SlideShare a Scribd company logo
TRAIN LIGHTING
SYSTEM
INTRODUCTION
 Train lighting is one of the important passenger amenities
which influence the image of Railways.
 First train ran on 16th April 1853, train lighting system came
to Indian Railway in 1930 through axle driven Dynamo.
 Power supply system for trains is designed and developed to
suit the requirement of AC and non-AC working in the trains.
 Few factors considered for development of such
systems are as under.
• Coach load
• Speed of the train
• Weight of the equipment
• Available technology for reliable equipment etc
TYPES OF GENERATION
 Self-generating
• Axle driven system working on 24V DC/ 110 V DC
 Mid-on-generation
• MOG with 415V, 3 phase generation, and 110V AC utilization
 End-on-generation
• EOG with 415V,3 phase generation, and 110V AC utilization
• EOG with 750V, 3 phase generation and 415 & 110V AC
utilization
TYPES OF GENERATION
 Head-on-generation
• Power feeding from OHE for lighting loads (EMUS):
 750V DC –light & fan works on 110V DC
 1500V DC – light & fan works on 110 V AC
 25 KV—light & fan works on 141 V AC
• Power feeding from HOG for Hotel Loads (Loco):
 Hotel load power is taken from Electric/Diesel Locomotive.
 Hotel load power supply taken directly from OHE through a separate
pantograph mounted on the power car.
SELF GENERATION SYSTEM:
 The power supply arrangement of SG coach has under slung
alternator, which is driven by the running axles of the coach with the
belt of the coach. The voltage of the alternator which varies with the
speed of the train is regulated with the help of RRU and converted to
110 V DC and is used for charging the battery. The electrical load of
the coach is supplied through the 110 v DC battery at the halt.
 Advantages:
• The system is independent of the mode of traction.
• As each coach has a battery, so no additional source is required.
• The problem/defect in any particular coach does not affect the
others.
• The system can be designed to suit its specific requirement.
• It gives better flexibility in rake formation majority of SG type
coach is more.
SELF GENERATION SYSTEM:
 Disadvantages:
• The electrical load of the coach is restricted by the limitation of the capacity of
generation i.e. 2*25 kW per coach at present.
• The power is not generated during standing or slow movement of the train,
therefore bulky batteries are provided.
• There is no standby source for alternator and batteries, so system became poor
reliability.
• The system requires the extensive maintenance of alternator, batteries, belts,
tensioning device etc.
• The system has the very poor efficiency of 57%for power it receives from the
locomotive.
SELF GENERATION SYSTEM:
BASIC CIRCUIT DIAGRAM
END ON GENERATION SYSTEM:
 Each EOG train has 2 power cars with 2 nos. of DA sets in each.
The power is fed by any two DA sets through IVC. The power is
supplied at 3 phase, 750V, which is stepped down in an
individual coach to 3 phase,415 V for supplying various loads
like RMPU, WRA etc. The 110v AC supply for lights and fans is
obtained by further stepping down the 415v supply. A 24 V
battery is used for supplying a few emergency lights provided in
the coach.
 Advantages:
• The system does not require the use of bulky batteries and alternators in
individual coaches.
• The system has higher reliability due to standby DA sets and reduced
number of equipment.
• Due to an elimination of heavy equipment, the dead weight of the coach
is reduced.
• The system is independent of the type of traction i.e. diesel or electric
locomotive.
