FACT SHEET                                                                                                                                                          www.visuresolutions.com




                                                                                                                                      for Product and Embedded Development

                                                                                                                                      Requirements Engineering
                                                                                                                                      for Product and Embedded
                                                                                                                                      Development


Requirements challenges                                                                                                               One tool for the complete
The use of embedded software has ballooned as an affordable                                                                           Requirements Lifecycle
way to deliver added value features while reducing
time-to-market. At the same time product have experienced                                                                             Visure Requirements is a proven flexible and complete
an increase in the complexity, and now face a number of new                                                                           Requirements Engineering tool, capable of streamlining
challenges:                                                                                                                           the software requirements process, from the product
                                                                                                                                      to the system requirements and to software, hardware
                                                                                                                                      and mechanical components. Visure Requirements
        Regulatory compliance                                                                                                         aids effective project collaboration and increases quality
                                                                                                                                      through requirements capture, analysis, specification,
Embedded software is becoming an essential part of modern                                                                             validation and verification, management and reuse.
products, and its criticality has increased in all sectors as well as
the number of standards and regulations required. The need to be
compliant with these regulations has significantly increased the
amount of effort spent in projects, as companies need to create and
keep up-to-date a vast amount of documentation, which has often
                                                                                                                                      Benefits
been performed manually in too many occasions. The waste of time
caused by manual work has crippled company profits.
                                                                                                                                                    Certification support for industry
                                                                                                                                                    standards, such as DO-178B/C,
        Mitigate risk                                                                                                                               IEC 61508, ISO 26262, IEC 62304,
The cost of correcting errors found in the production phase can be                                                                                  FMEA and GAMP5.
up to 300,000 times more expensive than if the errors had been
found in the requirements phase. Most software defects are directly
or indirectly related to poor Requirements Engineering practices.
                                                                                                                                                    One complete platform for                all
Software defects can result in notorious product recalls that can
completely erode company profits and image.
                                                                                                                                                    requirement-related activities.


        Growing complexity                                                                                                                          Process enforcement through a
Software has experienced an exponential growth, and so has the                                                                                      flexible solution that supports
complexity of the large-scale systems that normally derive into                                                                                     different process models including
variants of a product line. Pressure increases to deliver quality                                                                                   Automotive SPICE, CMMI, V-model,
products on time and within budget. The amount, criticality and                                                                                     Agile and ad hoc.
complexity of the requirements prevents companies without a
mature Requirements Engineering process from consistently
producing quality solutions and products on time.
                                                                                                                                                    Improved team communication and
                                                                                                                                                    collaboration through role-based
                                                                                                                                                    capabilities.
        Missing connection to market needs
        and business requirements
Despite the increase in software-based features, companies are                                                                                      Support for better quality products
delivering only a portion of the expected functionality. Shorter release                                                                            and reduced software defects.
cycles, reduced budgets, obsolete and changing requirements, and
a lack of communication cause companies to consistently fail to
meet original product goals and new market demands.



2012 Visure Solutions, S.L. Visure Requirements for Product and Embedded Development is a registered brand of Visure Solutions,S.L.
Graphical requirements structure

Visure Requirements graphically displays
relationships between the elements and
helping end users understand and follow
the requirements process in place at the
company. You can represent the flow-down
from product to system requirements and from
there to software, hardware and mechanical
requirements.

Visure Requirements can be initially configured
in a very simple and straightforward way,
helping users collect all requirements in one
single platform and structure them according
to their needs to offer a very easy start. It can
also be configured to satisfy the expectations
of an advanced expert, supporting complex
traceability, configuration management or
reporting.
                                                    Image 1. Example of a requirements flowdown and a requirements specification.




Regulatory compliance
Visure Requirements facilitates the regulatory
compliance of international standards such as
DO-178B/C, IEC 61508, ISO 26262, IEC 62304,
FMEA, FMECA and GAMP5, helping
standardize and enforce a requirements
process containing all activities and elements
required to fulfill these standards, such as full
traceability and risk management.

Visure Requirements provides a centralized
database that contains all requirement-related
information, including requirements, test cases,
use cases, glossary and risks; the configuration
management of all these artifacts and full
end-to-end      traceability  between      these
elements. Reports with the latest information                   Image 2: List view of the risks and and risk levels.
from the database can be generated to deliver
the corresponding documentation to the
certification authorities.




