SlideShare a Scribd company logo
PSFK presents


    THE FUTURE
    OF GAMING
    SUMMARY PRESENTATION



A                      REPORT

    CO N S U LTI N G
FOR YOUR FULL
COPY OF THE 150 PAGE
REPORT, VISIT:
www.psfk.com/future-of-gaming
INTRODUCTION

This report presents key trends emerging within the gaming         PSFK’s research kicked off with an analysis of nearly one thousand
space that brands, non-profits and communities can leverage         data points that showcased gaming innovation in various forms.
to foster engagement and motivate their target audience            Pattern recognition performed against this research yielded 17
towards achieving a desired outcome. It is designed to inspire     key trends organized around three core aspects of game design
anyone tasked with creating compelling user experiences,           —Purpose Behind the Game, Mechanics that Drive People to
whether that be on a digital screen, in the real world or          Action and Game Functionality and Systems. To understand
somewhere in between.                                              how these trends impact the marketplace and the opportunities
                                                                   they present, we interviewed numerous gaming experts and
We recognize that there is a tremendous amount of research
                                                                   have included their insights throughout the document.
and study taking place around gaming, and this report reflects
our contribution to that conversation. It is intended to provide
a current snapshot into the innovative ways that games are
                                                                   We hope that you find inspiration in every section of the 2011
being used within the broader marketplace, examine their
                                                                   issue of PSFK’s Future of Gaming report. For copies or an in
expanding role in effecting change on an individual and societal
                                                                   person presentation, please visit:
level, and highlight the new technologies that are making
                                                                   www.psfk.com/future-of-gaming
these experiences possible.
FOREWORD

Games and play are at the foundation of how people learn, develop      The mechanics behind games are evolving as social connectivity
and socialize. As humans we respond instantly to entertaining and      influences both the way and the pace at which people interact with
engaging experiences. But what makes a game worth playing? What        one another. The nature of our modern online presence allows us
rules must it have? How should it work?                                to communicate, compete and collaborate with one-another in real-
                                                                       time. Driven by rapid advances in mobile and sensor technology,
Our report provides an overview of the key trends permeating the
                                                                       games are now able to bridge real and virtual worlds. They can now
creation of games today. It specifically looks at how play is being
                                                                       take place across separate realities that often influence each other,
used by organizations, corporations and communities to achieve a
                                                                       creating new opportunities for play and changing the way players
specific purpose. Fueled by the ability to gather many players across
                                                                       experience their daily lives.
the world through online connectivity, projects of any scale can be
undertaken, overcoming previously unsolvable challenges. When
applied to socially responsible enterprise or charitable programs
                                                                                             Piers Fawkes, Founder, PSFK
these collective efforts are capable of bringing about real change.
PILLARS OF GAMING


THE PURPOSE
OF GAMING
PURPOSE OF GAMING



TO SOLVE
THE UNSOLVABLE
FOLD.IT                                     TO SOLVE THE UNSOLVABLE

GAMERS ASSIST IN CRACKING THE AIDS PUZZLE




                                               FOLD.IT
                       GAMERS ASSIST IN CRACKING THE AIDS PUZZLE
PURPOSE OF GAMING



TO LEVERAGE
COLLECTIVE
MANPOWER
PROJECT NOAH




           PROJECT NOAH
                      MISSION-BASED IMAGE GATHERING
               FOR CROWDSOURCED NATURE REFERENCES
PURPOSE OF GAMING


TO EMBED
KNOWLEDGE
NASA LEARNING
 TECHNOLOGIES
FUTURE SOCIAL GAME MAKES ASTROPHYSICS FUN
PURPOSE OF GAMING



TO TEACH PEOPLE
NEW SKILLS
TO TEACH PEOPLE NEW SKILLS

LEARN REAL GUITAR WHILE PLAYING AN INTERACTIVE VIDEO GAME




                                   ROCKSMITH
LEARN REAL GUITAR WHILE PLAYING AN INTERACTIVE VIDEO GAME
PURPOSE OF GAMING


TO IMPROVE
EVERYDAY BEHAVIOR
TO IMPROVE EVERYDAY BEHAVIOR

ACHIEVING MILESTONES IN OVERCOMING HEALTH-RELATED CHALLENGES




                               MINDBLOOM
                                  APP GAMIFIES PERSONAL GROWTH TO
                                 BOOST PHYSICAL AND MENTAL HEALTH
PURPOSE OF GAMING



TO PROMOTE
FUNDRAISING
TO PROMOTE FUNDRAISING

GAMERS HELP FEED HUNGRY CHILDREN




ZYNGA + PIZZA HUT
       GAMERS PURCHASE IN GAME ITEMS TO DONATE TO CHARITY
PURPOSE OF GAMING



TO SPREAD
THE WORD
LOCKERZ
PLATFORM HARNESSES POTENTIAL OF
  INFLUENTIAL SOCIAL NETWORKERS
PILLARS OF GAMING


MECHANICS
DRIVING PEOPLE
TO ACTION
MECHANICS THAT DRIVE PEOPLE TO ACTION



ONE-UPSMANSHIP
ONE-UPSMANSHIP

FITNESS GAMES WITH SOCIAL MOTIVATION AS IMPETUS




                                PULSWATCH
              FITNESS GAMES WITH SOCIAL MOTIVATION AS IMPETUS
MECHANICS THAT DRIVE PEOPLE TO ACTION



PEER PRESSURE
REEBOK
PROMISE KEEPER
   APP USES SOCIAL MEDIA PEER PRESSURE
         TO MOTIVATE USERS TO EXERCISE
MECHANICS THAT DRIVE PEOPLE TO ACTION



MONEY
ON THE LINE
STICKK.COM
BACKING UP RESOLUTIONS WITH MONEY
MECHANICS THAT DRIVE PEOPLE TO ACTION



REWARDS
RECYCLEBANK.COM
MOTIVATING EVERYDAY GREEN BEHAVIOR WITH REAL REWARDS
MECHANICS THAT DRIVE PEOPLE TO ACTION



EXCLUSIVE
ACCESS
BAL HARBOUR +
                 KLOUT
PARTY INVITES SENT ONLY TO PEOPLE WITH HIGH KLOUT SCORE
PILLARS OF GAMING


FUNCTIONALITY
AND SYSTEMS
GAME FUNCTIONALITY AND SYSTEMS



GESTURE-BASED
GAMING
MICROSOFT
KINECT-POWERED EDUCATIONAL GAME FOR CHILDREN
GAME FUNCTIONALITY AND SYSTEMS



MULTI-SCREEN
EXPERIENCES
MULTI-SCREEN EXPERIENCES

INTERACTIVE PING-PONG GAME TAKES THE OUTDOOR STAGE




                              MCDONALDS
      INTERACTIVE PING-PONG GAME TAKES THE OUTDOOR STAGE
GAME FUNCTIONALITY AND SYSTEMS



MIXING
REALITIES
MIXING REALITIES

iDEVICE CONSTRUCTION GAME MELDS OFFLINE ASSEMBLY WITH DIGITAL SCORE




               LIFE OF GEORGE
                        iDEVICE CONSTRUCTION GAME MELDS OFFLINE
                                           ASSEMBLY WITH DIGITAL STORE
GAME FUNCTIONALITY AND SYSTEMS



LIFE-SIZED
GAME PIECES
THE FRENCH
DIGITAL KITCHEN
  SENSOR-EMBEDDED KITCHEN UTENSILS OFFER
          VERBAL ADVICE FOR FUTURE CHEFS
GAME FUNCTIONALITY AND SYSTEMS



REAL WORLD GAME
ENVIRONMENTS
ZOMBIES, RUN!
    AUGMENTED AUDIO GAME SPURS FITNESS BY
IMMERSING RUNNERS IN ZOMBIE INFESTED WORLD
GAMING
 for
     GOOD          CONCEPTS TO SUPPORT
                   THE REALITY OF CLIMATE CHANGE




CO N S U LTI N G
FOREWORD

Games are the new normal. The popularity and proliferation         for advocates to reach entirely new audiences with games
of smart phones, tablets and other mobile devices—coupled          that are engaging, fun, and motivational.
with a wide variety of social networking platforms—provide
                                                                   Recently, I was introduced to Piers Fawkes and the
fertile ground for the incorporation of games into our lives
                                                                   wonderful team at PSFK and for the past several months
in fresh, new ways. Whether it’s playing Scrabble on your
                                                                   The Climate Reality Project, PSFK and I have collaborated
iPhone or Farmville on Facebook, now millions fill the
                                                                   in an open source “Gaming for Good” Challenge. I hope
interstitial moments of their lives with the simple fun that
                                                                   that you will enjoy the results of this collaboration and that
these programs and apps provide.
                                                                   it will encourage you to think creatively about social
As games have become ubiquitous, both the private and              impact games.
public sectors have begun to seriously look at the role that
gamification can play in their work. Game design, techniques
and mechanics, have something to teach those of us who
are seeking to engage people on issues of social importance.

In the forty years that I have worked to build public
awareness of the need to urgently solve the climate crisis,
I have always sought out new methods of communication—
from my slideshow on three Kodak carousels (which evolved
from an actual slideshow to a multi-media presentation on
Keynote)—to my work on An Inconvenient Truth, the “Live
Earth” global concerts, “24 Hours of Reality” on the web,
and an app for the iPhone and iPad called Our Choice.
Exploring the interplay of gamification and social change is
                                                                   AL GORE
                                                                   Former Vice President
a fascinating challenge, and one that I have been exploring
                                                                   Nobel Laureate
for the last three years. Clearly, there is tremendous potential
                                                                   Founder, The Climate Reality Project
INTRODUCTION

ABOUT THIS REPORT                                               ABOUT THE CLIMATE
PSFK challenged its readership of over 1MM creative             REALITY PROJECT
professionals to come up with concepts that address issues      The mission of The Climate Reality Project is to reveal the
put forth by The Climate Reality Project. Participants in the   full truth of the climate crisis in a way that ignites the moral
challenge were encouraged to leverage trends identified          courage in all of us. Climate Reality uses communications
in PSFK’s Future Of Gaming report to create potential           tools to connect the dots for people about what is
solutions.                                                      happening in science, politics, culture and climate so that all
                                                                of us can work to face and solve this challenge together.
PSFK received over 60 entries from around the world. This
book contains a shortlist of those concepts, as chosen by       The Climate Reality Project has launched a series of
The Climate Reality Project. By highlighting the strongest      events to bring the climate crisis back to the fore of public
concepts, PSFK hopes to shine a light on ways that The          consciousness and conversation. The first was 24 Hours
Climate Reality Project and other likeminded businesses can     of Reality, which connected the dots between extreme
solve some of the issues                                        weather around the globe and climate change. Upcoming
they face.                                                      events will include Antarctica, a voyage to the bottom of
                                                                the earth to bear witness to the truth of climate change,
                                                                coal and its multiple health concerns, and a spotlight on
                                                                climate “deniers” and the damage they are doing to our
                                                                ability to take action.
INTRODUCTION

ABOUT PSFK                                                    BACKGROUND
PSFK is the go-to source for new ideas and inspiration for    PSFK recently published an independent trends-research
creative professionals around the world. Based in New York    report titled PSFK’s Future Of Gaming. In that report, PSFK
City, PSFK is a trends-led business innovation company that   highlighted several topic areas, including the purpose,
publishes a daily news site, provides trends research and     mechanics, functions and systems behind games. In doing
innovation consultancy, manages a network of freelance        so, it presented a framework within which readers could
experts and hosts idea-generating events. We aim to inspire   contemplate innovation and best practices that currently
our readers, our clients and our guests to make things        exist within the gaming arena.
better—whether that’s better products, better services or
better ways of living.                                        This report served as the creative stimulus for a project
                                                              recently performed on behalf of The Climate Reality Project.

www.psfk.com
ABOUT THIS BOOK

THE BRIEF
WHAT THE CLIMATE REALITY PROJECT WANTS                        WHAT WE’RE LOOKING FOR
Global acceptance of the realities of climate change          The goal is to harness the energy of game-play to
                                                              encourage people to make a measurable impact on the
HOW                                                           climate conversation. We’re looking for game-play ideas
                                                              that meet one or more of the following objectives:
Create gamification tools that individuals, communities,
organizations and nations can use to embed this new reality   • To Build Awareness
                                                              • To Promote Fundraising

WHY                                                           • To Solve The Unsolvable

Individuals, communities, organizations and nations are       • To Embed Knowledge
failing to act in the face of climate change                  • To Teach People New Skills
                                                              • To Improve Everyday Personal Behavior
OUTCOME                                                       • To Leverage Collective Manpower
The conversation changes to focus on implementing
solutions to climate change
CLIMATE HEROES
esterni. 10-20137 Milano Italy
Contact: giada@esterni.org
www.esterni.org
CLIMATE HEROES