• The system has better energy efficiency as compared to the self-
generating system.
• Low maintenance.
END ON GENERATION SYSTEM:
 Disadvantages:
• The cost of energy is high due to fuel cost.
• Even with 750V, 3 phase, there is still an effect of voltage drop at the farthest
end of the train.
• Noise and smoke pollution are generated from power cars.
MID ON GENERATION SYSTEM:
 The MOG system was adopted by IR for slow-moving passenger
trains which have the very low generation to non-generation
ratio. These trains had one power car in the middle of the train,
which fed power supply to the coaches at either side of power
car. The power car coach had two DA set of 30 KVA each out of
which one was used as standby. The power car coach also had
one 3 phase, 30 KVA step down transformer of 415/110 V. The
110 V AC supplied to the coaches through couplers. The system
was discontinued after the introduction of EMU and DMU service.
 Advantages:
• The system was most suitable for slow-moving branch line passenger
trains. Light and fan of all the coaches had centralized control in power
car coach. Fan and lights were working on AC supply. There was no need
for standby batteries in the coaches.
 Disadvantages:
• There were noise and smoke; pollution due to DA set working.
• The operator was required to power car coach.
• Some valuable passenger spaces were occupied by DA sets.
HEAD ON GENERATION SYSTEM:
 The HOG scheme is widely used power supply by Railways world
over.
 The power supply system for the coaches is either received from the
locomotive or it is directly tapped from traction overhead lines into
the power cars.
 The system is considered to provide cost-effective, reliable and
energy efficient supply system for coaches.
 The HOG scheme can be considered with following two options.
 Hotel load power is taken from Electric/Diesel Locomotive.
 Hotel load power supply taken directly from OHE through a separate
pantograph mounted on the power car.
The second system is not considered technically feasible for
Indian Railways due to some limitations.
HEAD ON GENERATION SYSTEM:
 The power supply is received directly from locomotive through
couplers. The supply from locomotive can be a 750v, 3 phase supply
or a single phase supply received from loco is regulated and stepped
down in individual AC coaches, with the help of converters to provide
a regulated 415 V, 3 phase supply.
 Similarly, in AC coaches, power supply from locomotive can be
stepped down and regulated to provide single phase, 110 V AC
supplies.
 One power car with standby DA sets is also used in the train, which
can supply power to the coaches in case of failure of a locomotive.
HEAD ON GENERATION SYSTEM:
HEAD ON GENERATION SYSTEM:
 Advantage:
• Cheaper cost of power as compared to EOG & SG system.
• Pollution is less as compared to EOG system.
• One power car may be replaced by trailer coach, revenue increased.
• Escorting staff will be reduced to one power car.
• The net dead weight of the train is reduced as compared to SG system.
• HOG type AC coaches can be used in EOG type trains.
• This system is compatible with diesel and electric traction.
• Maintenance cost of HOG system coaches is lower as compared to SG
coaches
 Disadvantages:
• While working with electric locomotive there are power interruptions for short
durations to various electrical equipment except for lights while through the
neutral section.
• One power car is still required for supplying power during failure of OHE
supply or locomotive etc.HOG type coaches require rake integrity of coaches
similar to EOG system.
trainlighting.pdf

