You are working for a house builder at Kuala Lumpur. Your company has recently received
an invitation to tender a low cost apartment in Kajang, Selangor. You are required to
make a recommendation whether to accept or decline the tender invitation. What are the
5 main factors you will consider before making the recommendation? Explain how these
factors influence your decision.
COMPANY’S BACKGROUND
■ Date of Establishment: June 2008
■ Completed Projects : Low to medium cost residential buildings/shoplots
■ In-house Employees : Quantity Surveyors, Engineers, Project Manager etc.
■ Capital / Assets : RM250,000 in bank
■ No. of SiteWorkers : 20
■ MachineriesOwned : 2 excavators
TYPE OF PROJECT
TYPE OF PROJECT
Site location and accessibility :-
■ Low cost apartment is suitable to be constructed around Kajang
■ Existing road to provide safe access and egress
■ 35km away from our office
Past experience with similar projects ;-
■ Projects undertaken include low to medium range residential buildings
TYPE OF PROJECT
Is the project within the company boundaries?
■ Yes, capable of delivering the project due to past experiences.
Method of construction?
■ Adopt traditional construction method. (eg.Timber formwork)
TYPE OF PROJECT
Is the project complexity beyond the capability of the company?
■ No, it involves simple and typical designs only
The risk involved considering the nature of the work?
■ Accidents and injuries might occur at site due to traditional method of construction
■ Exterior work such as concreting and painting depends on weather condition
PROJECT SIZE
ANDVALUE
PROJECT SIZEANDVALUE
Project Size :-
■ 4 units x 5 storeys x 4 blocks
ProjectValue :-
■ RM 100,000 per unit x 4 units x 5 storeys x 4 blocks = RM8 million
PROJECT SIZEANDVALUE
Projected cash flow required during execution :-
■ Standard S Curve onGraph – past cost information and details of completed.
■ Critical Path Method (CPM) – technique for project planning made up of a
number of individual activities.
PROJECT SIZEANDVALUE
Is the project size beyond the capability of the firm?
■ Yes. It is within our boundaries as it is a medium scaled project.
Equipment, Labour and Plants :-
■ Equipment(s)– owns 2 excavators.
■ Labour(s) – 20-30 workers available.
PROJECT SIZEANDVALUE
Risks of project :-
■ Force majeure (construction risk)
■ Late changes / additional work
■ Site access
■ Labour productivity (performance risk)
■ Defective work – latent defects
■ Vandalism (security)
■ Intrusion
■ Delays
■ Liquidated ascertained damages (LAD)
PROJECT SIZEANDVALUE
Conditions of contract :-
■ Date of possession, deferment of possession, progress, delays, completion date
■ Liquidated ascertained damages
■ Partial possession
■ Quality of works
■ Testing and defects (Defects Liability Period)
TYPE OF CLIENT
TYPE OF CLIENT
Public Sector or Private Sector
■ Private Sector – Kelly Jeners
Financial capability of the client :-
■ Financially strong, reliable and has good financial records.
TYPE OF CLIENT
Reputation of the client :-
■ Well known among the peers in the industry.
■ Kelly Jeners delivers on its promises to the customers and is worthy of respect and
trust.
Relationship with the client :-
■ Has an existing and positive relationship with the client.
TYPE OF CLIENT
Expectations of the client :-
■ Client expects contractor to focus on their requirements, all of their needs and how to
solve their problems.
Form of contract :-
■ PAM Contract 2006 (With Quantities)
CURRENT AND
PROJECTEDWORKLOAD
OFTHE COMPANY
CURRENTAND PROJECTED
WORKLOAD OFTHE COMPANY
The need for work :-
■ The need for work is present since the company is only dealing with a medium range
cost residential project at the moment.
Other projects currently out for tender :-
■ Currently bidding for 2 projects and one of them is the Kajang low-cost apartment
project.
CURRENTAND PROJECTED
WORKLOAD OFTHE COMPANY
Forecast for upcoming projects :-
■ To be able to secure at least 5 projects in the next 2 years.
Availability of in-house staff :-
■ Yes. Quantity Surveyors, Engineers, Project Managers, etc.
CURRENTAND PROJECTED
WORKLOAD OFTHE COMPANY
Labour force availability :-
■ 20 workers.
Availability of equipment owned by the contractor :-
■ 2 excavators.
REGIONAL MARKET
CONDITIONS
REGIONAL MARKET CONDITIONS
Economical situation overall and the construction industry :-
■ Have to look into the economic factors of the country, such as GDP growth rate, or
GDP for construction (July 2016 – RM11899 million)
• How many projects are currently available in the market?
• How many competitors are expected to tender?
• How competitive are they and what is the experience of estimators?
• What are the status of the competitors?
REGIONAL MARKET CONDITIONS
Amount of work currently available in the industry :-
■ The lesser the work, the more likely contractors are forced to bid for works which may
be partly out of their competence and therefore more risky in terms of successful
implementation.
Availability of skilled workers and equipment needed :-
■ Not always available due to high demand at peak periods (January – April)
REGIONAL MARKET CONDITIONS
Rate of price escalation in labour/materials price :-
■ Different price between tender period and obtaining actual material period.
Unforeseeable circumstances which affects the final costs.
Codes and standards applicable in the region :-
■ Different area, different standards and procedures. Eg: Noise level cannot exceed
certain decibels in residential areas.
Reliability of subcontractors :-
■ Finding a good subcontractor would be a tough job without connection.
CONCLUSION
5 factors to consider:
■ Type Of Project
■ Project Size AndValue
■ Type of Client
■ Current and ProjectWorkload
■ Regional Market Conditions
FinalVerdict : OUR COMPANY IS RECOMMENDEDTO
ACCEPTTHETENDER FORTHE
PROJECT.
THE END

