Hydropower Plant
CONTENT
S
1. Introduction
2. Site selection
3. Components
4. Power House
5. Circuit Breakers
6. Conclusions
INTRODUCTI
ON
 In hydroelectric power station kinetic energy of
stored water is converted into electric energy .
 30% of the total power in world is provided by hydro
power plant.
 The world’s hydro power potential is about 2724
MkW
 Total hydro power potential of India is 84 MkW and
22% of this potential is being tapped by various
existing and ongoing power schemes.
 In India 25.32% of total electricity generation
capacity is produced by hydro power plant.
SITE SELECTION FOR A HYDRO POWER
PLANT
 Availability of water
 Water storage
 Water head
 Accessibility of site
 Distance from the load center
 Geological characteristics of site
COMPONENT
S
 Dam and Reservoir
 Spillway
 Fore Bay
 Surge tank
 Penstock
 Turbine
 Power house
 Draft tube
DAM ANDRESERVOIR
An open-air storage area usually formed by masonry or
earthwork where water is collected and kept in quantity so that it
may be drawn off for use.
 The water reservoir is the place behind the dam where water is
stored.
 The water in the reservoir is located higher than the rest of
the dam structure.
 The height of water in the reservoir decides how much potential
energy the water
 The higher the height of water, the more its potential energy.
 The high position of water in the reservoir also enables it to move
downwards effortlessly.
FORE BAY (RESERVOIR)
A forebay is an artificial pool of
water in front of a larger body of
water. The larger body of water
may be natural or human-made.
Forebays have a
number of functions.
 Head = 62 m
SPILLWAY
Spillway is constructed to act
as a safety valve. It discharge
the overflow water to the
down stream side when the
reservoir is full. These are
generally constructed of
concrete and provided with
water discharge opening.
SURGE TANK
 Surge tank acts as a temporary
reservoir.
 It helps in stabilizing the velocity
and pressure in penstock and
thereby saves penstock from
getting damaged.
 It serve as supply tank to the
turbine in case of increased load
conditions, and storage tank in
case of low load conditions.
PENSTOCK
 The penstock is the long pipe or the
shaft that carries the water flowing
from the reservoir towards the
power generation unit, comprised of
the turbines and generator.
 Diameter = 2.4 m
 Length = 108 m
 Material used = Milestone
 Thickness = 12 mm
 Rated Discharge = 4.771 cubic m/s
TRASH RACK
A trash rack or debris screen is a wooden or
metal structure, frequently supported by
masonry, that prevents water-borne debris
from entering the intake of a water mill,
pumping station or water conveyance. This
protects water wheels, penstocks, and sluice
gates from destruction during floods.
POWER
HOUSE
A power house usually contains following components:
 Hydraulic turbines
 Synchronous generators
 Governors
 MIV(Main Inlet Valve)
 OPU(Oil Pumping Unit)
 GLOP(Generator Lubrication Oil Pump)
 Storage batteries
 Bypass Valve
 Guide Vanes
 Draft Tube
MIV(Main Inlet Valve)
Main inlet valve or MIV is a valve which is
installed before water enters into spiral casing
of the hydro turbine..
Bypass Valve
It maintains the water level between MIV and
shaft blades.
Guide Vanes
Guide Vanes are fixed grooves
found in turbines that help direct
water, gas, or air around bends at
maximum efficiency. As Impellers
increase or decrease the flow of a
substance through a system, Guide
Vanes ensure that the substance is
passed evenly and as
smoothly as possible.
OPU(Oil Pump
Unit)
It used foo operation of
hydraulic equipment's like
MIV , Bypass Valve ,
Braking system etc.
GLOP(Generator Oil Pumping
Unit)
Lubricating oil pumps are used to supply oil to
lubrication points, e.g. for plain bearings. In the
case of circulation lubrication, the lubricating oil
pump takes in an amount of oil from a reservoir,
forces it through the lubrication points and then
feeds it back to the reservoir.
SELECTION OF
TURBINE
Synchronous Generator
 Output :- 39176 KVA
 No. of Phase :- 3
 4No. of Poles :- 10
 Voltage(AC) :- 6600 V
 Current(AC) :- 343 A.
 Frequency :- 50 Hz
 Speed :- 600 per minute
 Coolant Temp :- 40°c
 Limiting Speed :- 1174 per minute
 Power factor :- 0.85
 Stater Connection :- Star
 Exciting Current(DC) :- 188 A
 Exciting Voltage(DC) :- 267 V
 Altitude :- 2136
 Maximum Temp. of Stator By RTD:-
90°c
To reduce the velocity
head losses of the water
To allow the turbine to
be set above the tailrace
to facilitate inspection
and maintenance
DRAFT TUBE
Draft Tube is an empty
structure made beneath
the Turbine.
 For Generator Breaker VCB are used.
CIRCUIT BREAKER USED
 For Line Breaker SF6 breaker are used
 For transformer both(VCB and SF6) breaker are used .
CONCLUSI
ON
 In order to achieve a growth rate of 7-8 % as envisaged in
National policy of India, it is also required to tap all the small
Hydro Power potential of the country.
 The utilization of small Hydro Power Potential is especially
required in all states where the utilized potential is very low like in
MP and therefore optimum utilization of the same may set up an
stepping up stone for achieving self sufficiency in power sector in
country.
Thanks!
Do you have any questions?