More Related Content

Similar to trainlighting.pdf

Indian Railways Workshop Electrical PPT
Indian Railways Workshop Electrical PPTIndian Railways Workshop Electrical PPT
Indian Railways Workshop Electrical PPT
Nikunj Parashar
 
28101619005, PC-EE-801.ppt
28101619005, PC-EE-801.ppt28101619005, PC-EE-801.ppt
28101619005, PC-EE-801.ppt
PrakasBhowmik
 
Electric traction
Electric tractionElectric traction
Electric traction
SIDDHARAM GADEKAR
 
Electrical traction
Electrical traction Electrical traction
Electrical traction
Moideen Thashreef
 
TRACTION-INVETERS-LOCOMOTIVES-10.doc
TRACTION-INVETERS-LOCOMOTIVES-10.docTRACTION-INVETERS-LOCOMOTIVES-10.doc
TRACTION-INVETERS-LOCOMOTIVES-10.doc
HarishYadav582451
 
1302580505523 train lighting book
1302580505523 train lighting book1302580505523 train lighting book
1302580505523 train lighting book
firoj shaik
 
Electric Traction
Electric Traction Electric Traction
Electric Traction
ZunAib Ali
 
Electric traction
Electric tractionElectric traction
Electric traction
Piyush Kumar
 
Summer training in SOUTH EAST CENTRAL RAILWAY
Summer training in SOUTH EAST CENTRAL RAILWAYSummer training in SOUTH EAST CENTRAL RAILWAY
Summer training in SOUTH EAST CENTRAL RAILWAY
vijay patel
 
Electric traction in railways
Electric traction in railwaysElectric traction in railways
Electric traction in railways
suresh shindhe
 
ELECTRIC TRACTION SYSTEM
ELECTRIC TRACTION SYSTEMELECTRIC TRACTION SYSTEM
ELECTRIC TRACTION SYSTEM
SaikumarDendi
 
LHB Coache & Train Lighting.pptx
LHB Coache & Train Lighting.pptxLHB Coache & Train Lighting.pptx
LHB Coache & Train Lighting.pptx
hiyoy18481
 
TRACTION INVETERS LOCOMOTIVES 10.pptx
TRACTION  INVETERS LOCOMOTIVES 10.pptxTRACTION  INVETERS LOCOMOTIVES 10.pptx
TRACTION INVETERS LOCOMOTIVES 10.pptx
SohailKhan490408
 
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptxhgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hiyoy18481
 
Traction motor
Traction motorTraction motor
Traction motor
Rajneesh Budania
 
Engine control
Engine controlEngine control
Engine control
Pranchal Srivastava
 
Application of dc generator at railway coach
Application of dc generator at railway coachApplication of dc generator at railway coach
Application of dc generator at railway coach
jjasdxjz
 
Electric Traction System benefits and different types of electric traction sy...
Electric Traction System benefits and different types of electric traction sy...Electric Traction System benefits and different types of electric traction sy...
Electric Traction System benefits and different types of electric traction sy...
ravi9898000178
 
Electric traction system
Electric traction systemElectric traction system
Electric traction system
AmitKumar6931
 
Ueet presentation
Ueet presentationUeet presentation
Ueet presentation
Darshil Shah
 

Similar to trainlighting.pdf (20)

Indian Railways Workshop Electrical PPT
Indian Railways Workshop Electrical PPTIndian Railways Workshop Electrical PPT
Indian Railways Workshop Electrical PPT
 
28101619005, PC-EE-801.ppt
28101619005, PC-EE-801.ppt28101619005, PC-EE-801.ppt
28101619005, PC-EE-801.ppt
 
Electric traction
Electric tractionElectric traction
Electric traction
 
Electrical traction
Electrical traction Electrical traction
Electrical traction
 
TRACTION-INVETERS-LOCOMOTIVES-10.doc
TRACTION-INVETERS-LOCOMOTIVES-10.docTRACTION-INVETERS-LOCOMOTIVES-10.doc
TRACTION-INVETERS-LOCOMOTIVES-10.doc
 
1302580505523 train lighting book
1302580505523 train lighting book1302580505523 train lighting book
1302580505523 train lighting book
 
Electric Traction
Electric Traction Electric Traction
Electric Traction
 
Electric traction
Electric tractionElectric traction
Electric traction
 
Summer training in SOUTH EAST CENTRAL RAILWAY
Summer training in SOUTH EAST CENTRAL RAILWAYSummer training in SOUTH EAST CENTRAL RAILWAY
Summer training in SOUTH EAST CENTRAL RAILWAY
 
Electric traction in railways
Electric traction in railwaysElectric traction in railways
Electric traction in railways
 
ELECTRIC TRACTION SYSTEM
ELECTRIC TRACTION SYSTEMELECTRIC TRACTION SYSTEM
ELECTRIC TRACTION SYSTEM
 
LHB Coache & Train Lighting.pptx
LHB Coache & Train Lighting.pptxLHB Coache & Train Lighting.pptx
LHB Coache & Train Lighting.pptx
 
