Presentation by Pete Kirst of Conductix & Jon Snyder of DeSHAZO Crane LLC at the 27th Crane Symposium hosted by the Association for Iron & Steel Technology
Eagle P3 is a public-private partnership comprised of RTD’s East Rail Line, Gold Line, Commuter Rail Maintenance Facility and Northwest Rail Line Westminster segment. The total 36 miles of new commuter rail lines are scheduled to open one at a time in sequence in 2016. The project is being delivered and operated under a concession agreement that RTD has entered into with a concessionaire, Denver Transit Partners (DTP), a special purpose company owned by Fluor Enterprises, Uberior Investments and Laing Investments. DTP will design-build-finance-operate-maintain (DBFOM) the projects listed above all under a single contract. An integral part of this project is the systems engineering scope, and Jeff Whiteman and Jeff Boerman, with RTD, discuss the complexities of the Eagle P3 system and how the project is progressing with about two years left until operations begin. Tara Bettale, FasTracks Public Information Specialist – EagleP3 Project, provides a general FasTracks overview.
UK Spectrum Policy Forum - David Fell, Transport for London - London BusestechUK
UK Spectrum Policy Forum
Cluster 1: Transportation - 11 December 2014
David Fell, Network Architect, Technical Services Group, Transport for London
London Buses
More information at: http://www.techuk.org/about/uk-spectrum-policy-forum
All rights reserved
WIFI Goes to Town - An article summary presentation Adel Belasker
This is an article's summary presentation that intend to reveal and explain the most important points discussed in this Article .
Presented by Adel Belasker and Ismail Yaich
SOLECTEK KM 10Gbps PTP link microwave long range by info tech middle eastAli Shoaee
SOLECTEK KM Series
10Gbps Microwave Link Long Range
240MHz XPIC
• Two Dual-Transceiver radios on one side (side by side, single mount)
• Special branching circuit to combine all signals.
• One single-pol antenna – direct mount up to 6FT antennas
• Data and header compression – allows up to 20% increase in capacity
• Link Capacity will reach almost 10Gbps.
Eagle P3 is a public-private partnership comprised of RTD’s East Rail Line, Gold Line, Commuter Rail Maintenance Facility and Northwest Rail Line Westminster segment. The total 36 miles of new commuter rail lines are scheduled to open one at a time in sequence in 2016. The project is being delivered and operated under a concession agreement that RTD has entered into with a concessionaire, Denver Transit Partners (DTP), a special purpose company owned by Fluor Enterprises, Uberior Investments and Laing Investments. DTP will design-build-finance-operate-maintain (DBFOM) the projects listed above all under a single contract. An integral part of this project is the systems engineering scope, and Jeff Whiteman and Jeff Boerman, with RTD, discuss the complexities of the Eagle P3 system and how the project is progressing with about two years left until operations begin. Tara Bettale, FasTracks Public Information Specialist – EagleP3 Project, provides a general FasTracks overview.
UK Spectrum Policy Forum - David Fell, Transport for London - London BusestechUK
UK Spectrum Policy Forum
Cluster 1: Transportation - 11 December 2014
David Fell, Network Architect, Technical Services Group, Transport for London
London Buses
More information at: http://www.techuk.org/about/uk-spectrum-policy-forum
All rights reserved
WIFI Goes to Town - An article summary presentation Adel Belasker
This is an article's summary presentation that intend to reveal and explain the most important points discussed in this Article .
Presented by Adel Belasker and Ismail Yaich
SOLECTEK KM 10Gbps PTP link microwave long range by info tech middle eastAli Shoaee
SOLECTEK KM Series
10Gbps Microwave Link Long Range
240MHz XPIC
• Two Dual-Transceiver radios on one side (side by side, single mount)
• Special branching circuit to combine all signals.
• One single-pol antenna – direct mount up to 6FT antennas
• Data and header compression – allows up to 20% increase in capacity
• Link Capacity will reach almost 10Gbps.
Faculty of Engineering - Cairo University
Satellite Communication Course project was to present on some satellite systems. I chose ORBCOMM Satellite System.
IP based communications over satellitesBektaş Şahin
IP based communications over satellites is a hard task however emerging technologies improve it's viability. This presentation gives some insight about how it is done and showcase some of the problems and solution approaches. Also some constellations are given as examples to how this process is done.
You probably don’t think of load bank testing when it’s time to commission new equipment or upgrades. And that’s not surprising, since load banks of the size and complexity you require didn’t even exist 10 years ago. But they do now and ComRent has them available for rent.
