From audience feedback on their music video, digipak, and magazine advertisement, the students learned:
1) Elements like narrative, cinematography, and mise-en-scene were strengths, but some shots needed better lighting and angles.
2) The buildup in the song was not portrayed dramatically enough in the video.
3) The digipak needed more eye-catching colors and the inside images looked edited.
4) The magazine ad's font was hard to read and lacked social media links.
Going forward, they will improve planning, locations, editing, and include current marketing elements.