Principal and Shear Stresses:
• The vertical stress intensity Pmax or Pmin determined from the equation,
is not the maximum direct stress produced anywhere in the dam.
• When the the reservoir is full the vertical direct stress is maximum at the toe as the the resultant is
nearer to the toe.
• To study the principal stresses that will develop near the toe let us consider a small element ABC
near the toe of the dam.
• Let the downstream face of the dam be inclined at an angle ᾳ to to the vertical. This face of
the dam will act as a principal plane because the water pressure p’ acts at right angle to the
face, and also there is no shear stress acting on this plane. Since the principal planes are at
right angles to each other the plane BC drawn right angles to the face AB will be the second
principal plane. Let the stress acting on this plane be σ.
• Let ds, dr and db be the lengths of of AB, BC and CA respectively.
• p’ is the intensity of water pressure on the face AB and pv is the intensity of vertical pressure on
face AC and σ is the intensity of normal stress on face BC.
• Considering unit length of dam forces acting on faces AB, BC and CA are p’ds, σdr and pv.db
respectively.
• For σ to be maximum, p’ should be zero i.e. when there is no tail water then in such
case:
• If hydrodynamic pressure (pe’) exerted by tail water during an earthquake moving
towards the reservoir is also considered, then net pressure on face AB will be (p’-pe’)
because the effect of this earthquake will be to reduce the tail water pressure.
• The principal stress σ can be given by:
Shear stress on horizontal plane near the toe:
• A shear stress ԏ will act on face CA on which vertical stress is acting.
• Resolving all forces in horizontal direction we get:
• Neglecting tail water, shear stress is given by,
• If effect of hydrodynamic pressure produced by earthquake moving towards reservoir
is also considered then equation for shear stress near the toe becomes:
Gravity Method for stability analysis:
• The preliminary analysis of all gravity dams can be made easily by isolating a typical cross
section of dam of unit width.
• The dam is considered to be made up of a number of cantilevers of unit width each which act
independently of each other.
• Assumptions:
• The dam is considered to be composed of a number of cantilever each of which is 1m thick and
each of which acts independent of each other.
• No loads are transferred to the abutments by beam action.
• The foundation of the dam behave as a single unit
• The materials in the foundation and body of the dam are isotropic and homogeneous.
• The stresses developed in the foundation and body of the dam are within elastic limits.
• No movements of the foundations are caused due to transference of loads.
• Small openings made in the body of the dam do not affect the general distribution of stresses and
they only produce local effects as per St. Venant’s principle.
Procedure by analytical method:
• Consider a unit length of the dam.
• Work out the magnitude and directions of all vertical and horizontal forces acting on the dam and
their algebraic sum.
• Determine the lever arm of all these forces about the toe.
• Determine the moments of all these forces about the twoe and find out algebraic sum of all these
moments.
• Find out the location of resultant force by determining its distance from toe x= ∑M/ ∑V
• Find out the eccentricity of the resultant using e= (B/2)-x.
• Determine the vertical stresses at the toe and heel using the equation
• Determine the maximum normal stresses that is principal stresses at the toe and heel using the
equation: ԏ= (pv – p’)tan σ and
• Determine the factor of safety against overturning as equal
∑stabilising moment(+)
∑disturbing moment(−)
• Determine the factor of safety against sliding using sliding factor = µ (∑V+Bq)/ ∑H
• Shear friction factor
• Sliding factor must be greater than unity and SFF must be greater than 3 to 5. The analysis should
be carried out for reserve full as well as empty case.
Practical profile of a gravity dam:
• The elementary profile of gravity dam is only theoretical. Certain changes will have to be
made in this profile in order to cater to practical needs. These needs are:
a) Providing a straight top width for road construction over the top of the dam.
