SlideShare a Scribd company logo
Regional Projects & Emergency Services Division,
Environment & Engineering Department,
Room 409, 68/70, Marrowbone Lane, Dublin 8.
Rannog Regiunach Tionscadalí agus Seirbhisi Eigeandala, Roinn Comhshaoil agus Innealtóireachta
Seomra 409, 68/70 Sraid Naomh Mhuire, Baile Átha Cliath 8.
T: +353 (0) 1 222 4302 F: +353 (0) 1 4546435
E. gerry.oconnell@dublincity.ie
Ref:-OPW261113ol1

Re:

Clontarf Promenade Development and Flood

Alleviation Measures - Alfie Byrne Road to Wooden Bridge.

Preliminary Flood Alleviation Project Brief

Clontarf Promenade between Alfie Byrne Road and the wooden Bridge Bull Wall Road, is an expanse
of linear park, cycle track, walkways, trees, public seating, viewing points, art features, etc over a
length of 3.5km and varying width of generally 30-40m. A flood defence embankment was proposed
to be constructed in 2011 but due to public disquiet it was rejected. Subsequently, the local residents
and businesses met with Dublin City Council to try and find a way forward for development of the
Promenade including some form of flood defences.
Following the recommendation of a Conciliator between Clontarf Residents Association (CRA),
Clontarf Business Association (CBA) and various departments of Dublin City Council (DCC) a Joint
Working Group (JWG) was set up in February 2013 to try and agree a strategy for the development of
this portion of the Clontarf Promenade including flood alleviation measures. This group has had nine
meetings in total to date. The first four concentrating on the development of the community and city
asset which is the linear park, it’s recreational, environmental and linkage values for the people of
Clontarf, Dublin City and visitors. The next four meetings discussed the need for flood alleviation
measures, the requirements of any flood defence and the building blocks of the height of any coastal
flood defence; static flood level, wave height, wave overtopping, climate change allowance and
freeboard (safety) allowance.

It was agreed by the JWG that some form of flood defence was required, but any proposal should
minimise the visual impact to the Promenade, both with respect to its magnificent views, existing
features and with regard to the health and safety of people using this amenity, particularly at night. A
vision statement was produced by the JWG of the current assets of the Promenade Park and ideas
for future enhancement. The JWG thought that many of the existing features of the Promenade were
sufficiently good to be retained and any development should not be such as to make it
unrecognisable from its current character.

It was also recognised by the JWG that a preliminary proposal for the flood alleviation measures
would have to be agreed first as these will probably have a significant effect on development of the
Promenade. At meetings five to eight which included advice from various consultants and the Office
of Public Works, the JWG considered various flood alleviation options for the Promenade, raising the
existing sea wall, putting a floodwall in the green area of the promenade, the rejected 2011 proposal
and putting a floodwall adjacent to the footpath beside the Clontarf roadway.
1
It was noted that the existing sea wall does not extend the full length of the Promenade and is absent
for circa 300m at the western end where it meets the Alfie Byrne Road.

Following this analysis, the JWG agreed that, based on the available data the flood alleviation
proposal which is most likely to minimise the visual impact to the Promenade Park and leave as much
of it as possible for current usage or development would be a dual flood defence comprising the
existing sea wall and a secondary defence as close as possible to Clontarf Road and that this
proposal would be put forward for computer modelling analysis.
It was also agreed that in order to ensure that this strategy operates along the full length of the
Promenade, an extension of the existing sea wall of similar height would be necessary at the Alfie
Byrne Road end.
This dual defence strategy involves the following: leaving the existing sea wall generally as it is but
extending it to minimum health and safety levels (1.1m, 3’ 8”) at the Alfie Byrne Road end where it is
missing and providing a second wall with flood gates as near as possible to Clontarf roadway for as
much of the Promenade as it would be required. The existing sea wall defends against the current 1
in 200 year tide level of 3.15-3.2m Malin Head and also breaks up any overtopping waves. The
Promenade area will be sacrificed to flood waters in extreme events and its length and grass surface
will be used to advantage to contain and absorb flood waters. The secondary wall will only have to
cater for secondary waves, climate change and freeboard thus reducing it’s height to a minimum. The
car parks and all of the flood gates will be closed following warnings of very high tides; which are
normally issued two days in advance.
This brief is therefore to carry out sufficient hydraulic design and structural design to produce
preliminary drawings for discussion by the JWG and the public in general in order to finalise a
preliminary planning proposal for this revised Promenade development scheme and to carry out
preliminary costings for the scheme to ensure that funding can be provided for it.
Other options to protect certain higher risk areas of the promenade from flooding first, require a full
flood scheme to be developed, agreed and a funding stream for it secured.
The vision statement for the Promenade by the JWG is attached, plus a landscape analysis
presentation, by DCC Parks and Landscape Division which divides the Promenade into eight cells
and highlights the main current assets of each cell. The nodal points at each end and where major
roadways, (Vernon Avenue, Oulton Road, Hollybrook Road/St. Lawrence Road, Castle
Avenue/Haddon Road & Conquer Hill Road), meet the Promenade are of particular importance.