More Related Content

What's hot

Building Construction Assignment 1
Building Construction Assignment 1 Building Construction Assignment 1
Building Construction Assignment 1
Tan Jaden
 
Construction Technology II (Seminar) - Deep excavation
Construction Technology II (Seminar) - Deep excavationConstruction Technology II (Seminar) - Deep excavation
Construction Technology II (Seminar) - Deep excavation
Yee Len Wan
 
Building Technology Project 1
Building Technology Project 1Building Technology Project 1
Building Technology Project 1
zerospaces_
 
Building Construction Project 1
Building Construction Project 1Building Construction Project 1
Building Construction Project 1
Alexander Chung
 
Aldar Headquarters Dubai
Aldar Headquarters DubaiAldar Headquarters Dubai
Aldar Headquarters Dubai
Neha Rampuria
 
Building Technology PJT 1 Report
Building Technology PJT 1 Report Building Technology PJT 1 Report
Building Technology PJT 1 Report
ForestedTiger
 
Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...
aarenneoone
 
Presentation ibs
Presentation ibsPresentation ibs
Presentation ibs
UTHM
 
Estimating presentation (final)
Estimating presentation (final)Estimating presentation (final)
Estimating presentation (final)
MELVIN tan
 
Construction technology assignment
Construction technology assignmentConstruction technology assignment
Construction technology assignment
Lucas ChinSheng
 
Final submission be 2.0
Final submission be 2.0Final submission be 2.0
Final submission be 2.0
ahmong4
 
Building service project2
Building service project2Building service project2
Building service project2
limziahuei
 
Soldier Bored and Diaphragm
Soldier Bored and DiaphragmSoldier Bored and Diaphragm
Soldier Bored and Diaphragm
YingHongKang
 
Building Technology I
Building Technology IBuilding Technology I
Building Technology I
Ong Shi Hui
 
MEASUREMENT 4 SLIDES
MEASUREMENT 4 SLIDESMEASUREMENT 4 SLIDES
MEASUREMENT 4 SLIDES
wendyteosy
 
Bcon
BconBcon
Shanghai office tower (salsa)
Shanghai office tower (salsa)Shanghai office tower (salsa)
Shanghai office tower (salsa)
salsa moyara
 
kkr 2
kkr 2kkr 2
Spun pile
Spun pileSpun pile
Spun pile
Wen Crystal
 
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achah
Aisyah Asyikin
 

What's hot (20)

Building Construction Assignment 1
Building Construction Assignment 1 Building Construction Assignment 1
Building Construction Assignment 1
 
Construction Technology II (Seminar) - Deep excavation
Construction Technology II (Seminar) - Deep excavationConstruction Technology II (Seminar) - Deep excavation
Construction Technology II (Seminar) - Deep excavation
 
Building Technology Project 1
Building Technology Project 1Building Technology Project 1
Building Technology Project 1
 
Building Construction Project 1
Building Construction Project 1Building Construction Project 1
Building Construction Project 1
 
Aldar Headquarters Dubai
Aldar Headquarters DubaiAldar Headquarters Dubai
Aldar Headquarters Dubai
 
Building Technology PJT 1 Report
Building Technology PJT 1 Report Building Technology PJT 1 Report
Building Technology PJT 1 Report
 
Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...
 