Visure Requirements for Product and Embedded Development
Mitigate risk

From writing better requirements through
semantic analysis and prioritizing needs to
providing one of the industry’s most powerful
change impact analysis capabilities, Visure
Requirements helps you avoid pitfalls and
mitigate risk each step of the way.

The test case support in Visure Requirements
lets you define a validation and verification
process in the same platform to represent the
requirements coverage and quickly identify
unfulfilled customer and market requests.




                                                    Image 3: Result of individual requirement semantic analysis, highlighting low-quality aspects.



Product lines and variants

 Defining a catalog of high quality, reusable
 components          including    requirement
 specifications, use cases, test cases and
 traceability can become an extremely valuable
 asset for your company.

 Visure Requirements helps you create this
 catalog and build new products and variants
 for different market segments in a highly
 efficient way.

 Visure Requirements ensures that all the
 products reusing similar features in a product
 family are kept up-to-date by automatically
                                                    Image 4: Reusability capabilities in Visure Requirements enables product line management.
 synchronizing changes to the original features
 in the catalog to all variants.



Collaboration

Visure Requirements helps engage all
stakeholders by using a centralized database
that can be directly accessed by all teams
through role-based and tailored interfaces.
In addition, it facilitates, the communication
between customer and supplier through
offline capabilities like such as the exchange
of Microsoft Word, Microsoft Excel and XML
documents or through online, web interfaces.

Visure Requirements also helps engineering
teams from different disciplines collaborate by
accessing the latest information in the database
through integrations and open APIs.

                                                   Image 5: Visure Requirements allows distributed access to the Visure Requirements repository.



Requirements Engineering for Product and Embedded Development                                           www.visuresolutions.com
Feature list
                                                                                                        Support to UML and functional diagrams to represent concepts
                                     Requirements gathering                                             beyond plain text, to better understand the problem and extract
                                                                                                        requirements.

                                                                                                        Capture requirements through import and export to and from
                                     Requirements import and export
                                                                                                        Microsoft Word, Microsoft Excel, and IBM Rational DOORS.

                                                                                                        Definition of requirement templates e.g. user, system, component
                                     Manual capture of requirements
                                                                                                        requirements, with default codes, attributes and descriptions.

                                                                                                        Semantic analysis of the requirements and complete
                                     Semantic analysis                                                  specifications in order to identify low quality during
                                                                                                        requirements specification.

                                                                                                        Multiple representations of the requirements, their relationships
                                     Requirements analysis
                                                                                                        and their properties.

                                                                                                        FMEA/FMECA support by representing risks (severity,
                                     Risk management                                                    occurrence, detection, RPN), actions, traceability and other
                                                                                                        elements directly in the requirements view.

                                                                                                        User-oriented management for attributes, workflows, traceability,
                                     Requirements management
                                                                                                        filters and views.

                                                                                                        Support to complete end-to-end traceability between requirements,
                                                                                                        allowing you to represent user-defined types (derive, contradicts)
                                     Requirements traceability                                          and the direction of the relationship. The allowed relationships,
                                                                                                        types and direction between the elements can be enforced by
                                                                                                        administrators to help users follow the defined process.

                                                                                                        Representation of system requirements and the
                                     Requirements allocation                                            flowdown to lower level functions of the work breakdown
                                                                                                        structure.

                                                                                                        Representation of the different components and their
                                     Requirements decomposition
                                                                                                        requirements that meet higher level system requirements.

                                                                                                        Representation of full end-to-end traceability between all the
                                     Validation and verification
                                                                                                        elements and validation matrices to identify missed elements.

                                                                                                        Test case support, with complete traceability to requirements
                                                                                                        to identify requirements coverage and the status of the
                                     Requirements-based testing
                                                                                                        requirements based on the test results. Test results can be
                                                                                                        logged in Visure Requirements manually and automatically.

                                                                                                        Specification of the requirements through UML diagrams such as
                                     Requirements modeling                                              use cases, or through functional diagrams such as DFDs, allowing
                                                                                                        the tracing of each element in the diagrams to the requirements.

                                     Project management                                                 Outline project and product organization.

                                                                                                        Powerful reports with project information, traceability, metrics,
                                     Report generation                                                  dashboards, and output to several formats such as PDF, Microsoft
                                                                                                        Word, Microsoft Excel, XML and HTML.