b) Providing a free board above the top water surface so that water may not spill over the top of
dam due to wave action.
This addition will cause resultant force to shift towards the heel. Hence tension will be developed at
the toe.
In order to avoid this tension some masonry or concrete will have to be added to the upstream side as
shown in the figure.
Elementary profile of gravity dam:
The elementary profile of a dam subjected only to external water pressure on upstream side will be
right angle triangle having zero width at the water level and base width B at bottom.
When the reservoir is empty the only single force acting on it is self weight W of the dam and it acts
at a distance B/3 from the heel.
The vertical stress distribution at the base when the reservoir is empty is given as
The maximum vertical stress equal to 2W/B will act at heel and the vertical stress at toe will be 0.
When the reservoir is full the base width his governed by:
1. The resultant of all forces that is P, W and U passes through the outermost middle third point.
2. The dam is safe in sliding.
For the first condition to be satisfied the equation should be given by
Where Sc= specific gravity of concrete i.e. material of the dam.
C = constant called as seepage coefficient
According to USBR recommendation value of C is equal to 1 in calculation and 0 when no uplift is
considered.
If B is taken equal to or greater than H/√(Sc-C) no tension will be developed at the heel with full
reservoir,
when C = 1
If uplift pressure is not considered,
For second condition to be satisfied (the dam is safe in sliding) the frictional resistance should be
equal to or more than the horizontal forces
Equation can be given as:
From the above two equations of B the greater value should be chosen for design purpose.
In vertical stress distribution maximum stress will occur at the toe because the resultant is near the
toe. Hence the equation is given as:
And Pmin at the heel = 0.
The principal stress σ near the toe which is maximum normal stress is given by equation:
The shear stress ԏ at horizontal plane near the toe is given by equation:
Design considerations and fixing the section of dam:
1. Freeboard:
The margin between the maximum reservoir level and top of the dam is known as freeboard.
This must be provided in order to to avoid the possibility of water spilling over the dam top due to
wave action. This can also help as a safety for unforeseen floods higher than the designed flood.
The freeboard is generally provided equal to 3hw / 2.
Where,
These days freeboard equal to 4% to 5% of the the dam height is provided.
2. Top width:
The effects produced by the addition of of top width at the apex of elementary dam profile and their
remedies are explaind below:
Let AEF with the triangular profile of dam of height H1.
Let element ABQA be added at the apex for providing top width ‘a’ for road construction.
Let M1 and M2 be the inner third and outer third points on base. Thus AM1 and AM2 are the inner
third and outer third lines.
The weight of element W1 will act through the CG of
this triangle i.e. along CM.
Let CM and AM1 cross at H, and CM and AM2 cross at
K.
1. Reservoir empty case: We know that in the elementary profile the resultant of the force passes
through the inner third point when reservoir is empty.
The height H1’ below which the upstream batter is required can be worked out as:
Thus for the height greater than H1’ upstream batter is necessary.
2. Reservoir full case: When the reservoir is full the resultant of all the forces acting on elementary
profile passes through the outer third point.
When W1 is added to this initial resultant at any plane below the plane PKQ the resultant will shift
towards upstream side of dam.
For economic point of view the resultant should lie near the the downstream face of dam and hence
the slope of the downstream face may be flattened from QE to QE’.
Thus an increase in top width will increase the masonry or concrete in the added element and increase
it on upstream face, but shall reduce it on downstream face.
The most economical top width without considering earthquake forces has been found by Creager to
be equal to 14% of the dam height.
It's useful value varies between 6m to 10m and is generally taken approximately equal to √H, where
H is the height of maximum water level above the bed.
Thank You.