Presentation ibs
Presentation ibsPresentation ibs
Presentation ibs
 
Estimating presentation (final)
Estimating presentation (final)Estimating presentation (final)
Estimating presentation (final)
 
Construction technology assignment
Construction technology assignmentConstruction technology assignment
Construction technology assignment
 
Final submission be 2.0
Final submission be 2.0Final submission be 2.0
Final submission be 2.0
 
Building service project2
Building service project2Building service project2
Building service project2
 
Soldier Bored and Diaphragm
Soldier Bored and DiaphragmSoldier Bored and Diaphragm
Soldier Bored and Diaphragm
 
Building Technology I
Building Technology IBuilding Technology I
Building Technology I
 
MEASUREMENT 4 SLIDES
MEASUREMENT 4 SLIDESMEASUREMENT 4 SLIDES
MEASUREMENT 4 SLIDES
 
Bcon
BconBcon
Bcon
 
Shanghai office tower (salsa)
Shanghai office tower (salsa)Shanghai office tower (salsa)
Shanghai office tower (salsa)
 
kkr 2
kkr 2kkr 2
kkr 2
 
Spun pile
Spun pileSpun pile
Spun pile
 
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achah
 

Viewers also liked

Depreciation
DepreciationDepreciation
Depreciation
Muhammad Javeed
 
M3 Lecture 11 provisional sum prime cost sum
M3 Lecture 11 provisional sum  prime cost sumM3 Lecture 11 provisional sum  prime cost sum
M3 Lecture 11 provisional sum prime cost sum
Est
 
New jeevan anand
New jeevan anandNew jeevan anand
New jeevan anand
LIC of India
 
Pp1 seminar
Pp1 seminarPp1 seminar
Pp1 seminar
wendyteosy
 
Provisional sum prime cost sum
Provisional sum  prime cost sumProvisional sum  prime cost sum
Provisional sum prime cost sum
Est
 
ASIS CPP Study Flash Cards and Quiz
ASIS CPP Study Flash Cards and QuizASIS CPP Study Flash Cards and Quiz
ASIS CPP Study Flash Cards and Quiz
Brandon Gregg, CPP
 
Advanced Planning & Scheduling
Advanced Planning &  SchedulingAdvanced Planning &  Scheduling
Advanced Planning & Scheduling
uapippo
 
Advance Planning & Scheduling
Advance Planning & SchedulingAdvance Planning & Scheduling
Advance Planning & Scheduling
Anand Subramaniam
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
Nikhil Kumar
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
lizwi nyandu
 
Tender processing
Tender processingTender processing
Tender processing
dnyandev_d
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and material
ALI HYDER GADHI
 
Tender evaluation procedure
Tender evaluation procedureTender evaluation procedure
Tender evaluation procedure
ayushida
 
Tender procedure slide
Tender procedure slideTender procedure slide
Tender procedure slide
politeknik malaysia
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
Awanish Shukla
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing book
Thomas Britto
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
ALI HYDER GADHI
 
Tender
TenderTender
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
Pundlik Rathod
 
Tender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement Guide
Tender Process
 

Viewers also liked (20)

Depreciation
DepreciationDepreciation
Depreciation
 
M3 Lecture 11 provisional sum prime cost sum
M3 Lecture 11 provisional sum  prime cost sumM3 Lecture 11 provisional sum  prime cost sum
M3 Lecture 11 provisional sum prime cost sum
 
New jeevan anand
New jeevan anandNew jeevan anand
New jeevan anand
 
Pp1 seminar
Pp1 seminarPp1 seminar
Pp1 seminar
 
Provisional sum prime cost sum
Provisional sum  prime cost sumProvisional sum  prime cost sum
Provisional sum prime cost sum
 
ASIS CPP Study Flash Cards and Quiz
ASIS CPP Study Flash Cards and QuizASIS CPP Study Flash Cards and Quiz
ASIS CPP Study Flash Cards and Quiz
 
Advanced Planning & Scheduling
Advanced Planning &  SchedulingAdvanced Planning &  Scheduling
Advanced Planning & Scheduling
 
Advance Planning & Scheduling
Advance Planning & SchedulingAdvance Planning & Scheduling
Advance Planning & Scheduling
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
 
Tender processing
Tender processingTender processing
Tender processing
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and material
 
Tender evaluation procedure
Tender evaluation procedureTender evaluation procedure
Tender evaluation procedure
 
