IMPORTANCE
Load forecasting helps an electric utility to make
important decisions including decisions on
purchasing and generating electric power, load
switching, and infrastructure development.
Load forecasts are extremely important for
energy suppliers, ISOs, financial institutions, and
other participants in electric energy generation,
transmission, distribution, and markets.
Most forecasting methods use statistical
techniques or artificial intelligence algorithms
such as regression, neural networks, fuzzy logic,
and expert systems.
DEFINITION
Prediction of load or generation requirement can
be performed to assist in operation planning,
expansion strategy and policy formulations.
Hydropower plants has a gestation period of 10 to
15 years
Forecasting of load can be done for three
different duration based on accuracy required and
circumstances prevailing.
Models can be conceptual or statistical depending
on the requirement.
Type of Forecasting Models
LOAD PREDICTION MODEL
TYPES
SHORT TERM MEDIUM TERM LONG TERM
COVERING A PERIOD OF 20
YEARS OR MORE
COVERING A PERIOD OF 8
TO 10 YEARS
COVERING A PERIOD OF 4
TO 5 YEARS
PURRPOSE :
OPERATION PLANNING
PURRPOSE :
BASIS FOR EXPANSION
PURRPOSE :
POLICY FORMULATION
Model One : SCHEER FORMULA
G
=
10 𝐶
𝑈0⋅15
WHERE G = ANNUAL GROWTH IN GENERATION(PER CENT)
U = PER CAPITA GENERATION
C = CONSTANT
= 0.02(POPULATION GROWTH RATE)+1.330
THE CONSTANT IN THE SUPERSCRIPT OF U IS ASSUMED AS PER THE THUMB RULE THAT ‘A HUNDRED FOLD INCREASE IN U WILL REDUCE
THE RATE OF GROWTH BY HALF’
LONG TERM LOAD FORECASTING MODEL
POINTS TO REMEMBER
MAGNITUDE OF
FOLLOWING
PARAMETERS ARE
REQUIRED :
•GENERATION OF THE
STARTING YEAR IS
•POPULATION OF
STARTING YEAR
•POPULATION OF THE
CONSEQUENT YEARS
1
IF THE VALUE OF ABOVE
PARAMETERS IS KNOWN
THEN U AND C CAN BE
CALCULATED FROM
WHICH THE
GENERATION
REQUIREMENT OF THE
STARTING YEAR IS
DERIVED FROM THE
SCHEER FORMULA
2
THE RATE OF GROWTH IN
THE NEXT YEAR IS
CALCULATED BY
MULTIPLYING THE GROWTH
RATE OF STARTING YEAR
WITH (1+G)/100.
3
FROM THE GROWTH RATE
OF SECOND YEAR AND THE
POPULATION OF THE SAME
YEAR AS KNOWN FROM THE
FIRST POINT THE U AND C
OF SECOND YEAR CAN BE
PREDICTED FROM WHICH
RATE OF GROWTH CAN BE
ESTIMATED BY THE SAME
FORMULA.
4
IN THIS WAY YEAR BY YEAR
PREDICTION OF
GENERATION REQUIREMENT
IS DETERMINED.
5
Model two : BELGIUM FORMULA
E
= 𝐾 × 𝑀0⋅6
× 2 0.465𝑡
WHERE E = ELECTRICITY CONSUMPTION
M = INDEX OF MANUFACTURE OF PRODUCTION
t = TIME FOR WHICH CONSUMPTION TO BE PROJECTED
K = ADJUSTMENT FACTOR
LONG TERM LOAD FORECASTING MODEL
POINTS TO REMEMBER
THIS FORMULA IS AN EMPIRICAL FORMULA FOR EXTRAPOLATION OF TREND OF ENERGY
CONSUMPTION
DIFFERENT COUNTRIES HAVE SEPARATE FORMULA FOR THE ESTIMATION OF ENERGY
CONSUMPTION
THE ACCURACY OF THE FORMULA DEPENDS ON THE CALIBRATION AND MAY VARY WITH TYPE
OF DATA AVAILABLE AND OTHER RELATED APPROXIMATIONS.
Model Three : Additive Model by Chen et.al.
𝐿 = 𝐿 𝑛 + 𝐿 𝑤 + 𝐿 𝑠 + 𝐿 𝑟
where L is the total load,
Ln represents the “normal” part of the load, which is a set of standardized load
shapes for each “type” of day that has been identified as occurring throughout
the year,
Lw represents the weather sensitive part of the load,
Ls is a special event component that create a substantial deviation from the
usual load pattern, and
Lr is a completely random term, the noise.
LONG TERM LOAD FORECASTING MODEL
Model Four : Multiplicative Model
𝐿 = 𝐿 𝑛 × 𝐹𝑤 × 𝐹𝑆 × 𝐹𝑟
where
Ln = the normal(base) load
Fw, Fs, and Fr are positive numbers representing the corrections based on current weather (Fw),
special events (Fs), and random fluctuation (Fr).
Factors like electricity pricing (Fp) and load growth (Fg) can also be included.
LONG TERM LOAD FORECASTING MODEL
Model Five : Feinberg’s Load Forecasting Model
𝐿 𝑡 = 𝐹𝑎 + 𝑅𝑡
where Fa is 𝐹 ⅆ 𝑡 ⋅ ℎ 𝑡 ⋅ 𝑓 𝑤𝑡
L(t) is the actual load at time t,
d(t) is the day of the week,
h(t) is the hour of the day,
F(d,h) is the daily and hourly component,
w(t) is the weather data that include the temperature
and humidity,
f(w) is the weather factor,
R(t) is a random error.
And f(w) is estimated by :
𝑓 𝑤 = 𝛽0 + 𝛽𝑗 𝑋𝑗where Xj are explanatory variables which are nonlinear functions of current and past weather parameters
and βo, βj are the regression coefficients.
MID TERM LOAD FORECASTING MODEL
Types of Models used in Short Term load forecasting
Similar-day approach
Historical data for days within the last one to three years are searched for similar characteristics for
forecasting the data of a similar day or season.
Regression methods
Various regressive techniques are used to model the relationship between load consumption and
other factors such as weather, day type, and customer class.
Time series
Time series Models depends on the assumption that the data have an “internal structure”,
represented by the autocorrelation, trend, or seasonal variation. The different methods used in Time
Series Modelling is:
ARMA (autoregressive moving average), ARIMA (autoregressive integrated moving average), ARMAX
(autoregressive moving average with exogenous variables), and ARIMAX (autoregressive integrated
moving average with exogenous variables).
Contd.
Neural networks
The artificial neural networks (ANN) has been widely used for electric load forecasting since
1990.
Expert systems
“Rule based forecasting” uses mostly heuristic rules of nature for accurate forecasting.
Expert systems, incorporates the rules and procedures used by human experts into a software
framework for automatically making forecasts without human assistance.
Resources and References
1.E. A. Feinberg and D.Genethliou.Load Forecasting, Applied Mathematics for Power Systems.
2.E.A. Feinberg, J.T. Hajagos, and D. Genethliou. Load Pocket Modelling. Proceedings of the 2nd
IASTED International Conference: Power and Energy Systems, 50–54, Crete, 2002.
3.E.A. Feinberg, J.T. Hajagos, and D. Genethliou. Statistical Load Modelling. Proceedings of the
7th IASTED International Multiconference: Power and Energy Systems, 88–91, Palm Springs, CA,
2003.
4.H. Chen, C.A. Canizares, and A. Singh. ANN-Based Short-Term Load Forecasting in Electricity
Markets. Proceedings of the IEEE Power Engineering Society Transmission and Distribution
Conference, 2:411–415, 2001.
5.M.M. Dandekar and K.N.Sharma. Water Power Engineering, Vikas Publishing House Pvt
Ltd.,1979.