CLIMATE HEROES. GET READY TO CHANGE THE WORLD
Climate Heroes is an online game that capitalizes on the long-standing      Users are able to select from a number of superhero avatars, such
role of superheroes as beacons of goodness in our lives. This game gives    as Mr. Smog and Miss Waste, all of which are visually engaging and
users the opportunity to become a superhero and take up the fight            representative of a specific climate challenge. Users can capture climate
to solve the planet’s climate issues. The future of the planet is in your   abuse using their mobile phones and upload photos or share news
hands. Create your profile and save the world!                               items. Those that do so with regular frequency and take on the role of
                                                                            ‘influencer’ will be engaged by the Organization to do a public mission.
                                                                            A sample mission might be to organize a flash mob that sheds light on
                                                                            a specific issue.
CLIMATE HEROES




          Denunciation BLOG
CLIMATE HEROES

Multiple players can embody the same avatar and can choose to go on       share information, ideas and the successful ways in which they have
similar missions. In doing so, they create a team or a community of do-   combated climate abuse in their communities. The community can also
gooders that are battling a similar problem. The website can serve as a   be incentivized through things like prizes and recognition.
platform or forum for an open dialog amongst superheroes. Users can
CLIMATE TRAIL
Zemoga. 56 West 22nd Street, 10th Floor. New York, NY 11217
Contact: info@zemoga.com
Concept Lead: Sven Larsen
Team Members: Dan Licht, Yody Castro, Miguel Fernandez
www.zemoga.com
CLIMATE TRAIL

CLIMATE TRAIL
There’s a lot of information and disinformation surrounding climate
change. But much of the disinformation can be debunked by following the
“money trail” of companies sponsoring the research and publication that
disseminates this false data. How do we encourage the public to think for
themselves and question the sources of their information? By encouraging
them to play “Climate Trail”, a simple text-based game that mirrors the
functionality of classic online games like “Oregon Trail”.

At the start of the game, each player is given a leadership role in a
community with set levels of renewable resources, atmospheric levels, and
other indicators of climate health. The goal is to reach the year 2036 with a
healthy and livable community. As game play proceeds, players are asked
questions like “Do you want clean coal or wind power to be your town’s main
source of power” or “Do you want to clear 10,000 acres of forest to create
more farmland?” Correct answers help boost resource levels while wrong
answers impact negatively on community health. After each answer, players
are also presented with information about choices that were made in the
real world (e.g. Portland, Oregon switched to natural gas for city vehicles
and reduced emissions 30%). Users will also be able to share answers across
social networks like Twitter and Facebook.
CLIMATE TRAIL

Once the initial levels have been completed, players are promoted         Game play either ends when resource goals are reached on a global scale
to a higher rank with responsibilities for larger and more complex        or climate change has reached unacceptable levels and the community is
communities. As they progress to higher leadership levels they are also   no longer sustainable. Players will be able to compare their performances
greeted with new challenges (e.g. “Lobbyists want to meet with you to     against real life politicians. They will also be given tips on where they
discuss new vehicle standards.”).                                         went wrong in the game (e.g. “You believed reports about Clean Coal
                                                                          but research was actually funded by Mining Companies”) highlighting
                                                                          both the money trail and the need for independent consumer research
                                                                          on high impact environmental and climate issues.
GREENSQUARE
Awkward Hug. 373 92 Street Apt. B22. Brooklyn, NY 11209
Contact: Julie@awkwardhug.com
Concept Lead: Jim Babb
Team Members: Julie Coniglio & Josh Spiro
www.awkwardhug.com
GREENSQUARE

GREENSQUARE
Greensquare is a gaming platform that gives you and your friends         The goal of this game is, ultimately, to leverage collective
a new, greener way to explore local retail stores, bars, restaurants,    player-power to influence business’ environmental practices. Local
and businesses.                                                          businesses are motivated to compete for positive recognition, while
                                                                         consumers have the crowdsourced data they need to make informed
Players rate establishments based on their environmental practices.      purchasing decisions.
Does the restaurant recycle? Are customers encouraged to choose
reusable over disposable? On which kind of energy does the business
run? These factors contribute to a business’ Greensquare Rating.
Each rating consideration carries a weight proportional to its overall
environmental impact; this weight is determined by fact and science.
Check-ins at a particular location amplify the implications. The more
people who patronize a business, the greater the magnitude of its
environmental choices.
GREENSQUARE

Leaderboards and infographics display and compare player                 This real-world game is digitally managed via a smart phone app and
achievements (based on participation) and business achievements          browser interface. It will be built on a combination of the Foursquare,
(based on Greensquare rating and improvements); all compared locally,    Google Maps, and Yelp API.
regionally, and nationally. Local businesses are compared based on
ratings and check-ins, while chains and parent corporations are rated
and compared by aggregate data. Brand sponsors can offer rewards to
top players—providing a great opportunity for brands to show off their
green habits and products.
CLIMATE
REALITY PATROL
Parlor. 505 West 54th Street, Suite 1118. New York, NY 10019
Contact: alexpoole@mac.com
Concept Lead: Alex Poole
Team Members: Alex Poole & Rodd Chant
www.parlorcreativity.com
CLIMATE REALITY PATROL

CLIMATE REALITY PATROL
Idea: Social media activism meets gaming and rewards

Concept: Instantly tag your comments with Climate Reality keyword facts to
earn badges and rewards.

How it Works:
Climate Reality creates and hosts a database of short-form facts (1–2 sentences
each) tied to “hot topic” keywords. Each description includes a link to optionally
find a deeper resource of related information.

Users create a profile on The Climate Reality Patrol website, activate the browser
plugin, then begin patrolling the web, looking to dispel unfounded environmental
information in articles and comments from media sites, politicians, brands,
celebrities, blogs, etc.

Wherever commenting is allowed, users who’ve activated Climate Reality Patrol
can post responses including keywords that automatically pull facts served from
The Climate Reality database. The keywords are presented and activated via a
menu that appears as they type (similar to an advanced spell-check).

Other users who view these comments can hover over any of the activated keywords
to find a pop-up fact window that includes the respective “quick fact” and a link to
more info.
CLIMATE REALITY PATROL

Each post would include #ClimateRealityPatrol and/or @ClimateRealityPatrol at
the end by default, to brand the posts.

The Climate Reality Patrol website tracks user stats and features a leaderboard for
all user rankings. A Facebook app displays rankings on individual user’s profiles.

Levels of “Climate Reality Activist” badges are awarded based on the amount
of false information a user has dispelled (based on the number of keywords
they’ve posted).

Rewards could include special recognition, invitation to events, or entry into
exclusive contests.
SPROUT
Cynergy – The Technology Agency. 1600 K Street, NW, Suite 300, Washington, DC 20006, USA
Contact: Kes Sampanthar, kes.sampanthar@cynergysystems.com
Team Members: Kes Sampanthar, Peter Ruthenberg, Anton Abramov, Rick Kercz, Justin Cravalho,
              Chris Hays, Scott Wolfson
www.cynergysystems.com
SPROUT

SPROUT - GROWING CONCIOUSNESS
Consumers vote with their wallets everyday without realizing it. Sprout      The interface also captures Sprout points that users accumulate based
puts the power of informed decision-making back into the hands of           on their purchases. The goal is to motivate eco-conscious shopping
the consumers by providing them with tools to visualize the power and       behavior in a seamless fashion using systems that consumers already
environmental impact of their decisions.                                    understand. For example, a user’s ‘Sprout’ score is managed through
                                                                            a centralized web or mobile app that is reminiscent of Klout, the app
When making routine shopping decisions, Sprout’s augmented interface        that measures online social influence. Every buying decision is tracked
gives the consumer critical information about the ‘green impact’ of their   and rewarded with badges that reflect real-time scores through
purchases. Information about a product’s environmental footprint and        visual design and these decisions and badges can be shared with your
suggested alternatives appear instantly in the ‘blink’ view.                social network.
SPROUT

Sprout will let customers customize their shopping to achieve greener       about how they are treating the environment with respect to their
outcomes. Real-time decision-making tools, such as just-in-time supply-     purchases. Over time, if Sprout builds up a large enough user base, it can
chain management systems, can be converted into interactive decision-       introduce group eco-buying and other tools like offset recommendations
making systems that give consumers the power to make greener shopping       (such as planting a tree).
choices. For example, Sprout will let users understand why certain items,
that may have been manufactured at a local, ‘green’ factory, may be more
costly. This will ultimately empower them to make an informed decision
REALiTREE
Stark Design. 401 Broadway, Suite 1500. New York, NY 10013
Contact: daniel@starkdesignny.com
Concept lead: Daniel Stark
Team Members: Nancy Herrmann, Carly Dintaman, Kohl Norville, Maite Rios, Takayo Yamazaki
www.starkdesignny.com
REALiTREE

REALiTREE (pronounced RE-AL-i-TREE)
Realitree is a digital manifestation of our local environment and the       real tree, in that it will thrive and suffer according to the health of its
role that we are playing in sustaining its wellbeing. It is a game played   surrounding enviroment.
by different groups in many places. Individuals, teams, communities,
cities and even countries compete against their counterparts via Twitter,   Realitree’s environment takes into account news media, so news
Facebook and through other social tools.                                    stories that are in conflict with climate reality will reflect negatively on
                                                                            its health. Realitree will expose agents of the fossil fuel industry who
A Realitree is like a huge Tamagotchi for which thousands of people care.   propagate smear, innuendo, criminal hacking and leaking of out-of-
It is a massive projection showing a digital image of a tree, complete      context snippets or lies.
with leaves, branches, roots, sky and earth. Realitree functions like a
REALiTREE

Each Realitree will be fed two distinct types of data:                      climate change. On another level, Realitrees (planted in New York City,
• Current, statistical environmental data about the surrounding             for example) could compete against every other city where Realitrees
  community as well as news and insights about political and                are placed.
  corporate forces working against the climate’s good health.
• Real-time updates using tweets and the various social networking          Corporations would be allowed the opportunity to play and even
  activity of the Realitree’s caretakers. Anyone can participate in         remedy earlier misdeeds by correcting falsehoods and donating money
  keeping it alive and thriving through their real world deeds and          to pay for real initiatives in winning communities. Those that create the
  virtual nutrients, delivered through their social networking activity.    healthiest environment for their Realitree win the game.
  As their networks grow, they will be represented as the intertwined
  roots of the tree, keeping it alive, fed and guarded against attack.


The overall “health” of Realitree will be on constant display. With
good activities, it will grow, multiply and sway appreciatively.
With bad deeds, Realitree will appear to shake and wither. It will
always display climate reality truths, news, facts and shares from
participants throughout its community and all over the world.
We envision “planting” 300 Realitrees in cities and towns across
the globe.

Each caretaker will play on different levels and earn points by doing
different things. A single tweet, for example, may garner one point,
while a Foursquare check-in to a “green” business or using clean energy
at home will gain more points. On the Realitree website, through
Facebook connections, people can form teams, compete against
friends and measure their contributions to helping reverse the effects of
DESTINATION
REALITY: FARMVILLE
Arnold worldwide. 101 Huntington Avenue. Boston MA 02199
Contact: Meg Siegal, msiegal@arn.com
Team Members: Meg Siegal, Adrian Crook, Brendon Volpe, Mike Howard
www.arn.com / www.adriancrook.com
DESTINATION REALITY: FARMVILLE

DESTINATION REALITY: FARMVILLE
It’s a funny thing when there are more virtual farmers than real ones on Earth.   Farmers mitigate and adapt to unexpected weather conditions. Goods such
Real life farmers see the effects of climate change, but do virtual ones? Let’s   as wind-powered tractors, windmills, jackets to shield you from the elements,
partner with Farmville to drop a dose of Reality on the 31 million people who     seeds for heartier crops like organic cassava and chickpeas, decorations like a
log on daily to tend to their plants, harvest, and redeem gold coins for seeds,   Climate Reality flag, rainwater collection troughs and green ring tags for your
supplies, and fuel.                                                               livestock. We’d want to do this in a way that presents a challenge to Farmville
                                                                                  players, and makes it possible via gameplay mechanics to heal the destruction
We could partner with Zynga to plan the best way to expose crops to weather       caused by Climate events, illustrating that through action, we can change the
and wind and offer The Climate Reality Project branded goods to help              current trajectory.
DESTINATION REALITY: FARMVILLE

