The document presents a project report on the design and fabrication of a wheel changing kit aimed at simplifying the process of changing flat tires, which often requires significant manual effort and can lead to injuries. It outlines the usage of a motorized screw jack as a safer, more efficient alternative to traditional methods, detailing its components, design, and testing procedures. The project emphasizes a user-friendly approach, leveraging existing car jacks with minimal modifications to enhance convenience and reduce physical strain during tire changes.