Brief for consultant.
1. Read all previous reports on Clontarf Promenade Development from McCarthy Hyder
(liquidated), Royal Haskoning (now Royal Haskoning DHV) and others supplied.
2. Review 100 year and 200 year static water levels.
3. Review local generated wave heights, speeds and periods for current 100 year and 200
year events. Use information from RPS Belfast and Royal Haskoning DHV in this review.
4. Review OPW requirements for static seawater height, wave height, wave over topping,
climate change and freeboard allowances.
5. Use joint probability to calculate required defence levels at the existing sea wall and
adjacent to pathway beside Clontarf Road for 100 year and 200 year events. These
calculations are to be based on a dual defence system, using the existing sea wall,
extended to the corner adjacent to Alfie Byrne Road at a height of 1.1m above ground

2
level and a mainly new wall on the sea side of Clontarf Road Footpath beside the
Promenade.
This analysis is to include the breaking up of the primary waves at the sea wall, filling up
of the promenade area with sea water, generation of secondary waves in the Promenade
area to the second wall which will have a number of closable floodgates to allow
pedestrian access. Escape of floodwaters seaward after flood event and the use of nonreturn valves. Calculations of the height of the second wall should take into account the
distance between it and the sea wall and the beneficially role the Promenade will play in
alleviating flooding. The primary objective is to reduce the height of the secondary flood
wall to its minimum while maintaining the statutory flood protection levels required by the
Office of Public Works.
6. Carry out preliminary structural design of the new walls required. Comment of the
strength of the existing sea wall. Carry out a review of the aesthetic design of the
defences, including review of possible artistic approaches, material finishes, plus
maintenance and cost implications.
7. Produce preliminary drawings in plan with at least 20 cross-sections from the sea side of
the existing buildings on the opposite side of Clontarf Road with top levels and ground
levels of each proposed defence. Typical wall thicknesses and foundation cross-sections
are also required for proposed walls. These drawings will provide accurate flood defence
levels required to inform the subsequent design process.
8. Consultancy budget. Preliminary costings estimate of flood alleviation elements of the
scheme.
9. Allow for presentation of findings to Joint Working Group and one public consultation day
with subsequent alterations to documents.
10. Advise on revised EIS/EIA to An Bord Pleanala. Advise on best planning procurement
route.
11. Put preliminary programme together for hydraulic analysis, preliminary design,
promenade development preliminary design, planning procedures, detailed design,
contractor procurement, construction, maintain period, handover. Look at programme
with EIS requirements and programme if EIS is not required.
12. Comment on areas of promenade suitable for significant development post flood defence
construction and access to these, taking vision statement into account. Consider in
particular the node points at both end of the Promenade and the junctions of Clontarf
Road with other significant roadways.

Gerard O’Connell,
Engineer-in-Charge,
Regional Projects & Emergency Services Division.

3

More Related Content

What's hot

Flood Resistant Bridge Design in PNG rev0117 draft
Flood Resistant Bridge Design in PNG rev0117 draftFlood Resistant Bridge Design in PNG rev0117 draft
Flood Resistant Bridge Design in PNG rev0117 draftGibson Ali Holemba
 
General Flood Resistant Bridge Design Guidelines
General Flood Resistant Bridge Design GuidelinesGeneral Flood Resistant Bridge Design Guidelines
General Flood Resistant Bridge Design GuidelinesGibson Ali Holemba
 
Design of concrete Gravity Dam_Project B.E final
Design of concrete Gravity Dam_Project B.E finalDesign of concrete Gravity Dam_Project B.E final
Design of concrete Gravity Dam_Project B.E finalSyed Salman
 
Green ships and blue waters
Green ships and blue watersGreen ships and blue waters
Green ships and blue waters
Marcus 2012
 
Colombia seaport maritime industry
Colombia seaport maritime industryColombia seaport maritime industry
Colombia seaport maritime industry
Carlos Andrés García Sánchez
 
RBD_Briefing_Book
RBD_Briefing_BookRBD_Briefing_Book
RBD_Briefing_BookRoni Meryl
 
Abu Dhabi - Khalifa Port Industrial Zone Project - Hydronamic - Construction ...
Abu Dhabi - Khalifa Port Industrial Zone Project - Hydronamic - Construction ...Abu Dhabi - Khalifa Port Industrial Zone Project - Hydronamic - Construction ...
Abu Dhabi - Khalifa Port Industrial Zone Project - Hydronamic - Construction ...Niels Asjee
 