Thoughtstarters to get the partnership under way:                          Zynga can also introduce a new neighbor that everyone has. This
During the summer, Zynga releases an event called “The 7 Days Of           neighbor’s farm has been gravely affected by repeated climate events,
Summer.” Every 24 hours they would release a new theme in which the        and needs your help to recover. New characters, like a meteorologist,
community would be temporarily subjected to various extreme weather        can provide new challenges like preparing for a flood or frost.
events, and stage new Tasks and Quests to recover, mitigate and adapt.
A Task might take the form of installing a windmill, while a Quest might
include sharing your wind power. A Quest Series might take the form of
asking players to make their farm carbon neutral.
CLIMATE REALITY
WIEDEN+KENNEDY. NYC & PDX
Contact: erik.hanson@wk.com
Concept Lead: Dan Neumann
Team Members: Erik Hanson, Erin Brownie, Nick Barham, Dan Hon, Emma Wiseman,
              Jamie Ostrov, Laura Hall, Marshall Ball, Jason Gingold
www.wk.com
CLIMATE REALITY

CLIMATE REALITY
Every successful game creates a strong relationship between players and a   Farmville crops might wilt more quickly than usual forcing players to
virtual world. What if the worlds of the most popular games collided with   water them frequently before they can be harvested. In Angry Birds, an
ours to depict the dramatic realities of climate change?                    urgency mechanic is created when level elements made of ice begin to
                                                                            melt. In Call of Duty and other first-person shooters, a haze of pollution
To raise awareness and drive home the true impact of climate change,        depletes the health of characters not equipped with a gas mask. In World
we will create our own virtual climate change events in some of the         of Warcraft, deforestation forces players to adapt new ambush strategies.
most popular games in world. By working with top publishers like EA         In Grand Theft Auto, cars run out of gas quickly, unless the player uses a
and Rockstar, a wide range of games could be affected simultaneously        hybrid. The option to “buy” the necessary tools or equipment to deal with
ensuring we can reach a critical mass and stimulate a conversation about    the change could exist as a fundraising tool within each game as well.
climate change. On Earth Day, we will take the gaming world by surprise
by introducing new mechanics that completely alter the game world and       The overnight appearance of these changes will spur conversation about
how players interact with it.                                               the real world implications of climate change while informing gamers of the
                                                                            possible consequences.
MISSION GREEN
lg2. 3575, boul. Saint-Laurent. Montreal (Quebec) H2X 2T7
Contact: maubin@lg2.com
Concept Lead: Marilou Aubin
Team Members: Jean-François Perrault, Paul-Alex Gauthier, Stéphane Mailhot, Christian Letendre,
              Marc-André Fafard, Anne Bergeron, Éric Bouchard, Gabrielle Godbout, Mathieu Dufour
www.lg2.com
MISSION GREEN

MISSION GREEN
The Game: Mission Green takes on climate change by giving people a      The Enemy: Corporations and organizations that disrespect the
collective platform from which to address irresponsible and dishonest   environment, fool citizens and contribute to climate change.
corporate behavior. Rooted in crowdsourcing and petition, this game
aggregates geo-targeted mobile photography and content on a gaming      The Mission: As an ageny for Mission Green, a player’s ultimate goal is
platform that operates similarly to Digg (users can vote on items and   to get corporations and organizations to change their behavior via peer/
affect their popularity).                                               consumer pressure.
MISSION GREEN

The Tools: Players use mobiles to capture proof. They then post Green      The Reward System: Agents accumulate points as a byproduct of the
Reports on missiongreen.com and share them on social networks via          popularity of their reports, as well as social shares. Points are also
an app. Reports are ranked based on the number of people who also          earned for sharing other players’ Green Reports. The best agents are
condemn the corporation’s or organization’s behavior and how many          promoted and players receive badges for their work.
times it has been shared. When a Green Report reaches a certain level,
a yellow warning is sent to the corporation or organization whose ethics   The Climate Change: The Mission Green game gives power back to the
are in question. As the Green Report becomes more popular and more         people. It gives them the sense that they can have a positive impact on
widely shared, it reaches orange and red warnings, eventually promoting    climate change. It educates, raises awareness of best behavior and most
the ban of the specific corporation/organization.                           of all puts a reputation “price tag” on corporations and organizations that
                                                                           disrespect the environment. Mission Green is all about change—for good.
REALITY DROPS
Arnold worldwide. 101 Huntington Avenue. Boston MA 02199
Contact: Meg Siegal, msiegal@arn.com
Team Members: Adrian Crook, Kate Tetreault, Brendon Volpe, Bob Goodman, Sebastian Gard, Eugene Kim,
              David O’Trakoun, Meg Siegal, Mike Howard, Sam Gutglass, Deb Grant, Ebbey Mathew
www.arn.com / www.adriancrook.com
REALITY DROPS

REALITY DROPS
Right now, countless climate change conversations are raging in   This site makes it simple to spread science and destroy doubt.
online chat rooms, comment boards, and in social media. And       Climate news is prioritized by ‘heat’—hostility, reach, sentiment, and
wherever these conversations are happening, denial fuels the      timeliness. Earn points by grabbing related scientific articles, videos, and
flames higher. Winning these conversations means dousing the       data, pasting them into the most heated articles, and suffocating climate
denial. And that requires easy access to complex arguments.       denial under the weight of cold, hard reality.




               SPREAD
               SCIENCE
               DESTROY
                DOUBT
REALITY DROPS


The game builds awareness and educates people by offering the easy-          ditional points. And earning points will get your closer to unlocking new
to-understand scientific data they need to cool off the argument. We          levels and achievements.
identify the targets. You find the corresponding facts, and start dropping
Reality. Fly solo and scale the leaderboard against your fellow activists,   The site connects new articles to the most relevant scientific information
or join a team to spread out and outflank the denier echo chamber. You        about climate change. Users are offered a quick, easy way to join the
can earn points by joining conversation and dropping Reality on deniers.     fight and activate their social networks by sharing information with their
Retweets, shares, likes and comments on your Reality will earn you ad-       friends and followers.




    learn more at realitydrops.com


    Get more info.
CONTACT

PSFK is the go-to source for new ideas and inspiration for       GAMING FOR GOOD TEAM
creative professionals around the world. Based in New York
City, PSFK is a trends-led business innovation company that      PROJECT DIRECTOR                         CONTACT
                                                                 Piers Fawkes, President, PSFK            Jeff Weiner, PSFK
publishes a daily news site, provides trends research and                                                 Commercial Director
                                                                 piers@psfk.com
innovation consultancy, manages a network of freelance           646.520.4672                             jeff.weiner@psfk.com
experts and hosts idea-generating events. We aim to inspire                                               646.520.4665
our readers, our clients and our guests to make things better—
                                                                                                          42 Bond St.
whether that’s better products, better services or better ways
                                                                                                          6th Floor
of living.                                                                                                New York, NY 10012 USA
                                                                                                          www.psfk.com
www.psfk.com/future-of-gaming
                                                                                                          For copies of this report, visit:
                                                                                                          www.psfk.com/future-of-gaming

                                                                                                          Version 0.9 Press Preview
                                                                                                          December 2011




                                                                                        Printed on 10% post
                                                                                        consumer recycled paper
FUTURE OF GAMING
 GAMING FOR GOOD


FOR YOUR FULL
COPY OF THE 150 PAGE
REPORT, VISIT:
www.psfk.com/future-of-gaming




                                42
FUTURE OF GAMING

PSFK is the go-to source for new ideas and inspiration for        FUTURE OF GAMING 2011 TEAM
creative professionals around the world. We are a New York
City-based trends research and innovation company that            PROJECT DIRECTOR                     CONTACT
                                                                  Piers Fawkes, President, PSFK        Jeff Weiner, PSFK
publishes a daily news site, provides trends research and                                              Commercial Director
                                                                  piers@psfk.com
innovation consultancy, manages a network of freelance            646.520.4672                         jeff.weiner@psfk.com
experts and hosts idea-generating events. We aim to inspire                                            646.520.4665
our readers, our clients and our guests to make things better-    LEAD CONSULTANT
                                                                  Scott Lachut                         42 Bond St.
whether that’s better products, better services, or better ways
                                                                                                       6th Floor
of living.                                                        PROJECT MANAGER                      New York, NY 10012 USA
                                                                  Tim Ryan                             www.psfk.com
We hope that you find inspiration in every section of the
2011 issue of PSFK’s Future of Gaming report. For copies or an    RESEARCH & ANALYSIS                  For copies of this report, visit:
in-person presentation, please visit:                             Kristen Nozell                       www.psfk.com/future-of-gaming
www.psfk.com/future-of-gaming.                                    Nate Graham
                                                                  Matt Sabourin                        Version 0.9 Press Preview
                                                                  Dory Carr-Harris                     December 2011
                                                                  Nestor Bailey

                                                                  DESIGN DIRECTOR
                                                                  Peter Surrena

                                                                  PHOTOGRAPHY
                                                                  Louis Caldarola
                                                                  www.louiscaldarola.com/photography

More Related Content

What's hot

20 Things Successful Game Developers Do Beyond Making Games
20 Things Successful Game Developers Do Beyond Making Games20 Things Successful Game Developers Do Beyond Making Games
20 Things Successful Game Developers Do Beyond Making Games
Vlad Micu
 
2015 International CES Day 1 Recap #OgilvyCES
2015 International CES Day 1 Recap #OgilvyCES2015 International CES Day 1 Recap #OgilvyCES
2015 International CES Day 1 Recap #OgilvyCES
Ogilvy
 
We Are Social: Curiosity Stop #7
We Are Social: Curiosity Stop #7We Are Social: Curiosity Stop #7
We Are Social: Curiosity Stop #7
We Are Social
 
Social Gaming for the Next Billion Gamers
Social Gaming for the Next Billion GamersSocial Gaming for the Next Billion Gamers
Social Gaming for the Next Billion Gamers
Anuj R KHANNA
 
04 TMID
04 TMID04 TMID
Social game revenue potential, costs, and the keys to being successful in the...
Social game revenue potential, costs, and the keys to being successful in the...Social game revenue potential, costs, and the keys to being successful in the...
Social game revenue potential, costs, and the keys to being successful in the...
Mike Turner
 
CAUDRON Future proof organisation
CAUDRON Future proof organisationCAUDRON Future proof organisation
CAUDRON Future proof organisation
FIAT/IFTA
 
Game Analytics SiTF (David vs Goliath)
Game Analytics SiTF (David vs Goliath)Game Analytics SiTF (David vs Goliath)
Game Analytics SiTF (David vs Goliath)
Elvin Li
 
Transform your VR Experience and Expand your Audience with Mixed Reality
Transform your VR Experience and Expand your Audience with Mixed RealityTransform your VR Experience and Expand your Audience with Mixed Reality
Transform your VR Experience and Expand your Audience with Mixed Reality
Unity Technologies
 
Mobile Gaming Landscape Australia - 2014
Mobile Gaming Landscape Australia - 2014Mobile Gaming Landscape Australia - 2014
Mobile Gaming Landscape Australia - 2014
Inlight
 
Mobile World Congress 2013 Day 1 Recap - #MWC13
Mobile World Congress 2013 Day 1 Recap - #MWC13Mobile World Congress 2013 Day 1 Recap - #MWC13
Mobile World Congress 2013 Day 1 Recap - #MWC13
Ogilvy
 
CES Learnings
CES LearningsCES Learnings
CES Learnings
Matt Duchesne
 
Animoca Brands Strategy Update May 2020
Animoca Brands Strategy Update May 2020Animoca Brands Strategy Update May 2020
Animoca Brands Strategy Update May 2020
Animoca Brands
 
Shift Your Game: Mobile, Social, Gaming!
Shift Your Game: Mobile, Social, Gaming!Shift Your Game: Mobile, Social, Gaming!
Shift Your Game: Mobile, Social, Gaming!
Vivastream
 
We Are Social: Curiosity Stop #4
We Are Social: Curiosity Stop #4We Are Social: Curiosity Stop #4
We Are Social: Curiosity Stop #4
We Are Social
 
Top 5 Gaming Apps
Top 5 Gaming AppsTop 5 Gaming Apps
Top 5 Gaming Apps
Devansh Kaushik
 
Keynote: Riding the Digital Wave
Keynote: Riding the Digital WaveKeynote: Riding the Digital Wave
Keynote: Riding the Digital Wave
Merging Media
 
Welcome to Autonomous Living: Mindshare at CES 2017
Welcome to Autonomous Living: Mindshare at CES 2017Welcome to Autonomous Living: Mindshare at CES 2017
Welcome to Autonomous Living: Mindshare at CES 2017
Mindshare North America
 

What's hot (18)

20 Things Successful Game Developers Do Beyond Making Games
20 Things Successful Game Developers Do Beyond Making Games20 Things Successful Game Developers Do Beyond Making Games
20 Things Successful Game Developers Do Beyond Making Games
 
2015 International CES Day 1 Recap #OgilvyCES
2015 International CES Day 1 Recap #OgilvyCES2015 International CES Day 1 Recap #OgilvyCES
2015 International CES Day 1 Recap #OgilvyCES
 
We Are Social: Curiosity Stop #7
We Are Social: Curiosity Stop #7We Are Social: Curiosity Stop #7
We Are Social: Curiosity Stop #7
 
Social Gaming for the Next Billion Gamers
Social Gaming for the Next Billion GamersSocial Gaming for the Next Billion Gamers
Social Gaming for the Next Billion Gamers
 
04 TMID
04 TMID04 TMID
04 TMID
 
Social game revenue potential, costs, and the keys to being successful in the...
Social game revenue potential, costs, and the keys to being successful in the...Social game revenue potential, costs, and the keys to being successful in the...
Social game revenue potential, costs, and the keys to being successful in the...
 
