Hard and soft engineering strategies both have costs and benefits for reducing flood risk. Hard engineering uses structures like dams, reservoirs, and channel straightening to control floodwaters, but can be expensive and disrupt natural processes. Soft engineering employs solutions like flood warnings, preparedness, and limiting development in flood-prone areas. The best approach depends on the situation and requires weighing costs versus benefits of each option.