Tyler Hall - Project Experience
Tyler Hall - Project ExperienceTyler Hall - Project Experience
Tyler Hall - Project ExperienceTyler Hall
 
Feasibility Report - CREDM
Feasibility Report - CREDMFeasibility Report - CREDM
Feasibility Report - CREDMWilliam Grogan
 
Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011Mike Bisland
 
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...Stephen Flood
 
Huntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation ProjectHuntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation Project
Fairfax County
 
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Stephen Flood
 
Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...
Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...
Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...
Stephen Flood
 
Environmental impact assessment of padma multipurpose bridge
Environmental impact assessment of padma multipurpose bridgeEnvironmental impact assessment of padma multipurpose bridge
Environmental impact assessment of padma multipurpose bridge
Zuhair Ahmed Kowshik
 
CRS Research & Report
CRS Research & ReportCRS Research & Report
CRS Research & ReportGary Mitchell
 
Ala wai openhouse_presentation_20may2014_draft
Ala wai openhouse_presentation_20may2014_draftAla wai openhouse_presentation_20may2014_draft
Ala wai openhouse_presentation_20may2014_draftHonolulu Civil Beat
 

What's hot (20)

Pnacp687
Pnacp687Pnacp687
Pnacp687
 
Flood Resistant Bridge Design in PNG rev0117 draft
Flood Resistant Bridge Design in PNG rev0117 draftFlood Resistant Bridge Design in PNG rev0117 draft
Flood Resistant Bridge Design in PNG rev0117 draft
 
General Flood Resistant Bridge Design Guidelines
General Flood Resistant Bridge Design GuidelinesGeneral Flood Resistant Bridge Design Guidelines
General Flood Resistant Bridge Design Guidelines
 
Design of concrete Gravity Dam_Project B.E final
Design of concrete Gravity Dam_Project B.E finalDesign of concrete Gravity Dam_Project B.E final
Design of concrete Gravity Dam_Project B.E final
 
Lgu services amp
Lgu services ampLgu services amp
Lgu services amp
 
Green ships and blue waters
Green ships and blue watersGreen ships and blue waters
Green ships and blue waters
 
Colombia seaport maritime industry
Colombia seaport maritime industryColombia seaport maritime industry
Colombia seaport maritime industry
 
RBD_Briefing_Book
RBD_Briefing_BookRBD_Briefing_Book
RBD_Briefing_Book
 
Final Project Report
Final Project ReportFinal Project Report
Final Project Report
 
Abu Dhabi - Khalifa Port Industrial Zone Project - Hydronamic - Construction ...
Abu Dhabi - Khalifa Port Industrial Zone Project - Hydronamic - Construction ...Abu Dhabi - Khalifa Port Industrial Zone Project - Hydronamic - Construction ...
Abu Dhabi - Khalifa Port Industrial Zone Project - Hydronamic - Construction ...
 
Tyler Hall - Project Experience
Tyler Hall - Project ExperienceTyler Hall - Project Experience
Tyler Hall - Project Experience
 
Feasibility Report - CREDM
Feasibility Report - CREDMFeasibility Report - CREDM
Feasibility Report - CREDM
 
Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011
 
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
Dhi uk 2015 - marine - a new approach to modelling long-term shoreline evolut...
 
Huntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation ProjectHuntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation Project
 
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
 
Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...
Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...
Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...
 
Environmental impact assessment of padma multipurpose bridge
Environmental impact assessment of padma multipurpose bridgeEnvironmental impact assessment of padma multipurpose bridge
Environmental impact assessment of padma multipurpose bridge
 
CRS Research & Report
CRS Research & ReportCRS Research & Report
CRS Research & Report
 
Ala wai openhouse_presentation_20may2014_draft
Ala wai openhouse_presentation_20may2014_draftAla wai openhouse_presentation_20may2014_draft
Ala wai openhouse_presentation_20may2014_draft
 

Viewers also liked

Water, Water, Everywhere--flood mitigation in SW Manitoba & SE Saskatchewan
Water, Water, Everywhere--flood mitigation in SW Manitoba & SE SaskatchewanWater, Water, Everywhere--flood mitigation in SW Manitoba & SE Saskatchewan
Water, Water, Everywhere--flood mitigation in SW Manitoba & SE Saskatchewan
Jordan Morningstar
 
Flood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly DriveFlood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly Drive
Fairfax County
 
Flood Alleviation Scheme Banbury
Flood Alleviation Scheme BanburyFlood Alleviation Scheme Banbury
Flood Alleviation Scheme Banbury
CPCLLP69
 