CAUDRON Future proof organisation
CAUDRON Future proof organisationCAUDRON Future proof organisation
CAUDRON Future proof organisation
 
Game Analytics SiTF (David vs Goliath)
Game Analytics SiTF (David vs Goliath)Game Analytics SiTF (David vs Goliath)
Game Analytics SiTF (David vs Goliath)
 
Transform your VR Experience and Expand your Audience with Mixed Reality
Transform your VR Experience and Expand your Audience with Mixed RealityTransform your VR Experience and Expand your Audience with Mixed Reality
Transform your VR Experience and Expand your Audience with Mixed Reality
 
Mobile Gaming Landscape Australia - 2014
Mobile Gaming Landscape Australia - 2014Mobile Gaming Landscape Australia - 2014
Mobile Gaming Landscape Australia - 2014
 
Mobile World Congress 2013 Day 1 Recap - #MWC13
Mobile World Congress 2013 Day 1 Recap - #MWC13Mobile World Congress 2013 Day 1 Recap - #MWC13
Mobile World Congress 2013 Day 1 Recap - #MWC13
 
CES Learnings
CES LearningsCES Learnings
CES Learnings
 
Animoca Brands Strategy Update May 2020
Animoca Brands Strategy Update May 2020Animoca Brands Strategy Update May 2020
Animoca Brands Strategy Update May 2020
 
Shift Your Game: Mobile, Social, Gaming!
Shift Your Game: Mobile, Social, Gaming!Shift Your Game: Mobile, Social, Gaming!
Shift Your Game: Mobile, Social, Gaming!
 
We Are Social: Curiosity Stop #4
We Are Social: Curiosity Stop #4We Are Social: Curiosity Stop #4
We Are Social: Curiosity Stop #4
 
Top 5 Gaming Apps
Top 5 Gaming AppsTop 5 Gaming Apps
Top 5 Gaming Apps
 
Keynote: Riding the Digital Wave
Keynote: Riding the Digital WaveKeynote: Riding the Digital Wave
Keynote: Riding the Digital Wave
 
Welcome to Autonomous Living: Mindshare at CES 2017
Welcome to Autonomous Living: Mindshare at CES 2017Welcome to Autonomous Living: Mindshare at CES 2017
Welcome to Autonomous Living: Mindshare at CES 2017
 

Viewers also liked

Benefits of gaming
Benefits of gamingBenefits of gaming
Benefits of gaming
Venkatesh Movva
 
Video Gaming Trends
Video Gaming TrendsVideo Gaming Trends
Video Gaming Trends
Jerome Sudan
 
PSFK Presents: Future Of Design - 13 Inspirational Designers and Their Design...
PSFK Presents: Future Of Design - 13 Inspirational Designers and Their Design...PSFK Presents: Future Of Design - 13 Inspirational Designers and Their Design...
PSFK Presents: Future Of Design - 13 Inspirational Designers and Their Design...
PSFK
 
JWT 10 Trends for 2012 Executive Summary
JWT 10 Trends for 2012 Executive SummaryJWT 10 Trends for 2012 Executive Summary
JWT 10 Trends for 2012 Executive Summary
J. Walter Thompson Intelligence
 
JWT: 100 Things to Watch in 2012
JWT: 100 Things to Watch in 2012JWT: 100 Things to Watch in 2012
JWT: 100 Things to Watch in 2012
J. Walter Thompson Intelligence
 
Gaming Technology Presentation
Gaming Technology PresentationGaming Technology Presentation
Gaming Technology Presentation
MrQaz996
 
Video Game Powerpoint
Video Game PowerpointVideo Game Powerpoint
Video Game Powerpoint
Nari07
 
2016 Adobe Digital Insights Gaming Report
2016 Adobe Digital Insights Gaming Report2016 Adobe Digital Insights Gaming Report
2016 Adobe Digital Insights Gaming Report
Adobe
 
Chapter 11 – the gaming entertainment industry
Chapter 11 – the gaming entertainment industryChapter 11 – the gaming entertainment industry
Chapter 11 – the gaming entertainment industry
MiLei Chanbaek
 
The Emerging Virtual Reality Landscape: a Primer
The Emerging Virtual Reality Landscape: a PrimerThe Emerging Virtual Reality Landscape: a Primer
The Emerging Virtual Reality Landscape: a Primer
Sim Blaustein
 
GAMING LUMAscape
GAMING LUMAscape GAMING LUMAscape
GAMING LUMAscape
LUMA Partners
 
PSFK Future of Retail Report 2012
PSFK Future of Retail Report 2012PSFK Future of Retail Report 2012
PSFK Future of Retail Report 2012
PSFK
 
Download presentation
Download presentationDownload presentation
Download presentation
webhostingguy
 
Virtual Reality-Seminar presentation
Virtual Reality-Seminar  presentationVirtual Reality-Seminar  presentation
Virtual Reality-Seminar presentation
Shreyansh Vijay Singh
 
Digital Gaming Trends and Implications for Prevention
Digital Gaming Trends and Implications for PreventionDigital Gaming Trends and Implications for Prevention
Digital Gaming Trends and Implications for Prevention
Julie Hynes
 
"Mobile Tags & Realidades Mistas" por Martha Gabriel
"Mobile Tags & Realidades Mistas" por Martha Gabriel"Mobile Tags & Realidades Mistas" por Martha Gabriel
"Mobile Tags & Realidades Mistas" por Martha Gabriel
Martha Gabriel
 
Storytelling Cookbook *Micro Edition* (German)
Storytelling Cookbook *Micro Edition* (German)Storytelling Cookbook *Micro Edition* (German)
Storytelling Cookbook *Micro Edition* (German)
Christian Riedel
 
Gate StoryBOX
Gate StoryBOXGate StoryBOX
Gate StoryBOX
Keimpe de Heer
 
The maze runner
The maze runnerThe maze runner
The maze runner
LidiaGon
 

Viewers also liked (19)

Benefits of gaming
Benefits of gamingBenefits of gaming
Benefits of gaming
 
Video Gaming Trends
Video Gaming TrendsVideo Gaming Trends
Video Gaming Trends
 
PSFK Presents: Future Of Design - 13 Inspirational Designers and Their Design...
PSFK Presents: Future Of Design - 13 Inspirational Designers and Their Design...PSFK Presents: Future Of Design - 13 Inspirational Designers and Their Design...
PSFK Presents: Future Of Design - 13 Inspirational Designers and Their Design...
 
JWT 10 Trends for 2012 Executive Summary
JWT 10 Trends for 2012 Executive SummaryJWT 10 Trends for 2012 Executive Summary
JWT 10 Trends for 2012 Executive Summary
 
JWT: 100 Things to Watch in 2012
JWT: 100 Things to Watch in 2012JWT: 100 Things to Watch in 2012
JWT: 100 Things to Watch in 2012
 
Gaming Technology Presentation
Gaming Technology PresentationGaming Technology Presentation
Gaming Technology Presentation
 
Video Game Powerpoint
Video Game PowerpointVideo Game Powerpoint
Video Game Powerpoint
 
2016 Adobe Digital Insights Gaming Report
2016 Adobe Digital Insights Gaming Report2016 Adobe Digital Insights Gaming Report
2016 Adobe Digital Insights Gaming Report
 
Chapter 11 – the gaming entertainment industry
Chapter 11 – the gaming entertainment industryChapter 11 – the gaming entertainment industry
Chapter 11 – the gaming entertainment industry
 
The Emerging Virtual Reality Landscape: a Primer
The Emerging Virtual Reality Landscape: a PrimerThe Emerging Virtual Reality Landscape: a Primer
The Emerging Virtual Reality Landscape: a Primer
 
GAMING LUMAscape
GAMING LUMAscape GAMING LUMAscape
GAMING LUMAscape
 
PSFK Future of Retail Report 2012
PSFK Future of Retail Report 2012PSFK Future of Retail Report 2012
PSFK Future of Retail Report 2012
 
Download presentation
Download presentationDownload presentation
Download presentation
 
Virtual Reality-Seminar presentation
Virtual Reality-Seminar  presentationVirtual Reality-Seminar  presentation
Virtual Reality-Seminar presentation
 
Digital Gaming Trends and Implications for Prevention
Digital Gaming Trends and Implications for PreventionDigital Gaming Trends and Implications for Prevention
Digital Gaming Trends and Implications for Prevention
 
"Mobile Tags & Realidades Mistas" por Martha Gabriel
"Mobile Tags & Realidades Mistas" por Martha Gabriel"Mobile Tags & Realidades Mistas" por Martha Gabriel
"Mobile Tags & Realidades Mistas" por Martha Gabriel
 
Storytelling Cookbook *Micro Edition* (German)
Storytelling Cookbook *Micro Edition* (German)Storytelling Cookbook *Micro Edition* (German)
Storytelling Cookbook *Micro Edition* (German)
 
Gate StoryBOX
Gate StoryBOXGate StoryBOX
Gate StoryBOX
 
The maze runner
The maze runnerThe maze runner
The maze runner
 

Similar to PSFK Future of Gaming Report

Learning to Make Your Own Reality - IGDA Education Keynote 2009
Learning to Make Your Own Reality  - IGDA Education Keynote 2009Learning to Make Your Own Reality  - IGDA Education Keynote 2009
Learning to Make Your Own Reality - IGDA Education Keynote 2009
Jane McGonigal
 
COMPUTER GAMES VS SMARTPHONE GAMES
COMPUTER GAMES VS SMARTPHONE GAMES COMPUTER GAMES VS SMARTPHONE GAMES
COMPUTER GAMES VS SMARTPHONE GAMES
ramal699
 
Performance Studies student work
Performance Studies student workPerformance Studies student work
IIASA 35th Anniversary - Amplified Intelligence Games
IIASA 35th Anniversary - Amplified Intelligence GamesIIASA 35th Anniversary - Amplified Intelligence Games
IIASA 35th Anniversary - Amplified Intelligence Games
Jane McGonigal
 
Gamification
GamificationGamification
Gamification
Ralph Dobbertin
 
Social media dimensions of gaming
Social media dimensions of gamingSocial media dimensions of gaming
Social media dimensions of gaming
Harris Social Media LLC
 
Games for Change Methodology
Games for Change MethodologyGames for Change Methodology
Games for Change Methodology
Games for Change
 
The future of work is play igic 2011
The future of work is play   igic 2011The future of work is play   igic 2011
The future of work is play igic 2011
unlimited insights
 
Gaming for-good-psfk-111202215545-phpapp01
Gaming for-good-psfk-111202215545-phpapp01Gaming for-good-psfk-111202215545-phpapp01
Gaming for-good-psfk-111202215545-phpapp01
The Next SEM
 
Games for Change Lab
Games for Change LabGames for Change Lab
Games for Change Lab
Games for Change
 
imaginary: serious games and gamification
imaginary: serious games and gamificationimaginary: serious games and gamification
imaginary: serious games and gamification
imaginary srl
 
Imaginary October 2014
Imaginary October 2014Imaginary October 2014
Imaginary October 2014
Lucia Pannese
 
Jane McGonigal on the Future of Mobile Gaming
Jane McGonigal on the Future of Mobile GamingJane McGonigal on the Future of Mobile Gaming
Jane McGonigal on the Future of Mobile Gaming
Jane McGonigal
 
Serious Games: their potential as tools for international NGOs
Serious Games: their potential as tools for international NGOsSerious Games: their potential as tools for international NGOs
Serious Games: their potential as tools for international NGOs
NetHopeOrg
 
Games at the CTAM Summit 2007
Games at the CTAM Summit 2007Games at the CTAM Summit 2007
Games at the CTAM Summit 2007
Jane McGonigal
 
Gamester Corporate Presentation (En)
Gamester Corporate Presentation (En)Gamester Corporate Presentation (En)
Gamester Corporate Presentation (En)
Volkan Taban
 
Social Media Impact On Gaming
Social Media Impact On GamingSocial Media Impact On Gaming
Social Media Impact On Gaming
Capstrat
 