More Related Content

What's hot

Effective stress
Effective stressEffective stress
Effective stress
sudheerKumarY1
 
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion HeadworkDesign of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Ramanuj Jaldhari
 
Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1Mulugeta Abera
 
Canal Fall
Canal FallCanal Fall
Canal Fall
GAURAV. H .TANDON
 
TERZAGHI’S BEARING CAPACITY THEORY
TERZAGHI’S BEARING CAPACITY THEORYTERZAGHI’S BEARING CAPACITY THEORY
TERZAGHI’S BEARING CAPACITY THEORY
SANJEEV Wazir
 
Load carrying capacity of piles
Load carrying capacity of pilesLoad carrying capacity of piles
Load carrying capacity of piles
Latif Hyder Wadho
 
Permeability of Soils & Seepage Analysis
Permeability of Soils & Seepage AnalysisPermeability of Soils & Seepage Analysis
Permeability of Soils & Seepage Analysis
wasim shaikh
 
Diversion headwork
Diversion headwork Diversion headwork
Diversion headwork
Bibhabasu Mohanty
 
economic channel section
economic channel sectioneconomic channel section
economic channel section
Vaibhav Pathak
 
Dams and spillways
Dams and spillwaysDams and spillways
Gravity Dam
Gravity DamGravity Dam
Case study on effect of water table on bearing capacity
Case study on effect of water table on bearing capacityCase study on effect of water table on bearing capacity
Case study on effect of water table on bearing capacity
Abhishek Mangukiya
 
Numerical problem on bearing capacity is code terzaghi water table (usefulsea...
Numerical problem on bearing capacity is code terzaghi water table (usefulsea...Numerical problem on bearing capacity is code terzaghi water table (usefulsea...
Numerical problem on bearing capacity is code terzaghi water table (usefulsea...
Make Mannan
 
Earthen Dams
Earthen DamsEarthen Dams
Earthen Dams
GAURAV. H .TANDON
 
river training work
river training workriver training work
river training work
Vishal Chaudhari
 
4 permeability and seepage
4  permeability and seepage4  permeability and seepage
4 permeability and seepage
Khalid Al-Janabi PhD., M.ISGE, M.ISSMGE
 
Flow nets
Flow netsFlow nets
Flow nets
NEERAJ JAIN
 
Dynamic Pile Formulae
Dynamic Pile FormulaeDynamic Pile Formulae
Dynamic Pile Formulae
Kriti Singh
 
Khosla theory
Khosla theoryKhosla theory
Khosla theory
AparnaRath
 

What's hot (20)

Effective stress
Effective stressEffective stress
Effective stress
 
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion HeadworkDesign of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
 
Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1
 
Canal Fall
Canal FallCanal Fall
Canal Fall
 
TERZAGHI’S BEARING CAPACITY THEORY
TERZAGHI’S BEARING CAPACITY THEORYTERZAGHI’S BEARING CAPACITY THEORY
TERZAGHI’S BEARING CAPACITY THEORY
 
Load carrying capacity of piles
Load carrying capacity of pilesLoad carrying capacity of piles
Load carrying capacity of piles
 
Permeability of Soils & Seepage Analysis
Permeability of Soils & Seepage AnalysisPermeability of Soils & Seepage Analysis
Permeability of Soils & Seepage Analysis
 
Diversion headwork
Diversion headwork Diversion headwork
Diversion headwork
 
economic channel section
economic channel sectioneconomic channel section
economic channel section
 
Dams and spillways
Dams and spillwaysDams and spillways
Dams and spillways
 
Gravity Dam
Gravity DamGravity Dam
Gravity Dam
 
Case study on effect of water table on bearing capacity
Case study on effect of water table on bearing capacityCase study on effect of water table on bearing capacity
Case study on effect of water table on bearing capacity
 
Numerical problem on bearing capacity is code terzaghi water table (usefulsea...
Numerical problem on bearing capacity is code terzaghi water table (usefulsea...Numerical problem on bearing capacity is code terzaghi water table (usefulsea...
Numerical problem on bearing capacity is code terzaghi water table (usefulsea...
 
Earthen Dams
Earthen DamsEarthen Dams
Earthen Dams
 
Stilling basin
Stilling basinStilling basin
Stilling basin
 
river training work
river training workriver training work
river training work
 
4 permeability and seepage
4  permeability and seepage4  permeability and seepage
4 permeability and seepage
 
Flow nets
Flow netsFlow nets
Flow nets
 
Dynamic Pile Formulae
Dynamic Pile FormulaeDynamic Pile Formulae
Dynamic Pile Formulae
 
Khosla theory
Khosla theoryKhosla theory
Khosla theory
 

Similar to Gravity dams

construction of gravity dams
construction of gravity damsconstruction of gravity dams
construction of gravity dams
MitaliShelke
 
Module 3(1 of 2)GravityDam Forces.pptx
Module 3(1 of 2)GravityDam Forces.pptxModule 3(1 of 2)GravityDam Forces.pptx
Module 3(1 of 2)GravityDam Forces.pptx
RajKishor119055
 
18. Dams Stability & Environmental Impact.pdf
18. Dams Stability & Environmental Impact.pdf18. Dams Stability & Environmental Impact.pdf
18. Dams Stability & Environmental Impact.pdf
MuhammadAjmal326519
 
Chapter 3 2
Chapter 3 2Chapter 3 2
Chapter 3 2
shita43
 
Cel351 gravity damforces (1)
Cel351 gravity damforces (1)Cel351 gravity damforces (1)
Cel351 gravity damforces (1)
saibabu48
 