Flood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt MachielseFlood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt Machielse
YourAlberta
 
Classification of reservoirs
Classification of reservoirsClassification of reservoirs
Classification of reservoirs
Fertiglobe
 

Viewers also liked (6)

Water, Water, Everywhere--flood mitigation in SW Manitoba & SE Saskatchewan
Water, Water, Everywhere--flood mitigation in SW Manitoba & SE SaskatchewanWater, Water, Everywhere--flood mitigation in SW Manitoba & SE Saskatchewan
Water, Water, Everywhere--flood mitigation in SW Manitoba & SE Saskatchewan
 
Flood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly DriveFlood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly Drive
 
Flood Alleviation Scheme Banbury
Flood Alleviation Scheme BanburyFlood Alleviation Scheme Banbury
Flood Alleviation Scheme Banbury
 
Flood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt MachielseFlood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt Machielse
 
Classification of reservoirs
Classification of reservoirsClassification of reservoirs
Classification of reservoirs
 
Classification of Soil
Classification of SoilClassification of Soil
Classification of Soil
 

Similar to Flood alleviationbrief170214

Dollymount externalexpert ommgoc
Dollymount externalexpert ommgocDollymount externalexpert ommgoc
Dollymount externalexpert ommgoc
Naoise
 
Shimna Flood Alleviation Scheme webinar
Shimna Flood Alleviation Scheme webinarShimna Flood Alleviation Scheme webinar
Shimna Flood Alleviation Scheme webinar
Association for Project Management
 
Clontarf Flood Defence Report
Clontarf Flood Defence ReportClontarf Flood Defence Report
Clontarf Flood Defence ReportNaoise
 
15.2.2 bored pile wall - method statement
15.2.2   bored pile wall - method statement15.2.2   bored pile wall - method statement
15.2.2 bored pile wall - method statement
NECB
 
World Environment Day 2013: 'RSPB Wallasea Island Coast Project', Chris Tyas
World Environment Day 2013: 'RSPB Wallasea Island Coast Project', Chris Tyas World Environment Day 2013: 'RSPB Wallasea Island Coast Project', Chris Tyas
World Environment Day 2013: 'RSPB Wallasea Island Coast Project', Chris Tyas
Interdisciplinary Research at the University of Southampton
 
Dollymount External Expert
Dollymount External ExpertDollymount External Expert
Dollymount External Expert
Naoise
 
Balangero asbestos mine dumps restoration a few years after, in the aftermath...
Balangero asbestos mine dumps restoration a few years after, in the aftermath...Balangero asbestos mine dumps restoration a few years after, in the aftermath...
Balangero asbestos mine dumps restoration a few years after, in the aftermath...
Oboni Riskope Associates Inc.
 
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency 2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
SevernEstuary
 
Report to city council severe weather jan 2014
Report to city council   severe weather jan 2014Report to city council   severe weather jan 2014
Report to city council severe weather jan 2014
Naoise
 
PIC 2 Display Boards
PIC 2 Display BoardsPIC 2 Display Boards
PIC 2 Display Boards
Toronto Public Consultation Unit
 
The management of the flood hazard of the River Derwent
The management of the flood hazard of the River DerwentThe management of the flood hazard of the River Derwent
The management of the flood hazard of the River Derwent
A Hamill
 
Risk and standards based riprap design for grahamstown dam barker & hol...
Risk and standards based riprap design for grahamstown dam   barker & hol...Risk and standards based riprap design for grahamstown dam   barker & hol...
Risk and standards based riprap design for grahamstown dam barker & hol...
Joseph Ng'ang'a Thuo
 
BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015Blase Townsing
 
Whitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final finalWhitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final finalEdison Mugoya
 
Swansea lagoon presentation by ioan jenkins
Swansea lagoon presentation by ioan jenkinsSwansea lagoon presentation by ioan jenkins
Swansea lagoon presentation by ioan jenkins
Association for Project Management
 
Responses to Public Comments About Beach Restoration at Quogue
Responses to Public Comments About Beach Restoration at QuogueResponses to Public Comments About Beach Restoration at Quogue
Responses to Public Comments About Beach Restoration at Quogue
QuogueBeaches
 
Marine_Brochure_For_Web
Marine_Brochure_For_WebMarine_Brochure_For_Web
Marine_Brochure_For_WebMike Bisland
 

Similar to Flood alleviationbrief170214 (20)

Dollymount externalexpert ommgoc
Dollymount externalexpert ommgocDollymount externalexpert ommgoc
Dollymount externalexpert ommgoc
 
Shimna Flood Alleviation Scheme webinar
Shimna Flood Alleviation Scheme webinarShimna Flood Alleviation Scheme webinar
Shimna Flood Alleviation Scheme webinar
 