State of the art on persuasive games for water consumption
State of the art on persuasive games for water consumptionState of the art on persuasive games for water consumption
State of the art on persuasive games for water consumption
Alysson Diniz dos Santos
 
An Old Document for Tune Hopper Ideas
An Old Document for Tune Hopper IdeasAn Old Document for Tune Hopper Ideas
An Old Document for Tune Hopper Ideas
Tune Hopper
 
For the Win: What Businesses are Learning from the World of Games
For the Win: What Businesses are Learning from the World of GamesFor the Win: What Businesses are Learning from the World of Games
For the Win: What Businesses are Learning from the World of Games
Kevin Werbach
 

Similar to PSFK Future of Gaming Report (20)

Learning to Make Your Own Reality - IGDA Education Keynote 2009
Learning to Make Your Own Reality  - IGDA Education Keynote 2009Learning to Make Your Own Reality  - IGDA Education Keynote 2009
Learning to Make Your Own Reality - IGDA Education Keynote 2009
 
COMPUTER GAMES VS SMARTPHONE GAMES
COMPUTER GAMES VS SMARTPHONE GAMES COMPUTER GAMES VS SMARTPHONE GAMES
COMPUTER GAMES VS SMARTPHONE GAMES
 
Performance Studies student work
Performance Studies student workPerformance Studies student work
Performance Studies student work
 
IIASA 35th Anniversary - Amplified Intelligence Games
IIASA 35th Anniversary - Amplified Intelligence GamesIIASA 35th Anniversary - Amplified Intelligence Games
IIASA 35th Anniversary - Amplified Intelligence Games
 
Gamification
GamificationGamification
Gamification
 
Social media dimensions of gaming
Social media dimensions of gamingSocial media dimensions of gaming
Social media dimensions of gaming
 
Games for Change Methodology
Games for Change MethodologyGames for Change Methodology
Games for Change Methodology
 
The future of work is play igic 2011
The future of work is play   igic 2011The future of work is play   igic 2011
The future of work is play igic 2011
 
Gaming for-good-psfk-111202215545-phpapp01
Gaming for-good-psfk-111202215545-phpapp01Gaming for-good-psfk-111202215545-phpapp01
Gaming for-good-psfk-111202215545-phpapp01
 
Games for Change Lab
Games for Change LabGames for Change Lab
Games for Change Lab
 
imaginary: serious games and gamification
imaginary: serious games and gamificationimaginary: serious games and gamification
imaginary: serious games and gamification
 
Imaginary October 2014
Imaginary October 2014Imaginary October 2014
Imaginary October 2014
 
Jane McGonigal on the Future of Mobile Gaming
Jane McGonigal on the Future of Mobile GamingJane McGonigal on the Future of Mobile Gaming
Jane McGonigal on the Future of Mobile Gaming
 
Serious Games: their potential as tools for international NGOs
Serious Games: their potential as tools for international NGOsSerious Games: their potential as tools for international NGOs
Serious Games: their potential as tools for international NGOs
 
Games at the CTAM Summit 2007
Games at the CTAM Summit 2007Games at the CTAM Summit 2007
Games at the CTAM Summit 2007
 
Gamester Corporate Presentation (En)
Gamester Corporate Presentation (En)Gamester Corporate Presentation (En)
Gamester Corporate Presentation (En)
 
Social Media Impact On Gaming
Social Media Impact On GamingSocial Media Impact On Gaming
Social Media Impact On Gaming
 
State of the art on persuasive games for water consumption
State of the art on persuasive games for water consumptionState of the art on persuasive games for water consumption
State of the art on persuasive games for water consumption
 
An Old Document for Tune Hopper Ideas
An Old Document for Tune Hopper IdeasAn Old Document for Tune Hopper Ideas
An Old Document for Tune Hopper Ideas
 
For the Win: What Businesses are Learning from the World of Games
For the Win: What Businesses are Learning from the World of GamesFor the Win: What Businesses are Learning from the World of Games
For the Win: What Businesses are Learning from the World of Games
 

More from PSFK

PSFK's Future of Retail 2020 Report - Summary Presentation
PSFK's Future of Retail 2020 Report - Summary PresentationPSFK's Future of Retail 2020 Report - Summary Presentation
PSFK's Future of Retail 2020 Report - Summary Presentation
PSFK
 
Food Service Debrief
Food Service DebriefFood Service Debrief
Food Service Debrief
PSFK
 
Loyalty Debrief
Loyalty DebriefLoyalty Debrief
Loyalty Debrief
PSFK
 
Shopper Data Debrief
Shopper Data DebriefShopper Data Debrief
Shopper Data Debrief
PSFK
 
Store Experience Design Debrief
Store Experience Design DebriefStore Experience Design Debrief
Store Experience Design Debrief
PSFK
 
Occasion-Based Marketing Debrief
Occasion-Based Marketing DebriefOccasion-Based Marketing Debrief
Occasion-Based Marketing Debrief
PSFK
 
Travel Debrief
Travel DebriefTravel Debrief
Travel Debrief
PSFK
 
Digital Banking Playbook
Digital Banking Playbook Digital Banking Playbook
Digital Banking Playbook
PSFK
 
AI Retail Playbook
AI Retail PlaybookAI Retail Playbook
AI Retail Playbook
PSFK
 
PSFK CES 2018 Guide
PSFK CES 2018 GuidePSFK CES 2018 Guide
PSFK CES 2018 Guide
PSFK
 
Forecast Z
Forecast Z Forecast Z
Forecast Z
PSFK
 
Consumer 2020
Consumer 2020Consumer 2020
Consumer 2020
PSFK
 
Future of Manufacturing
Future of Manufacturing Future of Manufacturing
Future of Manufacturing
PSFK
 
PSFK Impact Debrief: Brand Growth
PSFK Impact Debrief: Brand GrowthPSFK Impact Debrief: Brand Growth
PSFK Impact Debrief: Brand Growth
PSFK
 
Future of Automotive Report
Future of Automotive ReportFuture of Automotive Report
Future of Automotive Report
PSFK
 
PSFK Future of Work Report
PSFK Future of Work ReportPSFK Future of Work Report
PSFK Future of Work Report
PSFK
 
PSFK CES Guide 2016
PSFK CES Guide 2016PSFK CES Guide 2016
PSFK CES Guide 2016
PSFK
 
PSFK Future of Retail 2016 Summary Report
PSFK Future of Retail 2016 Summary ReportPSFK Future of Retail 2016 Summary Report
PSFK Future of Retail 2016 Summary Report
PSFK
 
PSFK Presents the Future of Digital Safety & Security
PSFK Presents the Future of Digital Safety & SecurityPSFK Presents the Future of Digital Safety & Security
PSFK Presents the Future of Digital Safety & Security
PSFK
 
PSFK + Architizer: Building Tomorrow
PSFK + Architizer: Building TomorrowPSFK + Architizer: Building Tomorrow
PSFK + Architizer: Building Tomorrow
PSFK
 

More from PSFK (20)

PSFK's Future of Retail 2020 Report - Summary Presentation
PSFK's Future of Retail 2020 Report - Summary PresentationPSFK's Future of Retail 2020 Report - Summary Presentation
PSFK's Future of Retail 2020 Report - Summary Presentation
 
Food Service Debrief
Food Service DebriefFood Service Debrief
Food Service Debrief
 
Loyalty Debrief
Loyalty DebriefLoyalty Debrief
Loyalty Debrief
 
Shopper Data Debrief
Shopper Data DebriefShopper Data Debrief
Shopper Data Debrief
 
Store Experience Design Debrief
Store Experience Design DebriefStore Experience Design Debrief
Store Experience Design Debrief
 
Occasion-Based Marketing Debrief
Occasion-Based Marketing DebriefOccasion-Based Marketing Debrief
Occasion-Based Marketing Debrief
 
Travel Debrief
Travel DebriefTravel Debrief
Travel Debrief
 
Digital Banking Playbook
Digital Banking Playbook Digital Banking Playbook
Digital Banking Playbook
 
AI Retail Playbook
AI Retail PlaybookAI Retail Playbook
AI Retail Playbook
 
PSFK CES 2018 Guide
PSFK CES 2018 GuidePSFK CES 2018 Guide
PSFK CES 2018 Guide
 
Forecast Z
Forecast Z Forecast Z
Forecast Z
 
Consumer 2020
Consumer 2020Consumer 2020
Consumer 2020
 
Future of Manufacturing
Future of Manufacturing Future of Manufacturing
Future of Manufacturing
 
PSFK Impact Debrief: Brand Growth
PSFK Impact Debrief: Brand GrowthPSFK Impact Debrief: Brand Growth
PSFK Impact Debrief: Brand Growth
 
Future of Automotive Report
Future of Automotive ReportFuture of Automotive Report
Future of Automotive Report
 
PSFK Future of Work Report
PSFK Future of Work ReportPSFK Future of Work Report
PSFK Future of Work Report
 
PSFK CES Guide 2016
PSFK CES Guide 2016PSFK CES Guide 2016
PSFK CES Guide 2016
 
PSFK Future of Retail 2016 Summary Report
PSFK Future of Retail 2016 Summary ReportPSFK Future of Retail 2016 Summary Report
PSFK Future of Retail 2016 Summary Report
 
PSFK Presents the Future of Digital Safety & Security
PSFK Presents the Future of Digital Safety & SecurityPSFK Presents the Future of Digital Safety & Security
PSFK Presents the Future of Digital Safety & Security
 
PSFK + Architizer: Building Tomorrow
PSFK + Architizer: Building TomorrowPSFK + Architizer: Building Tomorrow
PSFK + Architizer: Building Tomorrow
 

Recently uploaded

Demystifying Knowledge Management through Storytelling
Demystifying Knowledge Management through StorytellingDemystifying Knowledge Management through Storytelling
Demystifying Knowledge Management through Storytelling
Enterprise Knowledge
 
What is an RPA CoE? Session 1 – CoE Vision
What is an RPA CoE?  Session 1 – CoE VisionWhat is an RPA CoE?  Session 1 – CoE Vision
What is an RPA CoE? Session 1 – CoE Vision
DianaGray10
 
The Microsoft 365 Migration Tutorial For Beginner.pptx
The Microsoft 365 Migration Tutorial For Beginner.pptxThe Microsoft 365 Migration Tutorial For Beginner.pptx
The Microsoft 365 Migration Tutorial For Beginner.pptx
operationspcvita
 
GraphRAG for LifeSciences Hands-On with the Clinical Knowledge Graph
GraphRAG for LifeSciences Hands-On with the Clinical Knowledge GraphGraphRAG for LifeSciences Hands-On with the Clinical Knowledge Graph
GraphRAG for LifeSciences Hands-On with the Clinical Knowledge Graph
Neo4j
 
Introducing BoxLang : A new JVM language for productivity and modularity!
Introducing BoxLang : A new JVM language for productivity and modularity!Introducing BoxLang : A new JVM language for productivity and modularity!
Introducing BoxLang : A new JVM language for productivity and modularity!
Ortus Solutions, Corp
 
AppSec PNW: Android and iOS Application Security with MobSF
AppSec PNW: Android and iOS Application Security with MobSFAppSec PNW: Android and iOS Application Security with MobSF
AppSec PNW: Android and iOS Application Security with MobSF
Ajin Abraham
 
Must Know Postgres Extension for DBA and Developer during Migration
Must Know Postgres Extension for DBA and Developer during MigrationMust Know Postgres Extension for DBA and Developer during Migration
Must Know Postgres Extension for DBA and Developer during Migration
Mydbops
 
Leveraging the Graph for Clinical Trials and Standards
Leveraging the Graph for Clinical Trials and StandardsLeveraging the Graph for Clinical Trials and Standards
Leveraging the Graph for Clinical Trials and Standards
Neo4j
 
Y-Combinator seed pitch deck template PP
Y-Combinator seed pitch deck template PPY-Combinator seed pitch deck template PP
Y-Combinator seed pitch deck template PP
c5vrf27qcz
 
Harnessing the Power of NLP and Knowledge Graphs for Opioid Research
Harnessing the Power of NLP and Knowledge Graphs for Opioid ResearchHarnessing the Power of NLP and Knowledge Graphs for Opioid Research
Harnessing the Power of NLP and Knowledge Graphs for Opioid Research
Neo4j
 
"NATO Hackathon Winner: AI-Powered Drug Search", Taras Kloba
"NATO Hackathon Winner: AI-Powered Drug Search",  Taras Kloba"NATO Hackathon Winner: AI-Powered Drug Search",  Taras Kloba
"NATO Hackathon Winner: AI-Powered Drug Search", Taras Kloba
Fwdays
 
