SlideShare a Scribd company logo
UP
TREAD= 250
RISER = 164
WIDTH=1500
GENERATORAREA
LIGHT
SOLAR
LIGHT
SOLAR
TERRACE
TERRACE
TERRACE
TERRACE
TERRACE
TERRACE
N
CLIENT
APPROVED
TITLE:
DATE DRAWN CHECKED
REV:01
SCALE
DATE
PROJECT
REV NO
DRG NO : SPUR/BHR/DGH/FR/04
SUB
DATE :
DPR TENDER
DATE : DATE :
EXECUTION
06.12.2014
JOB NO : 23-35-99002
WBVHA Tower, 2nd Floor,580, Anandapur,
Tel : 91 33 40176800/6826,Fax : 91 33 40176827
India office :
Kolkata- 700 107
E-mail : lahmeyer.kolkata@gmail.com
www.lahmeyer.com
Preparation of City Sanitation Plans, Feasibility Study Reports
and Detailed Project Reports for Integrated Municipal Solid
Waste Management, Comprehensive Wastewater Management,
Crematoria and Riverfront Development Projects in Urban
Local Bodies of Bihar - Group 2 : Dighwara
CONSULTANT
Support Programme for Urban Reforms in Bihar (SPUR)
Urban Development & Housing Department, Govt. of Bihar
REVISION
DESCRIPTION
KM SDDD
SHEET 1 OF 2
SHEET A1
NTS
900
1375
1285
750750
1375
1285
750750
1375
1285
750750
1375
1285
750750
1375
1285
750750
1375
1285
750750
2455
UP
TREAD= 250
RISER = 164
WIDTH=1500
U.GFRESH
WATERTANK
1520
2256
LADIES BATH
1900x1250
1900x1250
LADIES TOILET
1800X1250
1800X1250
GeneratorArea
OFFICE
3.50 x 4.00
IRON ROOM
6.1 X 4.0
LIGHT
SOLAR
Park Area
Main Entery
3600
6666
1662
2400
1500
2400
600
1000
250
300
0.8x2.25
2.0x2.25x2.6
2.0x2.0x2.7
3.5x2.25x3.8
1130
1000
600
SLUDGE DRYING BED
SLOPE
NOMINALSIZE
x2.6
TREAT WATER
TANK
EQUALIZATION
TANK
NEUTRALIZATION
TANK
GRIT CHAMBER
230
LIGHT
SOLAR
900
900
900
900
900
V1
V1
V1
V1
V1
1874
900
1749
6478
4230
6720 6708 3588 6720 6720 6720
449624006563
3675
41000
13460
GROUND FLOOR
FIRST FLOOR
CONTENTS
GENTS TOILET - 1
GENTS BATH. - 1
LADIES TOILET - 1
LADIES BATH. - 1
URINAL GENTS - 2
WASH BASIN - 3
SEPTIC TANK 7.08X4.47 M
WATER TANK - 2X1000 LIT HDPE
LEGENDS:-
DOOR D1 -- 3600 X 2100MM 1 NOS.
DOOR D3 -- 610 X 2100 MM 5 NOS.
VENTILATION V1 -- 600 X 450 MM 5 NOS.
WINDOW W1 -- 2400 X 750 MM 5 NOS.
WINDOW W2 -- 1500 X 750 MM 5 NOS.
1. ALL THE DIMENSIONS ARE IN M / UNLESS
OTHER WISE SPECIFIED IN DRAWING.
2. M-10 (1:3:6) FOR BASE CONCRETE
3. M-15 (1:2:4) FOR R.C.C. SLAB
4. BRICK CLASS DESIGNATION 100A
5. PLASTER 1: 4 (1 CEMENT ,4 SAND)
SANITARY FITTINGS
1. INDIAN W.C. 580X440 MM
2. FLAT BACK WASH BASIN 630X450 MM
3. 430X260X350 AND 340X410X265 MM SIZE
4. PVC PIPE 15 MM FOR WATER SUPPLY
5. PVC PIPE 25 MM FOR FLUSHING WC
6. PVC PIPE 150 MM FOR SEWER LINE
7. TAP- HEAVY DUTY CHROME PLATED BRASS TAP
FLOORING
URINALS
NOTES:-
LEGENDS:-
COLUMN
DOOR
WINDOW
TOILET
URINAL
VENTILATION
WASH BASIN W.B.
TIP
COLUMN C1 -- 300 X 230 MM 21 NOS.
DOOR D2 -- 1200 X 2100MM 1 NOS.
SOLAR LIGHT
SOLAR WATER
DRAIN
OPENING
PARK
300
230
D3
D3
D3
D3
D3
D2
D1
W2
W2 W2
W2
W2
W1W1 W1 W1 W1
Entery
BED ROOM
3.048 X 3.048m
KITCHEN
1.83X 1.93m
V1 W1
W.C.
1.33X 1.93m
HALL
6.43 X 3.12m
W1W1 D2
D2
D2D3
5393
6893
W1