Tender procedure slide
Tender procedure slideTender procedure slide
Tender procedure slide
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing book
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
 
Tender
TenderTender
Tender
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
Tender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement Guide
 

Similar to Estimating seminar

BS Enterprise Bathinda CONSTRUCTION COMPANY
BS Enterprise Bathinda CONSTRUCTION COMPANYBS Enterprise Bathinda CONSTRUCTION COMPANY
BS Enterprise Bathinda CONSTRUCTION COMPANY
imaanbakshi
 
Sanjeewa_CV updated on 23.02.2016
Sanjeewa_CV  updated on 23.02.2016Sanjeewa_CV  updated on 23.02.2016
Sanjeewa_CV updated on 23.02.2016
Sanjeewa Mahawedage
 
BS Enterprise Bathinda
BS Enterprise BathindaBS Enterprise Bathinda
BS Enterprise Bathinda
imaanbakshi
 
Profile -Gaurav Pant
Profile  -Gaurav PantProfile  -Gaurav Pant
Profile -Gaurav Pant
Gaurav Pant
 
English Gemininew Catalogue
English Gemininew CatalogueEnglish Gemininew Catalogue
English Gemininew Catalogue
gemini2012
 
English Gemininew Catalogue
English Gemininew CatalogueEnglish Gemininew Catalogue
English Gemininew Catalogue
gemini2012
 
Eng. Ahmed Yhia
Eng.  Ahmed YhiaEng.  Ahmed Yhia
Eng. Ahmed Yhia
ahmed yahia
 
CRM -Construction Industry and Construction Projects.pptx
CRM -Construction Industry and Construction Projects.pptxCRM -Construction Industry and Construction Projects.pptx
CRM -Construction Industry and Construction Projects.pptx
PrasadKadam82
 
Resume Update-15-01-2015
Resume Update-15-01-2015Resume Update-15-01-2015
Resume Update-15-01-2015
Engineer Haque
 
MAA CV 2015
MAA CV 2015MAA CV 2015
MAA CV 2015
Mehmood Ansari
 
Quantity Surveyor CV
Quantity Surveyor CVQuantity Surveyor CV
Quantity Surveyor CV
Mohan Kaliamurthy
 
Ajay Latest CV 20 Mar
Ajay Latest CV 20 MarAjay Latest CV 20 Mar
Ajay Latest CV 20 Mar
Ajay Kumar Singh
 
CV june-2016
CV june-2016CV june-2016
Najir mechanical engg. (HVAC)
Najir mechanical engg. (HVAC)Najir mechanical engg. (HVAC)
Najir mechanical engg. (HVAC)
NAJIRHUSEN
 
Abdullah Hamed Rashid Al-madailwi
Abdullah Hamed Rashid Al-madailwiAbdullah Hamed Rashid Al-madailwi
Abdullah Hamed Rashid Al-madailwi
Abdullah Hamed Al-Madailwi
 
07-CV - Andresa Lyra - Civil Engineer - 2016
07-CV - Andresa Lyra - Civil Engineer - 201607-CV - Andresa Lyra - Civil Engineer - 2016
07-CV - Andresa Lyra - Civil Engineer - 2016
Andresa Costa Lyra de Castro
 
Prjm project management
Prjm project managementPrjm project management
Prjm project management
Rakesh Kumar
 
ASMAA ATIA-Wuzzuf-CV
ASMAA ATIA-Wuzzuf-CVASMAA ATIA-Wuzzuf-CV
ASMAA ATIA-Wuzzuf-CV
Asmaa Gouda
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Amir Mohammed
 
Muhamad Ismail_Resume-Linkedin
Muhamad Ismail_Resume-LinkedinMuhamad Ismail_Resume-Linkedin
Muhamad Ismail_Resume-Linkedin
Muhamad Ismail Abdullah
 

Similar to Estimating seminar (20)

BS Enterprise Bathinda CONSTRUCTION COMPANY
BS Enterprise Bathinda CONSTRUCTION COMPANYBS Enterprise Bathinda CONSTRUCTION COMPANY
BS Enterprise Bathinda CONSTRUCTION COMPANY
 
Sanjeewa_CV updated on 23.02.2016
Sanjeewa_CV  updated on 23.02.2016Sanjeewa_CV  updated on 23.02.2016
Sanjeewa_CV updated on 23.02.2016
 
BS Enterprise Bathinda
BS Enterprise BathindaBS Enterprise Bathinda
BS Enterprise Bathinda
 