Clontarf Flood Defence Report
Clontarf Flood Defence ReportClontarf Flood Defence Report
Clontarf Flood Defence Report
 
15.2.2 bored pile wall - method statement
15.2.2   bored pile wall - method statement15.2.2   bored pile wall - method statement
15.2.2 bored pile wall - method statement
 
World Environment Day 2013: 'RSPB Wallasea Island Coast Project', Chris Tyas
World Environment Day 2013: 'RSPB Wallasea Island Coast Project', Chris Tyas World Environment Day 2013: 'RSPB Wallasea Island Coast Project', Chris Tyas
World Environment Day 2013: 'RSPB Wallasea Island Coast Project', Chris Tyas
 
Dollymount External Expert
Dollymount External ExpertDollymount External Expert
Dollymount External Expert
 
Balangero asbestos mine dumps restoration a few years after, in the aftermath...
Balangero asbestos mine dumps restoration a few years after, in the aftermath...Balangero asbestos mine dumps restoration a few years after, in the aftermath...
Balangero asbestos mine dumps restoration a few years after, in the aftermath...
 
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency 2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
 
Curricula Vitae - NVB
Curricula Vitae - NVBCurricula Vitae - NVB
Curricula Vitae - NVB
 
SRT Final Report
SRT Final ReportSRT Final Report
SRT Final Report
 
Report to city council severe weather jan 2014
Report to city council   severe weather jan 2014Report to city council   severe weather jan 2014
Report to city council severe weather jan 2014
 
PIC 2 Display Boards
PIC 2 Display BoardsPIC 2 Display Boards
PIC 2 Display Boards
 
EdgeW
EdgeWEdgeW
EdgeW
 
The management of the flood hazard of the River Derwent
The management of the flood hazard of the River DerwentThe management of the flood hazard of the River Derwent
The management of the flood hazard of the River Derwent
 
Risk and standards based riprap design for grahamstown dam barker & hol...
Risk and standards based riprap design for grahamstown dam   barker & hol...Risk and standards based riprap design for grahamstown dam   barker & hol...
Risk and standards based riprap design for grahamstown dam barker & hol...
 
BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015
 
Whitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final finalWhitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final final
 
Swansea lagoon presentation by ioan jenkins
Swansea lagoon presentation by ioan jenkinsSwansea lagoon presentation by ioan jenkins
Swansea lagoon presentation by ioan jenkins
 
Responses to Public Comments About Beach Restoration at Quogue
Responses to Public Comments About Beach Restoration at QuogueResponses to Public Comments About Beach Restoration at Quogue
Responses to Public Comments About Beach Restoration at Quogue
 
Marine_Brochure_For_Web
Marine_Brochure_For_WebMarine_Brochure_For_Web
Marine_Brochure_For_Web
 

More from Naoise

Sk 069 - ga working drawings
Sk 069 - ga working drawingsSk 069 - ga working drawings
Sk 069 - ga working drawings
Naoise
 
Clontarf to city centre cycle scheme
Clontarf to city centre cycle schemeClontarf to city centre cycle scheme
Clontarf to city centre cycle scheme
Naoise
 
17203 consultative forum no 3 30112018 issue compressed
17203 consultative forum no 3 30112018 issue compressed17203 consultative forum no 3 30112018 issue compressed
17203 consultative forum no 3 30112018 issue compressed
Naoise
 
Griffith Avenue SHD ncac presentation 21 01-2019
Griffith Avenue SHD ncac presentation 21 01-2019Griffith Avenue SHD ncac presentation 21 01-2019
Griffith Avenue SHD ncac presentation 21 01-2019
Naoise
 
Report no. 082019 of the environment strategic policy committee changes to ...
Report no. 082019 of the environment strategic policy committee   changes to ...Report no. 082019 of the environment strategic policy committee   changes to ...
Report no. 082019 of the environment strategic policy committee changes to ...
Naoise
 
Letter to An Taoiseach
Letter to An TaoiseachLetter to An Taoiseach
Letter to An Taoiseach
Naoise
 
DCC CEO Report to ABP
DCC CEO Report to ABPDCC CEO Report to ABP
DCC CEO Report to ABP
Naoise
 
Doc09102017 00001
Doc09102017 00001Doc09102017 00001
Doc09102017 00001
Naoise
 
2017.09.07 dcc120033 cyclist safety slides
2017.09.07 dcc120033 cyclist safety slides2017.09.07 dcc120033 cyclist safety slides
2017.09.07 dcc120033 cyclist safety slides
Naoise
 