More Related Content

Similar to 04 first floor plan dg (537 sq.m) sheet 1

BWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities BnagaloreBWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities Bnagalore
ADDA
 
Bangalore's Water Supply situation - BWSSB
Bangalore's Water Supply situation - BWSSBBangalore's Water Supply situation - BWSSB
Bangalore's Water Supply situation - BWSSB
Sangeeta (San) Banerjee
 
Bakwena Lodge Mgmt House
Bakwena Lodge Mgmt HouseBakwena Lodge Mgmt House
Bakwena Lodge Mgmt House
Grant Hepburn
 
A2005.2 BLDG 3&4 1F PLAN
A2005.2 BLDG 3&4 1F PLANA2005.2 BLDG 3&4 1F PLAN
A2005.2 BLDG 3&4 1F PLAN
Mattia Carmelo Vecchio
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
City of College Station
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
City of College Station
 
003948_Old Treasury Building 17
003948_Old Treasury Building 17003948_Old Treasury Building 17
003948_Old Treasury Building 17
Mark Jumeaux
 
Dick Smith
Dick SmithDick Smith
Dick Smith
Mike Darwich
 
Connecting Bridge
Connecting BridgeConnecting Bridge
Connecting Bridge
MahfuzurRahman939513
 
Am ltwn hseleft (1)
Am ltwn hseleft (1)Am ltwn hseleft (1)
Am ltwn hseleft (1)
ernesto brillantes
 
Merkinch Welfare Hall Technical Details
Merkinch Welfare Hall Technical DetailsMerkinch Welfare Hall Technical Details
Merkinch Welfare Hall Technical Details
Edward Brown
 
Amaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignAmaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan Design
KathleenFaithMamuad
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
Sunil Singh
 
Area Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.PlanArea Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.Plan
Lakshman R
 
3Sty_9CL.pdf
3Sty_9CL.pdf3Sty_9CL.pdf
3Sty_9CL.pdf
MunEngineersOfficeLa
 
INTERNSHIP PORTFOLIO.pptx
INTERNSHIP PORTFOLIO.pptxINTERNSHIP PORTFOLIO.pptx
INTERNSHIP PORTFOLIO.pptx
1847SAJIDPATEL
 
Baramati Building Architectural Drawings - R1 16.06.2023.pdf
Baramati Building Architectural Drawings - R1 16.06.2023.pdfBaramati Building Architectural Drawings - R1 16.06.2023.pdf
Baramati Building Architectural Drawings - R1 16.06.2023.pdf
krhimanshu0505
 
Drain details-final
Drain details-finalDrain details-final
Drain details-final
SitaramGarima
 
3 BHK Living room, Kitchen, Master Bedroom Mulund Mumbai
3 BHK Living room, Kitchen, Master Bedroom Mulund Mumbai3 BHK Living room, Kitchen, Master Bedroom Mulund Mumbai
3 BHK Living room, Kitchen, Master Bedroom Mulund Mumbai
Contractorbhai.com
 
Mr.santosh joshi-living-kitchen-master-bedroom
Mr.santosh joshi-living-kitchen-master-bedroomMr.santosh joshi-living-kitchen-master-bedroom
Mr.santosh joshi-living-kitchen-master-bedroom
Contractorbhai.com
 

Similar to 04 first floor plan dg (537 sq.m) sheet 1 (20)

BWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities BnagaloreBWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities Bnagalore
 
Bangalore's Water Supply situation - BWSSB
Bangalore's Water Supply situation - BWSSBBangalore's Water Supply situation - BWSSB
Bangalore's Water Supply situation - BWSSB
 
Bakwena Lodge Mgmt House
Bakwena Lodge Mgmt HouseBakwena Lodge Mgmt House
Bakwena Lodge Mgmt House
 
A2005.2 BLDG 3&4 1F PLAN
A2005.2 BLDG 3&4 1F PLANA2005.2 BLDG 3&4 1F PLAN
A2005.2 BLDG 3&4 1F PLAN
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
 