                                     Product lines and variants support                                 Establish a variant and product line management process.

                                                                                                        Support reuse of lists of functional or non-functional
                                     Reusability support                                                requirements, use cases and tests. Reused elements keep a
                                                                                                        trace to the original one, so they can be updated whenever
                                                                                                        it is modified.

                                     Configuration management                                           Support complete configuration management for individual

                Contact                                                                                 elements and specifications.

                                                                                                        Integrations with most popular design, test, project and user
Visure Solutions Headquarters        Integrations and APIs                                              management tools. Integration platform and plug-in
     Avda. de los Labradores, 1                                                                         SDK based on standard programming languages.
     Tres Cantos, Madrid 28760
              +34 91 806 17 13
       info@visuresolutions.com



    www.visuresolutions.com       2012 Visure Solutions, S.L. Visure Requirements for Product and Embedded Development is a registered brand of Visure Solutions,S.L.

Visure Requirements for Product and Embedded Devolpment - Visure Solutions - Requirements Engineering

  • 1.
    FACT SHEET www.visuresolutions.com for Product and Embedded Development Requirements Engineering for Product and Embedded Development Requirements challenges One tool for the complete The use of embedded software has ballooned as an affordable Requirements Lifecycle way to deliver added value features while reducing time-to-market. At the same time product have experienced Visure Requirements is a proven flexible and complete an increase in the complexity, and now face a number of new Requirements Engineering tool, capable of streamlining challenges: the software requirements process, from the product to the system requirements and to software, hardware and mechanical components. Visure Requirements Regulatory compliance aids effective project collaboration and increases quality through requirements capture, analysis, specification, Embedded software is becoming an essential part of modern validation and verification, management and reuse. products, and its criticality has increased in all sectors as well as the number of standards and regulations required. The need to be compliant with these regulations has significantly increased the amount of effort spent in projects, as companies need to create and keep up-to-date a vast amount of documentation, which has often Benefits been performed manually in too many occasions. The waste of time caused by manual work has crippled company profits. Certification support for industry standards, such as DO-178B/C, Mitigate risk IEC 61508, ISO 26262, IEC 62304, The cost of correcting errors found in the production phase can be FMEA and GAMP5. up to 300,000 times more expensive than if the errors had been found in the requirements phase. Most software defects are directly or indirectly related to poor Requirements Engineering practices. One complete platform for all Software defects can result in notorious product recalls that can completely erode company profits and image. requirement-related activities. Growing complexity Process enforcement through a Software has experienced an exponential growth, and so has the flexible solution that supports complexity of the large-scale systems that normally derive into different process models including variants of a product line. Pressure increases to deliver quality Automotive SPICE, CMMI, V-model, products on time and within budget. The amount, criticality and Agile and ad hoc. complexity of the requirements prevents companies without a mature Requirements Engineering process from consistently producing quality solutions and products on time. Improved team communication and collaboration through role-based capabilities. Missing connection to market needs and business requirements Despite the increase in software-based features, companies are Support for better quality products delivering only a portion of the expected functionality. Shorter release and reduced software defects. cycles, reduced budgets, obsolete and changing requirements, and a lack of communication cause companies to consistently fail to meet original product goals and new market demands. 2012 Visure Solutions, S.L. Visure Requirements for Product and Embedded Development is a registered brand of Visure Solutions,S.L.
  • 2.
    Graphical requirements structure VisureRequirements graphically displays relationships between the elements and helping end users understand and follow the requirements process in place at the company. You can represent the flow-down from product to system requirements and from there to software, hardware and mechanical requirements. Visure Requirements can be initially configured in a very simple and straightforward way, helping users collect all requirements in one single platform and structure them according to their needs to offer a very easy start. It can also be configured to satisfy the expectations of an advanced expert, supporting complex traceability, configuration management or reporting. Image 1. Example of a requirements flowdown and a requirements specification. Regulatory compliance Visure Requirements facilitates the regulatory compliance of international standards such as DO-178B/C, IEC 61508, ISO 26262, IEC 62304, FMEA, FMECA and GAMP5, helping standardize and enforce a requirements process containing all activities and elements required to fulfill these standards, such as full traceability and risk management. Visure Requirements provides a centralized database that contains all requirement-related information, including requirements, test cases, use cases, glossary and risks; the configuration management of all these artifacts and full end-to-end traceability between these elements. Reports with the latest information Image 2: List view of the risks and and risk levels. from the database can be generated to deliver the corresponding documentation to the certification authorities. Visure Requirements for Product and Embedded Development