Unit 3 Diversion and Impounding Structures
Unit 3 Diversion and Impounding StructuresUnit 3 Diversion and Impounding Structures
Unit 3 Diversion and Impounding Structures
Leema Margret A
 
i&hs.docx
i&hs.docxi&hs.docx
i&hs.docx
Mood Naik
 
gravity dam elementary profile.pdf
gravity dam elementary profile.pdfgravity dam elementary profile.pdf
gravity dam elementary profile.pdf
abhijitsaha99
 
Fdocuments.in gravity dams-ppt
Fdocuments.in gravity dams-pptFdocuments.in gravity dams-ppt
Fdocuments.in gravity dams-ppt
KASARLASAGAR1
 
Gravity dam forces
Gravity dam forcesGravity dam forces
Gravity dam forces
saibabu48
 
Dams
DamsDams
directandbendingstress-170212110125.pdf presentation
directandbendingstress-170212110125.pdf presentationdirectandbendingstress-170212110125.pdf presentation
directandbendingstress-170212110125.pdf presentation
RajeshKumarSingh740265
 
Direct and bending stress
Direct and bending stressDirect and bending stress
Direct and bending stress
Aditya Mistry
 
Gravitydam 2
Gravitydam 2Gravitydam 2
Gravitydam 2
saibabu48
 
Eccetric columns
Eccetric columnsEccetric columns
Eccetric columns
Tejashri Gulve
 
Lecture 2.pptx
Lecture 2.pptxLecture 2.pptx
Lecture 2.pptx
Robert Zedd
 
©McGraw-Hill Education. All rights reserved. Authorized only f.docx
©McGraw-Hill Education. All rights reserved. Authorized only f.docx©McGraw-Hill Education. All rights reserved. Authorized only f.docx
©McGraw-Hill Education. All rights reserved. Authorized only f.docx
gerardkortney
 
Unit 2 gravity dam-1
Unit 2 gravity dam-1Unit 2 gravity dam-1
Unit 2 gravity dam-1
Mood Naik
 
Direct-Bendng-Stress-pptx IMP.pptx
Direct-Bendng-Stress-pptx IMP.pptxDirect-Bendng-Stress-pptx IMP.pptx
Direct-Bendng-Stress-pptx IMP.pptx
Sougata Das
 
Gravity dam
Gravity damGravity dam
Gravity dam
Tanmoy Mustafi
 

Similar to Gravity dams (20)

construction of gravity dams
construction of gravity damsconstruction of gravity dams
construction of gravity dams
 
Module 3(1 of 2)GravityDam Forces.pptx
Module 3(1 of 2)GravityDam Forces.pptxModule 3(1 of 2)GravityDam Forces.pptx
Module 3(1 of 2)GravityDam Forces.pptx
 
18. Dams Stability & Environmental Impact.pdf
18. Dams Stability & Environmental Impact.pdf18. Dams Stability & Environmental Impact.pdf
18. Dams Stability & Environmental Impact.pdf
 
Chapter 3 2
Chapter 3 2Chapter 3 2
Chapter 3 2
 
Cel351 gravity damforces (1)
Cel351 gravity damforces (1)Cel351 gravity damforces (1)
Cel351 gravity damforces (1)
 
Unit 3 Diversion and Impounding Structures
Unit 3 Diversion and Impounding StructuresUnit 3 Diversion and Impounding Structures
Unit 3 Diversion and Impounding Structures
 
i&hs.docx
i&hs.docxi&hs.docx
i&hs.docx
 
gravity dam elementary profile.pdf
gravity dam elementary profile.pdfgravity dam elementary profile.pdf
gravity dam elementary profile.pdf
 
Fdocuments.in gravity dams-ppt
Fdocuments.in gravity dams-pptFdocuments.in gravity dams-ppt
Fdocuments.in gravity dams-ppt
 
Gravity dam forces
Gravity dam forcesGravity dam forces
Gravity dam forces
 
Dams
DamsDams
Dams
 
directandbendingstress-170212110125.pdf presentation
directandbendingstress-170212110125.pdf presentationdirectandbendingstress-170212110125.pdf presentation
directandbendingstress-170212110125.pdf presentation
 
Direct and bending stress
Direct and bending stressDirect and bending stress
Direct and bending stress
 