More Related Content

What's hot

Introduction about Power System Planning in the Presence of Uncertainties
Introduction about  Power System Planning in the Presence of Uncertainties Introduction about  Power System Planning in the Presence of Uncertainties
Introduction about Power System Planning in the Presence of Uncertainties ahmedgoun
 
Load Forecasting
Load ForecastingLoad Forecasting
Load Forecastinglinsstalex
 
LOAD FORECASTING.ppt
LOAD FORECASTING.pptLOAD FORECASTING.ppt
LOAD FORECASTING.pptLucasMogaka
 
Modern power system planning new
Modern power system planning newModern power system planning new
Modern power system planning newBayu imadul Bilad
 
Economic operation of Power systems by Unit commitment
Economic operation of Power systems by Unit commitment Economic operation of Power systems by Unit commitment
Economic operation of Power systems by Unit commitment Pritesh Priyadarshi
 
Load Forecasting Techniques.pdf
Load Forecasting Techniques.pdfLoad Forecasting Techniques.pdf
Load Forecasting Techniques.pdfAjay Bhatnagar
 
DigSILENT PF - 03 load flow analysis
DigSILENT PF - 03 load flow analysisDigSILENT PF - 03 load flow analysis
DigSILENT PF - 03 load flow analysisHimmelstern
 
power flow and optimal power flow
power flow and optimal power flowpower flow and optimal power flow
power flow and optimal power flowAhmed M. Elkholy
 
Congestion management
Congestion managementCongestion management
Congestion managementGAURAV KUMAR
 
Distribution System Planning and Design
Distribution System Planning and DesignDistribution System Planning and Design
Distribution System Planning and DesignAdithya Ballaji
 
TRANSMISSION PLANNING CRITERIA
TRANSMISSION PLANNING CRITERIATRANSMISSION PLANNING CRITERIA
TRANSMISSION PLANNING CRITERIAArun Muraleedharan
 
Principles of Power Systems V.K Mehta Complete Book - Chapter 4
Principles of Power Systems V.K Mehta Complete Book - Chapter 4Principles of Power Systems V.K Mehta Complete Book - Chapter 4
Principles of Power Systems V.K Mehta Complete Book - Chapter 4Power System Operation
 