Felix Langley, Network Technical Head at Network Rail, gave an insight into the diverse array of power engineering on the UK Railway, including AC/DC electrification, SCADA systems and the non-traction power supplies that feed signalling systems, points heating and level crossings.
• Introduction: VSC-HVDC connections
• VSC-HVDC structure and controller
• VSC-HVDC connected OWF frequency control
- Control strategy
- Simulation results
• VSC-HVDC interconnector frequency control
- Control strategy
- Simulation results
• Conclusion and future works
High performance browser networking ch5,6Seung-Bum Lee
Presentation material including summary of "High Performance Browser Networking" by Ilya Grigorik. This book includes very good summary of computer network not only for internet browsing but also multimedia streaming.
Faculty of Engineering - Cairo University
Satellite Communication Course project was to present on some satellite systems. I chose ORBCOMM Satellite System.
IP based communications over satellitesBektaş Şahin
IP based communications over satellites is a hard task however emerging technologies improve it's viability. This presentation gives some insight about how it is done and showcase some of the problems and solution approaches. Also some constellations are given as examples to how this process is done.
You probably don’t think of load bank testing when it’s time to commission new equipment or upgrades. And that’s not surprising, since load banks of the size and complexity you require didn’t even exist 10 years ago. But they do now and ComRent has them available for rent.
Felix Langley, Network Technical Head at Network Rail, gave an insight into the diverse array of power engineering on the UK Railway, including AC/DC electrification, SCADA systems and the non-traction power supplies that feed signalling systems, points heating and level crossings.
• Introduction: VSC-HVDC connections
• VSC-HVDC structure and controller
• VSC-HVDC connected OWF frequency control
- Control strategy
- Simulation results
• VSC-HVDC interconnector frequency control
- Control strategy
- Simulation results
• Conclusion and future works
High performance browser networking ch5,6Seung-Bum Lee
Presentation material including summary of "High Performance Browser Networking" by Ilya Grigorik. This book includes very good summary of computer network not only for internet browsing but also multimedia streaming.
Next Generation Fiber Structured Cabling and Migration to 40/100gPanduit
The new high speed Ethernet standards, 40GBASE-SR4 and 100GBASE-SR10, will require a change in the fiber cable plant. Here we examine the media and connectivity solutions needed to ease the migration for 10 Gigabit Ethernet to 40 and 100 Gigabit Ethernet.
This presentation describes potential simulator model changes as a result of the accident at Fukushima Daiichi Nuclear Power Plant.
For more information, go to GSES.com, email info@gses.com, and follow us on Twitter @GSESystems and Facebook.com/GSESystems. Thanks for viewing!
IEEE - Standards.
Ethernet Logical Link Control (LLC) and Media Access Control (MAC) sublayers.
Historic Ethernet: The foundation for Ethernet technology in 1970 was Alohanet.
Early Ethernet Media used coaxial cable to connect computers in a bus topology. It was known as Thicknet (10BASE5) and Thinnet (10BASE2).
Ethernet Collision Management.
There are two styles of Ethernet framing: IEEE 802.3 (original) and the revised IEEE 802.3 (Ethernet).
CSMA/CD, Carrier Sensle, Multiple Access, Collision Detection, JAM Signal and Random Backoff.
Ethernet Timing and latency.
Bit Time: The period of time required for a bit to be placed and sensed on the media.
Slot Time: is the time it takes for an electronic pulse to travel the length of the maximum theoretical distance between two nodes.
Inter-frame spacing.
Ethernet Types
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfKamal Acharya
The College Bus Management system is completely developed by Visual Basic .NET Version. The application is connect with most secured database language MS SQL Server. The application is develop by using best combination of front-end and back-end languages. The application is totally design like flat user interface. This flat user interface is more attractive user interface in 2017. The application is gives more important to the system functionality. The application is to manage the student’s details, driver’s details, bus details, bus route details, bus fees details and more. The application has only one unit for admin. The admin can manage the entire application. The admin can login into the application by using username and password of the admin. The application is develop for big and small colleges. It is more user friendly for non-computer person. Even they can easily learn how to manage the application within hours. The application is more secure by the admin. The system will give an effective output for the VB.Net and SQL Server given as input to the system. The compiled java program given as input to the system, after scanning the program will generate different reports. The application generates the report for users. The admin can view and download the report of the data. The application deliver the excel format reports. Because, excel formatted reports is very easy to understand the income and expense of the college bus. This application is mainly develop for windows operating system users. In 2017, 73% of people enterprises are using windows operating system. So the application will easily install for all the windows operating system users. The application-developed size is very low. The application consumes very low space in disk. Therefore, the user can allocate very minimum local disk space for this application.
