                                                                                                         The Challenge
 Hexaware provided comprehensive Testing and Automation services to the enable the                      The organization was facing business risks due to
 organization achieve its business objectives. The scope of work included:                              the following issues:
                                                                                                           Implementation of Life Cycle Model
   Implementation of LCM
                                                                                                           Inability to detect and track Metrics and SLA
   Metrics and SLA Tracking                                                                                Test Automation planning
   Availability of Offshore Resources during Lead time                                                  The overcome these issues the need was to:
                                                                                                           Understand and Analyze functionalities of
   Planning and estimation on Test Automation
                                                                                                           Energy and Engineering applications
 Solution Framework                                                                                        Install Energy related Application
 Planning                                                                                                  Connect to Microsoft Team Foundation Server
   Functional Requirement Study of the application was conducted                                           Prepare Test Cases based on Application that
                                                                                                           is not in the FRD
   Test Cases were prepared based on FRD and sent for client review                                        Track Clarification Logs
   Clarification Log was prepared and sent to the client for inputs                                        Conduct Defect Management Process in MS
 Designing                                                                                                 VSTS

   Test Approach Document was prepared and sign off was obtained from the client                        Value Delivered
                                                                                                            Maintaining of Quality Standards and Process
   Effort Estimation for each product was calculated                                                        throughout the project
   Testing was conducted after notes were released                                                          High level of transparency between the team
                                                                                                            Easier Resource Ramp up as all the team
Execution
                                                                                                            members are conversant with all the
   Defects were identified and tracked                                                                      applications
   Functional and Regression Testing of Resolved defects were stored in MS VSTS                             Availability of Resources during critical
 Measurement
                                                                                                            product releases and Timely escalation and
                                                                                                            tracking project related issues
   Delivery Note was sent to all stakeholders after test completion as an exit criteria                     Testing of Specs4.0 application on multiple
   Weekly Status Report was sent to the client                                                              browsers like IE 6.0/ 7.0 and Fire fox 1.5/2.0
                                                                                                            Effective Configuration Management through
                                                                                                            MS VSS
 Technology Environment                                                                                     Preparation of Knowledge Acquisition
   Web Server : IIS 6.0                                                                                     Documents (KAD) and causal analysis of the
                                                                                                            defects to monitor and upgrade testing
   Database Server : SQL Server 2005
                                                                                                            efficiency
   Dot Net, Weblogic, Win XP, 2000 Pro, Vista, Win 2000, 2003 Server                                        Continuous Knowledge upgrade of Application
                                                                                                            and effective testing. Exploring new areas of
                                                                                                            testing and training within the testing team
                                                                                                            Establishment of regular communication with
                                                                                                            the Onsite Team and with the client
                                                                                                            documented and sent to stakeholders as
                                                                                                            Minutes of Meeting (MOM)


© 2009 Hexaware Technologies. All rights reserved.                                                                                www.hexaware.com

Energy and engineering services leverages growth

  • 1.
    Case Study Energy & Utilities YOUR SUCCESS IS OUR FOCUS Leading Provider of Energy and Engineering Services Leverages Growth by Implementation and Automation Client Overview Leading global providers of critical technical information, decision, support tools and related services in the energy, defense, aerospace, construction, electronics and automotive industries Hexaware Approach The Challenge Hexaware provided comprehensive Testing and Automation services to the enable the The organization was facing business risks due to organization achieve its business objectives. The scope of work included: the following issues: Implementation of Life Cycle Model Implementation of LCM Inability to detect and track Metrics and SLA Metrics and SLA Tracking Test Automation planning Availability of Offshore Resources during Lead time The overcome these issues the need was to: Understand and Analyze functionalities of Planning and estimation on Test Automation Energy and Engineering applications Solution Framework Install Energy related Application Planning Connect to Microsoft Team Foundation Server Functional Requirement Study of the application was conducted Prepare Test Cases based on Application that is not in the FRD Test Cases were prepared based on FRD and sent for client review Track Clarification Logs Clarification Log was prepared and sent to the client for inputs Conduct Defect Management Process in MS Designing VSTS Test Approach Document was prepared and sign off was obtained from the client Value Delivered Maintaining of Quality Standards and Process Effort Estimation for each product was calculated throughout the project Testing was conducted after notes were released High level of transparency between the team Easier Resource Ramp up as all the team Execution members are conversant with all the Defects were identified and tracked applications Functional and Regression Testing of Resolved defects were stored in MS VSTS Availability of Resources during critical Measurement product releases and Timely escalation and tracking project related issues Delivery Note was sent to all stakeholders after test completion as an exit criteria Testing of Specs4.0 application on multiple Weekly Status Report was sent to the client browsers like IE 6.0/ 7.0 and Fire fox 1.5/2.0 Effective Configuration Management through MS VSS Technology Environment Preparation of Knowledge Acquisition Web Server : IIS 6.0 Documents (KAD) and causal analysis of the defects to monitor and upgrade testing Database Server : SQL Server 2005 efficiency Dot Net, Weblogic, Win XP, 2000 Pro, Vista, Win 2000, 2003 Server Continuous Knowledge upgrade of Application and effective testing. Exploring new areas of testing and training within the testing team Establishment of regular communication with the Onsite Team and with the client documented and sent to stakeholders as Minutes of Meeting (MOM) © 2009 Hexaware Technologies. All rights reserved. www.hexaware.com