JavaLand 2024: Application Development Green Masterplan
JavaLand 2024: Application Development Green MasterplanJavaLand 2024: Application Development Green Masterplan
JavaLand 2024: Application Development Green Masterplan
Miro Wengner
 
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeckPoznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
FilipTomaszewski5
 
Dandelion Hashtable: beyond billion requests per second on a commodity server
Dandelion Hashtable: beyond billion requests per second on a commodity serverDandelion Hashtable: beyond billion requests per second on a commodity server
Dandelion Hashtable: beyond billion requests per second on a commodity server
Antonios Katsarakis
 
GlobalLogic Java Community Webinar #18 “How to Improve Web Application Perfor...
GlobalLogic Java Community Webinar #18 “How to Improve Web Application Perfor...GlobalLogic Java Community Webinar #18 “How to Improve Web Application Perfor...
GlobalLogic Java Community Webinar #18 “How to Improve Web Application Perfor...
GlobalLogic Ukraine
 
Northern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving | Modern Metal Trim, Nameplates and Appliance PanelsNorthern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving
 
Discover the Unseen: Tailored Recommendation of Unwatched Content
Discover the Unseen: Tailored Recommendation of Unwatched ContentDiscover the Unseen: Tailored Recommendation of Unwatched Content
Discover the Unseen: Tailored Recommendation of Unwatched Content
ScyllaDB
 
What is an RPA CoE? Session 2 – CoE Roles
What is an RPA CoE?  Session 2 – CoE RolesWhat is an RPA CoE?  Session 2 – CoE Roles
What is an RPA CoE? Session 2 – CoE Roles
DianaGray10
 
Containers & AI - Beauty and the Beast!?!
Containers & AI - Beauty and the Beast!?!Containers & AI - Beauty and the Beast!?!
Containers & AI - Beauty and the Beast!?!
Tobias Schneck
 
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
Jason Yip
 

Recently uploaded (20)

Demystifying Knowledge Management through Storytelling
Demystifying Knowledge Management through StorytellingDemystifying Knowledge Management through Storytelling
Demystifying Knowledge Management through Storytelling
 
What is an RPA CoE? Session 1 – CoE Vision
What is an RPA CoE?  Session 1 – CoE VisionWhat is an RPA CoE?  Session 1 – CoE Vision
What is an RPA CoE? Session 1 – CoE Vision
 
The Microsoft 365 Migration Tutorial For Beginner.pptx
The Microsoft 365 Migration Tutorial For Beginner.pptxThe Microsoft 365 Migration Tutorial For Beginner.pptx
The Microsoft 365 Migration Tutorial For Beginner.pptx
 
GraphRAG for LifeSciences Hands-On with the Clinical Knowledge Graph
GraphRAG for LifeSciences Hands-On with the Clinical Knowledge GraphGraphRAG for LifeSciences Hands-On with the Clinical Knowledge Graph
GraphRAG for LifeSciences Hands-On with the Clinical Knowledge Graph
 
Introducing BoxLang : A new JVM language for productivity and modularity!
Introducing BoxLang : A new JVM language for productivity and modularity!Introducing BoxLang : A new JVM language for productivity and modularity!
Introducing BoxLang : A new JVM language for productivity and modularity!
 
AppSec PNW: Android and iOS Application Security with MobSF
AppSec PNW: Android and iOS Application Security with MobSFAppSec PNW: Android and iOS Application Security with MobSF
AppSec PNW: Android and iOS Application Security with MobSF
 
Must Know Postgres Extension for DBA and Developer during Migration
Must Know Postgres Extension for DBA and Developer during MigrationMust Know Postgres Extension for DBA and Developer during Migration
Must Know Postgres Extension for DBA and Developer during Migration
 
Leveraging the Graph for Clinical Trials and Standards
Leveraging the Graph for Clinical Trials and StandardsLeveraging the Graph for Clinical Trials and Standards
Leveraging the Graph for Clinical Trials and Standards
 
Y-Combinator seed pitch deck template PP
Y-Combinator seed pitch deck template PPY-Combinator seed pitch deck template PP
Y-Combinator seed pitch deck template PP
 
Harnessing the Power of NLP and Knowledge Graphs for Opioid Research
Harnessing the Power of NLP and Knowledge Graphs for Opioid ResearchHarnessing the Power of NLP and Knowledge Graphs for Opioid Research
Harnessing the Power of NLP and Knowledge Graphs for Opioid Research
 
"NATO Hackathon Winner: AI-Powered Drug Search", Taras Kloba
"NATO Hackathon Winner: AI-Powered Drug Search",  Taras Kloba"NATO Hackathon Winner: AI-Powered Drug Search",  Taras Kloba
"NATO Hackathon Winner: AI-Powered Drug Search", Taras Kloba
 
JavaLand 2024: Application Development Green Masterplan
JavaLand 2024: Application Development Green MasterplanJavaLand 2024: Application Development Green Masterplan
JavaLand 2024: Application Development Green Masterplan
 
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeckPoznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
 
Dandelion Hashtable: beyond billion requests per second on a commodity server
Dandelion Hashtable: beyond billion requests per second on a commodity serverDandelion Hashtable: beyond billion requests per second on a commodity server
Dandelion Hashtable: beyond billion requests per second on a commodity server
 
GlobalLogic Java Community Webinar #18 “How to Improve Web Application Perfor...
GlobalLogic Java Community Webinar #18 “How to Improve Web Application Perfor...GlobalLogic Java Community Webinar #18 “How to Improve Web Application Perfor...
GlobalLogic Java Community Webinar #18 “How to Improve Web Application Perfor...
 
Northern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving | Modern Metal Trim, Nameplates and Appliance PanelsNorthern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
 
Discover the Unseen: Tailored Recommendation of Unwatched Content
Discover the Unseen: Tailored Recommendation of Unwatched ContentDiscover the Unseen: Tailored Recommendation of Unwatched Content
Discover the Unseen: Tailored Recommendation of Unwatched Content
 
What is an RPA CoE? Session 2 – CoE Roles
What is an RPA CoE?  Session 2 – CoE RolesWhat is an RPA CoE?  Session 2 – CoE Roles
What is an RPA CoE? Session 2 – CoE Roles
 
Containers & AI - Beauty and the Beast!?!
Containers & AI - Beauty and the Beast!?!Containers & AI - Beauty and the Beast!?!
Containers & AI - Beauty and the Beast!?!
 