TRACTION INVETERS LOCOMOTIVES 10.pptx
TRACTION  INVETERS LOCOMOTIVES 10.pptxTRACTION  INVETERS LOCOMOTIVES 10.pptx
TRACTION INVETERS LOCOMOTIVES 10.pptx
 
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptxhgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
 
Traction motor
Traction motorTraction motor
Traction motor
 
Engine control
Engine controlEngine control
Engine control
 
Application of dc generator at railway coach
Application of dc generator at railway coachApplication of dc generator at railway coach
Application of dc generator at railway coach
 
Electric Traction System benefits and different types of electric traction sy...
Electric Traction System benefits and different types of electric traction sy...Electric Traction System benefits and different types of electric traction sy...
Electric Traction System benefits and different types of electric traction sy...
 
Electric traction system
Electric traction systemElectric traction system
Electric traction system
 
Ueet presentation
Ueet presentationUeet presentation
Ueet presentation
 

More from Asif682330

Anurag Attri.pptx
Anurag Attri.pptxAnurag Attri.pptx
Anurag Attri.pptx
Asif682330
 
132 KV Substation Gajraula.pptx
132 KV Substation Gajraula.pptx132 KV Substation Gajraula.pptx
132 KV Substation Gajraula.pptx
Asif682330
 
LHB Coaches.pdf
LHB Coaches.pdfLHB Coaches.pdf
LHB Coaches.pdf
Asif682330
 
3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf
3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf
3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf
Asif682330
 
Hydropower Plant.pptx
Hydropower Plant.pptxHydropower Plant.pptx
Hydropower Plant.pptx
Asif682330
 
Deforestation.ppt
Deforestation.pptDeforestation.ppt
Deforestation.ppt
Asif682330
 
Deforestation.ppt
Deforestation.pptDeforestation.ppt
Deforestation.ppt
Asif682330
 

More from Asif682330 (7)

Anurag Attri.pptx
Anurag Attri.pptxAnurag Attri.pptx
Anurag Attri.pptx
 
132 KV Substation Gajraula.pptx
132 KV Substation Gajraula.pptx132 KV Substation Gajraula.pptx
132 KV Substation Gajraula.pptx
 
LHB Coaches.pdf
LHB Coaches.pdfLHB Coaches.pdf
LHB Coaches.pdf
 
3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf
3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf
3. Air Conditioning Train Lighting Energy Efficiency - LC Sarser.pdf
 
Hydropower Plant.pptx
Hydropower Plant.pptxHydropower Plant.pptx
Hydropower Plant.pptx
 
Deforestation.ppt
Deforestation.pptDeforestation.ppt
Deforestation.ppt
 
Deforestation.ppt
Deforestation.pptDeforestation.ppt
Deforestation.ppt
 

Recently uploaded

UGC NET Exam Paper 1- Unit 1:Teaching Aptitude
UGC NET Exam Paper 1- Unit 1:Teaching AptitudeUGC NET Exam Paper 1- Unit 1:Teaching Aptitude
UGC NET Exam Paper 1- Unit 1:Teaching Aptitude
S. Raj Kumar
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
Jean Carlos Nunes Paixão
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
Celine George
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
adhitya5119
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
Constructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective CommunicationConstructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective Communication
Chevonnese Chevers Whyte, MBA, B.Sc.
 
ZK on Polkadot zero knowledge proofs - sub0.pptx
ZK on Polkadot zero knowledge proofs - sub0.pptxZK on Polkadot zero knowledge proofs - sub0.pptx
ZK on Polkadot zero knowledge proofs - sub0.pptx
dot55audits
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
Priyankaranawat4
 
Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...
PsychoTech Services
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
Colégio Santa Teresinha
 
Bed Making ( Introduction, Purpose, Types, Articles, Scientific principles, N...
Bed Making ( Introduction, Purpose, Types, Articles, Scientific principles, N...Bed Making ( Introduction, Purpose, Types, Articles, Scientific principles, N...
Bed Making ( Introduction, Purpose, Types, Articles, Scientific principles, N...
Leena Ghag-Sakpal
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
GeorgeMilliken2
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
Temple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation resultsTemple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation results
Krassimira Luka
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
Jyoti Chand
 