Profile -Gaurav Pant
Profile  -Gaurav PantProfile  -Gaurav Pant
Profile -Gaurav Pant
 
English Gemininew Catalogue
English Gemininew CatalogueEnglish Gemininew Catalogue
English Gemininew Catalogue
 
English Gemininew Catalogue
English Gemininew CatalogueEnglish Gemininew Catalogue
English Gemininew Catalogue
 
Eng. Ahmed Yhia
Eng.  Ahmed YhiaEng.  Ahmed Yhia
Eng. Ahmed Yhia
 
CRM -Construction Industry and Construction Projects.pptx
CRM -Construction Industry and Construction Projects.pptxCRM -Construction Industry and Construction Projects.pptx
CRM -Construction Industry and Construction Projects.pptx
 
Resume Update-15-01-2015
Resume Update-15-01-2015Resume Update-15-01-2015
Resume Update-15-01-2015
 
MAA CV 2015
MAA CV 2015MAA CV 2015
MAA CV 2015
 
Quantity Surveyor CV
Quantity Surveyor CVQuantity Surveyor CV
Quantity Surveyor CV
 
Ajay Latest CV 20 Mar
Ajay Latest CV 20 MarAjay Latest CV 20 Mar
Ajay Latest CV 20 Mar
 
CV june-2016
CV june-2016CV june-2016
CV june-2016
 
Najir mechanical engg. (HVAC)
Najir mechanical engg. (HVAC)Najir mechanical engg. (HVAC)
Najir mechanical engg. (HVAC)
 
Abdullah Hamed Rashid Al-madailwi
Abdullah Hamed Rashid Al-madailwiAbdullah Hamed Rashid Al-madailwi
Abdullah Hamed Rashid Al-madailwi
 
07-CV - Andresa Lyra - Civil Engineer - 2016
07-CV - Andresa Lyra - Civil Engineer - 201607-CV - Andresa Lyra - Civil Engineer - 2016
07-CV - Andresa Lyra - Civil Engineer - 2016
 
Prjm project management
Prjm project managementPrjm project management
Prjm project management
 
ASMAA ATIA-Wuzzuf-CV
ASMAA ATIA-Wuzzuf-CVASMAA ATIA-Wuzzuf-CV
ASMAA ATIA-Wuzzuf-CV
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
Muhamad Ismail_Resume-Linkedin
Muhamad Ismail_Resume-LinkedinMuhamad Ismail_Resume-Linkedin
Muhamad Ismail_Resume-Linkedin
 

Recently uploaded

Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
WaniBasim
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Fajar Baskoro
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
Priyankaranawat4
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
AyyanKhan40
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
Celine George
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
Dr. Mulla Adam Ali
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
TechSoup
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
Jean Carlos Nunes Paixão
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
simonomuemu
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
Celine George
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
IreneSebastianRueco1
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
RAHUL
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
mulvey2
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
National Information Standards Organization (NISO)
 

Recently uploaded (20)

Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
 
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPLAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UP
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
 