Event Management System Vb Net Project Report.pdfKamal Acharya
In present era, the scopes of information technology growing with a very fast .We do not see any are untouched from this industry. The scope of information technology has become wider includes: Business and industry. Household Business, Communication, Education, Entertainment, Science, Medicine, Engineering, Distance Learning, Weather Forecasting. Carrier Searching and so on.
My project named “Event Management System” is software that store and maintained all events coordinated in college. It also helpful to print related reports. My project will help to record the events coordinated by faculties with their Name, Event subject, date & details in an efficient & effective ways.
In my system we have to make a system by which a user can record all events coordinated by a particular faculty. In our proposed system some more featured are added which differs it from the existing system such as security.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
Maintaining high-quality standards in the production of TMT bars is crucial for ensuring structural integrity in construction. Addressing common defects through careful monitoring, standardized processes, and advanced technology can significantly improve the quality of TMT bars. Continuous training and adherence to quality control measures will also play a pivotal role in minimizing these defects.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Water Industry Process Automation and Control Monthly - May 2024.pdf
High Speed Data Transmission for Overhead Cranes – SSAB, Mobile Alabama Installation
1. High Speed Data Transmission for
Overhead Cranes – SSAB, Mobile
Alabama Installation
Pete Kirst – Global MDM – Conductix
Jon Snyder – Regional Mgr. - Deshazo
4. Crane Runway – Existing Methods of Power & Data Transmission
Festoon System
Conductor Bar
Leaky Co-Ax
or
or
Wi-Fi (Wireless Radio)
+
Combination System
6. Slotted Waveguide
Real time channel for ProfiNET Safe Signals
High Data Rates – up to 100Mb/sec
Video / Audio transmission via Ethernet
Fully Integrated
Solution
7. Slotted Waveguide
Radiated Emissions Electromagnetic
Simulation
• Signals travel inside the
dedicated profile only!
• No interference with other
wireless or radar system
signals!
• License and registration
free-globally
Installation as simple as a Conductor Rail System
Space requirements are same as a standard 4 pole
power system
12. SSAB – Mobile, Alabama
• The Fully Automated Cranes at SSAB were
starting to see festoon cable wear from
repetitive movements and festoon cables
getting caught on equipment and
transportation vehicles.
• Repair Solutions:
– Replace Festoon in kind
– Replace Festoon with ProfiDAT System
13. SSAB – Mobile, Alabama
• Existing Cranes
– (1) Fully Automated Sheet Lifting Crane
• 200 ft. Runway
• Festoon Power and Communication
– (2) Fully Automated Sheet Lifting Cranes
• Both Cranes on the Same Runway
• 275 ft. Runway
• Festoon Power and Communication
14. SSAB – Mobile, Alabama
• Converting Festoon System to
ProfiDAT Conductor
• Remove existing Festoon
• Keep existing Festoon brackets
• Slight Modifications to existing
brackets to be made to
accommodate the new Conductor
Bar brackets.
15. SSAB – Mobile, Alabama
• SSAB requested a second
Communication Bar for
Future Expansion.
• Conductor Bar Brackets
were fabricated for the (3)
Phase Bar and (2)
Communication Bars.
• Only (1) Communication
Bar was installed
17. SSAB – Mobile, Alabama
• Single Crane System
– Removed Existing Festoon System
– Modified Festoon Hangers to accommodate New Supports
– New Supports installed to Existing Festoon Hangers
• Spaced every 6 ft.
– 200 ft of 1500 Amp Heavy Bar
– (1) Communication Bar
• (1) Access Point
• (1) Client located on the crane
– Tested Crane Operation and Communication
• Assisted by Conductix Field Technician
– Total Crane Downtime 3 days
18. SSAB – Mobile, Alabama
• Dual Crane System
– Removed Existing Festoon System
– Modified Festoon Hangers to accommodate New Supports
– New Supports installed to Existing Festoon Hangers
• Spaced every 6 ft.
– 275 ft of 1500 Amp Heavy Bar
– (1) Communication Bar
• (1) Access Point
• (2) Clients Located on each Crane
– Tested Crane Operation and Communication
• Assisted by Conductix Field Technician
– Total Crane Downtime 4 days
Early 2019 we were contacted by SSAB inquiring about our ProfiDAT waveguide – as their existing festoon system created an obstacle to their operations.
Jon Snyder from Deshazo will talk more about the details of this application , but before I turn it over to him, I want to take a few additional minutes to bring awareness to NEW technology that has become available to handle safe & reliable data and video signals.