More Related Content

Similar to Hydropower Plant.pptx

eco friendly power generation through Speed breaker using water pressure
  eco friendly power generation through Speed breaker using water pressure  eco friendly power generation through Speed breaker using water pressure
eco friendly power generation through Speed breaker using water pressure
Samir9064
 
Testa low dam project 3
Testa low dam project 3Testa low dam project 3
Testa low dam project 3
neeraj prasad
 
Rps plant
Rps plantRps plant
Vocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR UttarakhandVocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR Uttarakhand
Shadab Khan
 
ppt.pptx
ppt.pptxppt.pptx
NTPC
NTPCNTPC
Hydropower
HydropowerHydropower
Hydropower
Divya Vishnoi
 
DVC Panchet Hydro Powerplant Project
DVC Panchet Hydro Powerplant ProjectDVC Panchet Hydro Powerplant Project
DVC Panchet Hydro Powerplant Project
Gargi Memorial Institute of Technology
 
hydro power plant
hydro power planthydro power plant
hydro power plant
vishalgohel12195
 
waris.pptx
waris.pptxwaris.pptx
waris.pptx
Basit861379
 
seminar on hydropower presentation
seminar on hydropower presentationseminar on hydropower presentation
seminar on hydropower presentation
ram sundar singh
 
Hydro electric power plant lecture
Hydro electric power plant lectureHydro electric power plant lecture
Hydro electric power plant lecture
c3b2a1
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)
inventionjournals
 
speed breaker power
speed breaker powerspeed breaker power
speed breaker power
Samir9064
 
Speed breaker power
Speed breaker powerSpeed breaker power
Speed breaker power
Samir9064
 
Pathri power house report
Pathri power house reportPathri power house report
Pathri power house report
Suman Saurav
 
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
Aniket Raj
 
Construction of PCC Parapet
Construction of PCC Parapet Construction of PCC Parapet
Construction of PCC Parapet
Himanshu Chakravarti
 
Hydro power plant
Hydro power plant Hydro power plant
Hydro power plant
AmitKumar6931
 
Hydro POWER PLANT
Hydro POWER PLANTHydro POWER PLANT
Hydro POWER PLANT
soprajap
 

Similar to Hydropower Plant.pptx (20)

eco friendly power generation through Speed breaker using water pressure
  eco friendly power generation through Speed breaker using water pressure  eco friendly power generation through Speed breaker using water pressure
eco friendly power generation through Speed breaker using water pressure
 
Testa low dam project 3
Testa low dam project 3Testa low dam project 3
Testa low dam project 3
 
Rps plant
Rps plantRps plant
Rps plant
 
Vocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR UttarakhandVocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR Uttarakhand
 
ppt.pptx
ppt.pptxppt.pptx
ppt.pptx
 
NTPC
NTPCNTPC
NTPC
 
Hydropower
HydropowerHydropower
Hydropower
 
DVC Panchet Hydro Powerplant Project
DVC Panchet Hydro Powerplant ProjectDVC Panchet Hydro Powerplant Project
DVC Panchet Hydro Powerplant Project
 
hydro power plant
hydro power planthydro power plant
hydro power plant
 
waris.pptx
waris.pptxwaris.pptx
waris.pptx
 
seminar on hydropower presentation
seminar on hydropower presentationseminar on hydropower presentation
seminar on hydropower presentation
 
