The purpose of this emergency project was to replace approximately 60-ft. segment of 8-inch wastewater sewer pipe that was broken and to retrieve a Closed-Circuit Television Inspection (CCTV) camera that was stuck in the pipe during routine maintenance work. The project was substantially complete on May 14, 2021.