003948_Old Treasury Building 17
003948_Old Treasury Building 17003948_Old Treasury Building 17
003948_Old Treasury Building 17
 
Dick Smith
Dick SmithDick Smith
Dick Smith
 
Connecting Bridge
Connecting BridgeConnecting Bridge
Connecting Bridge
 
Am ltwn hseleft (1)
Am ltwn hseleft (1)Am ltwn hseleft (1)
Am ltwn hseleft (1)
 
Merkinch Welfare Hall Technical Details
Merkinch Welfare Hall Technical DetailsMerkinch Welfare Hall Technical Details
Merkinch Welfare Hall Technical Details
 
Amaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignAmaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan Design
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
Area Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.PlanArea Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.Plan
 
3Sty_9CL.pdf
3Sty_9CL.pdf3Sty_9CL.pdf
3Sty_9CL.pdf
 
INTERNSHIP PORTFOLIO.pptx
INTERNSHIP PORTFOLIO.pptxINTERNSHIP PORTFOLIO.pptx
INTERNSHIP PORTFOLIO.pptx
 
Baramati Building Architectural Drawings - R1 16.06.2023.pdf
Baramati Building Architectural Drawings - R1 16.06.2023.pdfBaramati Building Architectural Drawings - R1 16.06.2023.pdf
Baramati Building Architectural Drawings - R1 16.06.2023.pdf
 
Drain details-final
Drain details-finalDrain details-final
Drain details-final
 
3 BHK Living room, Kitchen, Master Bedroom Mulund Mumbai
3 BHK Living room, Kitchen, Master Bedroom Mulund Mumbai3 BHK Living room, Kitchen, Master Bedroom Mulund Mumbai
3 BHK Living room, Kitchen, Master Bedroom Mulund Mumbai
 
Mr.santosh joshi-living-kitchen-master-bedroom
Mr.santosh joshi-living-kitchen-master-bedroomMr.santosh joshi-living-kitchen-master-bedroom
Mr.santosh joshi-living-kitchen-master-bedroom
 

More from Harish Mahavar

Boq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationBoq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping station
Harish Mahavar
 
Intze tank design
Intze tank designIntze tank design
Intze tank design
Harish Mahavar
 
154731476 rectangular-tank-std
154731476 rectangular-tank-std154731476 rectangular-tank-std
154731476 rectangular-tank-std
Harish Mahavar
 
350 kl overhead water intze tank design
350 kl overhead water intze tank design350 kl overhead water intze tank design
350 kl overhead water intze tank design
Harish Mahavar
 
08 treatment plant details
08  treatment plant details08  treatment plant details
08 treatment plant details
Harish Mahavar
 
Etp design capacity in dighwara
Etp design capacity in dighwaraEtp design capacity in dighwara
Etp design capacity in dighwara
Harish Mahavar
 
Oht tender
Oht tenderOht tender
Oht tender
Harish Mahavar
 
Rfp document for preparation of comprehensive detailed project report for rej...
Rfp document for preparation of comprehensive detailed project report for rej...Rfp document for preparation of comprehensive detailed project report for rej...
Rfp document for preparation of comprehensive detailed project report for rej...
Harish Mahavar
 

More from Harish Mahavar (8)

Boq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationBoq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping station
 
Intze tank design
Intze tank designIntze tank design
Intze tank design
 
154731476 rectangular-tank-std
154731476 rectangular-tank-std154731476 rectangular-tank-std
154731476 rectangular-tank-std
 
350 kl overhead water intze tank design
350 kl overhead water intze tank design350 kl overhead water intze tank design
350 kl overhead water intze tank design
 
08 treatment plant details
08  treatment plant details08  treatment plant details
08 treatment plant details
 
Etp design capacity in dighwara
Etp design capacity in dighwaraEtp design capacity in dighwara
Etp design capacity in dighwara
 
Oht tender
Oht tenderOht tender
Oht tender
 
Rfp document for preparation of comprehensive detailed project report for rej...
Rfp document for preparation of comprehensive detailed project report for rej...Rfp document for preparation of comprehensive detailed project report for rej...
Rfp document for preparation of comprehensive detailed project report for rej...
 