2017.08.28 db ncac&cac clontarf to city centre cycle route part 8 expla...
2017.08.28 db   ncac&cac clontarf to city centre cycle route part 8 expla...2017.08.28 db   ncac&cac clontarf to city centre cycle route part 8 expla...
2017.08.28 db ncac&cac clontarf to city centre cycle route part 8 expla...
Naoise
 
Abp150416
Abp150416Abp150416
Abp150416
Naoise
 
DCC Dollymount Flood Defence Report
DCC Dollymount Flood Defence ReportDCC Dollymount Flood Defence Report
DCC Dollymount Flood Defence Report
Naoise
 
Dollymount Flood Defence schematic
Dollymount Flood Defence schematicDollymount Flood Defence schematic
Dollymount Flood Defence schematic
Naoise
 
Dollymount flood wall review feb 2016 rev2
Dollymount flood wall review feb 2016 rev2Dollymount flood wall review feb 2016 rev2
Dollymount flood wall review feb 2016 rev2
Naoise
 
Draft Litter Management Plan
Draft Litter Management PlanDraft Litter Management Plan
Draft Litter Management Plan
Naoise
 
Proposed additional car parking facility - south of Timber Bridge
Proposed additional car parking facility  - south of Timber BridgeProposed additional car parking facility  - south of Timber Bridge
Proposed additional car parking facility - south of Timber Bridge
Naoise
 
Fairview Christmas Lights Switchon
Fairview Christmas Lights SwitchonFairview Christmas Lights Switchon
Fairview Christmas Lights Switchon
Naoise
 
S2S Presentation to DCC - 11th November 2015
S2S Presentation to DCC - 11th November 2015S2S Presentation to DCC - 11th November 2015
S2S Presentation to DCC - 11th November 2015
Naoise
 
S2S driver eye level below Sea Wall
S2S driver eye level below Sea WallS2S driver eye level below Sea Wall
S2S driver eye level below Sea Wall
Naoise
 
Item06a part8
Item06a part8Item06a part8
Item06a part8
Naoise
 

More from Naoise (20)

Sk 069 - ga working drawings
Sk 069 - ga working drawingsSk 069 - ga working drawings
Sk 069 - ga working drawings
 
Clontarf to city centre cycle scheme
Clontarf to city centre cycle schemeClontarf to city centre cycle scheme
Clontarf to city centre cycle scheme
 
17203 consultative forum no 3 30112018 issue compressed
17203 consultative forum no 3 30112018 issue compressed17203 consultative forum no 3 30112018 issue compressed
17203 consultative forum no 3 30112018 issue compressed
 
Griffith Avenue SHD ncac presentation 21 01-2019
Griffith Avenue SHD ncac presentation 21 01-2019Griffith Avenue SHD ncac presentation 21 01-2019
Griffith Avenue SHD ncac presentation 21 01-2019
 
Report no. 082019 of the environment strategic policy committee changes to ...
Report no. 082019 of the environment strategic policy committee   changes to ...Report no. 082019 of the environment strategic policy committee   changes to ...
Report no. 082019 of the environment strategic policy committee changes to ...
 
Letter to An Taoiseach
Letter to An TaoiseachLetter to An Taoiseach
Letter to An Taoiseach
 
DCC CEO Report to ABP
DCC CEO Report to ABPDCC CEO Report to ABP
DCC CEO Report to ABP
 
Doc09102017 00001
Doc09102017 00001Doc09102017 00001
Doc09102017 00001
 
2017.09.07 dcc120033 cyclist safety slides
2017.09.07 dcc120033 cyclist safety slides2017.09.07 dcc120033 cyclist safety slides
2017.09.07 dcc120033 cyclist safety slides
 
2017.08.28 db ncac&cac clontarf to city centre cycle route part 8 expla...
2017.08.28 db   ncac&cac clontarf to city centre cycle route part 8 expla...2017.08.28 db   ncac&cac clontarf to city centre cycle route part 8 expla...
2017.08.28 db ncac&cac clontarf to city centre cycle route part 8 expla...
 
Abp150416
Abp150416Abp150416
Abp150416
 
DCC Dollymount Flood Defence Report
DCC Dollymount Flood Defence ReportDCC Dollymount Flood Defence Report
DCC Dollymount Flood Defence Report
 
Dollymount Flood Defence schematic
Dollymount Flood Defence schematicDollymount Flood Defence schematic
Dollymount Flood Defence schematic
 
Dollymount flood wall review feb 2016 rev2
Dollymount flood wall review feb 2016 rev2Dollymount flood wall review feb 2016 rev2
Dollymount flood wall review feb 2016 rev2
 
Draft Litter Management Plan
Draft Litter Management PlanDraft Litter Management Plan
Draft Litter Management Plan
 
