The document calculates the water demand and wastewater generation for a proposed dhobighat or laundry facility in Dighwara. It determines that the facility will require 12,150 liters of water per day and generate 9,720 liters of wastewater daily. The design capacity of the effluent treatment plant for the facility should be 14,580 liters to treat 1.5 times the amount of expected wastewater.