Gravitydam 2
Gravitydam 2Gravitydam 2
Gravitydam 2
 
Eccetric columns
Eccetric columnsEccetric columns
Eccetric columns
 
Lecture 2.pptx
Lecture 2.pptxLecture 2.pptx
Lecture 2.pptx
 
©McGraw-Hill Education. All rights reserved. Authorized only f.docx
©McGraw-Hill Education. All rights reserved. Authorized only f.docx©McGraw-Hill Education. All rights reserved. Authorized only f.docx
©McGraw-Hill Education. All rights reserved. Authorized only f.docx
 
Unit 2 gravity dam-1
Unit 2 gravity dam-1Unit 2 gravity dam-1
Unit 2 gravity dam-1
 
Direct-Bendng-Stress-pptx IMP.pptx
Direct-Bendng-Stress-pptx IMP.pptxDirect-Bendng-Stress-pptx IMP.pptx
Direct-Bendng-Stress-pptx IMP.pptx
 
Gravity dam
Gravity damGravity dam
Gravity dam
 

Recently uploaded

HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 

Recently uploaded (20)

HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 

Gravity dams

  • 1. Gravity Dams Asst Prof: Mitali Shelke St. John College of Engineering and Management, Palghar Department of Civil Engineering
  • 2. Principal and Shear Stresses: • The vertical stress intensity Pmax or Pmin determined from the equation, is not the maximum direct stress produced anywhere in the dam. • When the the reservoir is full the vertical direct stress is maximum at the toe as the the resultant is nearer to the toe. • To study the principal stresses that will develop near the toe let us consider a small element ABC near the toe of the dam.
  • 3. • Let the downstream face of the dam be inclined at an angle ᾳ to to the vertical. This face of the dam will act as a principal plane because the water pressure p’ acts at right angle to the face, and also there is no shear stress acting on this plane. Since the principal planes are at right angles to each other the plane BC drawn right angles to the face AB will be the second principal plane. Let the stress acting on this plane be σ.
  • 4. • Let ds, dr and db be the lengths of of AB, BC and CA respectively. • p’ is the intensity of water pressure on the face AB and pv is the intensity of vertical pressure on face AC and σ is the intensity of normal stress on face BC. • Considering unit length of dam forces acting on faces AB, BC and CA are p’ds, σdr and pv.db respectively.
  • 5. • For σ to be maximum, p’ should be zero i.e. when there is no tail water then in such case: • If hydrodynamic pressure (pe’) exerted by tail water during an earthquake moving towards the reservoir is also considered, then net pressure on face AB will be (p’-pe’) because the effect of this earthquake will be to reduce the tail water pressure. • The principal stress σ can be given by:
  • 6. Shear stress on horizontal plane near the toe: • A shear stress ԏ will act on face CA on which vertical stress is acting. • Resolving all forces in horizontal direction we get:
  • 7. • Neglecting tail water, shear stress is given by, • If effect of hydrodynamic pressure produced by earthquake moving towards reservoir is also considered then equation for shear stress near the toe becomes:
  • 8. Gravity Method for stability analysis: • The preliminary analysis of all gravity dams can be made easily by isolating a typical cross section of dam of unit width. • The dam is considered to be made up of a number of cantilevers of unit width each which act independently of each other. • Assumptions: • The dam is considered to be composed of a number of cantilever each of which is 1m thick and each of which acts independent of each other. • No loads are transferred to the abutments by beam action. • The foundation of the dam behave as a single unit • The materials in the foundation and body of the dam are isotropic and homogeneous. • The stresses developed in the foundation and body of the dam are within elastic limits. • No movements of the foundations are caused due to transference of loads. • Small openings made in the body of the dam do not affect the general distribution of stresses and they only produce local effects as per St. Venant’s principle.
  • 9. Procedure by analytical method: • Consider a unit length of the dam. • Work out the magnitude and directions of all vertical and horizontal forces acting on the dam and their algebraic sum. • Determine the lever arm of all these forces about the toe. • Determine the moments of all these forces about the twoe and find out algebraic sum of all these moments. • Find out the location of resultant force by determining its distance from toe x= ∑M/ ∑V • Find out the eccentricity of the resultant using e= (B/2)-x. • Determine the vertical stresses at the toe and heel using the equation
  • 10. • Determine the maximum normal stresses that is principal stresses at the toe and heel using the equation: ԏ= (pv – p’)tan σ and • Determine the factor of safety against overturning as equal ∑stabilising moment(+) ∑disturbing moment(−) • Determine the factor of safety against sliding using sliding factor = µ (∑V+Bq)/ ∑H • Shear friction factor • Sliding factor must be greater than unity and SFF must be greater than 3 to 5. The analysis should be carried out for reserve full as well as empty case.