Hydro electric power plant lecture
Hydro electric power plant lectureHydro electric power plant lecture
Hydro electric power plant lecture
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)
 
speed breaker power
speed breaker powerspeed breaker power
speed breaker power
 
Speed breaker power
Speed breaker powerSpeed breaker power
Speed breaker power
 
Pathri power house report
Pathri power house reportPathri power house report
Pathri power house report
 
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
 
Construction of PCC Parapet
Construction of PCC Parapet Construction of PCC Parapet
Construction of PCC Parapet
 
Hydro power plant
Hydro power plant Hydro power plant
Hydro power plant
 
Hydro POWER PLANT
Hydro POWER PLANTHydro POWER PLANT
Hydro POWER PLANT
 

More from Asif682330

Anurag Attri.pptx
Anurag Attri.pptxAnurag Attri.pptx
Anurag Attri.pptx
Asif682330
 
132 KV Substation Gajraula.pptx
132 KV Substation Gajraula.pptx132 KV Substation Gajraula.pptx
132 KV Substation Gajraula.pptx
Asif682330
 
LHB Coaches.pdf
LHB Coaches.pdfLHB Coaches.pdf
LHB Coaches.pdf
Asif682330
 
trainlighting.pdf
trainlighting.pdftrainlighting.pdf
trainlighting.pdf
Asif682330
 
3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf
3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf
3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf
Asif682330
 
Deforestation.ppt
Deforestation.pptDeforestation.ppt
Deforestation.ppt
Asif682330
 
Deforestation.ppt
Deforestation.pptDeforestation.ppt
Deforestation.ppt
Asif682330
 

More from Asif682330 (7)

Anurag Attri.pptx
Anurag Attri.pptxAnurag Attri.pptx
Anurag Attri.pptx
 
132 KV Substation Gajraula.pptx
132 KV Substation Gajraula.pptx132 KV Substation Gajraula.pptx
132 KV Substation Gajraula.pptx
 
LHB Coaches.pdf
LHB Coaches.pdfLHB Coaches.pdf
LHB Coaches.pdf
 
trainlighting.pdf
trainlighting.pdftrainlighting.pdf
trainlighting.pdf
 
3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf
3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf
3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf
 
Deforestation.ppt
Deforestation.pptDeforestation.ppt
Deforestation.ppt
 
Deforestation.ppt
Deforestation.pptDeforestation.ppt
Deforestation.ppt
 

Recently uploaded

Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
enizeyimana36
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
Aditya Rajan Patra
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
mamamaam477
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 

Recently uploaded (20)

Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 

Hydropower Plant.pptx

  • 1. PRESENTATION ON HYDRO POWER PLANT Presented By:-  AJIJAZ NABI NAJAR 2007350200008 4th Year Electrical Engineering Presented To:-  Dr. Mohd. Ahmed  Dr. Archana Sharma Department of Electrical Engineering Rajkiya Engineer College Bijnor Uttar Pradesh
  • 3. CONTENT S 1. Introduction 2. Site selection 3. Components 4. Power House 5. Circuit Breakers 6. Conclusions
  • 4. INTRODUCTI ON  In hydroelectric power station kinetic energy of stored water is converted into electric energy .  30% of the total power in world is provided by hydro power plant.  The world’s hydro power potential is about 2724 MkW  Total hydro power potential of India is 84 MkW and 22% of this potential is being tapped by various existing and ongoing power schemes.  In India 25.32% of total electricity generation capacity is produced by hydro power plant.
  • 5. SITE SELECTION FOR A HYDRO POWER PLANT  Availability of water  Water storage  Water head  Accessibility of site  Distance from the load center  Geological characteristics of site
  • 6. COMPONENT S  Dam and Reservoir  Spillway  Fore Bay  Surge tank  Penstock  Turbine  Power house  Draft tube
  • 7. DAM ANDRESERVOIR An open-air storage area usually formed by masonry or earthwork where water is collected and kept in quantity so that it may be drawn off for use.  The water reservoir is the place behind the dam where water is stored.  The water in the reservoir is located higher than the rest of the dam structure.  The height of water in the reservoir decides how much potential energy the water  The higher the height of water, the more its potential energy.  The high position of water in the reservoir also enables it to move downwards effortlessly.
  • 8. FORE BAY (RESERVOIR) A forebay is an artificial pool of water in front of a larger body of water. The larger body of water may be natural or human-made. Forebays have a number of functions.  Head = 62 m
  • 9. SPILLWAY Spillway is constructed to act as a safety valve. It discharge the overflow water to the down stream side when the reservoir is full. These are generally constructed of concrete and provided with water discharge opening.
  • 10. SURGE TANK  Surge tank acts as a temporary reservoir.  It helps in stabilizing the velocity and pressure in penstock and thereby saves penstock from getting damaged.  It serve as supply tank to the turbine in case of increased load conditions, and storage tank in case of low load conditions.
  • 11. PENSTOCK  The penstock is the long pipe or the shaft that carries the water flowing from the reservoir towards the power generation unit, comprised of the turbines and generator.  Diameter = 2.4 m  Length = 108 m  Material used = Milestone  Thickness = 12 mm  Rated Discharge = 4.771 cubic m/s
  • 12. TRASH RACK A trash rack or debris screen is a wooden or metal structure, frequently supported by masonry, that prevents water-borne debris from entering the intake of a water mill, pumping station or water conveyance. This protects water wheels, penstocks, and sluice gates from destruction during floods.
  • 13. POWER HOUSE A power house usually contains following components:  Hydraulic turbines  Synchronous generators  Governors  MIV(Main Inlet Valve)  OPU(Oil Pumping Unit)  GLOP(Generator Lubrication Oil Pump)  Storage batteries  Bypass Valve  Guide Vanes  Draft Tube
  • 14. MIV(Main Inlet Valve) Main inlet valve or MIV is a valve which is installed before water enters into spiral casing of the hydro turbine.. Bypass Valve It maintains the water level between MIV and shaft blades.
  • 15. Guide Vanes Guide Vanes are fixed grooves found in turbines that help direct water, gas, or air around bends at maximum efficiency. As Impellers increase or decrease the flow of a substance through a system, Guide Vanes ensure that the substance is passed evenly and as smoothly as possible.
  • 16. OPU(Oil Pump Unit) It used foo operation of hydraulic equipment's like MIV , Bypass Valve , Braking system etc. GLOP(Generator Oil Pumping Unit) Lubricating oil pumps are used to supply oil to lubrication points, e.g. for plain bearings. In the case of circulation lubrication, the lubricating oil pump takes in an amount of oil from a reservoir, forces it through the lubrication points and then feeds it back to the reservoir.
  • 18. Synchronous Generator  Output :- 39176 KVA  No. of Phase :- 3  4No. of Poles :- 10  Voltage(AC) :- 6600 V  Current(AC) :- 343 A.  Frequency :- 50 Hz  Speed :- 600 per minute  Coolant Temp :- 40°c  Limiting Speed :- 1174 per minute  Power factor :- 0.85  Stater Connection :- Star  Exciting Current(DC) :- 188 A  Exciting Voltage(DC) :- 267 V  Altitude :- 2136  Maximum Temp. of Stator By RTD:- 90°c
  • 19. To reduce the velocity head losses of the water To allow the turbine to be set above the tailrace to facilitate inspection and maintenance DRAFT TUBE Draft Tube is an empty structure made beneath the Turbine.
  • 20.  For Generator Breaker VCB are used. CIRCUIT BREAKER USED  For Line Breaker SF6 breaker are used  For transformer both(VCB and SF6) breaker are used .
  • 21. CONCLUSI ON  In order to achieve a growth rate of 7-8 % as envisaged in National policy of India, it is also required to tap all the small Hydro Power potential of the country.  The utilization of small Hydro Power Potential is especially required in all states where the utilized potential is very low like in MP and therefore optimum utilization of the same may set up an stepping up stone for achieving self sufficiency in power sector in country.
  • 22. Thanks! Do you have any questions?