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumPhilippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
MJDuyan
 
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxBeyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
EduSkills OECD
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
Celine George
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
Priyankaranawat4
 

Recently uploaded (20)

UGC NET Exam Paper 1- Unit 1:Teaching Aptitude
UGC NET Exam Paper 1- Unit 1:Teaching AptitudeUGC NET Exam Paper 1- Unit 1:Teaching Aptitude
UGC NET Exam Paper 1- Unit 1:Teaching Aptitude
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
Constructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective CommunicationConstructing Your Course Container for Effective Communication
Constructing Your Course Container for Effective Communication
 
ZK on Polkadot zero knowledge proofs - sub0.pptx
ZK on Polkadot zero knowledge proofs - sub0.pptxZK on Polkadot zero knowledge proofs - sub0.pptx
ZK on Polkadot zero knowledge proofs - sub0.pptx
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
 
Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
 
Bed Making ( Introduction, Purpose, Types, Articles, Scientific principles, N...
Bed Making ( Introduction, Purpose, Types, Articles, Scientific principles, N...Bed Making ( Introduction, Purpose, Types, Articles, Scientific principles, N...
Bed Making ( Introduction, Purpose, Types, Articles, Scientific principles, N...
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
Temple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation resultsTemple of Asclepius in Thrace. Excavation results
Temple of Asclepius in Thrace. Excavation results
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
 
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumPhilippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
 
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxBeyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
 