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
 

PSFK Future of Gaming Report

  • 1. PSFK presents THE FUTURE OF GAMING SUMMARY PRESENTATION A REPORT CO N S U LTI N G
  • 2. FOR YOUR FULL COPY OF THE 150 PAGE REPORT, VISIT: www.psfk.com/future-of-gaming
  • 3. INTRODUCTION This report presents key trends emerging within the gaming PSFK’s research kicked off with an analysis of nearly one thousand space that brands, non-profits and communities can leverage data points that showcased gaming innovation in various forms. to foster engagement and motivate their target audience Pattern recognition performed against this research yielded 17 towards achieving a desired outcome. It is designed to inspire key trends organized around three core aspects of game design anyone tasked with creating compelling user experiences, —Purpose Behind the Game, Mechanics that Drive People to whether that be on a digital screen, in the real world or Action and Game Functionality and Systems. To understand somewhere in between. how these trends impact the marketplace and the opportunities they present, we interviewed numerous gaming experts and We recognize that there is a tremendous amount of research have included their insights throughout the document. and study taking place around gaming, and this report reflects our contribution to that conversation. It is intended to provide a current snapshot into the innovative ways that games are We hope that you find inspiration in every section of the 2011 being used within the broader marketplace, examine their issue of PSFK’s Future of Gaming report. For copies or an in expanding role in effecting change on an individual and societal person presentation, please visit: level, and highlight the new technologies that are making www.psfk.com/future-of-gaming these experiences possible.
  • 4. FOREWORD Games and play are at the foundation of how people learn, develop The mechanics behind games are evolving as social connectivity and socialize. As humans we respond instantly to entertaining and influences both the way and the pace at which people interact with engaging experiences. But what makes a game worth playing? What one another. The nature of our modern online presence allows us rules must it have? How should it work? to communicate, compete and collaborate with one-another in real- time. Driven by rapid advances in mobile and sensor technology, Our report provides an overview of the key trends permeating the games are now able to bridge real and virtual worlds. They can now creation of games today. It specifically looks at how play is being take place across separate realities that often influence each other, used by organizations, corporations and communities to achieve a creating new opportunities for play and changing the way players specific purpose. Fueled by the ability to gather many players across experience their daily lives. the world through online connectivity, projects of any scale can be undertaken, overcoming previously unsolvable challenges. When applied to socially responsible enterprise or charitable programs Piers Fawkes, Founder, PSFK these collective efforts are capable of bringing about real change.
  • 5.
  • 6. PILLARS OF GAMING THE PURPOSE OF GAMING
  • 7. PURPOSE OF GAMING TO SOLVE THE UNSOLVABLE
  • 8. FOLD.IT TO SOLVE THE UNSOLVABLE GAMERS ASSIST IN CRACKING THE AIDS PUZZLE FOLD.IT GAMERS ASSIST IN CRACKING THE AIDS PUZZLE
  • 9. PURPOSE OF GAMING TO LEVERAGE COLLECTIVE MANPOWER
  • 10. PROJECT NOAH PROJECT NOAH MISSION-BASED IMAGE GATHERING FOR CROWDSOURCED NATURE REFERENCES
  • 11. PURPOSE OF GAMING TO EMBED KNOWLEDGE
  • 12. NASA LEARNING TECHNOLOGIES FUTURE SOCIAL GAME MAKES ASTROPHYSICS FUN
  • 13. PURPOSE OF GAMING TO TEACH PEOPLE NEW SKILLS
  • 14. TO TEACH PEOPLE NEW SKILLS LEARN REAL GUITAR WHILE PLAYING AN INTERACTIVE VIDEO GAME ROCKSMITH LEARN REAL GUITAR WHILE PLAYING AN INTERACTIVE VIDEO GAME
  • 15. PURPOSE OF GAMING TO IMPROVE EVERYDAY BEHAVIOR
  • 16. TO IMPROVE EVERYDAY BEHAVIOR ACHIEVING MILESTONES IN OVERCOMING HEALTH-RELATED CHALLENGES MINDBLOOM APP GAMIFIES PERSONAL GROWTH TO BOOST PHYSICAL AND MENTAL HEALTH
  • 17. PURPOSE OF GAMING TO PROMOTE FUNDRAISING
  • 18. TO PROMOTE FUNDRAISING GAMERS HELP FEED HUNGRY CHILDREN ZYNGA + PIZZA HUT GAMERS PURCHASE IN GAME ITEMS TO DONATE TO CHARITY
  • 19. PURPOSE OF GAMING TO SPREAD THE WORD
  • 20. LOCKERZ PLATFORM HARNESSES POTENTIAL OF INFLUENTIAL SOCIAL NETWORKERS
  • 22. MECHANICS THAT DRIVE PEOPLE TO ACTION ONE-UPSMANSHIP
  • 23. ONE-UPSMANSHIP FITNESS GAMES WITH SOCIAL MOTIVATION AS IMPETUS PULSWATCH FITNESS GAMES WITH SOCIAL MOTIVATION AS IMPETUS
  • 24. MECHANICS THAT DRIVE PEOPLE TO ACTION PEER PRESSURE
  • 25. REEBOK PROMISE KEEPER APP USES SOCIAL MEDIA PEER PRESSURE TO MOTIVATE USERS TO EXERCISE
  • 26. MECHANICS THAT DRIVE PEOPLE TO ACTION MONEY ON THE LINE
  • 28. MECHANICS THAT DRIVE PEOPLE TO ACTION REWARDS
  • 29. RECYCLEBANK.COM MOTIVATING EVERYDAY GREEN BEHAVIOR WITH REAL REWARDS
  • 30. MECHANICS THAT DRIVE PEOPLE TO ACTION EXCLUSIVE ACCESS
  • 31. BAL HARBOUR + KLOUT PARTY INVITES SENT ONLY TO PEOPLE WITH HIGH KLOUT SCORE
  • 33. GAME FUNCTIONALITY AND SYSTEMS GESTURE-BASED GAMING
  • 35. GAME FUNCTIONALITY AND SYSTEMS MULTI-SCREEN EXPERIENCES
  • 36. MULTI-SCREEN EXPERIENCES INTERACTIVE PING-PONG GAME TAKES THE OUTDOOR STAGE MCDONALDS INTERACTIVE PING-PONG GAME TAKES THE OUTDOOR STAGE
  • 37. GAME FUNCTIONALITY AND SYSTEMS MIXING REALITIES
  • 38. MIXING REALITIES iDEVICE CONSTRUCTION GAME MELDS OFFLINE ASSEMBLY WITH DIGITAL SCORE LIFE OF GEORGE iDEVICE CONSTRUCTION GAME MELDS OFFLINE ASSEMBLY WITH DIGITAL STORE
  • 39. GAME FUNCTIONALITY AND SYSTEMS LIFE-SIZED GAME PIECES
  • 40. THE FRENCH DIGITAL KITCHEN SENSOR-EMBEDDED KITCHEN UTENSILS OFFER VERBAL ADVICE FOR FUTURE CHEFS
  • 41. GAME FUNCTIONALITY AND SYSTEMS REAL WORLD GAME ENVIRONMENTS
  • 42. ZOMBIES, RUN! AUGMENTED AUDIO GAME SPURS FITNESS BY IMMERSING RUNNERS IN ZOMBIE INFESTED WORLD
  • 43. GAMING for GOOD CONCEPTS TO SUPPORT THE REALITY OF CLIMATE CHANGE CO N S U LTI N G
  • 44. FOREWORD Games are the new normal. The popularity and proliferation for advocates to reach entirely new audiences with games of smart phones, tablets and other mobile devices—coupled that are engaging, fun, and motivational. with a wide variety of social networking platforms—provide Recently, I was introduced to Piers Fawkes and the fertile ground for the incorporation of games into our lives wonderful team at PSFK and for the past several months in fresh, new ways. Whether it’s playing Scrabble on your The Climate Reality Project, PSFK and I have collaborated iPhone or Farmville on Facebook, now millions fill the in an open source “Gaming for Good” Challenge. I hope interstitial moments of their lives with the simple fun that that you will enjoy the results of this collaboration and that these programs and apps provide. it will encourage you to think creatively about social As games have become ubiquitous, both the private and impact games. public sectors have begun to seriously look at the role that gamification can play in their work. Game design, techniques and mechanics, have something to teach those of us who are seeking to engage people on issues of social importance. In the forty years that I have worked to build public awareness of the need to urgently solve the climate crisis, I have always sought out new methods of communication— from my slideshow on three Kodak carousels (which evolved from an actual slideshow to a multi-media presentation on Keynote)—to my work on An Inconvenient Truth, the “Live Earth” global concerts, “24 Hours of Reality” on the web, and an app for the iPhone and iPad called Our Choice. Exploring the interplay of gamification and social change is AL GORE Former Vice President a fascinating challenge, and one that I have been exploring Nobel Laureate for the last three years. Clearly, there is tremendous potential Founder, The Climate Reality Project
  • 45. INTRODUCTION ABOUT THIS REPORT ABOUT THE CLIMATE PSFK challenged its readership of over 1MM creative REALITY PROJECT professionals to come up with concepts that address issues The mission of The Climate Reality Project is to reveal the put forth by The Climate Reality Project. Participants in the full truth of the climate crisis in a way that ignites the moral challenge were encouraged to leverage trends identified courage in all of us. Climate Reality uses communications in PSFK’s Future Of Gaming report to create potential tools to connect the dots for people about what is solutions. happening in science, politics, culture and climate so that all of us can work to face and solve this challenge together. PSFK received over 60 entries from around the world. This book contains a shortlist of those concepts, as chosen by The Climate Reality Project has launched a series of The Climate Reality Project. By highlighting the strongest events to bring the climate crisis back to the fore of public concepts, PSFK hopes to shine a light on ways that The consciousness and conversation. The first was 24 Hours Climate Reality Project and other likeminded businesses can of Reality, which connected the dots between extreme solve some of the issues weather around the globe and climate change. Upcoming they face. events will include Antarctica, a voyage to the bottom of the earth to bear witness to the truth of climate change, coal and its multiple health concerns, and a spotlight on climate “deniers” and the damage they are doing to our ability to take action.
  • 46. INTRODUCTION ABOUT PSFK BACKGROUND PSFK is the go-to source for new ideas and inspiration for PSFK recently published an independent trends-research creative professionals around the world. Based in New York report titled PSFK’s Future Of Gaming. In that report, PSFK City, PSFK is a trends-led business innovation company that highlighted several topic areas, including the purpose, publishes a daily news site, provides trends research and mechanics, functions and systems behind games. In doing innovation consultancy, manages a network of freelance so, it presented a framework within which readers could experts and hosts idea-generating events. We aim to inspire contemplate innovation and best practices that currently our readers, our clients and our guests to make things exist within the gaming arena. better—whether that’s better products, better services or better ways of living. This report served as the creative stimulus for a project recently performed on behalf of The Climate Reality Project. www.psfk.com
  • 47. ABOUT THIS BOOK THE BRIEF WHAT THE CLIMATE REALITY PROJECT WANTS WHAT WE’RE LOOKING FOR Global acceptance of the realities of climate change The goal is to harness the energy of game-play to encourage people to make a measurable impact on the HOW climate conversation. We’re looking for game-play ideas that meet one or more of the following objectives: Create gamification tools that individuals, communities, organizations and nations can use to embed this new reality • To Build Awareness • To Promote Fundraising WHY • To Solve The Unsolvable Individuals, communities, organizations and nations are • To Embed Knowledge failing to act in the face of climate change • To Teach People New Skills • To Improve Everyday Personal Behavior OUTCOME • To Leverage Collective Manpower The conversation changes to focus on implementing solutions to climate change
  • 48. CLIMATE HEROES esterni. 10-20137 Milano Italy Contact: giada@esterni.org www.esterni.org
  • 49. CLIMATE HEROES CLIMATE HEROES. GET READY TO CHANGE THE WORLD Climate Heroes is an online game that capitalizes on the long-standing Users are able to select from a number of superhero avatars, such role of superheroes as beacons of goodness in our lives. This game gives as Mr. Smog and Miss Waste, all of which are visually engaging and users the opportunity to become a superhero and take up the fight representative of a specific climate challenge. Users can capture climate to solve the planet’s climate issues. The future of the planet is in your abuse using their mobile phones and upload photos or share news hands. Create your profile and save the world! items. Those that do so with regular frequency and take on the role of ‘influencer’ will be engaged by the Organization to do a public mission. A sample mission might be to organize a flash mob that sheds light on a specific issue.
  • 50. CLIMATE HEROES Denunciation BLOG
  • 51. CLIMATE HEROES Multiple players can embody the same avatar and can choose to go on share information, ideas and the successful ways in which they have similar missions. In doing so, they create a team or a community of do- combated climate abuse in their communities. The community can also gooders that are battling a similar problem. The website can serve as a be incentivized through things like prizes and recognition. platform or forum for an open dialog amongst superheroes. Users can
  • 52. CLIMATE TRAIL Zemoga. 56 West 22nd Street, 10th Floor. New York, NY 11217 Contact: info@zemoga.com Concept Lead: Sven Larsen Team Members: Dan Licht, Yody Castro, Miguel Fernandez www.zemoga.com
  • 53. CLIMATE TRAIL CLIMATE TRAIL There’s a lot of information and disinformation surrounding climate change. But much of the disinformation can be debunked by following the “money trail” of companies sponsoring the research and publication that disseminates this false data. How do we encourage the public to think for themselves and question the sources of their information? By encouraging them to play “Climate Trail”, a simple text-based game that mirrors the functionality of classic online games like “Oregon Trail”. At the start of the game, each player is given a leadership role in a community with set levels of renewable resources, atmospheric levels, and other indicators of climate health. The goal is to reach the year 2036 with a healthy and livable community. As game play proceeds, players are asked questions like “Do you want clean coal or wind power to be your town’s main source of power” or “Do you want to clear 10,000 acres of forest to create more farmland?” Correct answers help boost resource levels while wrong answers impact negatively on community health. After each answer, players are also presented with information about choices that were made in the real world (e.g. Portland, Oregon switched to natural gas for city vehicles and reduced emissions 30%). Users will also be able to share answers across social networks like Twitter and Facebook.
  • 54. CLIMATE TRAIL Once the initial levels have been completed, players are promoted Game play either ends when resource goals are reached on a global scale to a higher rank with responsibilities for larger and more complex or climate change has reached unacceptable levels and the community is communities. As they progress to higher leadership levels they are also no longer sustainable. Players will be able to compare their performances greeted with new challenges (e.g. “Lobbyists want to meet with you to against real life politicians. They will also be given tips on where they discuss new vehicle standards.”). went wrong in the game (e.g. “You believed reports about Clean Coal but research was actually funded by Mining Companies”) highlighting both the money trail and the need for independent consumer research on high impact environmental and climate issues.
  • 55. GREENSQUARE Awkward Hug. 373 92 Street Apt. B22. Brooklyn, NY 11209 Contact: Julie@awkwardhug.com Concept Lead: Jim Babb Team Members: Julie Coniglio & Josh Spiro www.awkwardhug.com
  • 56. GREENSQUARE GREENSQUARE Greensquare is a gaming platform that gives you and your friends The goal of this game is, ultimately, to leverage collective a new, greener way to explore local retail stores, bars, restaurants, player-power to influence business’ environmental practices. Local and businesses. businesses are motivated to compete for positive recognition, while consumers have the crowdsourced data they need to make informed Players rate establishments based on their environmental practices. purchasing decisions. Does the restaurant recycle? Are customers encouraged to choose reusable over disposable? On which kind of energy does the business run? These factors contribute to a business’ Greensquare Rating. Each rating consideration carries a weight proportional to its overall environmental impact; this weight is determined by fact and science. Check-ins at a particular location amplify the implications. The more people who patronize a business, the greater the magnitude of its environmental choices.
  • 57. GREENSQUARE Leaderboards and infographics display and compare player This real-world game is digitally managed via a smart phone app and achievements (based on participation) and business achievements browser interface. It will be built on a combination of the Foursquare, (based on Greensquare rating and improvements); all compared locally, Google Maps, and Yelp API. regionally, and nationally. Local businesses are compared based on ratings and check-ins, while chains and parent corporations are rated and compared by aggregate data. Brand sponsors can offer rewards to top players—providing a great opportunity for brands to show off their green habits and products.
  • 58. CLIMATE REALITY PATROL Parlor. 505 West 54th Street, Suite 1118. New York, NY 10019 Contact: alexpoole@mac.com Concept Lead: Alex Poole Team Members: Alex Poole & Rodd Chant www.parlorcreativity.com