  • 11. Practical profile of a gravity dam: • The elementary profile of gravity dam is only theoretical. Certain changes will have to be made in this profile in order to cater to practical needs. These needs are: a) Providing a straight top width for road construction over the top of the dam. b) Providing a free board above the top water surface so that water may not spill over the top of dam due to wave action.
  • 12. This addition will cause resultant force to shift towards the heel. Hence tension will be developed at the toe. In order to avoid this tension some masonry or concrete will have to be added to the upstream side as shown in the figure.
  • 13. Elementary profile of gravity dam: The elementary profile of a dam subjected only to external water pressure on upstream side will be right angle triangle having zero width at the water level and base width B at bottom.
  • 14. When the reservoir is empty the only single force acting on it is self weight W of the dam and it acts at a distance B/3 from the heel. The vertical stress distribution at the base when the reservoir is empty is given as The maximum vertical stress equal to 2W/B will act at heel and the vertical stress at toe will be 0.
  • 15. When the reservoir is full the base width his governed by: 1. The resultant of all forces that is P, W and U passes through the outermost middle third point. 2. The dam is safe in sliding. For the first condition to be satisfied the equation should be given by Where Sc= specific gravity of concrete i.e. material of the dam. C = constant called as seepage coefficient According to USBR recommendation value of C is equal to 1 in calculation and 0 when no uplift is considered.
  • 16. If B is taken equal to or greater than H/√(Sc-C) no tension will be developed at the heel with full reservoir, when C = 1 If uplift pressure is not considered,
  • 17. For second condition to be satisfied (the dam is safe in sliding) the frictional resistance should be equal to or more than the horizontal forces Equation can be given as: From the above two equations of B the greater value should be chosen for design purpose.
  • 18. In vertical stress distribution maximum stress will occur at the toe because the resultant is near the toe. Hence the equation is given as: And Pmin at the heel = 0. The principal stress σ near the toe which is maximum normal stress is given by equation: The shear stress ԏ at horizontal plane near the toe is given by equation:
  • 19. Design considerations and fixing the section of dam: 1. Freeboard: The margin between the maximum reservoir level and top of the dam is known as freeboard. This must be provided in order to to avoid the possibility of water spilling over the dam top due to wave action. This can also help as a safety for unforeseen floods higher than the designed flood. The freeboard is generally provided equal to 3hw / 2. Where, These days freeboard equal to 4% to 5% of the the dam height is provided.
  • 20. 2. Top width: The effects produced by the addition of of top width at the apex of elementary dam profile and their remedies are explaind below: Let AEF with the triangular profile of dam of height H1. Let element ABQA be added at the apex for providing top width ‘a’ for road construction. Let M1 and M2 be the inner third and outer third points on base. Thus AM1 and AM2 are the inner third and outer third lines. The weight of element W1 will act through the CG of this triangle i.e. along CM. Let CM and AM1 cross at H, and CM and AM2 cross at K.
  • 21. 1. Reservoir empty case: We know that in the elementary profile the resultant of the force passes through the inner third point when reservoir is empty. The height H1’ below which the upstream batter is required can be worked out as: Thus for the height greater than H1’ upstream batter is necessary.
  • 22. 2. Reservoir full case: When the reservoir is full the resultant of all the forces acting on elementary profile passes through the outer third point. When W1 is added to this initial resultant at any plane below the plane PKQ the resultant will shift towards upstream side of dam. For economic point of view the resultant should lie near the the downstream face of dam and hence the slope of the downstream face may be flattened from QE to QE’.
  • 23. Thus an increase in top width will increase the masonry or concrete in the added element and increase it on upstream face, but shall reduce it on downstream face. The most economical top width without considering earthquake forces has been found by Creager to be equal to 14% of the dam height. It's useful value varies between 6m to 10m and is generally taken approximately equal to √H, where H is the height of maximum water level above the bed.