trainlighting.pdf

  • 2. INTRODUCTION  Train lighting is one of the important passenger amenities which influence the image of Railways.  First train ran on 16th April 1853, train lighting system came to Indian Railway in 1930 through axle driven Dynamo.  Power supply system for trains is designed and developed to suit the requirement of AC and non-AC working in the trains.  Few factors considered for development of such systems are as under. • Coach load • Speed of the train • Weight of the equipment • Available technology for reliable equipment etc
  • 3. TYPES OF GENERATION  Self-generating • Axle driven system working on 24V DC/ 110 V DC  Mid-on-generation • MOG with 415V, 3 phase generation, and 110V AC utilization  End-on-generation • EOG with 415V,3 phase generation, and 110V AC utilization • EOG with 750V, 3 phase generation and 415 & 110V AC utilization
  • 4. TYPES OF GENERATION  Head-on-generation • Power feeding from OHE for lighting loads (EMUS):  750V DC –light & fan works on 110V DC  1500V DC – light & fan works on 110 V AC  25 KV—light & fan works on 141 V AC • Power feeding from HOG for Hotel Loads (Loco):  Hotel load power is taken from Electric/Diesel Locomotive.  Hotel load power supply taken directly from OHE through a separate pantograph mounted on the power car.
  • 5. SELF GENERATION SYSTEM:  The power supply arrangement of SG coach has under slung alternator, which is driven by the running axles of the coach with the belt of the coach. The voltage of the alternator which varies with the speed of the train is regulated with the help of RRU and converted to 110 V DC and is used for charging the battery. The electrical load of the coach is supplied through the 110 v DC battery at the halt.  Advantages: • The system is independent of the mode of traction. • As each coach has a battery, so no additional source is required. • The problem/defect in any particular coach does not affect the others. • The system can be designed to suit its specific requirement. • It gives better flexibility in rake formation majority of SG type coach is more.
  • 6. SELF GENERATION SYSTEM:  Disadvantages: • The electrical load of the coach is restricted by the limitation of the capacity of generation i.e. 2*25 kW per coach at present. • The power is not generated during standing or slow movement of the train, therefore bulky batteries are provided. • There is no standby source for alternator and batteries, so system became poor reliability. • The system requires the extensive maintenance of alternator, batteries, belts, tensioning device etc. • The system has the very poor efficiency of 57%for power it receives from the locomotive.
  • 8. END ON GENERATION SYSTEM:  Each EOG train has 2 power cars with 2 nos. of DA sets in each. The power is fed by any two DA sets through IVC. The power is supplied at 3 phase, 750V, which is stepped down in an individual coach to 3 phase,415 V for supplying various loads like RMPU, WRA etc. The 110v AC supply for lights and fans is obtained by further stepping down the 415v supply. A 24 V battery is used for supplying a few emergency lights provided in the coach.  Advantages: • The system does not require the use of bulky batteries and alternators in individual coaches. • The system has higher reliability due to standby DA sets and reduced number of equipment. • Due to an elimination of heavy equipment, the dead weight of the coach is reduced. • The system is independent of the type of traction i.e. diesel or electric locomotive. • The system has better energy efficiency as compared to the self- generating system. • Low maintenance.
  • 9. END ON GENERATION SYSTEM:  Disadvantages: • The cost of energy is high due to fuel cost. • Even with 750V, 3 phase, there is still an effect of voltage drop at the farthest end of the train. • Noise and smoke pollution are generated from power cars.
  • 10. MID ON GENERATION SYSTEM:  The MOG system was adopted by IR for slow-moving passenger trains which have the very low generation to non-generation ratio. These trains had one power car in the middle of the train, which fed power supply to the coaches at either side of power car. The power car coach had two DA set of 30 KVA each out of which one was used as standby. The power car coach also had one 3 phase, 30 KVA step down transformer of 415/110 V. The 110 V AC supplied to the coaches through couplers. The system was discontinued after the introduction of EMU and DMU service.  Advantages: • The system was most suitable for slow-moving branch line passenger trains. Light and fan of all the coaches had centralized control in power car coach. Fan and lights were working on AC supply. There was no need for standby batteries in the coaches.  Disadvantages: • There were noise and smoke; pollution due to DA set working. • The operator was required to power car coach. • Some valuable passenger spaces were occupied by DA sets.
  • 11. HEAD ON GENERATION SYSTEM:  The HOG scheme is widely used power supply by Railways world over.  The power supply system for the coaches is either received from the locomotive or it is directly tapped from traction overhead lines into the power cars.  The system is considered to provide cost-effective, reliable and energy efficient supply system for coaches.  The HOG scheme can be considered with following two options.  Hotel load power is taken from Electric/Diesel Locomotive.  Hotel load power supply taken directly from OHE through a separate pantograph mounted on the power car. The second system is not considered technically feasible for Indian Railways due to some limitations.
  • 12. HEAD ON GENERATION SYSTEM:  The power supply is received directly from locomotive through couplers. The supply from locomotive can be a 750v, 3 phase supply or a single phase supply received from loco is regulated and stepped down in individual AC coaches, with the help of converters to provide a regulated 415 V, 3 phase supply.  Similarly, in AC coaches, power supply from locomotive can be stepped down and regulated to provide single phase, 110 V AC supplies.  One power car with standby DA sets is also used in the train, which can supply power to the coaches in case of failure of a locomotive.
  • 14. HEAD ON GENERATION SYSTEM:  Advantage: • Cheaper cost of power as compared to EOG & SG system. • Pollution is less as compared to EOG system. • One power car may be replaced by trailer coach, revenue increased. • Escorting staff will be reduced to one power car. • The net dead weight of the train is reduced as compared to SG system. • HOG type AC coaches can be used in EOG type trains. • This system is compatible with diesel and electric traction. • Maintenance cost of HOG system coaches is lower as compared to SG coaches  Disadvantages: • While working with electric locomotive there are power interruptions for short durations to various electrical equipment except for lights while through the neutral section. • One power car is still required for supplying power during failure of OHE supply or locomotive etc.HOG type coaches require rake integrity of coaches similar to EOG system.