Estimating seminar

  • 1. ESTIMATING SEMINAR 2 Aishath Hussain 0320429 Andrew Mah KoonYan 0318798 Ervinna Endela 0327508 MaybelleWang Sze Kher 0327553 WendyTeo SiewYen 0328242
  • 2. Question‽ You are working for a house builder at Kuala Lumpur. Your company has recently received an invitation to tender a low cost apartment in Kajang, Selangor. You are required to make a recommendation whether to accept or decline the tender invitation. What are the 5 main factors you will consider before making the recommendation? Explain how these factors influence your decision.
  • 3. COMPANY’S BACKGROUND ■ Date of Establishment: June 2008 ■ Completed Projects : Low to medium cost residential buildings/shoplots ■ In-house Employees : Quantity Surveyors, Engineers, Project Manager etc. ■ Capital / Assets : RM250,000 in bank ■ No. of SiteWorkers : 20 ■ MachineriesOwned : 2 excavators
  • 5. TYPE OF PROJECT Site location and accessibility :- ■ Low cost apartment is suitable to be constructed around Kajang ■ Existing road to provide safe access and egress ■ 35km away from our office Past experience with similar projects ;- ■ Projects undertaken include low to medium range residential buildings
  • 6. TYPE OF PROJECT Is the project within the company boundaries? ■ Yes, capable of delivering the project due to past experiences. Method of construction? ■ Adopt traditional construction method. (eg.Timber formwork)
  • 7. TYPE OF PROJECT Is the project complexity beyond the capability of the company? ■ No, it involves simple and typical designs only The risk involved considering the nature of the work? ■ Accidents and injuries might occur at site due to traditional method of construction ■ Exterior work such as concreting and painting depends on weather condition
  • 9. PROJECT SIZEANDVALUE Project Size :- ■ 4 units x 5 storeys x 4 blocks ProjectValue :- ■ RM 100,000 per unit x 4 units x 5 storeys x 4 blocks = RM8 million
  • 10. PROJECT SIZEANDVALUE Projected cash flow required during execution :- ■ Standard S Curve onGraph – past cost information and details of completed. ■ Critical Path Method (CPM) – technique for project planning made up of a number of individual activities.
  • 11. PROJECT SIZEANDVALUE Is the project size beyond the capability of the firm? ■ Yes. It is within our boundaries as it is a medium scaled project. Equipment, Labour and Plants :- ■ Equipment(s)– owns 2 excavators. ■ Labour(s) – 20-30 workers available.
  • 12. PROJECT SIZEANDVALUE Risks of project :- ■ Force majeure (construction risk) ■ Late changes / additional work ■ Site access ■ Labour productivity (performance risk) ■ Defective work – latent defects ■ Vandalism (security) ■ Intrusion ■ Delays ■ Liquidated ascertained damages (LAD)
  • 13. PROJECT SIZEANDVALUE Conditions of contract :- ■ Date of possession, deferment of possession, progress, delays, completion date ■ Liquidated ascertained damages ■ Partial possession ■ Quality of works ■ Testing and defects (Defects Liability Period)
  • 15. TYPE OF CLIENT Public Sector or Private Sector ■ Private Sector – Kelly Jeners Financial capability of the client :- ■ Financially strong, reliable and has good financial records.
  • 16. TYPE OF CLIENT Reputation of the client :- ■ Well known among the peers in the industry. ■ Kelly Jeners delivers on its promises to the customers and is worthy of respect and trust. Relationship with the client :- ■ Has an existing and positive relationship with the client.
  • 17. TYPE OF CLIENT Expectations of the client :- ■ Client expects contractor to focus on their requirements, all of their needs and how to solve their problems. Form of contract :- ■ PAM Contract 2006 (With Quantities)
  • 19. CURRENTAND PROJECTED WORKLOAD OFTHE COMPANY The need for work :- ■ The need for work is present since the company is only dealing with a medium range cost residential project at the moment. Other projects currently out for tender :- ■ Currently bidding for 2 projects and one of them is the Kajang low-cost apartment project.
  • 20. CURRENTAND PROJECTED WORKLOAD OFTHE COMPANY Forecast for upcoming projects :- ■ To be able to secure at least 5 projects in the next 2 years. Availability of in-house staff :- ■ Yes. Quantity Surveyors, Engineers, Project Managers, etc.
  • 21. CURRENTAND PROJECTED WORKLOAD OFTHE COMPANY Labour force availability :- ■ 20 workers. Availability of equipment owned by the contractor :- ■ 2 excavators.
  • 23. REGIONAL MARKET CONDITIONS Economical situation overall and the construction industry :- ■ Have to look into the economic factors of the country, such as GDP growth rate, or GDP for construction (July 2016 – RM11899 million) • How many projects are currently available in the market? • How many competitors are expected to tender? • How competitive are they and what is the experience of estimators? • What are the status of the competitors?
  • 24. REGIONAL MARKET CONDITIONS Amount of work currently available in the industry :- ■ The lesser the work, the more likely contractors are forced to bid for works which may be partly out of their competence and therefore more risky in terms of successful implementation. Availability of skilled workers and equipment needed :- ■ Not always available due to high demand at peak periods (January – April)
  • 25. REGIONAL MARKET CONDITIONS Rate of price escalation in labour/materials price :- ■ Different price between tender period and obtaining actual material period. Unforeseeable circumstances which affects the final costs. Codes and standards applicable in the region :- ■ Different area, different standards and procedures. Eg: Noise level cannot exceed certain decibels in residential areas. Reliability of subcontractors :- ■ Finding a good subcontractor would be a tough job without connection.
  • 26. CONCLUSION 5 factors to consider: ■ Type Of Project ■ Project Size AndValue ■ Type of Client ■ Current and ProjectWorkload ■ Regional Market Conditions FinalVerdict : OUR COMPANY IS RECOMMENDEDTO ACCEPTTHETENDER FORTHE PROJECT.