Short-term Load Forecasting based on Neural network and Local Regression
Short-term Load Forecasting based on Neural network and Local RegressionShort-term Load Forecasting based on Neural network and Local Regression
Short-term Load Forecasting based on Neural network and Local RegressionJie Bao
 
An overview of electricity demand forecasting techniques
An overview of electricity demand forecasting techniquesAn overview of electricity demand forecasting techniques
An overview of electricity demand forecasting techniquesAlexander Decker
 
Contingency analysis
Contingency analysisContingency analysis
Contingency analysisSajan Sahu
 
Generation shift factor and line outage factor
Generation shift factor and line outage factorGeneration shift factor and line outage factor
Generation shift factor and line outage factorViren Pandya
 
Load frequency control
Load frequency controlLoad frequency control
Load frequency controlMathankumar S
 
Atc calculation methods by shridhar kulkarni
Atc calculation methods by shridhar kulkarniAtc calculation methods by shridhar kulkarni
Atc calculation methods by shridhar kulkarniShridhar kulkarni
 

What's hot (20)

Introduction about Power System Planning in the Presence of Uncertainties
Introduction about  Power System Planning in the Presence of Uncertainties Introduction about  Power System Planning in the Presence of Uncertainties
Introduction about Power System Planning in the Presence of Uncertainties
 
Load Forecasting
Load ForecastingLoad Forecasting
Load Forecasting
 
LOAD FORECASTING.ppt
LOAD FORECASTING.pptLOAD FORECASTING.ppt
LOAD FORECASTING.ppt
 
Modern power system planning new
Modern power system planning newModern power system planning new
Modern power system planning new
 
Economic operation of Power systems by Unit commitment
Economic operation of Power systems by Unit commitment Economic operation of Power systems by Unit commitment
Economic operation of Power systems by Unit commitment
 
Load Forecasting Techniques.pdf
Load Forecasting Techniques.pdfLoad Forecasting Techniques.pdf
Load Forecasting Techniques.pdf
 
DigSILENT PF - 03 load flow analysis
DigSILENT PF - 03 load flow analysisDigSILENT PF - 03 load flow analysis
DigSILENT PF - 03 load flow analysis
 
power flow and optimal power flow
power flow and optimal power flowpower flow and optimal power flow
power flow and optimal power flow
 
Congestion management
Congestion managementCongestion management
Congestion management
 
Distribution System Planning and Design
Distribution System Planning and DesignDistribution System Planning and Design
Distribution System Planning and Design
 
POWER SYSTEM OPERATION AND CONTROL
POWER SYSTEM OPERATION AND CONTROLPOWER SYSTEM OPERATION AND CONTROL
POWER SYSTEM OPERATION AND CONTROL
 
Power system planing and operation (pce5312) chapter one
Power system planing and operation (pce5312) chapter onePower system planing and operation (pce5312) chapter one
Power system planing and operation (pce5312) chapter one
 
TRANSMISSION PLANNING CRITERIA
TRANSMISSION PLANNING CRITERIATRANSMISSION PLANNING CRITERIA
TRANSMISSION PLANNING CRITERIA
 
Principles of Power Systems V.K Mehta Complete Book - Chapter 4
Principles of Power Systems V.K Mehta Complete Book - Chapter 4Principles of Power Systems V.K Mehta Complete Book - Chapter 4
Principles of Power Systems V.K Mehta Complete Book - Chapter 4
 
Short-term Load Forecasting based on Neural network and Local Regression
Short-term Load Forecasting based on Neural network and Local RegressionShort-term Load Forecasting based on Neural network and Local Regression
Short-term Load Forecasting based on Neural network and Local Regression
 
An overview of electricity demand forecasting techniques
An overview of electricity demand forecasting techniquesAn overview of electricity demand forecasting techniques
An overview of electricity demand forecasting techniques
 
Contingency analysis
Contingency analysisContingency analysis
Contingency analysis
 
Generation shift factor and line outage factor
Generation shift factor and line outage factorGeneration shift factor and line outage factor
Generation shift factor and line outage factor
 
Load frequency control
Load frequency controlLoad frequency control
Load frequency control
 
Atc calculation methods by shridhar kulkarni
Atc calculation methods by shridhar kulkarniAtc calculation methods by shridhar kulkarni
Atc calculation methods by shridhar kulkarni
 

Similar to Five most used load forecasting models

load-forecasting.ppt
load-forecasting.pptload-forecasting.ppt
load-forecasting.pptjhbsxjbs
 
Short term load forecasting system based on support vector kernel methods
Short term load forecasting system based on support vector kernel methodsShort term load forecasting system based on support vector kernel methods
Short term load forecasting system based on support vector kernel methodsijcsit
 
Load forecasting,Megger,Earthing ELCB
Load forecasting,Megger,Earthing ELCBLoad forecasting,Megger,Earthing ELCB
Load forecasting,Megger,Earthing ELCBSuryakant Morey
 