  • 3.
    Mitigate risk From writingbetter requirements through semantic analysis and prioritizing needs to providing one of the industry’s most powerful change impact analysis capabilities, Visure Requirements helps you avoid pitfalls and mitigate risk each step of the way. The test case support in Visure Requirements lets you define a validation and verification process in the same platform to represent the requirements coverage and quickly identify unfulfilled customer and market requests. Image 3: Result of individual requirement semantic analysis, highlighting low-quality aspects. Product lines and variants Defining a catalog of high quality, reusable components including requirement specifications, use cases, test cases and traceability can become an extremely valuable asset for your company. Visure Requirements helps you create this catalog and build new products and variants for different market segments in a highly efficient way. Visure Requirements ensures that all the products reusing similar features in a product family are kept up-to-date by automatically Image 4: Reusability capabilities in Visure Requirements enables product line management. synchronizing changes to the original features in the catalog to all variants. Collaboration Visure Requirements helps engage all stakeholders by using a centralized database that can be directly accessed by all teams through role-based and tailored interfaces. In addition, it facilitates, the communication between customer and supplier through offline capabilities like such as the exchange of Microsoft Word, Microsoft Excel and XML documents or through online, web interfaces. Visure Requirements also helps engineering teams from different disciplines collaborate by accessing the latest information in the database through integrations and open APIs. Image 5: Visure Requirements allows distributed access to the Visure Requirements repository. Requirements Engineering for Product and Embedded Development www.visuresolutions.com
  • 4.
    Feature list Support to UML and functional diagrams to represent concepts Requirements gathering beyond plain text, to better understand the problem and extract requirements. Capture requirements through import and export to and from Requirements import and export Microsoft Word, Microsoft Excel, and IBM Rational DOORS. Definition of requirement templates e.g. user, system, component Manual capture of requirements requirements, with default codes, attributes and descriptions. Semantic analysis of the requirements and complete Semantic analysis specifications in order to identify low quality during requirements specification. Multiple representations of the requirements, their relationships Requirements analysis and their properties. FMEA/FMECA support by representing risks (severity, Risk management occurrence, detection, RPN), actions, traceability and other elements directly in the requirements view. User-oriented management for attributes, workflows, traceability, Requirements management filters and views. Support to complete end-to-end traceability between requirements, allowing you to represent user-defined types (derive, contradicts) Requirements traceability and the direction of the relationship. The allowed relationships, types and direction between the elements can be enforced by administrators to help users follow the defined process. Representation of system requirements and the Requirements allocation flowdown to lower level functions of the work breakdown structure. Representation of the different components and their Requirements decomposition requirements that meet higher level system requirements. Representation of full end-to-end traceability between all the Validation and verification elements and validation matrices to identify missed elements. Test case support, with complete traceability to requirements to identify requirements coverage and the status of the Requirements-based testing requirements based on the test results. Test results can be logged in Visure Requirements manually and automatically. Specification of the requirements through UML diagrams such as Requirements modeling use cases, or through functional diagrams such as DFDs, allowing the tracing of each element in the diagrams to the requirements. Project management Outline project and product organization. Powerful reports with project information, traceability, metrics, Report generation dashboards, and output to several formats such as PDF, Microsoft Word, Microsoft Excel, XML and HTML. Product lines and variants support Establish a variant and product line management process. Support reuse of lists of functional or non-functional Reusability support requirements, use cases and tests. Reused elements keep a trace to the original one, so they can be updated whenever it is modified. Configuration management Support complete configuration management for individual Contact elements and specifications. Integrations with most popular design, test, project and user Visure Solutions Headquarters Integrations and APIs management tools. Integration platform and plug-in Avda. de los Labradores, 1 SDK based on standard programming languages. Tres Cantos, Madrid 28760 +34 91 806 17 13 info@visuresolutions.com www.visuresolutions.com 2012 Visure Solutions, S.L. Visure Requirements for Product and Embedded Development is a registered brand of Visure Solutions,S.L.