Proposed additional car parking facility - south of Timber Bridge
Proposed additional car parking facility  - south of Timber BridgeProposed additional car parking facility  - south of Timber Bridge
Proposed additional car parking facility - south of Timber Bridge
 
Fairview Christmas Lights Switchon
Fairview Christmas Lights SwitchonFairview Christmas Lights Switchon
Fairview Christmas Lights Switchon
 
S2S Presentation to DCC - 11th November 2015
S2S Presentation to DCC - 11th November 2015S2S Presentation to DCC - 11th November 2015
S2S Presentation to DCC - 11th November 2015
 
S2S driver eye level below Sea Wall
S2S driver eye level below Sea WallS2S driver eye level below Sea Wall
S2S driver eye level below Sea Wall
 
Item06a part8
Item06a part8Item06a part8
Item06a part8
 

Recently uploaded

Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
Adtran
 
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex ProofszkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
Alex Pruden
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
Aftab Hussain
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
Laura Byrne
 
By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024
Pierluigi Pugliese
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
danishmna97
 
Introduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - CybersecurityIntroduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - Cybersecurity
mikeeftimakis1
 
20240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 202420240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 2024
Matthew Sinclair
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
Ana-Maria Mihalceanu
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
名前 です男
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
Guy Korland
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
Alan Dix
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
KAMESHS29
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
DianaGray10
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
DanBrown980551
 
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
SOFTTECHHUB
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
Quotidiano Piemontese
 
Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
Kumud Singh
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems S.M.S.A.
 
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Nexer Digital
 

Recently uploaded (20)

Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
 
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex ProofszkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
 
By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
 
Introduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - CybersecurityIntroduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - Cybersecurity
 
20240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 202420240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 2024
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
 
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
 
Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
 
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?
 

