17. Summary The general knowledge and experience in the field on rotating equipment has been slowly declining for many years. In addition brushholders have seldom ever received proper attention during trouble shooting or as part of a maintenance program. Therefore it is hoped that the above information will be helpful in creating awareness of the potential problems with brushholders as a very critical component in the satisfactory performance of carbon brushes on motors, generators, and other types of sliding contacts. The important factors to check for proper functioning of the holder and brush are: 1. Inside holder dimensions 2. Holder spacing 3.Holder angle 4.Holder height 5.Spring force 6. Electrical connections When there is an opportunity to implement new holders, the use of the principles mentioned above along with the coordination of the latest constant pressure holder .
  • 18. Installation Steps Carbon Brush 1-Disconnect the power to the machine using approvedlock-out procedures. 2. Remove all old brushesfrom the holders. Make Noteof any unusualconditions of the brushesincluding roughness orburning of the contact face, Polished sides on thecarbon, excess heat on thewires, or frayed shunt wires. Unusual brush conditionsare indications of the need for and improved brushdesign or for maintenanceon the machine. 3. Inspect the commutatorfor unusual conditions for high bars and mica.Make note for required maintenance. 4. Check the inside holdercavity for dust, dirt, oil, deposits, carbon buildup,corrosion, or burned areas and clean as needed. 5. Check the terminal connectionarea and clean, asneeded. 6. Brush holders should besecured to their mount andchecked that none havebecome loosened or are outof alignment. 7. Measure spring forces to ensure there is consistentcontact force at therecommended level. Usethe measured force to calculate the spring pressurefor comparison withrecommended level of 4.0+PSI. 8. Remove the old film fromthe brush tracks, if the newbrushes are made from a different grade. Dry untreatedcanvas applied witha pressure block or a rubberabrasive. Seater stone canbe used as an alternative. However, the remainingdust must be vacuumed or blown out of the machine.
  • 19. 9. Install new brushes in allholders with attention to theorientation on angled designs.Ensure that the brushes can move freely inthe radial direction and thatthere is a relatively close fitin the tangential and axialdirections. 10. Apply the pressure springto the top of the brush. 11. Pull up on the brush andallow to gently return tocontact with the commutatoror ring to ensure there is no binding of thebrush and spring. 12. Connect the terminals. Besure all terminal connections are tight and secure. 13. Seat the brushes to the contour of the commutatorusing non-metal bearingsandpaper or garnet paper.Do NOT use emery. Mediumcoarse grade paper pulledunder the brush face in thedirection of rotation improvesthe quality of the brush contact surface andspeeds the process. Thereshould be at least 90% ofthe brush face seated to the contour of the contactsur face prior to operating the machine at load. Oncethis level has been achieved, then the resultingdust in the machine aroundthe brushes, holders, andcommutator should bevacuumed or blown out. 14. Operate the machine at noload for the final wear-incontour of the contact surfaces in order to ensurecomplete electrical contactof the brushes. This procedureallows the brush tomake intimate contact in itsoperating position in theholder. 15. The machine is ready foruse. The film process onthe contact sur face can beenhanced with the use of anuntreated hardwood burnishingblock or a rubber polishingstone. This procedurecan reduce the high frictionand brush dust developed during the initial filmforming period. NOTE: In some cases timeallotment, operating conditions, or performance issues mayrequire the replacement of lessthan a full set of brusheswithout normal seating. Then, it is especially important to
  • 20. adhere to step 11 with extendedoperation at no-load. Shortcuts on procedures forbrush installation will result inexcess electrical damage to thebrush face and the contact surface. Causes of Commutation Failure 1- Streaking 2- Threading 3- Bar Edge Burning 4- Grooving 5- Slot Bar Marking 6- Photographing 7- Copper Streaking Causes • Low or unequal springpressure • Low current loads • Contaminated atmosphere • High humidity • Copper particle pickup fromcommutator (streaking)
  • 21. THREADING Causes • Low or unequal springpressure • Low current loads • Contaminated atmosphere • High humidity • Uneven current distribution • Conditions have beenmaintained for a long period of time and causedcommutator damage BAR EDGE BURNING Causes • Low or unequal springpressure • Incorrect brush alignment /off neutral
  • 22. • Wrong brush grade • Sparking caused bycommutation problems • Incorrect interpole strength Grooving Causes • Low or unequal springpressure • Contaminated atmosphere • Low humidity andtemperature • Abrasive brush grade
  • 23. SLOT BAR MARKING Causes • Low or unequal springpressure • Excess vibration • Wrong brush grade • Commutator becomesoverheated and softened • High Friction
  • 24. Copper Drag Causes • Uneven current distributionin armature windings • Unequal number of windingsin adjacent slots • Inconsistency in armaturewindings related to numberof coils, slots, andcommutator bars.
  • 25. Carbon Brush Failure The most common cause of carbon brush failure is incorrect spring tension. Oncethe proper force is applied, grade selection can be fine-tuned to ensure optimumbrush and machine performance. For reference, the chart below indicates the recommended ranges of spring pressure for various applications and the methodof calculating spring pressure from the measured spring force. Spring Pressure Industrial D.C Applications 4-6 psi 280-420 g/cm2 WRIM & Sync. Rings 3.5-4.5 psi 240-310 g/cm2 High Speed Turbine Rings Soft Graphite Grades 2.5-3.5 psi 170-240 g/cm2 Metal Graphite Brushes 4.5-5.5 psi 310-390 g/cm2 FHP Brushes 4-7 psi 280-490 g/cm2 Traction Brushes 5-8 psi 350-560 g/cm2 For brushes with top and bottom angles greater than 25 degrees, add an extra .5-1 psi = 35-70 g/cm2 Spring (P.S.I.) =Measured Force (lbs.) Pressure Brush Thickness (in.) X BrushWidth (in.) CONCLUSION A locomotive is a railwayvehicle that provides the motive power for a train. The word originates from the Latinloco – "from a place", ablative of locus, "place" + Medieval Latin motivus, "causing motion", and is a shortened form of the term locomotive engine,[1] first used in the early 19th century to distinguish between mobile and stationary steam engines. A locomotive has no payload capacity of its own, and its sole purpose is to move the train along the tracks. In contrast, some trains have self-propelled payload-
  • 26. carrying vehicles. These are not normally considered locomotives, and may be referred to as multiple units, motor coaches or railcars. The use of these self- propelled vehicles is increasingly common for passenger trains, but rare for freight. Vehicles which provide motive power to haul an unpowered train, but are not generally considered locomotives because they have payload space or are rarely detached from their trains, are known as power cars. Traditionally, locomotives pull trains from the front. Increasingly common is push- pull operation, where a locomotive pulls the train in one direction and pushes it in the other, and can be controlled from a control cab at the other end of the train. Like great books, no project is created entirely by an individual. There are many people involved in this project too and have helped a lot right from the beginning till the completion of our project. Any bouquets for the merits in this project should go to our door. Any brickbats we are ready to catch ourselves. It is with a great sincerity, we convey our heartfull gratitude to our Mr.Mohammad Israr, Supervisor, Electric Loco Shed, Kanpur, for his excellent guidance, valuable advice and ample co-operation throughout the training. It is a proud privilege to have availed of the opportunity of guidance.