  • 59. CLIMATE REALITY PATROL CLIMATE REALITY PATROL Idea: Social media activism meets gaming and rewards Concept: Instantly tag your comments with Climate Reality keyword facts to earn badges and rewards. How it Works: Climate Reality creates and hosts a database of short-form facts (1–2 sentences each) tied to “hot topic” keywords. Each description includes a link to optionally find a deeper resource of related information. Users create a profile on The Climate Reality Patrol website, activate the browser plugin, then begin patrolling the web, looking to dispel unfounded environmental information in articles and comments from media sites, politicians, brands, celebrities, blogs, etc. Wherever commenting is allowed, users who’ve activated Climate Reality Patrol can post responses including keywords that automatically pull facts served from The Climate Reality database. The keywords are presented and activated via a menu that appears as they type (similar to an advanced spell-check). Other users who view these comments can hover over any of the activated keywords to find a pop-up fact window that includes the respective “quick fact” and a link to more info.
  • 60. CLIMATE REALITY PATROL Each post would include #ClimateRealityPatrol and/or @ClimateRealityPatrol at the end by default, to brand the posts. The Climate Reality Patrol website tracks user stats and features a leaderboard for all user rankings. A Facebook app displays rankings on individual user’s profiles. Levels of “Climate Reality Activist” badges are awarded based on the amount of false information a user has dispelled (based on the number of keywords they’ve posted). Rewards could include special recognition, invitation to events, or entry into exclusive contests.
  • 61. SPROUT Cynergy – The Technology Agency. 1600 K Street, NW, Suite 300, Washington, DC 20006, USA Contact: Kes Sampanthar, kes.sampanthar@cynergysystems.com Team Members: Kes Sampanthar, Peter Ruthenberg, Anton Abramov, Rick Kercz, Justin Cravalho, Chris Hays, Scott Wolfson www.cynergysystems.com
  • 62. SPROUT SPROUT - GROWING CONCIOUSNESS Consumers vote with their wallets everyday without realizing it. Sprout The interface also captures Sprout points that users accumulate based puts the power of informed decision-making back into the hands of on their purchases. The goal is to motivate eco-conscious shopping the consumers by providing them with tools to visualize the power and behavior in a seamless fashion using systems that consumers already environmental impact of their decisions. understand. For example, a user’s ‘Sprout’ score is managed through a centralized web or mobile app that is reminiscent of Klout, the app When making routine shopping decisions, Sprout’s augmented interface that measures online social influence. Every buying decision is tracked gives the consumer critical information about the ‘green impact’ of their and rewarded with badges that reflect real-time scores through purchases. Information about a product’s environmental footprint and visual design and these decisions and badges can be shared with your suggested alternatives appear instantly in the ‘blink’ view. social network.
  • 63. SPROUT Sprout will let customers customize their shopping to achieve greener about how they are treating the environment with respect to their outcomes. Real-time decision-making tools, such as just-in-time supply- purchases. Over time, if Sprout builds up a large enough user base, it can chain management systems, can be converted into interactive decision- introduce group eco-buying and other tools like offset recommendations making systems that give consumers the power to make greener shopping (such as planting a tree). choices. For example, Sprout will let users understand why certain items, that may have been manufactured at a local, ‘green’ factory, may be more costly. This will ultimately empower them to make an informed decision
  • 64. REALiTREE Stark Design. 401 Broadway, Suite 1500. New York, NY 10013 Contact: daniel@starkdesignny.com Concept lead: Daniel Stark Team Members: Nancy Herrmann, Carly Dintaman, Kohl Norville, Maite Rios, Takayo Yamazaki www.starkdesignny.com
  • 65. REALiTREE REALiTREE (pronounced RE-AL-i-TREE) Realitree is a digital manifestation of our local environment and the real tree, in that it will thrive and suffer according to the health of its role that we are playing in sustaining its wellbeing. It is a game played surrounding enviroment. by different groups in many places. Individuals, teams, communities, cities and even countries compete against their counterparts via Twitter, Realitree’s environment takes into account news media, so news Facebook and through other social tools. stories that are in conflict with climate reality will reflect negatively on its health. Realitree will expose agents of the fossil fuel industry who A Realitree is like a huge Tamagotchi for which thousands of people care. propagate smear, innuendo, criminal hacking and leaking of out-of- It is a massive projection showing a digital image of a tree, complete context snippets or lies. with leaves, branches, roots, sky and earth. Realitree functions like a
  • 66. REALiTREE Each Realitree will be fed two distinct types of data: climate change. On another level, Realitrees (planted in New York City, • Current, statistical environmental data about the surrounding for example) could compete against every other city where Realitrees community as well as news and insights about political and are placed. corporate forces working against the climate’s good health. • Real-time updates using tweets and the various social networking Corporations would be allowed the opportunity to play and even activity of the Realitree’s caretakers. Anyone can participate in remedy earlier misdeeds by correcting falsehoods and donating money keeping it alive and thriving through their real world deeds and to pay for real initiatives in winning communities. Those that create the virtual nutrients, delivered through their social networking activity. healthiest environment for their Realitree win the game. As their networks grow, they will be represented as the intertwined roots of the tree, keeping it alive, fed and guarded against attack. The overall “health” of Realitree will be on constant display. With good activities, it will grow, multiply and sway appreciatively. With bad deeds, Realitree will appear to shake and wither. It will always display climate reality truths, news, facts and shares from participants throughout its community and all over the world. We envision “planting” 300 Realitrees in cities and towns across the globe. Each caretaker will play on different levels and earn points by doing different things. A single tweet, for example, may garner one point, while a Foursquare check-in to a “green” business or using clean energy at home will gain more points. On the Realitree website, through Facebook connections, people can form teams, compete against friends and measure their contributions to helping reverse the effects of
  • 67. DESTINATION REALITY: FARMVILLE Arnold worldwide. 101 Huntington Avenue. Boston MA 02199 Contact: Meg Siegal, msiegal@arn.com Team Members: Meg Siegal, Adrian Crook, Brendon Volpe, Mike Howard www.arn.com / www.adriancrook.com
  • 68. DESTINATION REALITY: FARMVILLE DESTINATION REALITY: FARMVILLE It’s a funny thing when there are more virtual farmers than real ones on Earth. Farmers mitigate and adapt to unexpected weather conditions. Goods such Real life farmers see the effects of climate change, but do virtual ones? Let’s as wind-powered tractors, windmills, jackets to shield you from the elements, partner with Farmville to drop a dose of Reality on the 31 million people who seeds for heartier crops like organic cassava and chickpeas, decorations like a log on daily to tend to their plants, harvest, and redeem gold coins for seeds, Climate Reality flag, rainwater collection troughs and green ring tags for your supplies, and fuel. livestock. We’d want to do this in a way that presents a challenge to Farmville players, and makes it possible via gameplay mechanics to heal the destruction We could partner with Zynga to plan the best way to expose crops to weather caused by Climate events, illustrating that through action, we can change the and wind and offer The Climate Reality Project branded goods to help current trajectory.
  • 69. DESTINATION REALITY: FARMVILLE Thoughtstarters to get the partnership under way: Zynga can also introduce a new neighbor that everyone has. This During the summer, Zynga releases an event called “The 7 Days Of neighbor’s farm has been gravely affected by repeated climate events, Summer.” Every 24 hours they would release a new theme in which the and needs your help to recover. New characters, like a meteorologist, community would be temporarily subjected to various extreme weather can provide new challenges like preparing for a flood or frost. events, and stage new Tasks and Quests to recover, mitigate and adapt. A Task might take the form of installing a windmill, while a Quest might include sharing your wind power. A Quest Series might take the form of asking players to make their farm carbon neutral.
  • 70. CLIMATE REALITY WIEDEN+KENNEDY. NYC & PDX Contact: erik.hanson@wk.com Concept Lead: Dan Neumann Team Members: Erik Hanson, Erin Brownie, Nick Barham, Dan Hon, Emma Wiseman, Jamie Ostrov, Laura Hall, Marshall Ball, Jason Gingold www.wk.com
  • 71. CLIMATE REALITY CLIMATE REALITY Every successful game creates a strong relationship between players and a Farmville crops might wilt more quickly than usual forcing players to virtual world. What if the worlds of the most popular games collided with water them frequently before they can be harvested. In Angry Birds, an ours to depict the dramatic realities of climate change? urgency mechanic is created when level elements made of ice begin to melt. In Call of Duty and other first-person shooters, a haze of pollution To raise awareness and drive home the true impact of climate change, depletes the health of characters not equipped with a gas mask. In World we will create our own virtual climate change events in some of the of Warcraft, deforestation forces players to adapt new ambush strategies. most popular games in world. By working with top publishers like EA In Grand Theft Auto, cars run out of gas quickly, unless the player uses a and Rockstar, a wide range of games could be affected simultaneously hybrid. The option to “buy” the necessary tools or equipment to deal with ensuring we can reach a critical mass and stimulate a conversation about the change could exist as a fundraising tool within each game as well. climate change. On Earth Day, we will take the gaming world by surprise by introducing new mechanics that completely alter the game world and The overnight appearance of these changes will spur conversation about how players interact with it. the real world implications of climate change while informing gamers of the possible consequences.
  • 72. MISSION GREEN lg2. 3575, boul. Saint-Laurent. Montreal (Quebec) H2X 2T7 Contact: maubin@lg2.com Concept Lead: Marilou Aubin Team Members: Jean-François Perrault, Paul-Alex Gauthier, Stéphane Mailhot, Christian Letendre, Marc-André Fafard, Anne Bergeron, Éric Bouchard, Gabrielle Godbout, Mathieu Dufour www.lg2.com
  • 73. MISSION GREEN MISSION GREEN The Game: Mission Green takes on climate change by giving people a The Enemy: Corporations and organizations that disrespect the collective platform from which to address irresponsible and dishonest environment, fool citizens and contribute to climate change. corporate behavior. Rooted in crowdsourcing and petition, this game aggregates geo-targeted mobile photography and content on a gaming The Mission: As an ageny for Mission Green, a player’s ultimate goal is platform that operates similarly to Digg (users can vote on items and to get corporations and organizations to change their behavior via peer/ affect their popularity). consumer pressure.
  • 74. MISSION GREEN The Tools: Players use mobiles to capture proof. They then post Green The Reward System: Agents accumulate points as a byproduct of the Reports on missiongreen.com and share them on social networks via popularity of their reports, as well as social shares. Points are also an app. Reports are ranked based on the number of people who also earned for sharing other players’ Green Reports. The best agents are condemn the corporation’s or organization’s behavior and how many promoted and players receive badges for their work. times it has been shared. When a Green Report reaches a certain level, a yellow warning is sent to the corporation or organization whose ethics The Climate Change: The Mission Green game gives power back to the are in question. As the Green Report becomes more popular and more people. It gives them the sense that they can have a positive impact on widely shared, it reaches orange and red warnings, eventually promoting climate change. It educates, raises awareness of best behavior and most the ban of the specific corporation/organization. of all puts a reputation “price tag” on corporations and organizations that disrespect the environment. Mission Green is all about change—for good.
  • 75. REALITY DROPS Arnold worldwide. 101 Huntington Avenue. Boston MA 02199 Contact: Meg Siegal, msiegal@arn.com Team Members: Adrian Crook, Kate Tetreault, Brendon Volpe, Bob Goodman, Sebastian Gard, Eugene Kim, David O’Trakoun, Meg Siegal, Mike Howard, Sam Gutglass, Deb Grant, Ebbey Mathew www.arn.com / www.adriancrook.com
  • 76. REALITY DROPS REALITY DROPS Right now, countless climate change conversations are raging in This site makes it simple to spread science and destroy doubt. online chat rooms, comment boards, and in social media. And Climate news is prioritized by ‘heat’—hostility, reach, sentiment, and wherever these conversations are happening, denial fuels the timeliness. Earn points by grabbing related scientific articles, videos, and flames higher. Winning these conversations means dousing the data, pasting them into the most heated articles, and suffocating climate denial. And that requires easy access to complex arguments. denial under the weight of cold, hard reality. SPREAD SCIENCE DESTROY DOUBT
  • 77. REALITY DROPS The game builds awareness and educates people by offering the easy- ditional points. And earning points will get your closer to unlocking new to-understand scientific data they need to cool off the argument. We levels and achievements. identify the targets. You find the corresponding facts, and start dropping Reality. Fly solo and scale the leaderboard against your fellow activists, The site connects new articles to the most relevant scientific information or join a team to spread out and outflank the denier echo chamber. You about climate change. Users are offered a quick, easy way to join the can earn points by joining conversation and dropping Reality on deniers. fight and activate their social networks by sharing information with their Retweets, shares, likes and comments on your Reality will earn you ad- friends and followers. learn more at realitydrops.com Get more info.
  • 78. CONTACT PSFK is the go-to source for new ideas and inspiration for GAMING FOR GOOD TEAM creative professionals around the world. Based in New York City, PSFK is a trends-led business innovation company that PROJECT DIRECTOR CONTACT Piers Fawkes, President, PSFK Jeff Weiner, PSFK publishes a daily news site, provides trends research and Commercial Director piers@psfk.com innovation consultancy, manages a network of freelance 646.520.4672 jeff.weiner@psfk.com experts and hosts idea-generating events. We aim to inspire 646.520.4665 our readers, our clients and our guests to make things better— 42 Bond St. whether that’s better products, better services or better ways 6th Floor of living. New York, NY 10012 USA www.psfk.com www.psfk.com/future-of-gaming For copies of this report, visit: www.psfk.com/future-of-gaming Version 0.9 Press Preview December 2011 Printed on 10% post consumer recycled paper
  • 79. FUTURE OF GAMING GAMING FOR GOOD FOR YOUR FULL COPY OF THE 150 PAGE REPORT, VISIT: www.psfk.com/future-of-gaming 42
  • 80. FUTURE OF GAMING PSFK is the go-to source for new ideas and inspiration for FUTURE OF GAMING 2011 TEAM creative professionals around the world. We are a New York City-based trends research and innovation company that PROJECT DIRECTOR CONTACT Piers Fawkes, President, PSFK Jeff Weiner, PSFK publishes a daily news site, provides trends research and Commercial Director piers@psfk.com innovation consultancy, manages a network of freelance 646.520.4672 jeff.weiner@psfk.com experts and hosts idea-generating events. We aim to inspire 646.520.4665 our readers, our clients and our guests to make things better- LEAD CONSULTANT Scott Lachut 42 Bond St. whether that’s better products, better services, or better ways 6th Floor of living. PROJECT MANAGER New York, NY 10012 USA Tim Ryan www.psfk.com We hope that you find inspiration in every section of the 2011 issue of PSFK’s Future of Gaming report. For copies or an RESEARCH & ANALYSIS For copies of this report, visit: in-person presentation, please visit: Kristen Nozell www.psfk.com/future-of-gaming www.psfk.com/future-of-gaming. Nate Graham Matt Sabourin Version 0.9 Press Preview Dory Carr-Harris December 2011 Nestor Bailey DESIGN DIRECTOR Peter Surrena PHOTOGRAPHY Louis Caldarola www.louiscaldarola.com/photography