Flood alleviationbrief170214

  • 1. Regional Projects & Emergency Services Division, Environment & Engineering Department, Room 409, 68/70, Marrowbone Lane, Dublin 8. Rannog Regiunach Tionscadalí agus Seirbhisi Eigeandala, Roinn Comhshaoil agus Innealtóireachta Seomra 409, 68/70 Sraid Naomh Mhuire, Baile Átha Cliath 8. T: +353 (0) 1 222 4302 F: +353 (0) 1 4546435 E. gerry.oconnell@dublincity.ie Ref:-OPW261113ol1 Re: Clontarf Promenade Development and Flood Alleviation Measures - Alfie Byrne Road to Wooden Bridge. Preliminary Flood Alleviation Project Brief Clontarf Promenade between Alfie Byrne Road and the wooden Bridge Bull Wall Road, is an expanse of linear park, cycle track, walkways, trees, public seating, viewing points, art features, etc over a length of 3.5km and varying width of generally 30-40m. A flood defence embankment was proposed to be constructed in 2011 but due to public disquiet it was rejected. Subsequently, the local residents and businesses met with Dublin City Council to try and find a way forward for development of the Promenade including some form of flood defences. Following the recommendation of a Conciliator between Clontarf Residents Association (CRA), Clontarf Business Association (CBA) and various departments of Dublin City Council (DCC) a Joint Working Group (JWG) was set up in February 2013 to try and agree a strategy for the development of this portion of the Clontarf Promenade including flood alleviation measures. This group has had nine meetings in total to date. The first four concentrating on the development of the community and city asset which is the linear park, it’s recreational, environmental and linkage values for the people of Clontarf, Dublin City and visitors. The next four meetings discussed the need for flood alleviation measures, the requirements of any flood defence and the building blocks of the height of any coastal flood defence; static flood level, wave height, wave overtopping, climate change allowance and freeboard (safety) allowance. It was agreed by the JWG that some form of flood defence was required, but any proposal should minimise the visual impact to the Promenade, both with respect to its magnificent views, existing features and with regard to the health and safety of people using this amenity, particularly at night. A vision statement was produced by the JWG of the current assets of the Promenade Park and ideas for future enhancement. The JWG thought that many of the existing features of the Promenade were sufficiently good to be retained and any development should not be such as to make it unrecognisable from its current character. It was also recognised by the JWG that a preliminary proposal for the flood alleviation measures would have to be agreed first as these will probably have a significant effect on development of the Promenade. At meetings five to eight which included advice from various consultants and the Office of Public Works, the JWG considered various flood alleviation options for the Promenade, raising the existing sea wall, putting a floodwall in the green area of the promenade, the rejected 2011 proposal and putting a floodwall adjacent to the footpath beside the Clontarf roadway. 1
  • 2. It was noted that the existing sea wall does not extend the full length of the Promenade and is absent for circa 300m at the western end where it meets the Alfie Byrne Road. Following this analysis, the JWG agreed that, based on the available data the flood alleviation proposal which is most likely to minimise the visual impact to the Promenade Park and leave as much of it as possible for current usage or development would be a dual flood defence comprising the existing sea wall and a secondary defence as close as possible to Clontarf Road and that this proposal would be put forward for computer modelling analysis. It was also agreed that in order to ensure that this strategy operates along the full length of the Promenade, an extension of the existing sea wall of similar height would be necessary at the Alfie Byrne Road end. This dual defence strategy involves the following: leaving the existing sea wall generally as it is but extending it to minimum health and safety levels (1.1m, 3’ 8”) at the Alfie Byrne Road end where it is missing and providing a second wall with flood gates as near as possible to Clontarf roadway for as much of the Promenade as it would be required. The existing sea wall defends against the current 1 in 200 year tide level of 3.15-3.2m Malin Head and also breaks up any overtopping waves. The Promenade area will be sacrificed to flood waters in extreme events and its length and grass surface will be used to advantage to contain and absorb flood waters. The secondary wall will only have to cater for secondary waves, climate change and freeboard thus reducing it’s height to a minimum. The car parks and all of the flood gates will be closed following warnings of very high tides; which are normally issued two days in advance. This brief is therefore to carry out sufficient hydraulic design and structural design to produce preliminary drawings for discussion by the JWG and the public in general in order to finalise a preliminary planning proposal for this revised Promenade development scheme and to carry out preliminary costings for the scheme to ensure that funding can be provided for it. Other options to protect certain higher risk areas of the promenade from flooding first, require a full flood scheme to be developed, agreed and a funding stream for it secured. The vision statement for the Promenade by the JWG is attached, plus a landscape analysis presentation, by DCC Parks and Landscape Division which divides the Promenade into eight cells and highlights the main current assets of each cell. The nodal points at each end and where major roadways, (Vernon Avenue, Oulton Road, Hollybrook Road/St. Lawrence Road, Castle Avenue/Haddon Road & Conquer Hill Road), meet the Promenade are of particular importance. Brief for consultant. 1. Read all previous reports on Clontarf Promenade Development from McCarthy Hyder (liquidated), Royal Haskoning (now Royal Haskoning DHV) and others supplied. 2. Review 100 year and 200 year static water levels. 3. Review local generated wave heights, speeds and periods for current 100 year and 200 year events. Use information from RPS Belfast and Royal Haskoning DHV in this review. 4. Review OPW requirements for static seawater height, wave height, wave over topping, climate change and freeboard allowances. 5. Use joint probability to calculate required defence levels at the existing sea wall and adjacent to pathway beside Clontarf Road for 100 year and 200 year events. These calculations are to be based on a dual defence system, using the existing sea wall, extended to the corner adjacent to Alfie Byrne Road at a height of 1.1m above ground 2
  • 3. level and a mainly new wall on the sea side of Clontarf Road Footpath beside the Promenade. This analysis is to include the breaking up of the primary waves at the sea wall, filling up of the promenade area with sea water, generation of secondary waves in the Promenade area to the second wall which will have a number of closable floodgates to allow pedestrian access. Escape of floodwaters seaward after flood event and the use of nonreturn valves. Calculations of the height of the second wall should take into account the distance between it and the sea wall and the beneficially role the Promenade will play in alleviating flooding. The primary objective is to reduce the height of the secondary flood wall to its minimum while maintaining the statutory flood protection levels required by the Office of Public Works. 6. Carry out preliminary structural design of the new walls required. Comment of the strength of the existing sea wall. Carry out a review of the aesthetic design of the defences, including review of possible artistic approaches, material finishes, plus maintenance and cost implications. 7. Produce preliminary drawings in plan with at least 20 cross-sections from the sea side of the existing buildings on the opposite side of Clontarf Road with top levels and ground levels of each proposed defence. Typical wall thicknesses and foundation cross-sections are also required for proposed walls. These drawings will provide accurate flood defence levels required to inform the subsequent design process. 8. Consultancy budget. Preliminary costings estimate of flood alleviation elements of the scheme. 9. Allow for presentation of findings to Joint Working Group and one public consultation day with subsequent alterations to documents. 10. Advise on revised EIS/EIA to An Bord Pleanala. Advise on best planning procurement route. 11. Put preliminary programme together for hydraulic analysis, preliminary design, promenade development preliminary design, planning procedures, detailed design, contractor procurement, construction, maintain period, handover. Look at programme with EIS requirements and programme if EIS is not required. 12. Comment on areas of promenade suitable for significant development post flood defence construction and access to these, taking vision statement into account. Consider in particular the node points at both end of the Promenade and the junctions of Clontarf Road with other significant roadways. Gerard O’Connell, Engineer-in-Charge, Regional Projects & Emergency Services Division. 3