Short-term load forecasting with using multiple linear regression
Short-term load forecasting with using multiple  linear regression Short-term load forecasting with using multiple  linear regression
Short-term load forecasting with using multiple linear regression IJECEIAES
 
Short Term Load Forecasting Using Multi Layer Perceptron
Short Term Load Forecasting Using Multi Layer Perceptron Short Term Load Forecasting Using Multi Layer Perceptron
Short Term Load Forecasting Using Multi Layer Perceptron IJMER
 
Ijmer 44041014-140513065911-phpapp02
Ijmer 44041014-140513065911-phpapp02Ijmer 44041014-140513065911-phpapp02
Ijmer 44041014-140513065911-phpapp02Nihar Ranjan Behera
 
Electric Load Forecasting
Electric Load ForecastingElectric Load Forecasting
Electric Load Forecastinginventy
 
Using Machine Learning to Quantify the Impact of Heterogeneous Data on Transf...
Using Machine Learning to Quantify the Impact of Heterogeneous Data on Transf...Using Machine Learning to Quantify the Impact of Heterogeneous Data on Transf...
Using Machine Learning to Quantify the Impact of Heterogeneous Data on Transf...Power System Operation
 
Lab manual psd v sem experiment no 4
Lab manual psd v sem experiment no 4Lab manual psd v sem experiment no 4
Lab manual psd v sem experiment no 4Sachin Airan
 
Feinberg.ppt
Feinberg.pptFeinberg.ppt
Feinberg.pptBakriBuga
 
Intelligent methods in load forecasting
Intelligent methods in load forecastingIntelligent methods in load forecasting
Intelligent methods in load forecastingprj_publication
 
Electric Load Forecasting Using Genetic Algorithm – A Review
Electric Load Forecasting Using Genetic Algorithm – A Review Electric Load Forecasting Using Genetic Algorithm – A Review
Electric Load Forecasting Using Genetic Algorithm – A Review IJMER
 
IRJET - Intelligent Weather Forecasting using Machine Learning Techniques
IRJET -  	  Intelligent Weather Forecasting using Machine Learning TechniquesIRJET -  	  Intelligent Weather Forecasting using Machine Learning Techniques
IRJET - Intelligent Weather Forecasting using Machine Learning TechniquesIRJET Journal
 
Quantification of operating reserves with high penetration of wind power cons...
Quantification of operating reserves with high penetration of wind power cons...Quantification of operating reserves with high penetration of wind power cons...
Quantification of operating reserves with high penetration of wind power cons...IJECEIAES
 
Forecasting electricity usage in industrial applications with gpu acceleratio...
Forecasting electricity usage in industrial applications with gpu acceleratio...Forecasting electricity usage in industrial applications with gpu acceleratio...
Forecasting electricity usage in industrial applications with gpu acceleratio...Conference Papers
 
DataScienceForRenewableEnergy.pptx
DataScienceForRenewableEnergy.pptxDataScienceForRenewableEnergy.pptx
DataScienceForRenewableEnergy.pptxAshish Patel
 

Similar to Five most used load forecasting models (20)

load-forecasting.ppt
load-forecasting.pptload-forecasting.ppt
load-forecasting.ppt
 
Short term load forecasting system based on support vector kernel methods
Short term load forecasting system based on support vector kernel methodsShort term load forecasting system based on support vector kernel methods
Short term load forecasting system based on support vector kernel methods
 
Load forecasting,Megger,Earthing ELCB
Load forecasting,Megger,Earthing ELCBLoad forecasting,Megger,Earthing ELCB
Load forecasting,Megger,Earthing ELCB
 
Short-term load forecasting with using multiple linear regression
Short-term load forecasting with using multiple  linear regression Short-term load forecasting with using multiple  linear regression
Short-term load forecasting with using multiple linear regression
 
I02095257
I02095257I02095257
I02095257
 
Short Term Load Forecasting Using Multi Layer Perceptron
Short Term Load Forecasting Using Multi Layer Perceptron Short Term Load Forecasting Using Multi Layer Perceptron
Short Term Load Forecasting Using Multi Layer Perceptron
 
Ijmer 44041014-140513065911-phpapp02
Ijmer 44041014-140513065911-phpapp02Ijmer 44041014-140513065911-phpapp02
Ijmer 44041014-140513065911-phpapp02
 
Electric Load Forecasting
Electric Load ForecastingElectric Load Forecasting
Electric Load Forecasting
 
Using Machine Learning to Quantify the Impact of Heterogeneous Data on Transf...
Using Machine Learning to Quantify the Impact of Heterogeneous Data on Transf...Using Machine Learning to Quantify the Impact of Heterogeneous Data on Transf...
Using Machine Learning to Quantify the Impact of Heterogeneous Data on Transf...
 
