This document discusses engineering ethics from an Islamic perspective. It begins by defining engineering ethics in Islam as rules and principles that engineers should follow in their professional lives. It then outlines several Islamic ethics for engineering, including obedience, prioritizing public welfare and safety, trustworthiness, avoiding bribery, proper supervision and reporting, and truthfulness. The document also discusses codes of ethics from the Institution of Engineers Bangladesh and the Board of Engineers Malaysia, and evaluates them based on the outlined Islamic ethics, aiming to identify areas for improvement.