Recently uploaded

CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
sachin chaurasia
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 

Recently uploaded (20)

CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 

04 first floor plan dg (537 sq.m) sheet 1

  • 1. UP TREAD= 250 RISER = 164 WIDTH=1500 GENERATORAREA LIGHT SOLAR LIGHT SOLAR TERRACE TERRACE TERRACE TERRACE TERRACE TERRACE N CLIENT APPROVED TITLE: DATE DRAWN CHECKED REV:01 SCALE DATE PROJECT REV NO DRG NO : SPUR/BHR/DGH/FR/04 SUB DATE : DPR TENDER DATE : DATE : EXECUTION 06.12.2014 JOB NO : 23-35-99002 WBVHA Tower, 2nd Floor,580, Anandapur, Tel : 91 33 40176800/6826,Fax : 91 33 40176827 India office : Kolkata- 700 107 E-mail : lahmeyer.kolkata@gmail.com www.lahmeyer.com Preparation of City Sanitation Plans, Feasibility Study Reports and Detailed Project Reports for Integrated Municipal Solid Waste Management, Comprehensive Wastewater Management, Crematoria and Riverfront Development Projects in Urban Local Bodies of Bihar - Group 2 : Dighwara CONSULTANT Support Programme for Urban Reforms in Bihar (SPUR) Urban Development & Housing Department, Govt. of Bihar REVISION DESCRIPTION KM SDDD SHEET 1 OF 2 SHEET A1 NTS 900 1375 1285 750750 1375 1285 750750 1375 1285 750750 1375 1285 750750 1375 1285 750750 1375 1285 750750 2455 UP TREAD= 250 RISER = 164 WIDTH=1500 U.GFRESH WATERTANK 1520 2256 LADIES BATH 1900x1250 1900x1250 LADIES TOILET 1800X1250 1800X1250 GeneratorArea OFFICE 3.50 x 4.00 IRON ROOM 6.1 X 4.0 LIGHT SOLAR Park Area Main Entery 3600 6666 1662 2400 1500 2400 600 1000 250 300 0.8x2.25 2.0x2.25x2.6 2.0x2.0x2.7 3.5x2.25x3.8 1130 1000 600 SLUDGE DRYING BED SLOPE NOMINALSIZE x2.6 TREAT WATER TANK EQUALIZATION TANK NEUTRALIZATION TANK GRIT CHAMBER 230 LIGHT SOLAR 900 900 900 900 900 V1 V1 V1 V1 V1 1874 900 1749 6478 4230 6720 6708 3588 6720 6720 6720 449624006563 3675 41000 13460 GROUND FLOOR FIRST FLOOR CONTENTS GENTS TOILET - 1 GENTS BATH. - 1 LADIES TOILET - 1 LADIES BATH. - 1 URINAL GENTS - 2 WASH BASIN - 3 SEPTIC TANK 7.08X4.47 M WATER TANK - 2X1000 LIT HDPE LEGENDS:- DOOR D1 -- 3600 X 2100MM 1 NOS. DOOR D3 -- 610 X 2100 MM 5 NOS. VENTILATION V1 -- 600 X 450 MM 5 NOS. WINDOW W1 -- 2400 X 750 MM 5 NOS. WINDOW W2 -- 1500 X 750 MM 5 NOS. 1. ALL THE DIMENSIONS ARE IN M / UNLESS OTHER WISE SPECIFIED IN DRAWING. 2. M-10 (1:3:6) FOR BASE CONCRETE 3. M-15 (1:2:4) FOR R.C.C. SLAB 4. BRICK CLASS DESIGNATION 100A 5. PLASTER 1: 4 (1 CEMENT ,4 SAND) SANITARY FITTINGS 1. INDIAN W.C. 580X440 MM 2. FLAT BACK WASH BASIN 630X450 MM 3. 430X260X350 AND 340X410X265 MM SIZE 4. PVC PIPE 15 MM FOR WATER SUPPLY 5. PVC PIPE 25 MM FOR FLUSHING WC 6. PVC PIPE 150 MM FOR SEWER LINE 7. TAP- HEAVY DUTY CHROME PLATED BRASS TAP FLOORING URINALS NOTES:- LEGENDS:- COLUMN DOOR WINDOW TOILET URINAL VENTILATION WASH BASIN W.B. TIP COLUMN C1 -- 300 X 230 MM 21 NOS. DOOR D2 -- 1200 X 2100MM 1 NOS. SOLAR LIGHT SOLAR WATER DRAIN OPENING PARK 300 230 D3 D3 D3 D3 D3 D2 D1 W2 W2 W2 W2 W2 W1W1 W1 W1 W1 Entery BED ROOM 3.048 X 3.048m KITCHEN 1.83X 1.93m V1 W1 W.C. 1.33X 1.93m HALL 6.43 X 3.12m W1W1 D2 D2 D2D3 5393 6893 W1