Feinberg
FeinbergFeinberg
Feinberg
 
Artificial intelligence in Power Stations
Artificial intelligence in Power StationsArtificial intelligence in Power Stations
Artificial intelligence in Power Stations
 
Lab manual psd v sem experiment no 4
Lab manual psd v sem experiment no 4Lab manual psd v sem experiment no 4
Lab manual psd v sem experiment no 4
 
Feinberg.ppt
Feinberg.pptFeinberg.ppt
Feinberg.ppt
 
Intelligent methods in load forecasting
Intelligent methods in load forecastingIntelligent methods in load forecasting
Intelligent methods in load forecasting
 
Electric Load Forecasting Using Genetic Algorithm – A Review
Electric Load Forecasting Using Genetic Algorithm – A Review Electric Load Forecasting Using Genetic Algorithm – A Review
Electric Load Forecasting Using Genetic Algorithm – A Review
 
IRJET - Intelligent Weather Forecasting using Machine Learning Techniques
IRJET -  	  Intelligent Weather Forecasting using Machine Learning TechniquesIRJET -  	  Intelligent Weather Forecasting using Machine Learning Techniques
IRJET - Intelligent Weather Forecasting using Machine Learning Techniques
 
Quantification of operating reserves with high penetration of wind power cons...
Quantification of operating reserves with high penetration of wind power cons...Quantification of operating reserves with high penetration of wind power cons...
Quantification of operating reserves with high penetration of wind power cons...
 
Forecasting electricity usage in industrial applications with gpu acceleratio...
Forecasting electricity usage in industrial applications with gpu acceleratio...Forecasting electricity usage in industrial applications with gpu acceleratio...
Forecasting electricity usage in industrial applications with gpu acceleratio...
 
H011137281
H011137281H011137281
H011137281
 
DataScienceForRenewableEnergy.pptx
DataScienceForRenewableEnergy.pptxDataScienceForRenewableEnergy.pptx
DataScienceForRenewableEnergy.pptx
 

More from Mrinmoy Majumder

Introduction to Ant Colony Optimization Techniques
Introduction to Ant Colony Optimization TechniquesIntroduction to Ant Colony Optimization Techniques
Introduction to Ant Colony Optimization TechniquesMrinmoy Majumder
 
Ten Ideas to open startups in smart agriculture.pptx
Ten Ideas to open startups in smart agriculture.pptxTen Ideas to open startups in smart agriculture.pptx
Ten Ideas to open startups in smart agriculture.pptxMrinmoy Majumder
 
When was the first bottled drinking water sold.pptx
When was the first bottled drinking water sold.pptxWhen was the first bottled drinking water sold.pptx
When was the first bottled drinking water sold.pptxMrinmoy Majumder
 
Fluid Mechanics : Five Factos from History
Fluid Mechanics : Five Factos from HistoryFluid Mechanics : Five Factos from History
Fluid Mechanics : Five Factos from HistoryMrinmoy Majumder
 
Vulnerability Analysis of Wetlands under Changed Climate Scenarios with the h...
Vulnerability Analysis of Wetlands under Changed Climate Scenarios with the h...Vulnerability Analysis of Wetlands under Changed Climate Scenarios with the h...
Vulnerability Analysis of Wetlands under Changed Climate Scenarios with the h...Mrinmoy Majumder
 
10 Most Recent Special Issues Calls for Papers
10 Most Recent Special Issues Calls for Papers10 Most Recent Special Issues Calls for Papers
10 Most Recent Special Issues Calls for PapersMrinmoy Majumder
 
Ten Ideas to open startups in smart agriculture
Ten Ideas to open startups in smart agricultureTen Ideas to open startups in smart agriculture
Ten Ideas to open startups in smart agricultureMrinmoy Majumder
 
Explore the latest advancements in hydro and energy informatics with seven ne...
Explore the latest advancements in hydro and energy informatics with seven ne...Explore the latest advancements in hydro and energy informatics with seven ne...
Explore the latest advancements in hydro and energy informatics with seven ne...Mrinmoy Majumder
 
An Introduction to Water Cycle Algorithm
An Introduction to Water Cycle AlgorithmAn Introduction to Water Cycle Algorithm
An Introduction to Water Cycle AlgorithmMrinmoy Majumder
 
What is the difference between Free and Paid Subscriber of HydroGeek Newslett...
What is the difference between Free and Paid Subscriber of HydroGeek Newslett...What is the difference between Free and Paid Subscriber of HydroGeek Newslett...
What is the difference between Free and Paid Subscriber of HydroGeek Newslett...Mrinmoy Majumder
 
Ten Most Recognizable Case Studies of Using Outlier.pptx
Ten Most Recognizable Case Studies of Using Outlier.pptxTen Most Recognizable Case Studies of Using Outlier.pptx
Ten Most Recognizable Case Studies of Using Outlier.pptxMrinmoy Majumder
 
Five Ideas for opening startups in Virtual and Green Water
Five Ideas for opening startups in Virtual and Green WaterFive Ideas for opening startups in Virtual and Green Water
Five Ideas for opening startups in Virtual and Green WaterMrinmoy Majumder
 
What is next in AI ML Modeling of Water Resource Development.pdf
What is next in AI  ML Modeling of Water Resource Development.pdfWhat is next in AI  ML Modeling of Water Resource Development.pdf
What is next in AI ML Modeling of Water Resource Development.pdfMrinmoy Majumder
 
Very Short Term Course on MAUT in Water Resource Management.pdf
Very Short Term Course on MAUT in Water Resource Management.pdfVery Short Term Course on MAUT in Water Resource Management.pdf
Very Short Term Course on MAUT in Water Resource Management.pdfMrinmoy Majumder
 
Most Recommended news,products and publications from hydroinformatics
Most Recommended news,products and publications from hydroinformaticsMost Recommended news,products and publications from hydroinformatics
Most Recommended news,products and publications from hydroinformaticsMrinmoy Majumder
 
Latest Jobs, Scholarship Opportunities and CFPs in.pptx
Latest Jobs, Scholarship Opportunities and CFPs in.pptxLatest Jobs, Scholarship Opportunities and CFPs in.pptx
Latest Jobs, Scholarship Opportunities and CFPs in.pptxMrinmoy Majumder
 
Seven Techniques that you will learn when you enrol forMTech in Hydroinformat...
Seven Techniques that you will learn when you enrol forMTech in Hydroinformat...Seven Techniques that you will learn when you enrol forMTech in Hydroinformat...
Seven Techniques that you will learn when you enrol forMTech in Hydroinformat...Mrinmoy Majumder
 
Five New Ideas of Start Up under Hydro.pptx
Five New Ideas of Start Up under Hydro.pptxFive New Ideas of Start Up under Hydro.pptx
Five New Ideas of Start Up under Hydro.pptxMrinmoy Majumder
 
Five Example Application of Hydroinformatics for Optimal Management of Ground...
Five Example Application of Hydroinformatics for Optimal Management of Ground...Five Example Application of Hydroinformatics for Optimal Management of Ground...
Five Example Application of Hydroinformatics for Optimal Management of Ground...Mrinmoy Majumder
 

More from Mrinmoy Majumder (20)

Introduction to Ant Colony Optimization Techniques
Introduction to Ant Colony Optimization TechniquesIntroduction to Ant Colony Optimization Techniques
Introduction to Ant Colony Optimization Techniques
 
Ten Ideas to open startups in smart agriculture.pptx
Ten Ideas to open startups in smart agriculture.pptxTen Ideas to open startups in smart agriculture.pptx
Ten Ideas to open startups in smart agriculture.pptx
 
When was the first bottled drinking water sold.pptx
When was the first bottled drinking water sold.pptxWhen was the first bottled drinking water sold.pptx
When was the first bottled drinking water sold.pptx
 
Fluid Mechanics : Five Factos from History
Fluid Mechanics : Five Factos from HistoryFluid Mechanics : Five Factos from History
Fluid Mechanics : Five Factos from History
 
Vulnerability Analysis of Wetlands under Changed Climate Scenarios with the h...
Vulnerability Analysis of Wetlands under Changed Climate Scenarios with the h...Vulnerability Analysis of Wetlands under Changed Climate Scenarios with the h...
Vulnerability Analysis of Wetlands under Changed Climate Scenarios with the h...
 
10 Most Recent Special Issues Calls for Papers
10 Most Recent Special Issues Calls for Papers10 Most Recent Special Issues Calls for Papers
10 Most Recent Special Issues Calls for Papers
 
Ten Ideas to open startups in smart agriculture
Ten Ideas to open startups in smart agricultureTen Ideas to open startups in smart agriculture
Ten Ideas to open startups in smart agriculture
 
Explore the latest advancements in hydro and energy informatics with seven ne...
Explore the latest advancements in hydro and energy informatics with seven ne...Explore the latest advancements in hydro and energy informatics with seven ne...
Explore the latest advancements in hydro and energy informatics with seven ne...
 
An Introduction to Water Cycle Algorithm
An Introduction to Water Cycle AlgorithmAn Introduction to Water Cycle Algorithm
An Introduction to Water Cycle Algorithm
 
What is the difference between Free and Paid Subscriber of HydroGeek Newslett...
What is the difference between Free and Paid Subscriber of HydroGeek Newslett...What is the difference between Free and Paid Subscriber of HydroGeek Newslett...
What is the difference between Free and Paid Subscriber of HydroGeek Newslett...
 
Ten Most Recognizable Case Studies of Using Outlier.pptx
Ten Most Recognizable Case Studies of Using Outlier.pptxTen Most Recognizable Case Studies of Using Outlier.pptx
Ten Most Recognizable Case Studies of Using Outlier.pptx
 
Five Ideas for opening startups in Virtual and Green Water
Five Ideas for opening startups in Virtual and Green WaterFive Ideas for opening startups in Virtual and Green Water
Five Ideas for opening startups in Virtual and Green Water
 
Water and Energy in style
Water and Energy in styleWater and Energy in style
Water and Energy in style
 
What is next in AI ML Modeling of Water Resource Development.pdf
What is next in AI  ML Modeling of Water Resource Development.pdfWhat is next in AI  ML Modeling of Water Resource Development.pdf
What is next in AI ML Modeling of Water Resource Development.pdf
 
Very Short Term Course on MAUT in Water Resource Management.pdf
Very Short Term Course on MAUT in Water Resource Management.pdfVery Short Term Course on MAUT in Water Resource Management.pdf
Very Short Term Course on MAUT in Water Resource Management.pdf
 
Most Recommended news,products and publications from hydroinformatics
Most Recommended news,products and publications from hydroinformaticsMost Recommended news,products and publications from hydroinformatics
Most Recommended news,products and publications from hydroinformatics
 
Latest Jobs, Scholarship Opportunities and CFPs in.pptx
Latest Jobs, Scholarship Opportunities and CFPs in.pptxLatest Jobs, Scholarship Opportunities and CFPs in.pptx
Latest Jobs, Scholarship Opportunities and CFPs in.pptx
 
Seven Techniques that you will learn when you enrol forMTech in Hydroinformat...
Seven Techniques that you will learn when you enrol forMTech in Hydroinformat...Seven Techniques that you will learn when you enrol forMTech in Hydroinformat...
Seven Techniques that you will learn when you enrol forMTech in Hydroinformat...
 
Five New Ideas of Start Up under Hydro.pptx
Five New Ideas of Start Up under Hydro.pptxFive New Ideas of Start Up under Hydro.pptx
Five New Ideas of Start Up under Hydro.pptx
 
Five Example Application of Hydroinformatics for Optimal Management of Ground...
Five Example Application of Hydroinformatics for Optimal Management of Ground...Five Example Application of Hydroinformatics for Optimal Management of Ground...
Five Example Application of Hydroinformatics for Optimal Management of Ground...
 

Recently uploaded

Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 

Recently uploaded (20)

Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 

Five most used load forecasting models

  • 1. FIVE MODELS TRADITIONALLY USED FOR ELECTRICAL LOAD PREDICTIONS DR.MRINMOY MAJUMDER (ORCID ID : 0000-0001-6231-5989) “RENEWABLE ENERGY” of MTECH(HYDROINFORMATICS ENGG “ INNOVATE FOR SUSTAINABILITY”- www.baipatra.ws
  • 2. IMPORTANCE Load forecasting helps an electric utility to make important decisions including decisions on purchasing and generating electric power, load switching, and infrastructure development. Load forecasts are extremely important for energy suppliers, ISOs, financial institutions, and other participants in electric energy generation, transmission, distribution, and markets. Most forecasting methods use statistical techniques or artificial intelligence algorithms such as regression, neural networks, fuzzy logic, and expert systems.
  • 3. DEFINITION Prediction of load or generation requirement can be performed to assist in operation planning, expansion strategy and policy formulations. Hydropower plants has a gestation period of 10 to 15 years Forecasting of load can be done for three different duration based on accuracy required and circumstances prevailing. Models can be conceptual or statistical depending on the requirement.
  • 4. Type of Forecasting Models LOAD PREDICTION MODEL TYPES SHORT TERM MEDIUM TERM LONG TERM COVERING A PERIOD OF 20 YEARS OR MORE COVERING A PERIOD OF 8 TO 10 YEARS COVERING A PERIOD OF 4 TO 5 YEARS PURRPOSE : OPERATION PLANNING PURRPOSE : BASIS FOR EXPANSION PURRPOSE : POLICY FORMULATION
  • 5. Model One : SCHEER FORMULA G = 10 𝐶 𝑈0⋅15 WHERE G = ANNUAL GROWTH IN GENERATION(PER CENT) U = PER CAPITA GENERATION C = CONSTANT = 0.02(POPULATION GROWTH RATE)+1.330 THE CONSTANT IN THE SUPERSCRIPT OF U IS ASSUMED AS PER THE THUMB RULE THAT ‘A HUNDRED FOLD INCREASE IN U WILL REDUCE THE RATE OF GROWTH BY HALF’ LONG TERM LOAD FORECASTING MODEL
  • 6. POINTS TO REMEMBER MAGNITUDE OF FOLLOWING PARAMETERS ARE REQUIRED : •GENERATION OF THE STARTING YEAR IS •POPULATION OF STARTING YEAR •POPULATION OF THE CONSEQUENT YEARS 1 IF THE VALUE OF ABOVE PARAMETERS IS KNOWN THEN U AND C CAN BE CALCULATED FROM WHICH THE GENERATION REQUIREMENT OF THE STARTING YEAR IS DERIVED FROM THE SCHEER FORMULA 2 THE RATE OF GROWTH IN THE NEXT YEAR IS CALCULATED BY MULTIPLYING THE GROWTH RATE OF STARTING YEAR WITH (1+G)/100. 3 FROM THE GROWTH RATE OF SECOND YEAR AND THE POPULATION OF THE SAME YEAR AS KNOWN FROM THE FIRST POINT THE U AND C OF SECOND YEAR CAN BE PREDICTED FROM WHICH RATE OF GROWTH CAN BE ESTIMATED BY THE SAME FORMULA. 4 IN THIS WAY YEAR BY YEAR PREDICTION OF GENERATION REQUIREMENT IS DETERMINED. 5
  • 7. Model two : BELGIUM FORMULA E = 𝐾 × 𝑀0⋅6 × 2 0.465𝑡 WHERE E = ELECTRICITY CONSUMPTION M = INDEX OF MANUFACTURE OF PRODUCTION t = TIME FOR WHICH CONSUMPTION TO BE PROJECTED K = ADJUSTMENT FACTOR LONG TERM LOAD FORECASTING MODEL
  • 8. POINTS TO REMEMBER THIS FORMULA IS AN EMPIRICAL FORMULA FOR EXTRAPOLATION OF TREND OF ENERGY CONSUMPTION DIFFERENT COUNTRIES HAVE SEPARATE FORMULA FOR THE ESTIMATION OF ENERGY CONSUMPTION THE ACCURACY OF THE FORMULA DEPENDS ON THE CALIBRATION AND MAY VARY WITH TYPE OF DATA AVAILABLE AND OTHER RELATED APPROXIMATIONS.
  • 9. Model Three : Additive Model by Chen et.al. 𝐿 = 𝐿 𝑛 + 𝐿 𝑤 + 𝐿 𝑠 + 𝐿 𝑟 where L is the total load, Ln represents the “normal” part of the load, which is a set of standardized load shapes for each “type” of day that has been identified as occurring throughout the year, Lw represents the weather sensitive part of the load, Ls is a special event component that create a substantial deviation from the usual load pattern, and Lr is a completely random term, the noise. LONG TERM LOAD FORECASTING MODEL
  • 10. Model Four : Multiplicative Model 𝐿 = 𝐿 𝑛 × 𝐹𝑤 × 𝐹𝑆 × 𝐹𝑟 where Ln = the normal(base) load Fw, Fs, and Fr are positive numbers representing the corrections based on current weather (Fw), special events (Fs), and random fluctuation (Fr). Factors like electricity pricing (Fp) and load growth (Fg) can also be included. LONG TERM LOAD FORECASTING MODEL
  • 11. Model Five : Feinberg’s Load Forecasting Model 𝐿 𝑡 = 𝐹𝑎 + 𝑅𝑡 where Fa is 𝐹 ⅆ 𝑡 ⋅ ℎ 𝑡 ⋅ 𝑓 𝑤𝑡 L(t) is the actual load at time t, d(t) is the day of the week, h(t) is the hour of the day, F(d,h) is the daily and hourly component, w(t) is the weather data that include the temperature and humidity, f(w) is the weather factor, R(t) is a random error. And f(w) is estimated by : 𝑓 𝑤 = 𝛽0 + 𝛽𝑗 𝑋𝑗where Xj are explanatory variables which are nonlinear functions of current and past weather parameters and βo, βj are the regression coefficients. MID TERM LOAD FORECASTING MODEL
  • 12. Types of Models used in Short Term load forecasting Similar-day approach Historical data for days within the last one to three years are searched for similar characteristics for forecasting the data of a similar day or season. Regression methods Various regressive techniques are used to model the relationship between load consumption and other factors such as weather, day type, and customer class. Time series Time series Models depends on the assumption that the data have an “internal structure”, represented by the autocorrelation, trend, or seasonal variation. The different methods used in Time Series Modelling is: ARMA (autoregressive moving average), ARIMA (autoregressive integrated moving average), ARMAX (autoregressive moving average with exogenous variables), and ARIMAX (autoregressive integrated moving average with exogenous variables).
  • 13. Contd. Neural networks The artificial neural networks (ANN) has been widely used for electric load forecasting since 1990. Expert systems “Rule based forecasting” uses mostly heuristic rules of nature for accurate forecasting. Expert systems, incorporates the rules and procedures used by human experts into a software framework for automatically making forecasts without human assistance.
  • 14. Resources and References 1.E. A. Feinberg and D.Genethliou.Load Forecasting, Applied Mathematics for Power Systems. 2.E.A. Feinberg, J.T. Hajagos, and D. Genethliou. Load Pocket Modelling. Proceedings of the 2nd IASTED International Conference: Power and Energy Systems, 50–54, Crete, 2002. 3.E.A. Feinberg, J.T. Hajagos, and D. Genethliou. Statistical Load Modelling. Proceedings of the 7th IASTED International Multiconference: Power and Energy Systems, 88–91, Palm Springs, CA, 2003. 4.H. Chen, C.A. Canizares, and A. Singh. ANN-Based Short-Term Load Forecasting in Electricity Markets. Proceedings of the IEEE Power Engineering Society Transmission and Distribution Conference, 2:411–415, 2001. 5.M.M. Dandekar and K.N.Sharma. Water Power Engineering, Vikas Publishing House Pvt Ltd.,1979.